RUNOFF REDUCTION VOLUME, WATER QUALITY VOLUME AND STREAM CHANNEL PROTECTION SIZING CALCULATIONS



Similar documents
APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Post Construction Stormwater Management Checklist Program

Basic Hydrology. Time of Concentration Methodology

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

STORMWATER MANAGEMENT CHECKLIST

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

URBAN DRAINAGE CRITERIA

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

CITY UTILITIES DESIGN STANDARDS MANUAL

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Computing Stormwater Runoff Rates and Volumes

CHAPTER 3 STORM DRAINAGE SYSTEMS

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Storm Drainage Systems

ARTICLE II STORM DRAINAGE. (From Ordinance No ; August 4, 1987; Sections III through VIII)

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

H. Khalid Jamil 9367 Verain Street San Diego, CA, (858)

SECTION INLETS INLET LOCATIONS

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

Riprap-lined Swale (RS)

Permeable Pavement Treatment Capacity

Design Templates Stormwater Calculation Summary

STORM DRAINS CHAPTER 7

SUSTAINABLE URBAN DRAINAGE SYSTEMS

CHAPTER 2 HYDRAULICS OF SEWERS

SECTION 5: SANITARY SEWER SYSTEM DESIGN

Stormwater Management Functional Servicing Report

Drainage Analysis for the McKownville Area

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

Stormwater/Wetland Pond Construction Inspection Checklist

Burnsville Stormwater Retrofit Study

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

Implementing Green Infrastructure in Atlanta

Outlet stabilization structure

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing.

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE

Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Functional Servicing and Storm Water Management Report. Project Location: 258 Sunview Street Waterloo, Ontario

Permeable Interlocking Concrete Pavements

SECTION STORM DRAINAGE TABLE OF CONTENTS

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

CHAPTER 5. Storm Sewer

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS

TARP Section 2.2 Stormwater BMP Screening for Validation

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

ADS Water Quality Units

What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)

GRAND COUNTY STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA MANUAL. OFFICIALLY ADOPTED: August 1 st, 2006

Planning, Health and Environment Division

Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006

Emergency Spillways (Sediment basins)

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

City of Shelbyville Site Inspection Checklist

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

Underground Injection Control Storm Water Information

A plan for conversion of stormwater to groundwater recharge on the Utah Valley University main campus, Orem, Utah

BMP 6.4.6: Dry Well / Seepage Pit

BMP #: Dry Wells / French Drains

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

CHAPTER 7 STORM WATER DESIGN

MODULE 2 RULES RELATING RULES RELA

Ruissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage

STORM DRAINAGE GENERAL INFORMATION Drainage Systems VDOT Requirements Metric Plan Preparation...

City of West Linn Public Works Design Standards Table of Contents

Costs for Green Infrastructure and Stormwater Retention Practices

Project Manager. Geoff Masotti, P.Eng. T Ext. 254 T

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

SANITARY SEWER SPECIFICATIONS

CHAPTER 4 STORM DRAINAGE SYSTEMS

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal

Site Development Information Worksheet for single family residential development

STORM DRAINAGE DESIGN CRITERIA. City of Sheridan, Wyoming

SECTION 5 DRAFTING STANDARDS

National Pollutant Removal Performance Database

CHAPTER 5 HYDROLOGIC ANALYSIS AND DESIGN

A n. P w Figure 1: Schematic of the hydraulic radius

Permeable Interlocking Concrete Pavements. The Stormwater Problem

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Costs for Green Infrastructure and Stormwater Controls

Transcription:

RUNOFF REDUCTION VOLUME, WATER QUALITY VOLUME AND STREAM CHANNEL PROTECTION SIZING CALCULATIONS UWMS 130 PINES BRIDGE ROAD TOWN OF NEW CASTLE WESTCHESTER COUNTY, NY JMC Project: 5043 Drawing Reference: DA-1, DA-2 Computed by: Checked by: SS DV Date Printed: 4/17/2012

Water Quality Volume (WQ v ) & Water Quality Peak Flow (Q p ) NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION JMC Project No: 5043 Unified Stormwater Sizing Criteria (See section 4.1,8.1b) Computed By: SS Project: UWMS MASJID & ISLAMIC CENTER Checked BY: DV Location: 130 PINES BRIDGE ROAD NEW CASTLE, NY Sheet: 1of 1 Date: 12/23/08 Dwg, Ref: DA-2 Revision Date: 04/16/12 D E S I G N P A R A M E T E R S FORM SYMBOL UNITS PDA-1A PDA-1B PDA-1C PDA-2A PDA-2B TOTAL DEVELOPED AREA MAST.tab A acres 4.71 0.86 0.35 1.893 0.51 EXISTING IMPERVIOUS AREA (only alternative practice) MAST.tab I E acres 0.40 0.00 0.00 0.00 0.38 PROPOSED IMPERVIOUS AREA MAST.tab I P acres 0.10 0.67 0.35 0.26 0.00 90% RAINFALL EVENT NUMBER (See Figure 4.1) MAST.tab P inches 1.30 1.30 1.30 1.30 1.30 PRO-TIME OF CONCENTRATION (Use TR-55 equations) MAST.tab T c hours 0.27 0.08 0.08 0.20 0.22 WQv STANDARD PRACTICE (only alternative practice) SP % 0% 0% 0% 0% 0% D E S I G N C A L C U L A T I O N S WATER QUALITY VOLUME CALCULATION (Section 4.1) PRACTICE NAME SEE ABOVE OTHER GROUP INFIL. BASIN INFIL. BASIN WET SWALE OTHER GROUP SMP SELECTION MATRICES (See above table) SEE ABOVE O-G I-2 I-2 O-2 O-G PERCENTAGE PERMANENT POOL SEE ABOVE PPP % 0% 0% 0% 0% 0% PERCENTAGE FOREBAY PRETREATMENT POOL SEE ABOVE PFP % 0% 25% ROOF 10% 0% TOTAL WATER QUALITY VOLUME WQ v =3630*P(0.05*A+0.9*I) WQ v acres-ft 0.035 0.070 0.036 0.036 0.003 TOTAL WATER QUALITY VOLUME WQ v =3630*P(0.05*A+0.9*I) WQ v cu. ft. 1,536 3,065 1,578 1,564 121 TOTAL WQv VOLUME PROVIDED EXDT.tab WQ v cu. ft. N/R 6,747 4,290 N/R PERMANENT POOL REQUIRED Vpool=WQv*PPP V pool cu. ft. 0 0 0 PERMANENT POOL VOLUME PROVIDED PV.tab V pool cu. ft. 0 0 3,273 FOREBAY PRETREATMENT REQUIRED Vpret=WQv*PFP V pret cu. ft. 766 0 156 FOREBAY PRETREATMENT PROVIDED PV.tab V pret cu. ft. 4,114 0 171 WATER QUALITY PEAK FLOW CALCULATION (Appendix B.2) RUNOFF VOLUME IN INCHES Q=WQ v /(A*3630) Q inches 0.98 1.24 0.23 CN=1000/(10+5*P+10*Q-10(Q 2 +1.25*Q*P) ½ ) CN 96.90 99.44 81.41 CN ROUNDED CN 97 99 81 CN < or = 98 CN 97 98 81 INITIAL ABSTRACTION I a =200/CN-2 I a inches 0.06 0.04 0.47 RATIO R=I a /P R 0.05 0.03 0.36 C 0 = A*R 2 +B*R +C C 0 2.47 2.47 2.35 C 1 = A*R 2 +B*R +C C 1-0.49-0.48-0.49 C 2 = A*R 2 +B*R +C C 2-0.18-0.19-0.12 UNIT PEAK DIS. qu=10^(c 0 +C 1 *Log(T c )+C 2 *(log(t c )) 2 ) q u cfs/mi 2 /in 616.02 591.53 423.73 WATER QUALITY PEAK FLOW Q p =qu*a*q/640 Q p cfs 0.81 0.40 0.29 ALTERNATIVE PRACTICE FOR PRETREATMENT (Chapter 9) WATER QUALITY PEAK TREATMENT FLOW PROVIDED Q p P cfs 1.10 N/R N/A WQ VOLUME PROVIDED WQp=640*3600*Q P P/qu WQ P cu. ft. 4,114 COMPANY CDS MODEL PRODUCT CDS2020 QUANTITY 1 APPROX. SIZE L' x W' or DIAMETER ft. 6

RUNOFF REDUCTION VOLUME WORKSHEET JMC Project: 5043 Design Points: 1 & 2 UWMS Drainage Areas: 1B, 1C & 2A Total Water Quality Treatment Volume Initial Water Quality Volume WQ V 6,207 Adjusted Water Quality Volume WQ V 6,207 Minimum Runoff Reduction Volume Design Storm [90% Rainfall Event Number] or [1-yr Storm Depth] P 1.3 In Total Area of new Impervious Cover Aic 1.29 Ac Hydrologic Soil Group (HSG) Specific Reduction Factor S 0.33 Runoff Volume [0.05 + 0.009 x %I] R V 0.95 Impervious Cover targeted for Runoff Reduction [S x Aic] Ai 0.43 Ac TOTAL VOLUME Required [ = (P x R V x Ai) / 12] 1,908 Runoff Reduction Techniques (Volume) GREEN INFRASTRUCTURE PRACTICE / SMP SYMBOL VALUE UNITS Infiltration Basin #1B 11,466 Vegetated Swale #2A-1 137 Vegetated Swale #2A-2 184 TOTAL 11,787 Runoff Reduction Is Total > Adjusted WQ V? Is Total > Minimum? YES YES Date Printed: 4/17/2012

VEGETATED SWALE WORKSHEET Vegetated Swale #2A-1 JMC Project: 5043 Design Point: 2 Drainage Area: 2A-1 Site Data for Drainage Area to be Treated by Practice Design Storm [90% Rainfall Event Number] P 1.3 In Impervious Area I 0.20 Ac Area A 0.37 Ac Percent Impervious %I 52.66 % Runoff Volume [0.05 + 0.009 x %I] R V 0.52 TOTAL VOLUME Required [WQ V = (P x R V x A) / 12] WQ V 916 Design Storm [1-yr Storm Depth] P In TOTAL VOLUME Required (TMDL) [WQ V = 1-yr Storm Runoff] WQ V Design Parameters Water Quality Volume WQ V 916 Water Quality Flow Rate Q WQ 0.27 S 10 Year Storm Flow Rate Q 10 1.32 S Channel Design Given/Assumed Information Channel Longitudinal Slope S 4.00 % Channel Bottom Width W 4.00 Ft Channel Depth D 1.25 Ft Channel Side Slope (Hori./Verti.) z 3 Determine WQv Flow Depth & Velocity WQv Flow Depth Q WQ h 0.17 Ft Manning's Coefficeint (varying with flow depth see fig L.1) n 0.15 Water Quality Flow Rate in Channel Q 0.42 S Velocity of Q V=Q/(D*(z*D+W) V 0.04 FPS Determine Channel Length WQv Minimum Detention Time t 5 min. Length of Swale Required L=v*t*60 l 13 Ft Length of Swale Provided L 200 Ft Determine Q 10 Flow Depth & Velocity Peak Discharge Q 10 (TR-55 10 year storm) Q 10 1.32 S Peak Discharge Q 10 Depth Q 10 h 0.32 Ft Q 10 Free Board Provided f 0.93 Ft Minimum Depth of Swale Required h 0.82 Ft Total Depth of Swale Provided H 1.25 Ft Velocity of Q 10 V 10 =Q 10 /(Q 10 h*(z*q 10 h+w) V 10 0.82 FPS Runoff Reduction 20% Runoff Reduction of Required WQv in HSG A and B 183 10% Runoff Reduction of Required WQv in HSG C and D 92 15% Runoff Reduction of Required WQv in HSG C Modified* 137 12% Runoff Reduction of Required WQv in HSG D Modified* 110 *Modifications must be in accordance with Soil Restoration Standards Date Printed: 4/17/2012

VEGETATED SWALE WORKSHEET Vegetated Swale #2A-2 JMC Project: 5043 Design Point: 2 Drainage Area: 2A-2 Site Data for Drainage Area to be Treated by Practice Design Storm [90% Rainfall Event Number] P 1.3 In Impervious Area I 0.18 Ac Area A 0.63 Ac Percent Impervious %I 28.68 % Runoff Volume [0.05 + 0.009 x %I] R V 0.31 TOTAL VOLUME Required [WQ V = (P x R V x A) / 12] WQ V 919 Design Storm [1-yr Storm Depth] P In TOTAL VOLUME Required (TMDL) [WQ V = 1-yr Storm Runoff] WQ V Design Parameters Water Quality Volume WQ V 919 Water Quality Flow Rate Q WQ 0.21 S 10 Year Storm Flow Rate Q 10 0.91 S Channel Design Given/Assumed Information Channel Longitudinal Slope S 3.50 % Channel Bottom Width W 4.00 Ft Channel Depth D 1.25 Ft Channel Side Slope (Hori./Verti.) z 3 Determine WQv Flow Depth & Velocity WQv Flow Depth Q WQ h 0.17 Ft Manning's Coefficeint (varying with flow depth see fig L.1) n 0.15 Water Quality Flow Rate in Channel Q 0.39 S Velocity of Q V=Q/(D*(z*D+W) V 0.04 FPS Determine Channel Length WQv Minimum Detention Time t 5 min. Length of Swale Required L=v*t*60 l 12 Ft Length of Swale Provided L 110 Ft Determine Q 10 Flow Depth & Velocity Peak Discharge Q 10 (TR-55 10 year storm) Q 10 0.91 S Peak Discharge Q 10 Depth Q 10 h 0.27 Ft Q 10 Free Board Provided f 0.98 Ft Minimum Depth of Swale Required h 0.77 Ft Total Depth of Swale Provided H 1.25 Ft Velocity of Q 10 V 10 =Q 10 /(Q 10 h*(z*q 10 h+w) V 10 0.69 FPS Runoff Reduction 20% Runoff Reduction of Required WQv in HSG A and B 184 10% Runoff Reduction of Required WQv in HSG C and D 92 15% Runoff Reduction of Required WQv in HSG C Modified* 138 12% Runoff Reduction of Required WQv in HSG D Modified* 110 *Modifications must be in accordance with Soil Restoration Standards Date Printed: 4/17/2012

INFILTRATION WORKSHEET Site Data for Drainage Area to be Treated by Practice JMC Project: 5043 Design Point: 1 Infiltration Basin #1B Drainage Areas: 1B &1C Design Storm [90% Rainfall Event Number] P 1.3 In Impervious Area I 1.03 Ac Area A 1.21 Ac Percent Impervious %I 84.65 % Runoff Volume [0.05 + 0.009 x %I] R V 0.81 TOTAL VOLUME Required [WQ V = (P x R V x A) / 12] WQ V 4,643 Design Storm [1-yr Storm Depth] P In TOTAL VOLUME Required (TMDL) [WQ V = 1-yr Storm Runoff] WQ V Water Quality Volume Provided 2 Year Storm Entering System from PDA-1B & PDA-1C Q 2 IN 12,740 2 Year Storm Exiting System Q 2 OUT 0 Runoff Volume Infiltrated 12,740 Runoff Reduction 90% of WQ V Infiltrated 11,466 Date Printed: 4/17/2012

Water Quality Volume (WQ v ) & Water Quality Peak Flow (Q p ) for Vegetated Swale Calculations NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Unified Stormwater Sizing Criteria (See section 4.1) RAINFALL DISTRIBUTION TYPE III (R=I a /P) C i =A*R 2 +B*R+C A B C Coefficients for the equation unit peak C 0-1.774 0.3301 2.4577 " Coefficients for the equation unit peak C 1 1.8622-0.7397-0.4627 Coefficients for the equation unit peak C 2-0.0648 0.2276-0.1932 D E S I G N P A R A M E T E R S SYMBOL UNITS PDA-2A-1 PDA-2A-2 TOTAL DRAINAGE AREA A acres 0.37 0.63 EXISTING IMPERVIOUS AREA (only alternative practice) I E acres 0.00 0.00 PROPOSED IMPERVIOUS AREA I P acres 0.20 0.18 90% RAINFALL EVENT NUMBER (See Figure 4.1) P inches 1.30 1.30 PRO-TIME OF CONCENTRATION (Use TR-55 equations) T c hours 0.08 0.24 D E S I G N C A L C U L A T I O N S WATER QUALITY VOLUME CALCULATION (Section 4.1) TOTAL WATER QUALITY VOLUME WQ v =3630*P(0.05*A+0.9*I) WQ v cu. ft. 915 918 WATER QUALITY PEAK FLOW CALCULATION (Appendix B.2) RUNOFF VOLUME IN INCHES Q=WQ v /(A*3630) Q inches 0.68 0.40 CN=1000/(10+5*P+10*Q-10(Q 2 +1.25*Q*P) ½ ) CN 92.79 86.96 CN ROUNDED CN 93 87 CN < or = 98 CN 93 87 INITIAL ABSTRACTION I a =200/CN-2 I a inches 0.15 0.30 RATIO R=I a /P R 0.12 0.23 C 0 = A*R 2 +B*R +C C 0 2.47 2.44 C 1 = A*R 2 +B*R +C C 1-0.52-0.53 C 2 = A*R 2 +B*R +C C 2-0.17-0.14 UNIT PEAK DIS. qu=10^(c 0 +C 1 *Log(T c )+C 2 *(log(t c )) 2 ) q u cfs/mi 2 /in 694.45 520.18 WATER QUALITY PEAK FLOW Q p =qu*a*q/640 Q p cfs 0.27 0.21

Type... Master Network Summary Page 2.01 Name... Watershed File... S:\2005\5043\PONDPACK\2012-04-16_SS\5043-PDA-VEGETATED SWALES.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Westchester Coun Total Depth Rainfall Return Event in Type RNF ID ------------ ------ ---------------- ---------------- 10 5.0000 Synthetic Curve TypeIII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft ----------------- ---- ------ ---------- -- --------- -------- -------- ------------ PDA-2A-1 AREA 10 4790 12.1000 1.32 PDA-2A-2 AREA 10 3884 12.2000.91 *WET SWALE JCT 10 8675 12.1000 2.14 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 9:40 AM 4/18/2012

STREAM CHANNEL PROTECTION VOLUME Cp v NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Unified Stormwater Sizing Criteria (See Section 4.4 & Appendix B.2) RAINFALL DISTRIBUTION TYPE III (R=I a /P) C i =A*R 2 +B*R+C A B C Coefficients for the equation unit peak C 0-1.774 0.3301 2.4577 Coefficients for the equation unit peak C 1 1.8622-0.7397-0.4627 Coefficients for the equation unit peak C 2-0.0648 0.2276-0.1932 D E S I G N P A R A M E T E R S SYMBOL UNITS PDA-1B & 1C PDA-2A TOTAL DEVELOPED AREA A acres 1.21 1.89 RAINFALL EVENT (1-year recurrence, 24-hr. duration) P 1 inches 2.80 2.80 RUNOFF CURVE NUMBER (proposed) CN 94.00 70.00 TIME OF CONCENTRATION (Use TR-55 equations) T c hours 0.08 0.24 D E S I G N C A L C U L A T I O N S CHANNEL PROTECTION VOLUME, (Cp v ) ((see Section 4.4 and Appendix B) INITIAL ABSTRACTION I a =(200/CN)-2 I a inches 0.128 0.857 RATIO R=I a /P 1 R 0.05 0.31 C 0 = A*R 2 +B*R +C C 0 2.47 2.39 C 1 = A*R 2 +B*R +C C 1-0.49-0.51 C 2 = A*R 2 +B*R +C C 2-0.18-0.13 UNIT PEAK DIS. q u =10^(C 0 +C 1 *Log(T c )+C 2 *(log(t c )) 2 ) q u cfs/mi 2 /in 613.11 459.48 RUNOFF (TR-55) Q=((P 1 -I a )^2)/(P 1 +4*I a ) Q inches 2.16 0.61 PEAK DISCHARGE Q p1 =q u *A*Q (TR-5 1 year storm) Q p1 cfs 2.50 0.82 RATIO of out/in flow (q o /q i )=14.121*q u^(-0.9703) (q o /q i ) 0.03 0.04 (V s /V r )=0.682-1.43*(q o /q i )+1.64*(qo/qi) 2-0.804*(qo/qi) 3 (V s /V r ) 0.64 0.63 HYG RUNOFF VOLUME V r =Q*A*3630 (TR-55 1year) V r cu. ft. 9,490 4,164 acres-ft 0.22 0.10 REQUIRED STORAGE VOLUME Vs=(Vs/Vr)*V r (Cpv) Vs cu. ft. 6,106 2,630 acres-ft 0.14 0.06 Provided Runoff Reduction Volume RRv 11,787 0 Net Channel Protection Volume Required 0 2,630 STORAGE VOLUME PROVIDED EXDT.tab (Cp v ) cu. ft. 0 2,902 AVERAGE RELEASE Q avg =V s /(24hr*3600sec) Q avg cfs 0.07 0.03 MAXIMUM RELEASE Q max =2*Q avg Q max cfs 0.14 0.06 *According to Section 4.4 of NYS Stormwater Management Design Manual, the CPv requirement does not apply if the reduction of the entire CPv is achieved through green infrastructure or infiltration systems. The infiltration system infiltrates enough runoff into the ground to meet the entire CPv requirement for the site, however the wet swale outlet control structure is also designed to provide CPv.

DESIGN OF OUTLET CONTROL STRUCTURE ORIFII FOR EXTENDED DETENTION OF WATER JMC Project No: 5043 QUALITY & STREAM CHANNEL PROTECTION VOLUMES Computed By: SS Checked BY: DV Project: UWMS Dwg, Ref: DA-1, DA-2 DESIGN PARAMETERS SYMBOL UNITS SUB AREA NAME PDA-2A DRAINAGE AREA A acres PRACTICE DESIGNATION O-2 PRACTICE NAME Wet Swale PERCENTAGE PERMANENT POOL REQUIRED PPR % 50% PERCENTAGE PERMANENT POOL PROVIDED PPP 100% PERCENTAGE FOREBAY PRETREATMENT POOL PFR % 10% PERCENTAGE FOREBAY PRETREATMENT POOL PROVIDED PFP 0% TOTAL WATER QUALITY VOLUME REQUIRED WQvr cu. ft. 1,564 PERMANENT POOL REQUIRED Vpool=WQv*PPP VR pool cu. ft. 782 PERMANENT POOL VOLUME PROVIDED VP pool cu. ft. 4,290 PRETREATMENT REQUIRED Vpret=WQv*PFP VR pret cu. ft. 156 PRETREATMENT PROVIDED BY VEGETATED SWALES VP pret cu. ft. 321 ELEVATION PERMANENT POOL (orifice inv. above permanent pool) E 1 (ft.) 578.62 Elev. Ext. Det. for rest of WQv (Use E-Q-V from PondPack at Volume WQVR) E 2 (ft.) 578.62 EXTENDED DETENTION ELEV. PROVIDED (rounded UP) E 2P (ft.) 578.62 DESIGN WATER QUALITY ORIFICE (See Section 8.2 Step 6.) VERIFY IF IS ENOUGH PERMANENT POOL PROVIDED OKAY VERIFY IF IS ENOUGH FOREBAY POOL PROVIDED OKAY EXTENDED DETENTION VOLUME REQUIRED EDvr=WQvr-VRpool-VRpret ED VR (cfs) 626 EXTENDED DETENTION VOLUME PROVIDED (to be) EDvp=WQvp-VPpool EDvp cu. ft. 0 AVERAGE DISCHARGE (to be release in 24 hr) Q 0 =ED VP /(24hr*3600sec) Q 0 (cfs) 0.00000 AVERAGE HEAD WATER QUALITY H 0 =(E 2 -E 1 )/2 H 0 (ft.) 0.00 ORIFICE DIAMETER CALCULATION D 0 =6.166*Q 0.5 0.25 0 /H 0 D 0 (in.) 0 ORIFICE DIAMETER ROUNDDOWN @ 1/8) D W (in.) 0 ORIFICE DIAMETER PROVIDED (suggested less than calculated) D W (in.) 1 3/8 AVERAGE HEAD PROVIDED H W =(Q 0 /(C*π*D 2 W /4)) 2 =(Q 0 /(0.02626*D 2 W )) 2 H W (ft.) 0.000000 EXTENDED DETENTION ORIFICE ELEV. PROVIDED E 2P =E 1 +Dw/(2*12)+2*Hw E 2P (ft.) 578.62 WATER QUALITY VOLUME PROVIDED WQ VP Use E-Q-V from PondPack at E 2P WQvp (cfs) 4,290 VERIFY IF ENOUGH WATER QUALITY IS PROVIDED OKAY DESIGN CHANNEL PROTECTION ORIFICE (See Section 8.2 Step 7.) CHANNEL PROTECTION VOLUME REQUIRED CP VR (cu. ft.) 2,630 PERMANENT POOL VOLUME PROVIDED VP pool (cu. ft.) 4,290 TOTAL CHANNEL PROTECTION VOLUME REQUIRED TCP VR =CP VR +VP pool TCP VR (cu. ft.) 6,920 ELEVATION PERMANENT POOL (orifice invert above permanent pool) see above E 1 (ft.) 578.62 EXTENDED DETENTION ELEV. PROVIDED (rounded,1) see above E 2P (ft.) 578.62 EXTENDED DETENTION C PV ELEVATION Use E-Q-V from PondPack at Volume CPv E 3 (ft.) 579.35 AVERAGE HEAD WATER QUALITY H 0 =(E 3 -E 1 )/2 H 0 (ft.) 0.37 AVERAGE HEAD CHANNEL PROTECTION H 1 =(E 3 -E 2P )/2 H 1 (ft.) 0.37 AVERAGE DISCHARGE (release rate in 24 hr) Q 0C =CP VR /(24hr*3600sec) Q 0C (cfs) 0.0304 AVERAGE DISCHARGE (calculated at WQ orifice ) Q W =0.02626*D 2 W *Hw 0.5 Q W (cfs) 0.00 DISCHARGE CHANNEL PROTECTION Q 1C =Q 0C -Q W Q 1C (cfs) 0.0304 ORIFICE DIAMETER CALCULATION D 1C =6.166*Q 0.5 0.25 1C /H 1 D 1C (in.) 1.384 ORIFICE DIAMETER ROUNDDOWN @ 1/8) D 1C (in.) 1 3/8 ORIFICE DIAMETER PROVIDED D CP (in.) 1 3/8 AVERAGE HEAD PROVIDED H W =(Q 1C /(C*π*D CP /4)) 2 =(Q 1C /(0.02626*D 2 CP )) 2 H CP (ft.) 0.38 EXTENDED DETENTION ELEV. PROVIDED E 2CP =E 2P +Dcp/(2*12)+2*Hcp E 2CP (ft.) 579.43 TOTAL CHANNEL PROTECTION VOLUME PROVIDED Use E-Q-V from PondPack at E 2CP CPvp (cu. ft.) 7,192 NET CHANNEL PROTECTION VOLUME PROVIDED CP V =CP VP -VPpool (cu. ft.) 2,902 VERIFY IF ENOUGH CHANNEL PROTECTION VOLUME IS PROVIDED OKAY

PROPRIETARY PRACTICE WORKSHEET Continuous Deflective Separation Unit JMC Project: 5043 Design Point: 1 Drainage Area: 1B Coefficients for the equation unit peak [R = I a / P] [C i = A x R 2 + B x R + C] Rainfall Distribution Type: III A B C C 0-1.774 0.3301 2.4577 C 1 1.8622-0.7397-0.4627 C 2-0.0648 0.2276-0.1932 Site Data for Drainage Area to be Treated by Practice DESCRIPTION Design Storm [90% Rainfall Event Number] Impervious Area Area Percent Impervious Runoff Volume [0.05 + 0.009 x %I] TOTAL VOLUME Required [WQ V = (P x R V x A) / 12] Pretreatment Required for Infiltration System is 50% WQ V SYMBOL VALUE UNITS P 1.3 In I 0.67 Ac A 0.86 Ac %I 78.10 % R V 0.75 WQ V 3,066 Pre WQ V 1,533 Water Quality Peak Flow Calculation DESCRIPTION Required Pretreatment Water Quality Volume Design Storm [90% Rainfall Event Number] or [1-yr Storm Depth] Time of Concentration Runoff Volume [Q = WQ V / (A x 3630)] Curve Number [CN = 1000 / (10 + 5P + 10Q - 10 x (Q 2 + 1.25 QP) ½ ] Curve Number Initial Abstraction [I a = 200 / CN - 2] Ratio [R = I a / P] C 0 = A x R 2 + B x R + C C 1 = A x R2 + B x R + C C 2 = A x R2 + B x R + C Unit Peak Discharge Peak Discharge [Q p = q u x A x Q / 640] SYMBOL VALUE UNITS WQ V 1,533 P 1.3 In t c 0.0833 Hr Q 0.49 In CN 89.11 CN 89 I a 0.24 In R 0.19 C 0 2.46 C 1-0.54 C 2-0.15 q u 720.45 cfs/mi 2 /in Q p 0.48 cfs Proposed Device DESCRIPTION Water Quality Peak Flow Provided Water Quality Volume Provided [WQ V = 640 x 3600 x Q P x P / q u ] Model Designation Quantity SYMBOL VALUE UNITS Q p 0.7 cfs WQ V 2,239 Contech CDS2015-4 1 Date Printed: 4/17/2012

Available Models Precast** Cast In Place Inline Offline Offline 1. Structure diameter represents the typical inside dimension of the concrete structure. Offline systems will require additional concrete diversion components. 2. Depth Below Pipe and Sump Capacities can vary to accommodate specific site design. 3. Water Quality Flow is based on 80% removal of a Particle Size Distribution (PSD) having a mean particle size: d50=125-µm, which is a typical PSD gradation characterizing particulate matter (TSS/SSC) in urban rainfall runoff. Water Quality Flow, Particle Size & Performance Notes: 80% removal (Re=80%) performance forecasts of the PSD having a d50=125-µm is derived from controlled tests of a unit equipped with 2400-µm screen. Performance forecasts for specific particle size gradations or d50s=50, 75, 125, 150 & 200-µm are also available. Removal forecasts based on unit evaluations conducted in accordance with the Technology Assessment Protocol - Ecology (TAPE) protocols, Washington Department of Ecology (WASDOE). Units can be sized to achieve specific Re performance for peak flow rates for specific Water Quality Flows, over the hydrograph of a Water Quality Storm Event or sized to meet a specific removal on an average basis using accepted probabilistic methods. When sizing based on a specific water quality flow rate, the required flow to be treated should be equal to or less than the listed water quality flow for the selected system. Contact our support staff for the most cost effective sizing for your area. page 6 Typical Internal MH Diameter or Typical Depth 2 Below Water Quality Flow 3 Screen Typical Equivalent ID 1 Pipe Invert 125 µm Diameter/Height Sump Capacity CDS Model ft m ft m cfs L/s ft m yd 3 m 3 CDS2015-4 4 1.2 3.5 1.1 0.7 19.8 2.0/1.5 0.6/0.5 0.5 0.4 CDS2015 5 1.5 5.2 1.6 0.7 19.8 2.0/1.5 0.6/0.5 1.3 1.0 CDS2020 5 1.5 5.7 1.7 1.1 31.2 2.0/2.0 0.6/0.6 1.3 1.0 CDS2025 5 1.5 6.0 1.8 1.6 45.3 2.0/2.5 0.6/0.8 1.3 1.0 CDS3020 6 1.8 6.2 1.9 2.0 56.6 3.0/2.0 0.9/0.6 2.1 1.6 CDS3030 6 1.8 7.1 2.2 3.0 85.0 3.0/3.0 0.9/0.9 2.1 1.6 CDS3035 6 1.8 7.6 2.3 3.8 106.2 3.0/3.5 0.9/1.1 2.1 1.6 CDS4030 8 2.4 8.6 2.6 4.5 127.4 4.0/3.0 1.2/0.9 5.6 4.3 CDS4040 8 2.4 9.7 3.0 6.0 169.9 4.0/4.0 1.2/1.2 5.6 4.3 CDS4045 8 2.4 10.3 3.1 7.5 212.4 4.0/4.5 1.2/1.4 5.6 4.3 CDS3020-D 6 1.8 6.2 1.9 2.0 56.6 3.0/2.0 0.9/0.6 2.1 1.6 CDS3030-DV 6 1.8 6.9 2.1 3.0 85.0 3.0/3.0 0.9/0.9 2.1 1.6 CDS3030-D 6 1.8 7.1 2.2 3.0 85.0 3.0/3.0 0.9/0.9 2.1 1.6 CDS3035-D 6 1.8 8.7 2.6 3.8 106.2 3.0/3.5 0.9/1.1 2.1 1.6 CDS4030-D 7 2.1 8.6 2.6 4.5 127.4 4.0/3.0 1.2/0.9 4.3 3.3 CDS4040-D 7 2.1 9.6 2.9 6.0 169.9 4.0/4.0 1.2/1.2 4.3 3.3 CDS4045-D 7 2.1 10.1 3.1 7.5 212.4 4.0/4.5 1.2/1.4 4.3 3.3 CDS5042-DV 9.5 2.9 9.6 2.9 9.0 254.9 5.0/4.2 1.5/1.3 1.9 1.5 CDS5640-D 8 2.4 9.5 2.9 9.0 254.9 5.6/4.0 1.7/1.2 5.6 4.3 CDS5050-DV 9.5 2.9 10.3 3.1 11 311.5 5.0/5.0 1.5/1.5 1.9 1.5 CDS5653-D 8 2.4 10.9 3.3 14 396.5 5.6/5.3 1.7/1.6 5.6 4.3 CDS5668-D 8 2.4 12.4 3.8 19 538.1 5.6/6.8 1.7/2.1 5.6 4.3 CDS5678-D 8 2.4 13.4 4.1 25 708.0 5.6/7.8 1.7/2.4 5.6 4.3 CDS7070-DV 12 3.7 14 4.3 26 736.3 7.0/7.0 2.1/2.1 3.3 2.5 CDS10060-DV 17.5 5.3 12 3.7 30 849.6 10.0/6.0 3.0/1.8 5.0 or 10.2 3.8 or 7.8 CDS10080-DV 17.5 5.3 14 4.3 50 1416.0 10.0/8.0 3.0/2.4 5.0 or 10.2 3.8 or 7.8 CDS100100-DV 17.5 5.3 16 4.9 64 1812.5 10.0/10.0 3.0/3.0 5.0 or 10.2 3.8 or 7.8 CDS150134-DC 22 6.7** 22 6.7** 148 4191.4 15.0/13.4 4.6/4.1 20.4 15.6 CDS200164-DC 26 7.9** 26 7.9** 270 7646.6 20.0/16.4 6.1/5.0 20.4 15.6 CDS240160-DC 32 9.8** 25 7.6** 300 8496.2 24.0/16.0 7.3/4.9 20.4 15.6 **Sump Capacities and Depth Below Pipe Invert can vary due to specific site design