Application Guide for Equipotential Earth Mat Installation on Substation Structure Mounted Switches



Similar documents
EARTHING AND BONDING AT SECONDARY SUBSTATIONS

OUTDOOR DISCONNECTORS A division of ACTOM (Pty) Ltd

Takfan Machinery and Mould Co Ltd. Plug in Bushing. LV Monoblock. RMU Bushing. 4 Way CT Terminal.

Pigeon Spike Stainless Economy Bird Spikes Includes specifications for: Pigeon Spike Stainless models, hardware and surface cleaning.

Packaged Terminal Air Conditioner Wall Sleeve Installation

CODE OF PRACTICE FOR EARTHING AND BONDING SYSTEM FOR SIGNALLING EQUIPMENTS SPECIFICATION NO. RDSO/SPN/197/2008 SIGNAL DIRECTORATE

TC Grounding and Bonding for Telecommunications Systems

Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting Hardware.

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

12 Appendix 12 Earth Electrodes And Earth Electrode

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Hyperlinks are Inactive

Model # 940P-V6. Page 1 of 11

Earthing Guidance Notes

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

LOCKHEED HYDRAULIC BRAKING SYSTEMS MORRIS 8 CARS

PART E SPECIFICATIONS

Structural Failures Cost Lives and Time

Guidelines for Earthquake Bracing Residential Water Heaters

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork

Dozen. 12 playground hazards

TABLE OF CONTENT

CDGRD-10. Grounding. Solutions For Comm/Data Applications

SMD Rework Station TABLE OF CONTENTS

PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES

SELECTION, APPLICATION AND MAINTENANCE

ATS Overhead Table Shelf System INSTRUCTION MANUAL

How to Conduct a Magnet Pull Test

HORIZONTAL INSTALLATION

SECTION 807 PUMP STATION REHABILITATION

SECTION PIPE HANGERS AND SUPPORTS

HYDRAULIC TABLE CART 500-LB.

NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT SECTION GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS

ELECTRICAL PRACTICES FOR CONSTRUCTION WORK

3", 4", 6" & 8" Model H Series Alarm Check Valve Installation and Maintenance Guide

Lightweight, Heavy Duty

SHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS

Saferand easierinstallation

Circuit Electrical Testing

Introduction to Data Centre Design

HYDRAULIC LIFT TABLE CART 2200-LB.

SECTION WINDOW WASHING SYSTEMS

OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

INSTALLATION MANUAL ELECTRIC RANGE. Please read these instructions thoroughly before installing and operating the range.

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller

StructureScan Installation

KEEP FOR FUTURE REFERENCE MRTALP VERTICAL LIFT BAR READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

Guidelines for Earthquake Bracing of Residential Water Heaters

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

Video Camera Installation Guide

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES

Assessment of Soil Resistivity on Grounding of Electrical Systems: A Case Study of North-East Zone, Nigeria

CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions

RAY-MAX Integrated Solar Power Strip

LSA-PLUS Series 2 Connection and Disconnection Modules and Accessories

The New York City Sidewalk Law

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version

ScottishPower Distribution Cables & Equipment. Metal Theft

V47 Series Temperature Actuated Modulating Water Valves

MBSAW. Meat Cutting Band Saw With Meat Grinder Assembly & Operating Instructions

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

BETON. CONCRETE EFFECT IMITATION CONCRETE FOR A PURE AND MODERN EFFECT Application instructions primer - base - finish

1000-LB. TRAILER JACK OWNER S MANUAL

Anodes and Misc Equipment

MASTER CYLINDER. Section 2. Master Cylinder. Tandem Master Cylinder. Master Cylinder

This presentation to be used in conjunction with:

JANUS INTERNATIONAL CORPORATION INSTALLATION INSTRUCTIONS Pantheon Mini Operator

Work in Substations - General

DO NOT attempt to repair hub and wheel bearing assembly.

Uncovered Decks & Porches

12. REAR WHEEL/BRAKE/SUSPENSION

Wind Direction Smart Sensor (S-WDA-M003)

INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS

Part No. AJS & MATCHLESS WHEELS & BRAKES - NEW PARTS Price (20% VAT)

PRODUCT MANUAL - M090

SEMFWE232 SQA Unit Code H2BN 04 Cutting plate and sections using shearing machines

Item #: BTOL Assembly Instructions

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

POLE MOUNT SYSTEM-3 INSTALLATION

Removable Aluminium posts

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & Instructions For Installation, Operation & Maintenance

Original Assembly Guide

F250 6 RADIUS ARM KIT

Mobile Home Pre-Inspection Checklist

Operation manual. drill rig KERN-DEUDIAM KBS-Series K100

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: No.: SE-...

60 WATT LED TRIPLE BEAM WORKLIGHT

Awning Instructions. Standard Manual 1.5m to 4.5m

12 WATT LED AMBER LIGHT BAR

CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS

Installation, Operation and Maintenance Instructions. Uniflex ABB PTMV

Transcription:

Application Guide for Equipotential Earth Mat Installation on Author: Tony Haggis / Nigel Johnson Version: 2 Approver: Bob Ferris Date of Issue: Oct 2005 Reviewer: Nigel Johnson Next Review Date:

REVISION LOG Version 2 Prepared by: Nigel Johnson Approved by: Robert Ferris Date: Oct 2005 Notes: EME Installation Guide converted to Central Networks Application Guide Version 1 Prepared by: Tony Haggis Notes: EME Installation Guide Approved by: Andy Land Date: May 2005 Version: 2 Oct 2005 2 of 11

CONTENTS Page Background... 4 Safety... 4 Testing Procedure for Installation of Gratings... 5 Materials... 6 Installation Guidance... 6 Version: 2 Oct 2005 3 of 11

Background Safety An objective of the work is to enable live operation on isolators and switches installed within outdoor substation compounds by release of Suspension of Operating Practice SOP 294 (applicable to the East). The gratings will be installed in the West where the existing foot-plates are non-existent or inadequate (e.g. concrete with metal strips). The work is to install a metallic grating under the operators standing position which is electrically connected to the switch handle. This is to ensure that persons operating the switch have their feet and hands at the same potential should a fault occur when switching It is essential that the gratings are placed where the operator stands (vertical handle) or walks (rotary handle) during the operation. The connection on the grating must be visible for the operator to check before switching. (To prevent tripping hazards it may be necessary to provide a light covering of stone which can be readily moved by the operator). A grating shall be installed at every isolator and earth switch position. A grating shall also be installed at any fault thrower location. The connection from the grating to the handle must go directly between the two and must not form part of the existing conductor between the handle and the rest of the earth grid. This is to ensure any earth fault current flowing down the structure to the earth grid does not flow via the connection to the grating or through the grating itself. Existing gratings that are being replaced may need modifications to the connections to bring it in line with the above requirement. The work is subject to the Distribution Safety Rules. Work only permitted at sites where the earthing continuity tests have been successfully completed. Work only by Authorised Persons in receipt of appropriate safety document and risk assessment on a site by site basis. Existing earth connections and tapes MUST NOT be broken or cut Version: 2 Oct 2005 4 of 11

Testing Procedure before Installation of Gratings LV rubber gloves MUST be worn at all times when test leads are connected to the substation earths. 1) Identify a suitable reference earth connection in the substations (e.g. NER earth or obvious earth bar in switch-room.) 2) Use a four terminal earth tester to test continuity between reference earth and the handles of all switches where the grating is to be installed. a) You should obtain a reading of between 0.005 to 0.025 ohms. b) Readings over 0.025 should be treated with suspicion and all test connections checked. c) If the reading is still high, then a poor earth connections from handle to earth tape is likely check from tape to the reference earth. d) If the high reading cannot be resolved, make the equipment safe according to East - procedure P3 of section 22 of the Power System Operations Manual - Loss of Substation Earthing Emergency Procedure and inform the control engineer of the isolators affected West Depleted Earthing Procedure found in Section 49 of System Operations Manual LEM Saturn Geo X shown other suitable 4 terminal earth testers may also be used. 3) On a large site you can declare a new reference point by testing it back the first reference and then make further test from there. (saves having very long leads) 4) If everything is in order then install the grating as detailed in the Installation Section below. 5) At end of the work provide results to the Control Engineer for SOP294 to be removed (East only). Version: 2 Oct 2005 5 of 11

Materials Commodity Code Item 2356200 Earth mat grating - 1m x 1m 2356210 Fixing spike for earth mat grating 2356220 Stainless steel bolt 10mm x 25mm 2356230 Stainless steel nut 10mm 2356240 Stainless steel washer 10mm 2356250 Stainless steel spring washer 10mm 5093135 Earth tape 25mm by 3mm 3982100 Contact grease Direct purchase Copper flow brazing rod Direct purchase Hook -bolt Direct purchase Epoxy resin concrete fixing system Direct purchase Post hole concrete mix Installation Guidance Vertical operation One grating placed centrally 500-550mm from the switch structure Layout of Gratings Rotary operation Up to five gratings to give a 1.5m (+/- 0.1m) radius from the fulcrum Version: 2 Oct 2005 6 of 11

Remove chippings to provide a level base & flush fit. Fill grating with further chippings for stability. Apply contact grease to the edges of the gratings before bolting together Contact grease 5 stainless steel nuts & bolts per side Bolt Plain Washers Nut Spring Washer grating Contact Grease Version: 2 Oct 2005 7 of 11

Layout subject to practicalities and ergonomics Remove trench covers from under grating and use as packing to level grating. Stabilise with chippings Cut outs for pipe-work Cut half sections of grating where necessary Further support with anchor bolts or spikes as required Hook-bolt - epoxy fixing into concrete Trench Fixing spike bolted to grating and concreted in Grating Trench Version: 2 Oct 2005 8 of 11

Tin earth tape & bolt to grating, greasing the connection. Braze to earth tape going direct to switch handle or mech box Always make the connection visible for inspection If the tape connection is likely to be a tripping hazard then a light covering of chippings is permitted to reduce the tripping hazard These shall be uncovered by hand to verify presence of connection prior to switching. Version: 2 Oct 2005 9 of 11

Two Visible Connections For Rotary Mats If not covered by chippings (not a tripping hazard) then paint grey to deter theft. Finally Test Continuity Maximum of 0.025 Ohms between the mat and the handle mechanism box Version: 2 Oct 2005 10 of 11

The end result Version: 2 Oct 2005 11 of 11