Third Runway is Key to Hong Kong s Competitiveness. Professor Anthony Cheung Bing-leung Secretary for Transport and Housing



Similar documents
Maritime and Civil Aviation

THE BRITISH CHAMBER OF COMMERCE POSITION PAPER ON THE AIR FREIGHT INDUSTRY IN HONG KONG

ECONOMIC CONTRIBUTION

FLIGHT PATH TO GROWTH THE CASE FOR INCREASING LONDON S AIR CAPACITY

Hong Kong: the premier gateway for doing business in China and Asia

Hong Kong: The Gateway to China InvestHK; Strengthening Hong Kong s Leading Position in Asia Cambridge, Thursday May 3 rd 2012

The Economic Outlook of Hong Kong. in the Context of China s 12th Five-Year Plan

ADVANTAGES OF INCORPORATING A TRADING COMPANY IN HONG KONG AND STRUCTURING CHINA INVESTMENTS VIA HONG KONG

TERMINAL 2 ANNUAL REPORT 2006/07

Air China Limited Announces 2013 Annual Results

Hong Kong: Gateway to China for Estonian Businesses

DHL Central Asia Hub. Central Asia Hub Page

Debt Financing for MP2030

Latest Developments in Logistics in Hong Kong and Related Matters

An Overview of Cathay Pacific Airways

Key Issues Facing Hotel And Tourism Development In Hong Kong

years in the community

Operational Risk, Business Continuity & Crisis Management

Current Market. Predicting the future is a risky business. Meet your new

FRAConnect Incentive program

Head 79 INVEST HONG KONG

Economic impact of airport: the Roissy Charles de Gaulle airport example

Suggested presentation outline

A Second Runway for Gatwick Initial response to the Airports Commission s recommendation report

Opening Remarks at Business Seminar Hong Kong: Seize Now Your Opportunities for Business in China and Beyond

Transport Infrastructure Development in China October Fung Business Intelligence Centre

Green Hong Kong: Environmental Protection, Renewable Energy and Electric Vehicles

Head 79 INVEST HONG KONG

over that in Year APP

The future development of air transport in the UK Make your views known

ALCATEL-LUCENT S INDUSTRY LEADING TECHNOLOGY BOOSTS CHINA EASTERN S GLOBAL CALL CENTER AND VOICE PLATFORM

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT

STH heads maritime delegation to Europe STH responds to 2014 Xinhua-Baltic Exchange International Shipping Centre Development Index Report

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

The Economic Benefits of Aviation and Performance in the Travel & Tourism Competitiveness Index

China's Aviation Sector - Overview, Current Trends & Opportunities for European Suppliers

PRESIDENT S YEAR-END REPORT

Aviation Safety: Making a safe system even safer. Nancy Graham Director, Air Navigation Bureau International Civil Aviation Organization

ENVIRONMENT. Aviation. Property. Marine Services. Trading & Industrial. Beverages

In summer 2011, the Lufthansa Group operates 156 weekly flights to and from China including Hong Kong. Beijing Daily non-stop flights to Frankfurt

LEGISLATIVE COUNCIL BRIEF HONG KONG SECTION OF GUANGZHOU SHENZHEN HONG KONG EXPRESS RAIL LINK

Prevention of loss of communication. Air China

Head 79 INVEST HONG KONG

How To Strengthen The Relationship Between Hong Kong And The Mainland

B. INFORMATION ON ACT HOLDINGS, COSCO PACIFIC AND CHINA SHIPPING

Air China hosts the market opening ceremony at the Stock Exchange of Hong Kong to Celebrate the 10 th anniversary of its listing in Hong Kong

The business of Gatwick Airport Limited

Research note: Assessment index of international tourism hubs

Current and Forecast Demand

Ministry of Small Business,Technology and Economic Development

CONTENT. The Shanghai Pudong International Airport Project 2

A Look into the Future of Airport Planning, Design, and Construction by Analyzing Current Issues

HONG KONG. the hub, the gateway and the services centre

An airport for Western Sydney. Building Western Sydney s future

Legislative Council Panel on Commerce and Industry. Hong Kong/Shanghai Economic and Trade Cooperation Conference

Environmental Impact Statement for Las Vegas Supplemental Commercial Service Airport. Peter Byrne, Deputy Project Manager

THE UNIVERSAL SECURITY AUDIT PROGRAMME (USAP)

Development of Shanghai Integrated Transport ( ) XIAO Hui and GU Yu

Luis Muñoz Marín International Airport (SJU) Public-Private Partnership Airport Project December 2011

Nanaimo Airport Business Plan Summary June 2007 EXECUTIVE SUMMARY

Air China Limited Announces 2014 Annual Results

Malmi - Helsinki City International Airport. Malmi operators development plan

Submission NSW Inquiry into Regional Aviation Services

Hong Kong: A Logistics Hub Part I

Scheduled destination. Half the world s population lives within 5-hour flying time from Hong Kong

EUROPEAN AIRPORTS AND TOURISM ORGANISATIONS TOGETHER ON OPEN SKIES

Building a Logistics/Supply Chain Hub The Singapore Experience. Hum SinHoon NUS Business School National University of Singapore

LC Paper No. CB(1)1866/08-09(03) For discussion on 16 June Legislative Council Panel on Commerce and Industry

Hong Kong: - The Food & Wine Trading Centre in Asia - The Logistics Hub in Asia. Bonnie Shek Director, Australia / New Zealand

Legislative Council Panel on Commerce and Industry. Trade Relations between Hong Kong and Taiwan

HONG KONG. the hub, the gateway and the services centre. HONG KONG - the hub, the gateway and the services centre

Discussion Paper 01: Aviation Demand Forecasting

FACT SHEET UNMANNED AIRCRAFT SYSTEMS (UAS)

Integrating occupational health and safety measures into the construction process at Frankfurt Airport

Implications of the 12 th Five-Year Programme for Hong Kong Businesses

The General Aviation Industry in China 2012

Business Review ETD ANNUAL REPORT 2003 TRAVELSKY TECHNOLOGY LIMITED

Part One Operation of Aircraft Part Two Arrangements for Maintenance Support Flight Operations Notice

Norwegian UK set to takeoff as airline is granted UK Air Operating License

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

STATES OF JERSEY AIR TRANSPORT PERMITS: REVISED POLICY STATEMENT. Presented to the States on 4th November 2003 by the Economic Development Committee

Block 0: Capabilities within our Grasp

Speech of Mr. Raoul Starmans, Vice President of Royal TenCate China at the ITMF Conference 2014 in Beijing, China

Audit Results by Transport Sector

Accommodating ggrowth and hub development: experiences from Amsterdam and India

China Travel Mission Prospectus

Taoyuan Aerotropolis Infrastructure Project and. Taoyuan International Airport Terminal 3 Project TAIWAN

Jargon Buster. Amadeus APIS ASK ATA ATC ATD. BA2Buy BAA BABS. Agents Discount Tickets (AD75 - pay 25% of fare)

/Flughafen München GmbH Annual Press Conference

Heathrow, Gatwick and Stansted market power assessments

Business Confidence Survey

Going local and engaging with the world. Finnair. Maarit Keränen

BEFORE THE DEPARTMENT OF TRANSPORTATION WASHINGTON, D.C.

Outstanding prospects Welcome to Flughafen Zürich AG

Best Practice in Economic Regulation: Lessons from the UK

(Travel insurance designed for NokScoot passengers and underwritten by ACE Insurance Limited.)

Transcription:

Third Runway is Key to Hong Kong s Competitiveness Professor Anthony Cheung Bing-leung Secretary for Transport and Housing Over the past decade, passenger number and cargo tonnage at the Hong Kong International Airport (HKIA) have respectively increased by 8% and 5% on average per year. The number of flight movements has risen 65% to 391 000 last year. Each day about 1 100 flights fly to and from some 180 destinations worldwide, including Mainland cities, making Hong Kong one of the world s global and regional aviation hubs and contributing immensely to our trade, logistics and tourism industries. However, the current two-runway system can only allow for a practical maximum capacity of 68 flights per hour. If present air traffic growth trend continues, HKIA will reach saturation in the coming two years. If HKIA is not to give up its hard-earned hub status, amid fierce competition from other international airports in the region, notably Singapore, Seoul and Shanghai, as well as Guangzhou and Shenzhen in the Pearl River Delta (PRD) area, which are all having further expansion, there is no alternative but to build a third runway without delay. The question is therefore not whether or when, but how to take the project forward.

Under the Airport Authority s (AA) plan, a three-runway system can handle around 100 million passengers and cargo throughput of some 9 million tonnes by 2030. AA has already completed a rigorous statutory environmental impact assessment (EIA) covering 12 aspects including aircraft noise, air quality, marine ecology and impact on human health. A total of 250 mitigation and enhancement measures, including setting up a biggest-ever 2 400-hectare marine park, were committed in the EIA report to address public opinion and the views of the Advisory Council on the Environment. The Director of Environmental Protection granted the environmental permit for the project in November 2014 with conditions. AA has taken these conditions fully on board and aims at achieving development alongside environmental conservation under its vision to be one of the world s greenest airports. AA has put up a self-financing plan based on the joint contribution principle for this mega infrastructure, estimated to cost $141.5 billion in money-of-the-day prices. It comprises raising market borrowings given AA s AAA credit rating; restoring present airport charges for airlines to pre-2000 level with subsequent adjustments in line with inflation; and introducing an airport construction fee per departing passenger except transit passengers. AA also plans to retain all profits earned without dividend payment for ten years.

Government supports such joint-contribution approach. Through borrowings, the market will exercise financial prudence in scrutinizing the business viability of the project. Charging an airport construction fee to help finance airport expansion is not uncommon overseas. However, the Government is of the view that AA should maximize borrowings and lower the airport construction fee so as to reduce burden on passengers. AA is also asked to design airline charges in such a way as to facilitate and encourage the most efficient use of the airport, and encourage the use of more wide-body planes. Airspace and its management naturally determine how much air traffic an airport can accommodate within international safety limits. The airspace over Hong Kong and the surrounding PRD area has seen tremendous growth since the 2000s, constituting one of the busiest in the whole of China. In 2004, recognizing the need to optimize the utilization and management of PRD airspace, a tripartite working group was formed among the Civil Aviation Administration of China (CAAC), Hong Kong Civil Aviation Department (CAD) and Macao Civil Aviation Authority, to work out planning targets and measures to enhance cooperation, coordination and standardization of procedures and measurements. The result was the PRD airspace management plan in 2007 aiming at implementing various improvement measures by phases before 2020. AA s target runway capacity of 102 flights per hour (or 620 000 flights per year) under the three-runway system was premised on

such plan which also envisaged five runways for Guangzhou and three runways for Shenzhen. CAD has been engaging mainland authorities to take forward the 2007 plan, and some measures have been rolled out in recent years. The Central Authorities including CAAC are supportive of the three-runway system so as to maintain Hong Kong s global aviation hub position. We will continue to work closely with CAAC on technical solutions to optimize the use of PRD airspace and meet the operational needs of all sides, thereby achieving mutual gain. AA will take into consideration Government s feedback and review its financial proposal and design scheme for the three-runway system, making necessary adjustments to ensure the financing arrangements are fair and reasonable, and that the capital investment is well justified. It will also develop appropriate planning contingencies and cost control measures. Some critics of the third runway have suggested that HKIA could expand the existing 68 flights per hour limit to 86 flights even with two runways, citing a 1992 report prepared for the then Provisional Airport Authority. Such suggestion is based on wrong understanding. That report actually pointed to a range of maximum capacity from 52 to 86 flights per hour for dual runways depending on various conditions and constraints. Due to the surrounding terrain notably Lantau Island s high

mountains, it would be impracticable and unsafe under international standards to achieve the higher targets. CAD s commissioned consultancy in 1994 confirmed a two-runway maximum capacity of 63 movements per hour. Subsequently, the UK-based National Air Traffic Services reviewed this capacity in 2008 and concluded that using the latest air traffic control technology, it could be raised to 68 flights per hour subject to various enhancement measures. We know for sure that maintaining the status quo would mean no growth for Hong Kong aviation, losing out our business and hub advantage to neighbouring international airports, and reducing our economic competitiveness. Just enhancing terminal and cargo facilities with only two runways will not remove the ultimate runway capacity bottleneck.