Montering av väggbeslag på Brustor B-25 och B-25 Elite.



Similar documents
ORDER FORM B25/B28 - B25/B28 Elite

REPLACEMENT INSTRUCTIONS FOR AWNING

Awning Instructions. Full Cassette 1.5m to 6m

PITCHED ROOF STRUCTURES

TECHNICAL MANUAL AWNINGS STELA, JASMINA, ISABELA, LAURA

Basic Spring Motor Roller Shades

S OUNTING INSTRUCTION M M o u n t i n g k i t 2 &

Original Assembly Guide

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Technical Information

Installation Instructions

Fitting Instructions Garador, Westland & Catnic Garage Door Spring Box Roller Wheels & Wall Bracket & Link Arm

Mini multi-purpose sewing machine

DIAGNOSTIC SERVICE MANUAL

Awning Instructions. Standard Manual 1.5m to 4.5m

CONTENTS. 1. CE DECLARATION OF CONFORMITY FOR MACHINES pag DESCRIPTION pag TECHNICAL SPECIFICATIONS pag INSTALLATION pag.

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

General Safety. Always do a risk assessment.

R O A D M A S T E R, I N C.

Slides and Drawers. The right collection

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C.

Guide rail bracket (for adjustable heads)

PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS

INSTALLATION INSTRUCTIONS

EXPLORE 4-Leg Teaming Table with Screen Share Assembly Instructions

TENSION ISSUES? ROLLER SEE PAGE 7

Front axle components, overview

Time needed: ~3h for lid replacement only. Add 1h for operation harness in lid and ~2h more for installing drive unit and cable harness in trunk.

Horizontal Mini Blinds Installation Guide

Remote Head REMO ONE. Code Manual

DIAGNOSTIC SERVICE MANUAL

R O A D M A S T E R, I N C.

2&3 SECTION LOFT LADDER

R O A D M A S T E R, I N C.

Made of durable, lightweight polyester material - the same material used for tents.

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales

TS93 EMR T/PT/TDE. Surface applied door closer

Roll-Up Door Maintenance Guide

SLACK PERFORMANCE KARTS

R O A D M A S T E R, I N C.

TONNEAU INSTALLATION GUIDE


Structural Holding System

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY

Auto Sentry-eXP Maintenance

INSTRUCTION. Industrial Sewing Machines. No First published : June 1997 Second edition : March 2001

R O A D M A S T E R, I N C.

Rating when used as a weight carrying hitch without spring bars:

DIAMOND Retractable Rodding Robot Model SPRAYROD-R

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV Kit Number. Models. Additional Parts Required. Kit Contents

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

INSTRUCTION BOOK FOR. Dual Monitor Video Conferencing Cart

Gripper Kit for the Boe-Bot Robot (#28202)

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

Removable Aluminium posts

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

OWNER S MANUAL. Permolock C3. Docking system for Power wheelchair in vehicle

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

INSTRUCTIONS: LocknCharge Laptop Carts

All-Season Sunroom Sliding Glass Door Installation Instructions

COMPACT ELITE MAT CUTTER

Installation Instructions

ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.

Retrofit Instructions Installing a Sport Heated Steering Wheel - Leather, Multifunction BMW X5, E53,

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair

INSTRUCTION MANUAL (WINDOW WIPER)

I BEAM TRACK INSTALLATION

Power Window/Power Lock Installation. To begin with you will need all the parts listed below:

Model No: VS SAFETY INSTRUCTIONS VS INTRODUCTION & APPLICATIONS VS CONTENTS. 2.1 Introduction. 2.

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

Build Your Own Solar Car Teach build learn renewable Energy! Page 1 of 1

Fish Grader User Manual

Cable Drum Installation

R O A D M A S T E R, I N C.

TSB PART NAME PART NUMBER REMARK H000FFF

Technical data sheet PVC Bi-fold doors

REARWARD- & FORWARD-FACING USER MANUAL ECE R GROUP WEIGHT AGE 0+/ kg 6m-4y

KEYPAD LOCK RETROFIT KIT

Metal Free Standing Canopy Assembly Instructions

Wanda Technology Inc. Side Post Aluminum Umbrella OWNER S MANUAL

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions

INSTALLATION MANUAL. Contents JAPANESE ENGLISH GERMAN FRENCH ITALIAN SPANISH. To the installing technician: CEILING BRACKET

R O A D M A S T E R, I N C.

1. SAFETY RULES. 8. Avoid placing objects in the path of the blades.

CUSTOM AUXILIARY FORWARD LIGHTING KIT

K17.12 Door closers K17. Doors

TECHNICAL INFORMATION

Control Box Wiring For PRSstandard Tool

R O A D M A S T E R, I N C.

AM/FM ANTENNA RELOCATION KIT

10 ft x 20 ft / 3 m x 6 m STEEL FRAME CAR CANOPY

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

1. SAFETY RULES WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR PERSONAL INJURY, MOUNT FAN TO OUTLET BOX MARKED "ACCEPTABLE FOR FAN SUPPORT".

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

HORIZONTAL INSTALLATION

uline.com SPECIFICATIONS

HEAVY DUTY STAIR LIFT SYSTEM Installation and Service Manual

Transcription:

Montering av väggbeslag på Brustor B-25 och B-25 Elite. De breda beslagen måste sitta bakom arminfästningarna i kassetten. Arminfästningarna är markerade med svarta tuschstreck bak på markisen. Om ett smalt beslaget finns med, sätts det i mitten på markisen. Markisen går sönder och ingen garanti gäller om detta inte beaktas. Montering av takbeslag på Brustor B-25 och B-25 Elite. De breda beslagen måste sitta exakt bakom arminfästningarna i kassetten. Arminfästningarna är markerade med svarta tuschstreck bak på markisen. Av de smala beslagen sätts ett i varje ända och ett i mitten på markisen. Markisen går sönder och ingen garanti gäller om detta inte beaktas.

DEALER SERVICE MANUAL 09.V1 ENG INSTALLATION INSTRUCTIONS B25 - B28 (ELITE) / B26 ELITE / B27 Read these installation instructions carefully. A correct functioning needs a correct installation. No guarantee will be allowed for wrong installation. SELECTION OF FIXATION MATERIAL Calculate with a retracting force on the bolts of 370 kg (830 lbs) (for a wind pressure of 70 N/m or 1.5 lbf/ft ). Eventually consult a fixation materials expert. REQUIRED TOOLS Drilling machine with rock drill and a metall drill dia.3,9 Open-ended spanner SW 10, 17 en 19. Hexagon pin wrench 5mm Rope and waterlevel FIXATION OF THE WALL BRACKETS The wall brackets are positioned just behind the arm brackets (FIG.1). The position is marked at the back of the box (FIG.2). The underside of the brackets is at the same height as the underside of the box. Fix the brackets in line on the right place (FIG.2). In order to guarantee a smooth operation, make sure that the awning is hung horizontally. Hang the awning into the brackets. Secure it with the insert blocs and fix the blocs (FIG.3) ADJUSTMENT 3th HOOK (B25 Elite / Prestige) ADJUSTMENT OF THE PASSAGE HEIGHT(FIG.4) Check the passage height and the complete horizontal position of the frontprofile. To adjust the arm projection: Loosen the 2 sidenuts (19mm) of the arm support (FIG.4A). Adjust the height by turning the lower adjusting bolt (FIG.4B). Tighten the 2 sidenuts securely (FIG.4C). Check if the frontprofile is parallel to the box. ADJUSTMENT OF THE LEADRAIL (FIG.5) Roll out the awning completely till the fabric is hanging loose. Adjust the leadrail by turning it till its front is in vertical position. Tighten the screws as shown on FIG.5B. The height of the hinge of the arms in closed position, can be adjusted as shown on FIG.5A. ELECTRICAL CONNECTION OF THE MOTOR The electrical connection is done in accordance to the connection scheme shown on FIG.6. When the motor is installed on the right hand side, reverse the brown and the black wire. ADJUSTMENT ENDSTROKE OF THE MOTOR The adjustment of the endstroke is already done during the assembling of the awning. For re-adjustment, proceed as follows: A. SOMFY SLT ( blue and yellow or white button) (FIG.8) Press fully the blue and the yellow or white limit switch push button on the motor. Now all setting is turned off. Roll out the awning till the required point of cease. Unlock the yellow or white limit switch push button by pressing it. Now the OUT-position is installed. Roll up the awning untill about 10cm before reaching the required IN-position. Unlock the blue limit switch push button by pressing it. Now the IN-position is installed. In fact, from the set position the motor will continu at reduced force during a few seconds. By doing this the box will always stay completely closed. B. ONLY FOR SOLTIS OR PVC-FABRICS SOMFY LT (yellow and white button) Remove the side plate of the box. Press fully the yellow and the white limit switch push button on the motor. Now all setting is turned off. Roll out the awning till the required point of cease. Unlock the first(front) limit switch push button by pressing it. Now the OUT-position is installed. Roll up the awning completely. Unlock the rear limit switch push button by pressing it. Now the IN-position is installed. C. ADJUSTMENT ENDSTROKE MOTOR ELERO See instructions enclosed with the motor and page 13 D. SOMFY OREA RTS INSTALLATION OF A COUPLED AWNING(FIG.7) Place the wall supports as indicated on FIG.1 (4 arms) The bracket of 1 meter is placed at the disjunction of the two awning parts. Hang the part of the awning containing the gear box or motor into its brackets and secure it with the insert blocs. Roll out the awning for half a meter. Hang the second part of the awning into its brackets. Tie it first with a rope to keep the box closed. Release the rope so that the fabric of both parts is hanging at the same level. Make sure that the channel in both roller tubes are in the same line and join both parts together. Join the two parts together with the insert screws (FIG.7-ref.2) Fasten the second part with the inserts. Join the lead rails with the coupling profile as shown on FIG.10A INSTALLATION OF THE INTERMEDIATE TUBE (FIG.9) Install the intermediate tube in such a way that the canvas is unfolded from above and the red mark on the spindle end corresponds to the red mark on the bracket. Slide the intermediate canvas into the coupling profile (FIG.10B) Put the intermediate tube into its right bracket. Wind up the spring 8 turns (max. 6 turns from 3,5m projection on) as shown on FIG.9-ref.1. Glide the left bracket over the lip of the spring spindle (FIG.9- ref.2) and fasten it securely (FIG.9-ref.3). Roll out the awning and close it again. To drill the 2 holes dia.3,9, and fix the coupling profile toghether with 2 screws and 2 bolts (FIG.10A) To fix the intermediate canvas into the coupling profile (FIG.10B) USER INSTRUCTIONS The awning is a sun - and not a rain - protection. Roll up when raining or snowing. Make sure the awning is closed in windy weather conditions. Do not hang any other objects to the frontprofile or to the arms. For electric powered Uit. W. 1,50 2,05-3,50 3,51-4,00 4,01-5,50 5,51-6,00 / 3 arms 5,51-6,50 / 2 arms 6,51-7,00 7,01-8,00 8,01-1100 11,01-12,00 12,01-13,00 12,01-13,00 2,00 2,50 3,00-3,50-3,75 - FABRIC IN ONE PART FABRIC IN TWO PARTS 3 PARTS 3 PARTS 0 0 0 0 0 0 0 0-0 - 0 0 0-0 - 0-0 - 0 0 0 - - - - - - DEALER SERVICE MANUAL BRUSTOR LOURDESSTRAAT 84 B-8940 GELUWE T. +32 (0) 56.53.18.53 F. +32 (0) 56.53.18.20 / 9

1 2 3 4 = 4A 4B = 4C 5C 5B 6 7 DIN7981 3,5x10 3,9 DIN912 M6x12 (2x) DIN 7981 4,2x13 (6x) SW 5 8 9 10A 10 / DEALER SERVICE MANUAL BRUSTOR LOURDESSTRAAT 84 B-8940 GELUWE T. +32 (0) 56.53.18.53 F. +32 (0) 56.53.18.20

DEALER SERVICE MANUAL 09.V1 ENG RAFTER FOR SIDEPANEL THIRD HOOK (B25 Elite / Prestige) DEALER SERVICE MANUAL BRUSTOR LOURDESSTRAAT 84 B-8940 GELUWE T. +32 (0) 56.53.18.53 F. +32 (0) 56.53.18.20 / 11

INTEGRATED SUPPORT ARMS B25 (ELITE) - B26 ELITE - B27 INSTALLATION INSTRUCTIONS USER INSTRUCTIONS Read these installation and user instructions carefully. No guarantee will be admitted for wrong installation or use. INSTALLATION Remove one sideplate from the frontprofile. Slide the housingprofile of the support arms into the slot at bottom of the frontprofile. Make sure that there is enough space at the operation side for the handle. Drill holes dia. 3mm through the inferior slot of the housing and the frontprofile (FIG. 1A). drill holes at approximately 1.5m from each other. Enlarge the holes in the frontprofile to dia.3.5mm.(fig.1b) Screw the two profiles together with the delivered srews (FIG.2) Fix the sideplate back to the frontprofile. USE Slide the support arms out of the housing(fig. 3). Adjust the support arm at the required height and fasten by pulling up the flipper (FIG. 4). A nylon support is included to attach the endpieces of the support arms (for attachment on the ground according to the possibilities). 1A 1B 2 3 4 12 / DEALER SERVICE MANUAL BRUSTOR LOURDESSTRAAT 84 B-8940 GELUWE T. +32 (0) 56.53.18.53 F. +32 (0) 56.53.18.20

DEALER SERVICE MANUAL 09.V1 ENG HEIGHT ADJUSTMENT ɑ = 5 ɑ = 38 LA(m) V (cm) U (cm) V (cm) U (cm) 1,50 13 154 88 125 2,00 17 204 118 165 2,50 21 219 146 200 3,00 25 296 176 238 3,50 Elite 31 349 215 276 3,75 Elite 34 374 230 295 ɑ = inclination angle V = fall LA = armlength U = extension = = ADJUSTMENT FOR CLOSING THE BOX DEALER SERVICE MANUAL BRUSTOR LOURDESSTRAAT 84 B-8940 GELUWE T. +32 (0) 56.53.18.53 F. +32 (0) 56.53.18.20 / 13