Transrapid Project Shanghai



Similar documents
The future is already here

Technology and System Layout of the Transrapid Maglev Project

The Shanghai Maglev Route

The Discussion of The Long-distance Maglev Transportation Organization Mode

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS Cambridge International Level 3 Pre-U Certificate Principal Subject

CTCS Chinese Train Control System

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

The Future is Made of Ideas. Power Converters Included.

TEIO12. Maglev project. Extension of the Maglev Train Track between Shanghai and Huangzhou

Advance your thinking. Experience the future Transrapid

Shanghai s maglev project

Dispelling the Top Ten Myths of Maglev by Laurence E. Blow President, MaglevTransport, Inc.

Gigaset A580 / A585. Environmental Product Declaration according to ISO 14021

RailServices THROUGH THE ENTIRE LIFE CYCLE WORLDWIDE

FedEx HealthCare Solutions. Supporting the global healthcare industry

Gigaset AS180 / AS185. Environmental Product Declaration according to ISO 14021

Railway Research and Technology in China Today

Development of Shanghai Integrated Transport ( ) XIAO Hui and GU Yu

Background Information

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009

Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport. Report

C a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s

DC Traction Power Supply. Powerful, efficient and safe. siemens.com/mobility

Frame of IoT in China

siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021

Interim Manager Profile / Consultant Profile. Robert W. Haase Dipl. Ing. (FH) / Dipl. Wirtschafts Ing. (FH)

ABB PSPS Erich Steinmann; Generator control-2013

Trapeze Rail System Simulation and Planning

English. Trapeze Rail System.

Newsletter September 2013

STRUCTURAL DEFORMATION CAUSED BY AERODYNAMIC EXCITATIONS DURING THE PASSING OF MAGLEV VEHICLES

Key Development Trends in Supply Chain Management

Valve Remote Control Systems Centralized Hydraulics for marine vessels and offshore installations

Up-to-Date with Electrical Equipment

Policies and progress on transport access, including access for the rural population and low-income households

Permissible ambient temperature Operation Storage, transport

SCI/VERKEHR COLOGNE 2008 THE WORLD MARKET FOR ELECTRIC LOCOMOTIVES. Rolling Stock, Procurements, Manufacturers, Market Development

Expression of interest for the delivery of an Initial Operating Segment

Analysing the Metro Cityring in Copenhagen

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

ETIHAD RAIL. Corporate Presentation

TRANSRAPID SHANGHAI Construction of the First Commercial Operational Line

News service. DB Schenker: A reliable partner of the automotive industry

Thailand s Logistics

Girder, guideway, hybrid, Munich, optimization, Shanghai, Transrapid

Product Specification

CAD/ CAM Prof. P. V. Madhusudhan Rao Department of Mechanical Engineering Indian Institute of Technology, Delhi Lecture No. # 03 What is CAD/ CAM

Expense Reports for Reimbursement

China Travel Mission Prospectus

Why build the Silvertown Tunnel?

Date of birth/ -place 10 December1957, Wiesbaden

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL

Hyperloop Technologies Inc

Gigaset E490/ E495. Environmental Product Declaration according to ISO 14021

Smart Grids Part 3. Renewable Energy and Cyber Security

NATUS SOLUTIONS Turnkey Project Management Project Engineering and Industrial Installations. Electrotechnical Solutions at the Highest Level

Fuel Cell solutions for maritime and harbour applications Proton Motor Fuel Cell GmbH. Sebastian Dirk Venice, 14th of June

5SV Residual Current Protective Devices

Welcome to FMS! Want to know more?

Marking systems. Make your mark! In quality and logistics

Your Multimodal Partner. IBS, the 08/10/10

Always in the Fast Lane. Voith DIWA in BRT Systems

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.

The German High Speed Rail System. DB International GmbH Ottmar Grein Bilbao,

The Research of Vancl Network Marketing

Inland Waterway Infrastructure - Mekong River cruise promoting factor. Tokyo September 2010

Concentrating on the essentials: the new Basic Panels SIMATIC HMI. Answers for industry.

International Business Central European Business Realities UNIVERSITY OF ECONOMICS, PRAGUE, CZECH REPUBLIC

RUF climate solutions

More efficient logistics processes with FleetBoard Logistics Management.

Distribution Voltage Regulators

Electro Hydraulic System (EHS)

Market Growth and New Regulations Demand Network Modernization

Vectors. Objectives. Assessment. Assessment. Equations. Physics terms 5/15/14. State the definition and give examples of vector and scalar variables.

不 来 梅 科 技 大 学. Hochschule Bremen Programme: September 20 - October 08. Bremen University of Applied Sciences at the Expo Shanghai 2010

Agile Expansion to China. Armin M. Oracle Retail CrossTalk, Washington DC,

KNX city concept. Dipl.-Ing. Lutz Steiner, KNX Scientific

Contents. TRIP & time clearance 11 Backlight 12 Wheel size 12

COSCON: SAP Technologies Help Create a Unified Enterprise Data Platform for Global Operations

With Bosch Software Innovations ConnectedManufacturing Solutions.

New Renault Trucks Euro 5 range: cleaner, higherperformance

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

Impact of the climate change discussion on the

Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division

MASTER OF CHINA-EUROPE BUSINESS STUDIES

Load Building and Route Scheduling

LOGISTICS & CUSTOMS CONSIDERATIONS IN TURKEY. How to use Turkey as a Gateway for Your Products Getting your Products into Turkey- Tariff Issues

A new radio system for the German coast

MANUAL FOR THE GRANT OF THE DORA PLUS SUB-ACTIVITY 1.2 STUDY MIGRATION OF DOCTORAL DEGREE STUDENTS

The Follo Line Project

EB TechPaper. Test drive with the tablet. automotive.elektrobit.com

ISIO 200. Binary Input/Output (I/O) Terminal with IEC Interface

Preschool For All Program Evaluation TEACHER SELF EVALUATION

MGB Maglev Guideway Bögl. Progress is built on ideas.

Greyhound Lines, Inc. Rural Feeder Service Handbook

Alstom Transport supplier of Tram Systems in PPP schemes

Transcription:

Transrapid Project Shanghai Dipl. Ing. Dieter Hoffmann, Siemens AG Abstract Following brief negotiations initiated at the end of the year 2000, the contract for the supply of the airport link using the Transrapid Maglev system was signed in January 2001 by the Chinese Customer, the Shanghai Maglev Transportation Development Co. and the German Consortium formed by Transrapid International GmbH, ThyssenKrupp Transrapid GmbH and Siemens AG. The paper presents the project goals, the project process and challenges as well as the major scope of involvement of each participating party beginning with the signing of the contract up to commercial operation by the customer. 1 INTRODUCTION The 30 km line between Pudong International Airport and Long Yang Road Station of Metro Line 2 was erected and commissioned by the German Consortium Transrapid International, ThyssenKrupp and Siemens in cooperation with the Shanghai Maglev Transportation Development Co. over a period of approximately three years. On December 31, 2002 the first three-section vehicle performed the VIP run with a maximum speed of up to 430km/h. The VIP run was attended by Chinese Premier Minister Zhu Ronghi and German Chancellor Gerhard Schröder as well as other high-ranking officials. Commercial operation began in January 2004. Today, the system operates in shuttle and circular mode with up to 3 five-section vehicles and 10 minutes headway according to transportation requirements. Between January 2003 and the start of commercial operation more than 130,000 visitors have had the opportunity to travel on the train. By July 2004 more than 1 million passengers had traveled on the Transrapid and more than 1 million kilometers have been covered by the fleet. 129

Figure 1 shows the track details. Figure 1 Project characteristics Track length (double track): 30 km double track Stations : 2 30 km Vehicles: 3 trains with 5 sections each 3 trains with 5 sections Speed: 430 km/h 430 km/h Trip time one way: 7.5 minutes 7.5 minutes Minimum headway: 10 minutes Daily operation: 18 hours 130

2 Contractual parties The Customer is a group formed by the End User Shanghai Maglev Transrapid Development Co. (SMTDC) and Party A consisting of the three companies as SIIC Shanghai International Trade (Group) Co. LTD, Shanghai Pudong International Airport Import & Export Corporation and Shanghai SITICO International Trading Co. SMTDC was the contact partner responsible for project handling. The Contractor group was formed by the Consortium Transrapid called Party B consisting of Transrapid International GmbH % Co. KG (TRI), Siemens AG (SAG) and ThyssenKrupp Transrapid GmbH (TKT-TR). The Consortium members SAG and TKT-TR were structured according to subprojects such as: Operation Control System (OCS), Power and Propulsion System (PPP) and Additional Systems (ADS) for Siemens AG. The three Siemens subprojects were managed by the Project Management Team of which one subproject manager assumed the leading role for the SAG scope of supply. In the same way ThyssenKrupp Transrapid GmbH was assigned the subprojects for the Long Stator Winding (TKL), Vehicle (TKV) and Switches (TKS). The scope of supply was divided between Customer and Contractor. The customer SMTDC had to construct the infrastructure like Long Yang Lu station including the operation control center, Pudong International Airport station, maintenance facilities and the concrete guideway. Additionally the assembly work was the task of the customer. The Contractor s responsibility was the E&M scope of the system as well as the System Engineering and Overall Project Management provided by TRI. SAG was in charge of the Operation Control System (OCS), the Power Supply and the Propulsion System (PPP) as well as the Power Rails and Information/Communication Systems (ADS). Equipment like vehicles, switches, stator packs and the long stator windings were supplied by TKT-TR. The share of the Consortium was 7 % for Transrapid International 48 % for Siemens AG and 45 % for ThyssenKrupp Transrapid GmbH. 131

3 Milestones With the Contract for Erection of the Airport Link Pudong International Airport to Long Yang Lu having been signed (Figure 2), the major goals of the project were defined on January 23, 2001. The system had to be ready for the VIP run (Figure 3), which was a major event attended by high-ranking politicians, within 23 months following the start of the project. In approximately 35 months the system had to be ready for commercial operation (Figure 4). Figure 2; Contract signature 23.01.2001 Figure 3; VIP run 31.12.2002 Figure 4; Commercial operation 01.01.2004 132

After planning the infrastructure of the building, and finishing the construction work of the guideway beam construction hall, the Customer was able to start the construction of the guideway with the assistance of the German Guideway Experts in February 2001. Following the agreement of the Overall Time Schedule on May 18, 2001, the key milestones were broken down for each delivery of the Transrapid Consortium. Figures 5 and 6 present the goals achieved during the project process. Date January, 2001 April, 2001 January, 2002 March 2002 May, 2002 May, 2002 August, 2002 November, 2002 December 31, 2002 Event Contract signature Start of construction work Start of installation OCS Start of installation PPP Start commissioning OCS Start commissioning PPP First vehicle in Shanghai Track B for VIP run available VIP run with 430 km/h Figure 5; From project start through to the VIP run The Chinese customer started installation of the equipment under supervision of the contractor one year after signing of the contract. In the next half year most of the equipment was assembled by the client and the consortium, including 2 substations plus the power supply 110/20 kv and the propulsion equipment 7 wayside transformer stations 60 wayside switch stations 133

wayside feeder cable system approximately 125,000 stator packets approximately 950 km of long stator winding cable 23.8 km power rails including the power rail supply 8 switches including the switch stations operation control system and additional systems for communication and information. After only 16 months, commissioning of the power supply and control system hardware and software began. The first vehicle arrived in Shanghai in August 2002 and Track B was fully available for operation after just 22 months. The VIP run was a great success and took place on December 31, 2002. It demonstrated to the world that the Transrapid is a very high-performance system. Date January/February, 2003 March, 2003 May, 2003 July, 2003 August, 2003 October, 2003 November, 2003 January 1, 2004 Event Demonstration runs Runs with 5-section vehicle Start rides track A 430 km/h Vehicle meeting at max. op. Finish commissioning Start safety qualification World record ride with 501 km/h Start of commercial operation Figure 6; From VIP run to start of commercial operation 134

After the VIP run it was necessary to let the public experience the performance of the system. For six weeks the people of Shanghai as well as foreign travellers were allowed to test the train during the demonstration run period. In March 2003 the first 5-section vehicle tests started and in May 2003 Track A was put into operation with a maximum operational speed of 430 km/h. Then two months later two vehicles passed each other in opposite directions at a maximum speed of 430 km/h. By the end of August the commissioning had been completed and at the beginning of October 2003 the Safety Qualification process began. In November 2003 the configuration consisting of a two, five and eight-section vehicle was successfully tested and the Transrapid world record speed of 501 km/h was achieved. The system has been in commercial operation since the beginning of 2004. 4 Goals, challenges and solutions It is important to mention some of the goals and challenges. The Consortium had to face the fact that the system is the first commercial application of the Transrapid. It was also the first time the system had to be operated with more than one vehicle: in this case three. The expectations of the public and politicians of both countries involved were very high and therefore success was no option. In addition to the above-mentioned challenges, technical issues like the very high humidity and very high temperature of the Shanghai area had to be considered. Incidentally, nearly 12,000 tons of freight had to be shipped by SAG from Germany to Shanghai. The first electrical components arrived in Shanghai in September 2001. Most of the equipment apart from the vehicles was delivered by October 2002. The last vehicle arrived in Shanghai in July 2003. Added to the short time of 23 months up to the VIP run and 35 months up to the start of commercial operation, many challenges had to be overcome. The environmental conditions had to be checked so that they could be modified if necessary by means of air conditioning. The space available in the buildings had to correspond to the requirements of the equipment to be installed. The mechanical and electrical interfaces of every component had to be clarified. The method of shipment, by airfreight or by ship, and the necessary time for shipment had to be taken into account. In addition it was necessary, by checking with the customer, to find the easiest way to get the equipment into China. The personnel requirement in Shanghai had to be planned as well. Last but not least all special equipment had to be brought to Shanghai in good time. Customer staff had to be trained how to use the special tools in a proper manner. The process of supervision and assembly work procedures had to be agreed upon. The complexity of the system is shown in Figure 7, which mainly shows the interfaces of the electrical subsystems delivered. 135

5 Cultural challenges Figure 7, Interfaces of the subsystems Not only technical or logistical issues need to be raised. Human issues are a major part of success especially in complex international projects. In order to agree on the design, many design liaison meetings were held and the customer s staff had to be trained for Operation of the system Maintenance of the system Rules & Regulations An open cooperation is also a cultural challenge and needs a clear understanding of cultural differences. E.g. whereas Western people often do not mind when they get their meal it seems to be quite an important issue for Eastern people. It is important to be aware of such minor issues and respect them in order to create a pleasant and productive atmosphere for meetings. It was also of great importance to know who is the right partner for communication in terms of decision makers, technical aspects, etc. Excellent preparation of documents and a good translation were essential for good understanding. And what is valid worldwide also did count during the examination of this project. You have to set up agreed common project processes at an early stage and then, of course, you are expected to stick to them. 136

All training activities were carried out based on the principle Train the Trainer. This means nothing more than establishing the people first trained as multiplier for the next staff to be trained (avalanche effect). It is therefore essential to select the right people to act as multiplier at a later stage. Here again excellent documentation is a key to success. It must be appreciated that the methods of learning are different between the Western world and Eastern world. It had to be assumed that, whereas the Western people prefer to start with a look from top down, Eastern people often prefer to start learning bottom up. It is no secret to say that every trainer had to be able to understand the trainees needs. 6 Facts for success As shown in Figure 8, the system is up and running today with a high stability. The system safety was demonstrated and proven between January and July 2004. By the end of July nearly 100% of the scheduled trips were without a delay of less than 5 minutes headway. This was compensated by the system over a normal day of operation. It can be seen that in July 2004 a total of 1 million kilometers were covered and more than 1 million passengers traveled with the Transrapid. Figure 8; Technical availability of the Transrapid system The success of the project is due entirely to the people involved and I have to thank everybody for being part of the team. Additional facts are: Use of modern communication technologies like email, fax, video-meetings, in other words less paper work to bridge the distance between two continents Communication at its best through good personal relationships Processing the job to gain an advantage from the time difference between China and Germany 137

Good understanding of intercultural differences of everybody involved on both sides Getting the right information at the right time for the right person Integration of Chinese personnel in supplier teams and training of customer staff Being a reliable partner throughout the whole project Quick decisions and high flexibility And, last but not least, open feedback should not just be a measure, but more project culture Figure 9 shows one example of how to realize the facts mentioned above. Figure 9; Drake boat race The above photo symbolizes how to get strong, fast and successful. Join a team, work hard and in harmony together, have good control over what you do, be well prepared and you will win the race. 138