The Shanghai Maglev Route



Similar documents
Contents Technical Information Drivers Cabin Controls Exterior Lighting and Destination Screen Keyboard Controls...

Transrapid Project Shanghai

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS Cambridge International Level 3 Pre-U Certificate Principal Subject

The Discussion of The Long-distance Maglev Transportation Organization Mode

The future is already here

1. Safe Operation - Please be careful while operating the Rickshaw: the motor is fairly strong so be cautious while engaging the throttle.

Using STAMP to analysis Chinese High Speed Railway Accident Yong-wen Railway Accident

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

Table of Contents. Introducing AYGO. Accessing your vehicle 2 3. Lights 9. Wipers 10. Electric windows 4. Gear change 11

The risk of derailment and collision, and safety systems to prevent the risk

SECTION MediaStation Model 125 Electric Lateral Files (ELF)

This section deals with mandatory and optional equipment for your vehicle as well as suggestions for safer road use.

Welcome to SCANIA Truck Driving Simulator - The Game

GAUGEMASTER PRODIGY EXPRESS

Lineside Signal Spacing and Speed Signage

Dual core CPU 3.0 GHz 4 GB system memory Dedicated graphics card with 1024 MB memory (GeForce GTS 450-class equivalent or better)

MODEL OF THE ELECTROMAGNETIC LEVITATION DEVICE

Electronically Controlled Air Suspension (ECAS) for Trucks

A Beginners Guide to Track Laying.

DRIVING TEST POSSIBLE QUESTIONS & ANSWERS.

Lineside Signal Spacing and Speed Signage

CTCS Chinese Train Control System

INSTRUCTION MANUAL. FOR TECHNICAL ASSISTANCE: VERSION 3.2 ITEM #330

Advance your thinking. Experience the future Transrapid

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.

Positive Control of Truck and Trailer Movement

PRODUCTIVITY THROUGH INNOVATION 600 CONTROL DIRECT DRIVE TECHNICAL/OPERATION MANUAL

Driving in Fog, Rain and Wind for School Bus Drivers. Reference Guide and Test

Estimation of electrical losses in Network Rail Electrification Systems

DRIVING IN NEW ZEALAND

IMPLEMENTING VEHICLE LOCATION SYSTEM FOR PUBLIC BUSES IN SINGAPORE

Blender Notes. Introduction to Digital Modelling and Animation in Design Blender Tutorial - week 9 The Game Engine

Railway Research and Technology in China Today

FOR IMMEDIATE RELEASE

Development of Combined Automatic Blade Control for Snow-Removing Grader

Trainguard Sirius CBTC

AWS and TPWS Interface Requirements

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015

SolidWorks: Mirror, Revolve, and. Introduction to Robotics

INSTRUCTOR S GUIDE. Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers

Vehicle Standards Instruction (General 18.0) Projecting Loads Released January 2014

Exploring Magnetism. DataQuest

Map reading made easy

MONORAIL. Scomi Rail THE REVOLUTION OF URBAN TRANSIT. A smooth ride quality. Higher passenger capacity. Energy efficiency. Lower operating costs.

Hybrid shunter locomotive

Left Hand Limit Switch. Housing. Left Hand. Connections. Motor Connector BROWN PURPLE GRAY BLACK DARK BLUE BLACK BROWN BROWN LIGHT BLUE.

Multi-information Display (see MID )

Lectric Enterprises 5905 Sprucepine Drive Winston Salem, NC Telephone

Jump-Start Tutorial For ProcessModel

1 INTRODUCTION TO TRAIN SIMULATOR FEATURES OF TRAIN SIMULATOR GETTING STARTED... 6

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety.

Adding Heart to Your Technology

Dual core CPU 3.0 GHz 4 GB system memory Dedicated graphics card with 1024 MB memory (GeForce GTS 450-class equivalent or better)

mouse (or the option key on Macintosh) and move the mouse. You should see that you are able to zoom into and out of the scene.

Dual or Quad Core Processor 2.2+ GHz 2 GB RAM 512 MB video card: GeForce GTS 250 or better, ATI Radeon HD 4850 or better

New Urban Transport System for Middle East Monorail System for Dubai Palm Jumeirah Transit System

User manual DinaSys DTC/DTS and DTC/DTZ

The ABB i-bus KNX Room Master Concept Your first step into the KNX world

CYBEX GmbH Riedinger Str Bayreuth Germany.

HSR THE TRAIN OF THE FUTURE New technologies and research trends

Appendix A. About RailSys 3.0. A.1 Introduction

GENERAL TYPING EXAMINATION

Ell STEERING COLUMN CONTROLS STEERING COLUMN CONTROLS

Technology and System Layout of the Transrapid Maglev Project

Railway Technical Web Pages Infopaper No. 3. Rules for High Speed Line Capacity or, Summary

S a f e G u i d a n c e. Single Lamp Control and Monitoring

To start using your phone as a navigation device, tap the TomTom button in the Windows Mobile start menu.

CS2 System Available for Memory Sticks. New ipad App Main Station Announced

Commentary Drive Assessment

UAQ 4 MAGNETIC LEVITATING TRAIN WITH NEAR ZERO ENERGY CONSUMPTION

Gateway2Travel Manual

Nav-Cam 7000 TripMaster Software User Guide

Safety Speed Indicators. Badge Readers. Trainborne Recorders. Tone Generators. SIL2 PWM Traction/Brake Controllers. SIL2 Safety Displays

4. Other Information Signs CHAPTER 4

What s in the box. TomTom XL. EasyPort TM mount. Car Charger. Documentation pack. USB cable

SCHOOL BUS TRANSPORTATION Frequently Asked Ques ons

A comprehensive information system for railway networks

>> smart cross connect Users Guide. November 2014.

Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail

Opening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages Overview of Series E5/E6 Shinichiro Tajima

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL

Multi-Protocol decoder with Load regulation

Government 1009: Advanced Geographical Information Systems Workshop. LAB EXERCISE 3b: Network

Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division

Current Loop Tuning Procedure. Servo Drive Current Loop Tuning Procedure (intended for Analog input PWM output servo drives) General Procedure AN-015

AUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS

House Design Tutorial

REPORT OF THE ROAD SAFETY CAMERA COMMISSIONER TO THE MINISTER FOR POLICE AND EMERGENCY SERVICES

Arrival and Departure. Information for disabled passengers and passengers with reduced mobility at Frankfurt Airport

2009 QUICK REFERENCE GUIDE GET INFORMED. ROLL.

Magnetic Fields and Their Effects

Operating Vehicle Control Devices

GSM Gate Opener GSM Remote Switch RTU5015 User Manual

MAGICAR M871A. Car alarm with two-way remote User s guide

USER MANUAL. EZRUN Series Brushless Speed Controller EZRUN-150A-PRO

Computer Training Centre University College Cork

Adaptive cruise control (ACC)

Web Portal Step by Step

Provision of Lineside Signals

Lesson 5: School Bus Safety

Transcription:

The Shanghai Maglev Route 1

Contents 1. About the Shanghai Maglev... 3 2. Background information about EMS Technology... 4 3. Your train... 5 3.1 Getting to know the cab... 5 3.2 Central DMI screen additional information: Chinese to English... 6 3.3 Automatic train operation (ATO) and Automatic train protection (ATP)... 7 3.4 Cabin view... 8 3.5 Hot key list... 9 3.6 Braking system... 9 3.7 Signalling... 9 4. About the scenarios... 10 4.1 Career scenarios... 10 4.2 Tutorial scenario... 11 4.3 Quick Drive scenario... 12 5. Developer... 13 2

1. About the Shanghai Maglev The Shanghai Maglev Train (or Shanghai Transrapid) is a maglev line that operates in Shanghai, China. It is the first commercially operated high-speed magnetic levitation line in the world. The original plan to extend the maglev line to create the Beijing Shanghai High- Speed Railway was eventually shelved in favour of conventional high-speed technology, leaving the existing 30km maglev line between Pudong International Airport and Longyang Road, Pudong. Construction of the SMT line began in March 1, 2001, and on 1 January 2004 it began test operations. The top operational speed of the train is 431 km/h, making it the world's fastest train in regular commercial service since its opening in April 2004. During a non-commercial test run on 12 November 2003, a maglev train achieved a Chinese record speed of 501 km/h. The Shanghai Maglev has a length of 153m, a width of 3.7m, a height of 4.2m and a two-class cabin, which accommodates 574 passengers. Basic route information Length of mainline: 29.8 km Maximum line speed: 430 km/h Technology: Electromagnetic suspension (EMS) Completion date: 31, Dec, 2002 Operating hours: 06:45-21:40 (Longyang road station) 07:02-21:42 (Pudong airport station) Number of stations: 2 3

2. Background information about EMS Technology Electromagnetic suspension (EMS) is the magnetic levitation of an object achieved by constantly altering the strength of a magnetic field produced by electromagnets using a feedback loop. In most cases, the levitation effect is mostly due to permanent magnets as they don't have any power dissipation, with electromagnets only used to stabilize the effect. In electromagnetic suspension systems (EMS), the train levitates above a steel rail while electromagnets, attached to the train, are oriented toward the rail from below. The system is typically arranged on a series of C-shaped arms, with the upper portion of the arm attached to the vehicle, and the lower inside edge containing the magnets. The rail is situated inside the C, between the upper and lower edges. Magnetic attraction varies inversely with the cube of distance, so minor changes in distance between the magnets and the rail produce greatly varying forces. These changes in force are dynamically unstable a slight divergence from the optimum position tends to grow, requiring sophisticated feedback systems to maintain a constant distance from the track, approximately 15 millimeters. The major advantage of suspended maglev systems is that they work at all speeds, unlike electrodynamic systems, which only work at a minimum speed of about 30 km/h. This eliminates the need for a separate low-speed suspension system, and can simplify track layout. The SMT is propelled by propulsion coils mounted in the track, in fact it is a kind of linear motor: the propulsion coils provide force to move the train forward or backward (brake). For more information about SMT you can visit here: http://www.smtdc.com/en/ 4

3. Your train 3.1 Getting to know the cab Left side of cab desk 1 Emergency brake button 2 Startup button 3 Combined handle notch display 4 Reserve handle notch display 5 Traction current 6 Control voltage (v) 7 Onboard equipment voltage (v) 8 Head light switch 9 Cab light switch 10 Reading light switch 11 ATO startup button 12 ATO off button 5

Right side of cab desk 1 Combined power/brake handle 2 Reverser handle 3 Distance to next speed limit bar 4 Next speed limit 5 Distance to next speed limit 6 Current speed limit 7 Speedo meter 8 Current speed 9 Control voltage (v) 10 Traction voltage (kv) 11 Traction current (A) 12 Onboard equipment voltage (v) 13 Onboard equipment current (A) 3.2 Central DMI screen: additional information Chinese to English The information below is what will be displayed on the central DMI screen, and mean the following: Emergency brake display. When this shows, it means the emergency brake is applied. When the train is stopped this display will switch off. ATO malfunction. This means ATO cannot be started. ATO function is ON. This means the train is under fully automatic operation. To turn on ATO you must: 1. Move reverser handle to forward position; 2. Click ATO ON button on the desk. To turn it off, click the ATO OFF button. Door open display. When this is displayed, it means the train doors are open. If the train arrives at a station while ATO is on, 5 seconds after doors are closed the ATO will start the train again. 6

3.3 Automatic train operation (ATO) and Automatic train protection (ATP) This pack features fully workable ATO and ATP functions. ATP will help to avoid any dangerous situations and ATO will help free you from lots of cab tasks. When ATO is ON, it will operate the train automatically from start to stop. It can even reverse the train at Pudong Airport station. When you apply the ATO, the train will run fully automatically according to the speed and signals assigned by the control center. When the train arrives at Longyang Road station or Pudong Airport station, it will stop at the correct position (especially at Longyang Road station, which has glass barriers on the platform). The train can even reverse itself automatically at Pudong airport station. When ATO is on and the train arrives at Pudong Airport station, 1) the train will start heading to the reverse point automatically 5 seconds after the doors close. 2) When stopped at the reverse point, shift to the other cab and start ATO again, and the train will move to the next platform and stop in the correct position (you may need to switch the junction). If you wish to start the ATO, please make sure: 1. Reverser handle is in FORWARD position: 2. Doors are closed (Especially when starting a scenario). When ATO is on, a green box with Chinese text will display on the lower part of central DMI screen. You can turn off the ATO at any time by pressing the ATO OFF button on the desk or by using the hot key. 7

3.4 Cabin view The SMT train also features a detailed passenger cabin view. You can press key 5 to enter the cabin. While inside the cabin, you can move around by pressing the left and right left arrow key ( or ). The cabin also includes a digital clock and speedometer. When ATO is on, you can relax in the cabin and watch the speedometer reach 430 km/h and the scenery flash past. 8

3.5 Hot key list Key Function Key Function H Headlight up W Reverser handle move forward Shift+H Headlight down S Reverser handle move backward L Cab light A Combined handle move forward N Reading light D Combined handle move backward Z Startup key Y ATO ON X ATO OFF Backspace Emergency brake button 3.6 Braking system In order to slow down the train without any physical contact or airbrake system, the SMT train changes the direction of the electric current so it generates a counterforce from the magnetic propulsion system. In Train Simulator, the train uses dynamic braking controlled by scripting to simulate this process. When travelling at over 400 km/h, even a slight movement of the brake handle will cause driving quality errors in-game, so please use the brake very carefully when driving the train manually at high speed. 3.7 Signaling The SMT route does not have any color signals or any other tradition signaling system. It uses speed codes sent from the control center and processed by the onboard ATP/ATO system. If the route ahead is blocked and it is not possible to proceed, you will get a 0 speed limit code on the central screen. You can press the Tab key to request permission to proceed. 9

4. About the scenarios 4.1 Career scenarios In the following career scenarios, your suggested speed limit is 300 km/h. 1. Early Morning Train Round Trip Start position: Depot Terminal station: Pudong Airport station Duration:28 minutes It s early in the morning and you re assigned to drive the first train to run between downtown and Pudong Airport. In this scenario it is recommended that you use the ATO system to reduce the work load. 2. The Advantage of ATO Start position: Longyang Road station Terminal station: Pudong Airport station Duration:15 minutes ATO not only frees you from lots of cab work, but also improves efficiency of train operation, especially in bad weather. As SMT trains don t have wipers or a horn, ATO is your best friend on a day like today. 3. Parallel Operation Start position: Longyang Road station Terminal station: Longyang Road station Duration:45 minutes There are usually two sets of trains running on this line. As moving the junction and reversing at Pudong Airport station will take some time, both trains are running shuttle services back and forth without switching lines. Today you will take train SMT002 on Track B for a round trip. You can turn on the ATO system but don t forget to turn it off before you open the passenger doors. 10

4. Last service of the day Start position: Pudong Airport station Terminal station: Depot Duration:35 minutes This is the last train leaving Pudong Airport station. This train will stop first at Longyang Road station, then return to Pudong Airport station. Finally you must drive your train back to the depot. 5. A Foggy Morning Start position: Pudong Airport station Terminal station: Pudong Airport station Duration:25 minutes This morning you have to face a new challenge. Visibility is poor and ATO is out, can you handle this? 6. Heavy rain, watch out! Start position: Pudong Airport station Terminal station: Depot Duration:35 minutes The weather forecast said the first typhoon of the year is about to hit Shanghai. Though it s still far away, the periphery of the typhoon has already brought heavy rain to the city. Due to the bad weather, the last service of the day is almost an hour earlier than usual. You re driving the last train of the day: make a round trip from Pudong Airport station and then return to the depot. 4.2 Tutorial scenario You can find the tutorial scenario under the Tutorial section in the Academy menu. Introduction to the Shanghai Maglev Start position: Longyang Road station Terminal station: Pudong Airport station Duration:30 minutes This scenario will teach you how to drive the SMT train and how to use the ATO system. 11

4.3 Quick Drive scenario This route also features Quick Drive scenarios. You can select Quick Drive by clicking Quick Drive in the game menu: 12

5. Developer Develop: Publish: Union Workshop Dovetail Games Special thanks: Beta testing team 3rd party team of Dovetail Games For more DLC and game news please visit: www.railsimulator.com For our website you can click: www.uws-trainsim.com 13