Entry Door System Installation Instructions

Similar documents
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Basement Window Installation Guide Hopper and Sliding

Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Brick Veneer Construction

Tundra Series Windows January 2016

Active and Passive Sash Replacement

DIY CABINET REFACING INSTALLATION GUIDE

Installing Window and Door Mouldings

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Basic Spring Motor Roller Shades

Sun Vinyl New Construction Windows Homeowner's Warranty

DE Frame with C Series Sidelight

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Clad Direct Glaze Window Installation Instructions

Barewood Octagon and Elongated Windows Installation Instructions

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:

Acrylic Walls Installation Instructions

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Hinge, Blocker, and Tab Adjustment Guide

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

PANELIZED HOME INSTALLATION GUIDELINE

Premier & Deluxe 3-Season Room Sliding Glass Door

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)

Retractable Screen. Replacement Screen Instructions

FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?

Sash Replacement Guide

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

Installation S D I TECHNICAL DATA SERIES. and Troubleshooting Guide. for Standard Steel Doors and Frames STEEL DOOR INSTITUTE

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Ceiling Mounted Folding Attic Ladders Installation Instructions

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

WINDOW INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Destiny Shower Enclosure Installation Instructions

GreenGuard Housewrap Installation Guide

4 5/16 Subframe Installation

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

Installation Instructions

RZ Guardrail System Installation Manual

Balance Shoe and Balance Replacement

Therma-Tru Slim-Line Sliding Patio Door. Assembly and Installation

INSTALLATION INSTRUCTIONS for Swinging French and Patio Doors (JII105)

Composite Stone Veneer

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09042K1

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Eggers meticulously-crafted door frames are rivaled only by their beauty, quality and lasting performance. Turning nature s beauty into works of art

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors

INSTALLATION OF A BAY WINDOW

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

London Farm Kitchen Sinks

Hinge Replacement & Hinge and Hardware Adjustment Guide for Andersen Frenchwood Hinged Patio Doors Manufactured Before November 2005

Installation Instructions

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

Installation Guide for Andersen Architectural Wood Inswing Entry Doors

WINDOW REPAIR MANUAL & REFERENCE GUIDE

Heavy Glass Frameless Shower Door With Return Panel

PRODUCT GUIDE Vinyl Patio Doors (JPG008)

KITCHEN INSTALLATION GUIDE

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

SECTION 6. Glass Storefront Doors:

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS WINDOWS

All-Season Sunroom Sliding Glass Door Installation Instructions

OWNER S MANUAL Table Tennis Table Patent Pending

Owner s Manual & Safety Instructions

SPIRAL STAIR KIT INSTALLATION MANUAL

Window Care, Warranty & Service

ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Installation Instructions

Important Information for Installer & Homeowner

March 14, Installation of Bay, Bow and Garden Windows

PATHWAY Classic Series with Handrails Portable Wheelchair Ramp INSTRUCTIONS FOR USE 6428 REV A

How to Install Hardwood Flooring Over a Sub Floor

Dog Kennel WORLDWIDE

Best Barns USA Assembly Book

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

InsulView Window Installation Instructions

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors without Nailing Fin (JII015) IMPORTANT INFORMATION AND GLOSSARY

Replacement Installation Instructions

How to Build a Poker Table

VISION SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

Assembly GUIDE. display wine cellar kits. Required. Suggested. Questions? or visit wineracksamerica.com

Old Goats, Inc. and Screendoors.com WOOD SCREEN DOOR

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab


CordlessPleated FabricShade including Top-Down/Bottom-Up. owner's handbook

Transcription:

Entry Door System Installation Instructions IMPORTANT Read these instructions completely before beginning installation. Please use caution when completing any building project. Safety glasses Phillips head screwdriver Power drill or screw gun with #2 Phillips head bit 1/8 drill bit Hammer Level Tape measure Square Step Stool ing gun with tube of latex caulk #8 x 3 exterior grade screws Gloves ROUGH OPENING DIMENSIONS Before removing your old door, or preparing the rough opening for a new door, verify that the size of the door purchased will properly fit your opening. Consult your retailer/lumber yard for size availability of these and other sidelite sizes. mold dimension is measured from outside edge of brickmold on door unit. Add 1 1 /2 to the rough opening width if a 2 x 4 is used between the door and a single sidelite and 3 if 2 x4 studs are used between the door and double sidelites. IMPORTANT: This door system has a 1-1/4 threshold height which allows for approximately a 1 opening clearance over carpet, tile or other floor coverings. If this clearance is not sufficient, the complete door system should be installed on a wood spacer high enough to ensure swing clearance. If a spacer is used, the rough opening height must be adjusted accordingly. NEW CONSTRUCTION ROUGH OPENING DIMENSIONS - SWING IN UNITS DOOR SIZE 2 6 2 8 3 0 3 6 Double Door 5 0 Double Door 5 4 Double Door 6 0 Sidelite Only OPENING TYPE WOOD FRAME UNIT 1 DOOR WITH 14 SIDELITE 1 WIDTH 6 8 HT. 8 0 HT. SINGLE DOUBLE 2 8-1/4 3 11-3/4 5 3-1/4 2 10 4 1-1/2 5 5 2 10-1/4 3 0 3 2-1/4 3 4 3 8-1/4 3 10 5 2-3/4 5 4-1/2 5 6-3/4 5 8-1/2 6 2-3/4 6 4-1/2 Work safely with tools, wear safety glasses 4 1-3/4 4 3-1/2 4 5-3/4 4 7-1/2 4 11-3/4 5 1-1/2 6 6-1/4 6 8 6 10-1/4 7 0 7 6-1/4 7 8 1 4-1/4 1 6 5 5-1/4 5 7 5 9-1/4 5 11 6 3-1/4 6 5 7 9-3/4 7 11-1/2 8 1-3/4 8 3-1/2 8 9-3/4 8 11-1/2 1. For 12 sidelites remove 2 for each sidelite. NEW CONSTRUCTION ROUGH OPENING DIMENSIONS - SWING OUT UNITS WITH A BUMPER SILL Swing out rough opening dimensions are identical to those above, except that the 6 8 & 8 0 heights which are each reduced by 7 /8. TABLE 1 ABOUT YOUR DOOR FIGURE 1 Head mold Hinge Jamb Hinge Hinge mold Head Jamb Latch Jamb Door Slab Latch mold STEP 1: FIGURE 2 PREPARATION OF ROUGH OPENING Square Level Determine rough opening size from Table 1. Make sure that opening is the proper size, and is plumb, square, and level before installing door. The three sides of the opening must be in the same plane (not twisted) to assure proper operation (Figure 2). NOTE: If you require a 20 minute smoke and draft rated opening, the gap between the door frame and rough opening must not exceed 1 /8 on the top and sides. Sweep Threshold/Sill Skid Plate (Plastic) or Skid Board (Wood or Cardboard Threshold must be on a flat level solid surface.

STEP 2: Skid Plate (Plastic) on Bottom of Door or Skid Board (Wood or Cardboard) on Bottom of Door Remove all packaging material from door except pre-hanging clips (part keeping the door closed). The door is fully assembled and may have a skid board attached under the threshold. Remove the skid board or other packaging material (Figure 5). DO NOT REMOVE Pre-hanging clips (part keeping the door closed) until instructed to do so. Pre-Hanging Clip PREPARATION OF DOOR SYSTEM FOR INSTALLATION A Door system without the threshold attached requires assembly before installation. Refer to the final assembly instructions included with your threshold. FIGURE 3 ing Procedures: Aluminum Threshold DO NOT REMOVE THE PRE-HANGING CLIPS UNTIL INSTRUCTED TO DO SO. THESE CLIPS HOLD THE DOOR SYSTEM ALIGNED AND CLOSED DURING INSTALLATION. DO NOT ATTEMPT TO REMOVE THE PLASTIC SKID PLATE FROM THE BOTTOM OF THE DOOR SILL. FIGURE 5 Pre-Hanging Clip Skid Board ing Procedures Just before you set the door in place, put a generous bead of caulk along the outside edge of the floor (Figure 6A) caulk the outside two legs of the threshold (Figure 6B). FIGURE 6A FIGURE 4 FIGURE 4A FIGURE 6B On aluminum thresholds, put a generous bead of caulk at the outside edge of the subfloor (Fig. 4) or, with the door system at the outside base of the opening, caulk the skid plate (Fig. 4A). For construction where the subfloor doesn't end, the caulk bead should be positioned 1/2" in from the edge of the outer wall surface. IMPORTANT: When installing a door with sidelites on concrete, construction adhesive should be used under the jambs at the edges of the active door to firmly anchor it. Make sure the door system is correctly positioned and operates properly before the adhesive cures. Once the adhesive hardens, it will be impossible to adjust the position of the threshold without breaking the bond. STEP 3: SETTING THE DOOR SYSTEM STEP 4: TEMPORARILY SECURE HINGE JAMB CAUTION: USE PROPER LIFTING TECHNIQUES. DOOR UNIT IS HEAVY AND MAY REQUIRE TWO PEOPLE TO LIFT. 2 Place the bottom of he door unit in the center of the rough opening (Figure 7 (1). Tilt the door unit up and into position (Figure 7 (2). FIGURE 8 Plumb the hinge jamb, or sidelite jamb on the hinge side (only one jamb on a double door) and temporarily hold it in place with two #8 x 3 screws through the jamb approximately 2 below the top and center hinges (Figure 8). NOTE: For 8 0 door use two #8 x 3 screws through the jamb approximately 2 below the top and lower-middle hinges (Figure 8). FIGURE 9 Shim FIGURE 9A 1/8 Maximum Allowable Gap (Fire Rated Doors) FIGURE 7 1 FIGURE 9B Shim Go inside through another entry and shim the unit in place using pairs of tapered shims (Figure 9, 9A, and 9B). Place shims directly behind all three hinges ( 4 hinges on a 8 0 door) on the hinge jamb. Check for uniform gap between frame and rough opening. Go outside and install #8 x 3 screws through the jams at the shim locations It is critical that the complete assembly be plumb, square and not twisted to operate properly.

STEP 5 ALIGN THE DOOR SYSTEM Plumb and square the latch jamb. Shim between the jamb and rough (3 locations between latch and deadbolt, and opposite hinges) opening to assure proper alignment. Verify that the latch jamb is plumb and square. Temporarily secure the latch jamb with three #8 x 3 drywall screws at shim locations. IMPORTANT: Do not shim the head jamb of a single door system. On door systems with sidelites, shim in the area above the joint between the door unit and the sidelite unit and secure this area with additional drywall screws. NOTE: The gap between the door frame and rough opening must not exceed 1/8 for 20 minute smoke and draft rated openings. Gaps exceeding 1/8 must be solidly shimmed (Figure 9A). STEP 6 ADJUST THE LATCH JAMB Remove the pre-hanging clips keeping the door closed. Make sure that the door has not shifted and the clearances around the door are equal along the entire length and width of the door slab. Examine the weatherstrip system along the latch side of the door to see if it is in equal or uniform contact with the slab from the top to the bottom (Figures 10 & 10A). If it is not, remove one or both of the screws and adjust the latch jamb plumb until uniform contact is made. In the case of doors with sidelites, the entire latch jamb sidelite should be adjusted. On double doors, adjust the hinge jamb of the inactive door to assure proper weatherstrip contact at the astragal. Re-secure the adjusted jamb after proper weatherstrip contact is achieved. NOTE: For 20 minute smoke and draft rated openings, a pair of #8 x 3 drywall screws must be used every 16 inches on center on both latch and hinge jambs. FIGURE 10 Correct Incorrect FIGURE 1OA Gaps at top or bottom STEP 7 ADJUST THE HINGE JAMB #9 x 2 1 /4 FIGURE 12 Four #9 x 2-1/4 wood screws are provided with single doors and eight are provided with double doors. Two of these screws are to be installed on the jamb leaf of the top hinge in the holes closest to the weatherstrip (Figure 12). One each of these screws should be installed on the remaining hinges in the top hole closest to the weatherstrip. Drill a 1/8 pilot hole in the security screw locations before installing the screws. After the screws are installed, open and close the door to re-check clearances. If the clearances are not uniform, adjust these screws and shims to achieve proper clearances. NOTE: (8 door) has six #9 x 2-1/4 wood screws which are provided with single doors, and twelve are provided with double doors. Two of these screws are to be installed on the jamb leaf of the lower-middle hinge in the holes closest to the weatherstrip (Figure 12A). Remove the 2 temporary screws on the hinge jamb from step 4 (2 from top and bottom of door). FIGURE 12A STEP 8 ADDITIONAL FASTENING FOR DOUBLE DOORS AND DOOR SYSTEMS WITH SIDELITES FIGURE 13 FIGURE 14 When a door system with sidelites is installed on a wood floor, the jambs where the sidelite and door meet must be secured to the floor. Drill and countersink two guide holes through the inside of the jambs into the floor at the locations shown (Figure 14). Install two #8 x 3 drywall screws per sidelite. Assembly is now complete. Trim the interior as desired. Install two #8 x 3 drywall screws along the head jamb of double door systems for additional reinforcement as shown (Figure 13). Do not shim the head jamb.

STEP 9 CAULK THE DOOR IMPORTANT: around entire frame on exterior wall (where brickmold meets wall) at intersection of jamb and threshold, and along exterior nose of threshold (Figure 15). FIGURE 15 STEP 10 FINISHING INSTRUCTIONS All Stanley Doors come with a paint ready surface. Further prime painting is not recommended. Prior to painting an exterior grade putty, or paintable caulk, must be used to cover all nail and screw holes in the frame. These fillers must be dry before the painting process can start. Before applying a paint finish, lightly scuff sand the entire steel door panel with 220 grit sandpaper,. (Figure 16) DO NOT SAND FIBERGLASS DOORS! wipe the door and jamb surfaces with mineral spirits to remove any oil, dust or debris. (Figure 17). Followed by a water and detergent solution to remove any residue. Finish painting outside of your door and jambs with high quality exterior oil or latex based house paint and the inside with a high quality interior or exterior latex paint. The complete door surface, including decorative trim, jamb and door edges must be painted. TIP: To yield a smoother finish remove the door from the hinges and place door in a horizontal position, such as on top of sawhorses or clean bench top (Figure 18). Paint one side and let dry, flip door and paint the other side. To remove in swing doors use a center punch and a hammer to tap the bottom of the hinge pins to remove (Figure 19). On outswing doors remove the screws from the hinges of the door. NOTE: While most paints are dry to the touch within a couple of hours, they may not be fully cured and hardened for up to 2 weeks. Please see paint manufacturer s instructions for more information. See the WOOD GRAIN FINISHING INSTRUCTIONS pamphlet for fiberglass staining instructions. IMPORTANT: ALWAYS PAINT IN A WELL-VENTILATED AREA. BE SURE TO COVER WORK AREA WITH A DROP CLOTH. FOLLOW ALL WARNINGS AND INSTRUCTIONS FROM THE PAINT MANUFAC- TURER. WARNING: DARK COLOR DOORS, AND DOORS WITH ATTACHED STORM DOORS, WILL BECOME VERY HOT TO THE TOUCH IN DIRECT SUNLIGHT. Do not paint weatherstrip and do not close the door until the paint is dry (see paint manufacturer s specifications on minimum drying time). Painting the jamb, header and brick mold within 45 days of installation, and the door slab within the time specified (see Table 2) after installation, will greatly increase the performance of the door system, and is required to maintain product warranty. Depending on region, repainting every 1 to 7 years will be required. FINISHING REQUIREMENTS Product Line Wood Frame & Trim - All Utility/basic & Builder Series Door Slab and lite frame Sta-Tru Plus Door slab and lite frame Smooth Fiberglass Door Slab Woodgrain Fiberglass Door Slab Pre-finished Door Slab Must be painted by* 45 days 45 Days 1 Year 45 Days 45 Days 2 Years * Pre-finished Door Slab only needs finish preparation and re-coating with a UV resistant, exterior grade, clear varnish or polyurethane (i.e. marine spar varnish). TABLE 2 FIGURE 16 FIGURE 17 FIGURE 18 FIGURE 19

STEP 11 SILL ADJUSTMENT (ADJUSTABLE RAIL THRESHOLD ONLY) FIGURE 20 1. 2. 3. 4. 5. 1. Hinge Jamb 2. Hinge Pad 3. Rail 4. Threshold 5. Adjusting Screws 6. Latch Seal 7. Lock Jamb 8. Sweep Once your Stanley Door has been properly installed, it is very important to test its threshold for an adequate seal and proper adjustment. The threshold is factory adjusted to 1 1/4. This is the optimum threshold height under most conditions. The sweep of your Stanley Door should not be excessively compressed. A compression of 1/16 will be adequate. 8. 7. 6. Steps to test threshold seal of FIGURE 21 your Stanley Door. 1. Close door on a piece of paper placed over the threshold. (Figure 21) 2. Pull paper between the sweep of the door and the threshold. 3. If the threshold is properly adjusted, you should feel some tension, but if the paper tears, the door s seal is too tight. If there is no tension on the paper, the door s seal is too loose. To properly adjust the threshold seal if it is too tight. 1. Adjust rail by tightening all screws (turn clockwise 1/2 turn. 2. Repeat seal test. If paper does not slide beneath door with a feeling of tension, repeat Step 2. Re-test seal. 3. Continue testing threshold until it is properly adjusted. To properly adjust the threshold seal if it is too loose. (WARNING: Do not increase height by more the 1/4 ) 1. Adjust rail by loosening all screws (turn counter-clockwise) 1/2 turn. 2. Repeat seal test. If paper does not slide beneath door with a feeling of tension, repeat Step 2. Re-test seal. 3. Continue testing threshold until it is properly adjusted. STEP 12 INSTALL FOAM PADS 1. Add a bead of caulk at both ends of rail where the rail meets the jambs. 2. On door lock-side of rail, affix beige latch seal vertically to jamb on top of caulk where jamb and rail meet. Push seal into caulk.(figure 20) 3. On door-hinge side of rail, affix hinge pad (black pad) horizontally to jamb on top of caulk where jamb and rail meet. Push seal into caulk.figure 20) NOTE: For Double Doors: Test the seal for the active and inactive doors. Adjust the threshold seal if necessary by following the instructions above. Once threshold seal is properly adjusted. affix beige latch seal vertically so bottom of seal is resting where rail and astragal (the center jamb between both doors) meet. Remember to replace both hinge pads. STEP 13 INSTALL LATCH AND/OR DEADBOLT HARDWARE See hardware manufactures instructions for installation details. NOTE: Included with the door are two (2) latch/deadbolt adapters (Figure 22). These trim parts are used on the door slab behind the latch and/or deadbolt to give the door edge a more finished appearance. FIGURE 22

Entry Door Basic Door Builder Series Door Sta-Tru Plus Door Fiberglass Door LIMITED WARRANTY Duration 5 years 10 years Lifetime Lifetime Stanley Doors ("Stanley") warrants its entry doors to be free of deficiencies in materials and workmanship to the original purchaser. This LIMITED WARRANTY is applicable only to doors installed in single family, owner occupied dwellings and its duration is specified in the WARRANTY DURATION TABLE above. The product price is consideration for this LIMITED WARRANTY. This LIMITED WARRANTY is subject to the exceptions, exclusions, disclaimers, and limitations described below and is in lieu of all other warranties, including the implied warranty of merchantability. This LIMITED WARRANTY gives the purchaser specific legal rights. You may have other rights which vary by state. Exceptions to LIMITED WARRANTY: Doors installed in non-owner occupied dwellings (e.g. apartments, duplexes, etc.) are warranted up to 10 years from the date of purchase or from the date of manufacture. The only exception is Basic Doors which are warranted up to 5 years from the date of purchase or from "the date of manufacture." (date of manufacture establishes effective date of LIMITED WARRANTY if there is no documentation). Decorative glass and wood component parts, manufactured by Stanley, are warranted to be free from deficiencies in materials and workmanship up to 10 years from the date of purchase or manufacture. The only exception is Basic Doors which are warranted up to 5 years from the date of purchase or manufacture. Doors installed within 5 miles from any body of saltwater are warranted up to 10 years from the date of purchase or manufacture. The only exception is Basic Doors which are warranted up to 5 years from the purchase or manufacture. Doors assembled with components supplied by manufacturers other than Stanley are not covered by this LIMITED WARRANTY. Stanley reserves the right to discontinue or modify any of its products, including the color, door style and/or glass design, without notice. Stanley may substitute products or components of comparable quality or price for discontinued or modified products. Events LIMITED WARRANTY does not cover: Condensation on the interior surface of the door or glass. Incidental or consequential damages and/or expenses. Some states do not allow the exclusion or limitation of incidental or consequential damages, so this specific limitation or exclusion may not apply to you. Finishing not complete before the following deadlines after installation: 45 days for wood frame and trim, 45 days for Basic/Builder/Woodgrain Fiberglass/ Smooth Fiberglass, 1 year for Sta-Tru Plus Doors, and 2 years for Pre-Finished Fiberglass Doors. Any deficiencies that result from: - installation not in strict adherence with Stanley's written instructions; - maintenance not in strict adherence with Stanley's written instructions; - improper handling and storage; - modification or alteration of the door system by anyone who is not a authorized Stanley representative; - vandalism, misuse, neglect, impact by foreign objects, acts of god, fire, explosion or other casualty; - air pollutants, including acid rain, and exposure to harmful chemicals or normal weathering caused by exposure to the elements; - minor air and water infiltration in severe weather conditions; - any failure of the structure/building/foundation in to which the door is installed; - any other causes beyond Stanley's control and not related to the manufacturing process. LIMITED WARRANTY exclusive remedies: During the applicable LIMITED WARRANTY period, Stanley will REPLACE, REPAIR, OR REFUND the amount paid for any door determined by an authorized Stanley representative or authorized Stanley distributor to be deficient in material and workmanship. These remedies do not include labor charges or other expenses in connection with repair, removal, or installation of either the original or a replacement product. Such labor and/or expenses are the responsibility of the customer. If a Stanley representative determines replacement is required, the terms of this LIMITED WARRANTY may be prorated depending upon purchase dates. Basic and Builder Series Doors are not prorated. Sta-Tru Plus and Fiberglass Doors are prorated in the following manner: from 10 years or less from the date of purchase, no prorating is applicable; from 11-20 years, it's prorated at 50%; and from 21 years on up, it's prorated at 25%. In lieu of replacement or repair, Stanley reserves the right to refund the amount paid by the original purchaser of the door, not including labor and/or additional expenses. Stanley will not be responsible for any repair or replacement costs in excess of the cost of the replacement door. All costs incurred for repair or replacement must be previously authorized in writing by Stanley. Claim Procedure: Return your completed WARRANTY registration card within 30 days from date of purchase to establish the effective date of this LIMITED WARRANTY. To make a claim, promptly notify Stanley in writing of the claimed deficiency. If the claimant has not previously submitted the WARRANTY registration card, proof of purchase and installation must accompany the claim. Written claims must be submitted to Stanley Door Systems, Warranty Department, 7300 Reames Rd., Charlotte, NC 28216. Questions: Please direct questions about this LIMITED WARRANTY to: 1-800-521-2752. 2002 The Stanley Works New Britian CT. 06053 http://www.stanleyworks.com Part #00824 Rev. 06/02