GK Packing System Welding Instructions



Similar documents
Robot Welding Torch System

VdS en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS en : (01)

TARIFF CODE and updates standard

Removing chips is a method for producing plastic threads of small diameters and high batches, which cause frequent failures of thread punches.

Tubing Data. Contents. Tubing Selection. Tubing Handling. Tubing Material. Tubing Outside Diameter Hardness. Tubing Wall Thickness

SMARTY 160 POWER page 4-5 SMARTY 180 / 220 XL page 4-6 SMARTY TX 250 page 4-7. SMARTY TX 160 Alu page 4-8 SMARTY TX 220 Alu page 4-9

Structural welding is a process by which the parts that are to be connected are heated and

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

DiwiTherm, Resistance Thermometers Model TR75, with digital Display Battery or Solar Powered

AMPSEAL* Automotive Plug Connector and Header Assembly

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

Threaded Resistance Thermometers Model TR10-D, Miniature Design

39HQ Airovision Air Handling Units

Chapter 5 - Aircraft Welding

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

HOW TO MAKE A MOTOR BRACKET

Skirt 1 / 4. The Skirt. The skirt patterns were downloaded from Mark's site but they need expanding before they can be used.

Two most common lock nut groups: 1-Prevailing Torque Type Lock Nuts:

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes

3.3 Welding and welded connections

Modular Locomotive System Instruction Manual for HBK8 George Body Kit

Autogenous Laser Welding of Aluminum

Metal Pressfitting Pipe Systems

Rules for Classification and Construction Additional Rules and Guidelines

Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/ Stud Welding

TITANIUM FABRICATION CORP.

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: No.: SE-...

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

INDIAN STANDARDS (BIS) ON WELDING


Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

TRITON CONTAINER INTERNATIONAL. Reefer Technical Bulletins. Version 4.0

Puddle Flange. FRANK Puddle Flange

Light-Weight Panels. High quality panels.

TIGER Drylac U.S.A., Inc Swenson Avenue St Charles, IL T F office.us@tiger-coatings.us

INSTALLATION INSTRUCTIONS RISE SEALING SYSTEM FOR MULTI-CABLE TRANSITS

TYPE APPROVAL CERTIFICATE

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels

Sheet Metal Shearing & Bending

Sprinkler Identification Number. Page 1 of 6 MARCH 2014 TFP288. Worldwide Contacts.

GPD Rubber Press Seals

SCREEN PRINTING INSTRUCTIONS

Lathe Milling Attachment

Screw Thread Design. Rev

Field Welding Inspection Guide

Oil and Gas Pipeline Design, Maintenance and Repair

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS

North Carolina FFA Association Agricultural Mechanics Career Development Event

TIG WELDING TIPS by Tom Bell

Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D.

2013 Edition. Flanged fittings 30"-64" NSF. industrial Applications, water & Wastewater. Certified to ANSI/NSF 61

Holes & Selective Laser Sintering

Delivery Programme 2013

25-kV Apparatus Bushings B Series (bolt-in) for Elbow to Air-Insulated Service 200 Amp, 600 Amp and 1250 Amp

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

MGB Chrome Bumper Conversion

VSH Press Sprinkler Galvanized System

Cedar Cottage Doghouse Plans

TBi Industries RoboMIG TBi Robot welding torches 1 YEAR ON TCP. Air and water cooled. Also for robots with integrated cable assemblies

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

Sheet metal operations - Bending and related processes

James M. Pleasants Company

SOHOline and SOHO Slimline The SOHOline and SOHO Slimline offer a modular, sturdy and compact design

Saferand easierinstallation

Guidelines for Earthquake Bracing of Residential Water Heaters

Rollers. from the UK s largest roller manufacturer. Quality Performance Reliability

building applications copper - redefined

ESAB Swift Arc Transfer TM MAG welding at very high travel speed

Steel production. Furnace linings made from carbon and graphite are applied for the production of primary iron.

Solid shape molding is not desired in injection molding due to following reasons.

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

MEGA GUARD COLUMN CORE GUARD DAWG COLUMN PROTECTOR. Smart Investments in Plant Safety

Butt Fusion Welding of HDPE Pipes Work Procedure

JIS G3445 Carbon steel tubes for machine structural purposes

Anodes and Misc Equipment

Vacuum drying oven for non-flammable solvents

A Beginner s Guide to MIG Welding

IMO Resolution A.754(18) Fire Resistance Tests Fire Safety Onboard Ships BY

08. SEK IDC CONNECTORS

SIGRAFLEX . Properties. Applications

Flash Butt Welding Machines

FRAME DOOR OPENING, DOOR AND SIDE PANEL OUTER

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

Detection of Pipe Leaks Connection of Pulse Monitoring System in Thermal Utilities

SD. Flat roof. Rack Mounting. Installation instructions (2010/11) AU

Self-operated Temperature Regulators Temperature Regulator Type 1u

Application Specification SIAMEZE * Standard and Fine Range Terminals 18 Mar 11 Rev C

Conceptual Design of Buildings (Course unit code 1C2)

Can you design a frameless shower enclosure that doesn't leak?

BBWX1 Satellite Weather Receiver. Installation and Maintenance Guide

SERVER ROOM CABINET INSTALLATION CONCEPTS

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE

Guidelines for Earthquake Bracing Residential Water Heaters

Clad Direct Glaze Window Installation Instructions

VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A

Flex Circuit Design and Manufacture.

Transcription:

GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL info@de.roxtec.com, www.roxtec.de

Welding instructions Page 2/18 Welding instructions for GK packing system Foreword: The GK packing system is a safety-related component in shipbuilding. This safety system is of decisive importance on board a ship. For this reason, all necessary tests according to the latest IMO resolution A.754(18) have been carried out on the GK packing system and successfully passed. In the event of a fire, a collision, or if a leaking medium has to be held back, you will be dependent on the reliable sealing off of compartments for the protection not only of the life and health of persons on board but also for preventing greater damage to the ship itself or even its loss. Only when all work on or with the GK packing system has been carried out with care can the high expectations be satisfied which are placed on the packing system with regard to fire resistance, water- and gas-tightness. All of the information which follows is intended as recommendations which the person carrying out the work should check for their appropriateness in the individual case.

Welding instructions Page 3/18 Table of contents Section Page: Foreword 2 Table of contents 3 Scope of validity 4 Types of frames 4 1. Welding method 5 1.1 Design 1.2 Welding current 1.3 Welding materials 1.3.1 Stick electrode 1.3.2 Welding wire 1.3.3 Shielding gases 5 6 6 6 7 7 2. Cut-out 8 2.1 General information 2.2 Size of the cut-out 2.3 Cut edge of the cut-out 2.4 Shape of the cut-out 8 12 13 13 3. Fitting the frame into bulkhead or deck 14 4. Tacking the frame 15 4.1 Number and position of tacks 15 5. Welding the frame 16 5.1 Checking the welding 17 5.2 Checking dimensional tolerances 17 6. Finishing 6.1 Finishing aluminium structures 18 18

Welding instructions Page 4/18 Welding instructions Scope of validity: GK packing system (frame): Single frames and group frames made of - S 235 JR / 1.0037 (St37-2) - S 355 J2G3 / 1.0570 (ST52-3N) to be welded into suitable / compatible steel plates. In addition frames made of aluminium AlMg3, mat. no.: 3.3535, EN AW5754 for welding into aluminium panels made of compatible aluminium. (As regards other materials please consult ROXTEC-Hamburg) Types of frame: SPK/SPR-60 sizes 2 to 8 SPK/SPR sizes 2 to 8: single and group frames SPK-S30 sizes 2 to 8: single and group frames SPK-S50 sizes 2 to 8: single and group frames SPKh-120/180 sizes 2 to 8 RM connection piece sizes 50 to 200 Information about other types of frame or materials / material combinations may be obtained from: ROXTEC GmbH Neuer Höltigbaum 1-3 22143 Hamburg Tel: 040-657 398-0 Fax: 040-657 398-50/51 Email: info@de.roxtec.com Internet: www.roxtec.de (www.gkmarine.de)

Welding instructions Page 5/18 1. Welding method A suitable welding method should be used for welding GK single and group frames. In principle there is no different in the welding method between frames without a flange (SPK, SPR) and frames with a flange (SPK-F, SPR-F). 1.1 Design The connection between the frame and the plate takes the form of a single or a double fillet weld (depending on design requirements). Fig. 1.1 Weld details Minimum and maximum thickness of fillet weld a Table 1.1 Fillet weld thickness a Plate thickness t amax [mm] amin [mm] ----------------------------------------------------------------- 6 4.2 3.0 8 5.6 3.0 10 7.0 3.0

Welding instructions Page 6/18 1.2 Welding current An amperage should be selected which will ensure sufficient fusing of the base material. In addition, it should be selected such that there is as little heat input as possible in order to avoid unnecessary thermal stress and deformation. 1.3 Welding materials 1.3.1 Stick electrode With steel structures One suitable stick electrode is: Type E 425 B 32 H5 * DIN 1912 Key: E 425 B 32 H5 H2 content 5 ml / 100 g weld metal PA and PB weld position type of current: AC/DC covering: basic (rebaking at 300 C; 2 h) minimum impact energy: 47 J at -50 C tensile strength: Rm 420 N/mm² manual arc welding or Type E 4343 RR (B)7 * DIN 1912 Key: E 4343 RR(B) 7 covering: thick rutile basic minimum impact energy: 47 J at -20 C minimum impact energy: 28 J at -30 C tensile strength: Rm 430 N/mm² manual arc welding

Welding instructions Page 7/18 1.3.2 Welding wire With steel structures I. A suitable type of welding wire (MAG welding) is: (1) Type EMK 6D; 1.2 mm; material no.: 1.5125 * DIN 8559 SG 2 or (2) Type SG3 C Y46 4 3 * Key: SG3 C Y46 4 3 minimum impact energy: 47 J at -20 C minimum impact energy: 28 J at -30 C Rm = 530-680 N/mm² RP = 460 N/mm² shielding gas CO 2. mechanical quality class 3 With aluminium structures II. A suitable type of welding wire (MIG welding) is: AlMg 5; dia. 1.2 mm * The wire feed should be adapted to the conditions prevailing. 1.3.3 Shielding gases With steel structures I. A suitable type of shielding gas for welding (MAG) is: For (1) M 2.1 (Corgon 18) shielding gas DIN 32526 - M21 * For (2) C1 (carbon acid) shielding gas DIN 32526 - C1 * Consumption of shielding gas is given as approx. 15 l/min. * With aluminium structures II. A suitable type of shielding gas for welding (MIG) is: Argon 4.6 * * All data are recommendations whose suitability should be verified in the individual case by the company carrying out the work.

Welding instructions Page 8/18 2. Cut-out 2.1 General information The location of the cut-out for the GK clamping frames should be chosen carefully. The cut-out should be laid out such that the cables, bundled tubing and pipes to be routed straight through the packing frame. In particular the position of the cable racks in front of the frame should be taken into consideration. The cables and pipes should have a bending radius R2 which in area A (see Fig. 2.1) allows the cables or pipes to be routed at right-angles in parallel through the packing frame. Fig. 2.1 Determining the position of the cut-out

Welding instructions Page 9/18 Furthermore, it should be ensured that the frames have sufficient clearance from deckheads, adjacent bulkheads, HP profiles or other components. A minimum distance of 25 mm is recommended. Type SPK (see Fig. 2.2) Fig. 2.2 Minimum distances with frames of type SPK The frame can also be mounted flush to the bulkhead or deck on one side and there welded with a I-weld seam. Type SPR (see Fig. 2.3) Caution! With frames of type SPR it is also important to ensure that the pressure bolt can be operated. The threaded hole should also be protected against welding residues during welding-in. The maximum possible plate thickness into which a frame of this type can be welded is 8 mm. If plates are thicker a type SPR frame with additional depth should be used.

Welding instructions Page 10/18 Fig. 2.3 Minimum distances with frames of type SPR Type RM sleeve (see Fig. 2.4) Fig. 2.4 Minimum distances with frames of type RM sleeve The frame can also be mounted flush to the bulkhead or deck on one side and there welded with a I-weld seam. If cables and pipes are not routed at right angles through deck or bulkhead it is possible to fit the GK frame at an angle in the opening. Here it should be noted that the cut-out dimensions become larger.

Welding instructions Page 11/18 Fig. 2.5 Fig. 2.6 GK frame at GK frame at an angle up to 5.4 an angle up to 28.35

Welding instructions Page 12/18 2.2 Size of the cut-out Type SPK frame: The size of the cut-out should be such that an air gap not exceeding 2 mm runs all the way round the GK frame which is to be used. In each case the dimension Z = 2-4 mm should be added to the width and height of the packing frame to give the cut-out dimensions. Alternatively, in aluminium structures the air gap will not exceed 1 mm. In each case the dimension Z = 1-2 mm should be added to the width and height of the packing frame to give the cut-out dimensions. Fig. 2.7 Size of the cut-out To prevent cracks from forming the corners of the cut-out should always be rounded. Table 2.1 in Section 2.3 gives the radii for the individual types. Type Rm sleeve: The size of the cut-out for a sleeve should be such that an air gap not exceeding 2 mm runs all the way round the GK sleeve which is to be used. In each case the dimension Z = 1-2 mm should be added to the external diameter of the pipe to give the cut-out dimensions.

Welding instructions Page 13/18 2.3 Cut edge of the cut-out A cut-out of sufficient size should be created in the plate for mounting GK single or group frames. The cut edges should be vertical (90 ) to the surface of the plate. Fig. 2.8 Cut edge of the cut-out The cut edges must be smooth and without burr in order to prevent problems in the weld seam. 2.4 Shape of the cut-out The outline of the cut-out should have rounded corners. The straight cut edges of the openings must be parallel and at right angles to each other.

Welding instructions Page 14/18 Radii for the most important types of frame: Table 2.1 Cut-out radii GK frame types: SPK-60 sizes 2 to 8 R = 12 mm SPK/SPR sizes 2 to 8: single and group frames R = 12 mm SPK-S30 sizes 2 to 8: single and group frames R = 32 mm SPK-S50 sizes 2 to 8: single and group frames R = 52 mm SPKh-120 sizes 2 to 8 R = 72 mm SPKh-180 sizes 2 to 8 R = 102 mm 3. Fitting the frame into bulkhead or deck The GK frame can be installed in any position. They can be installed anywhere space permits and the minimum clearances are observed (see Section 2.1). Fig. 3.1 The GK frame can be installed in any position.

Welding instructions Page 15/18 4. Tacking the frames Before being tacked, the frame should be fixed in its installation position such that a constant air gap runs around the entire frame. Tacking should ensure that welding is as distortion-free as possible. 4.1 Number and position of tacks Tacking should fix the frame in its ideal position. Tacking points should be located as shown in Fig. 4.1. DIN EN 1090-2 should be taken into account when laying out the weld seams. Unnecessary tacks should be avoided if a good weld seam is to be achieved. Fig. 4.1 Location and number of tacking points The air gap should not be larger as otherwise the deformation expected after the frame is welded in will exceed permitted values (see Section 5.1.2). In all cases tacking should be only from one side since every tack disturbs the structure in the weld seam and incomplete weld fusion may occur.

Welding instructions Page 16/18 5. Welding the frames Welding-in is done in several steps (see Fig. 5.1) in order to achieve an even input of heat. Welding is continued at the opposite position. Under no circumstances should welding-in be done in just one single operation. This would result in impermissible deformations of the frame which would endanger the impermeability of the packed opening. Fig. 5.1 Welding sequence - if welding is required on both sides, welding can be done in fewer steps on the second side.

Welding instructions Page 17/18 5.1 Checking the welding No breaks are permitted in the weld seams, weld starting points must be carefully executed and must be impermeable without any gaps so that the packing frame is watertight and gastight. 5.2 Checking dimensional tolerances After welding-in and after cooling, the internal dimensions of the frame should be checked: Table 5.1 Maximum values of the internal dimensions GK type D H [mm] [mm] SPK-/SPR-60 60.0 - SPK/SPR 120.0 - SPK-S30/S50 120.0 - SPKh-120-120.0 SPKh-180-180.0 These values have a tolerance of ± 1.0 mm. Fig. 5.2 Designation of internal dimensions In the event of a deviation from these values, please contact ROXTEC Hamburg.

Welding instructions Page 18/18 6. Finishing The weld seams must be cleared of welding residues. 6.1 Finishing steel structures Any paint residues (burnt paint) caused by the welding must be completely removed from the inner surfaces of the frame. Fresh corrosion protection is absolutely essential! (Surface quality as at delivery according to DIN 80 200: 3F99) Primer coating: -Celerol reaction primer zinc chromate-free settings: oxide red Coating thickness 20 to 25 µm. - SigmaWeld (after consultation) 6.1 Finishing aluminium structures Fresh corrosion protection is not necessary.