Similar documents
COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS.

Sample Career Ladder/Lattice for Energy (Petroleum Sector)

Understanding Well Construction and Surface Footprint


Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

RIG SELECTION AND COMPARISON OF TOP DRIVE AND ROTARY TABLE DRIVE SYSTEMS FOR COST EFFECTIVE DRILLING PROJECTS IN KENYA

The Blocks and Drilling Line

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig. Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH

Offshore Structures. Offshore Drilling Equipment

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

Careers in geothermal energy: Power from below

BOP PRESSURE TESTING PROCEDURE

AFRREV STECH An International Journal of Science and Technology Bahir Dar, Ethiopia. Vol.1 (1) January-March, 2012: ISSN:

Drilling Rigs, Equipment & Parts

High Capacity Helical Piles Limited Access Projects

TruTrak Automated directional drilling system

Grounding and Bonding Against Static Electricity. Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute

Drilling rigs and technologies

Below is a step-by-step guide to the process of installing a borehole

Rotary Vertical Drilling System (RVDS)

PACE RIGS. Customized Drilling Solutions

Drilling fleet. Capabilities. Agriculture. Water. Environment.

Hot Rocks Geothermal Drilling, Operations and Insurance Implications

1 DESCRIPTION OF THE APPLIANCE

SunMaxx Solar Filling Station Operating Instructions

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Drilling Problems. pull

CAREER OPPORTUNITIY IN THE ENERGY SECTOR

DRILLING METHODS. The material below reviews the range of hole making and hole clearing approaches in common use in the drilling industry.

Curso Física Básica Experimental I Cuestiones Tema IV. Trabajo y energía.

Operating Instructions Drill rig DRU160

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

GEOTHERMAL WELL LOGGING: TEMPERATURE AND PRESSURE LOGS

SECTION 22 LIGHTNING PROTECTION SYSTEM

Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

Atlas Copco Exploration Products. Explorac reverse circulation rigs

DecisionSpace Well Engineering Software

The Legacy Continues.

Degree/ Higher Education Jobs:

These Installation Instructions are valid for antennas in the following version:

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

An Introduction to Oil and Gas Well Servicing

Estimation of shear force for blind shear ram blowout preventers

HMIS Top Drive System

Milling and Machining Center Basics

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

Atlas Copco Exploration Products. Christensen core drilling rigs

Recommended Practice for Occupational Safety for Oil and Gas Well Drilling and Servicing Operations

THE FLYING SCOT A BASIC GUIDE TUNING AND SAIL TRIM By Harry Carpenter

hs2 Ground A non-technical guide

Fundamentals of Drilling Course Outline

Society of Petroleum Engineers Drilling Systems Automation Technical Section (DSATS) Drillbotics. International University Competition

OUR SERVICES. Training - Assessment - Events. Driving our industry forward.

Fish Grader User Manual

Specifications for a Precision CNC Vertical Machining Center. Section I. Mechanical Performance Specifications (must meet or exceed)

The Basics of a Rotary Table with Cross Slide mounted on a Mill Table, Version 2

BLADDER SURGE CONTROL SYSTEM

Geothermal Drilling in Enel Green Power. October 2013

High Power Laser for Rock Drilling

Machine Moving. By Norm Berls

Energize your mind. April Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones

Advanced Training Onshore (mountains, forests, etc.) Advanced Training Offshore (vessels, ships, open water, swift water, etc.)

Cubility - Facilities and offices

GEOTHERMAL HEATING APPLICATIONS FOR RESIDENTIAL HOMES

Career on a drilling rig

GEOTHERMAL HEATING AND COOLING INTRODUCTION

How To Use A Water Source Heat Pump

High Strain Dynamic Load Testing of Drilled Shafts

Course available 24/7 for up to six months from the date of purchase or until completion

CHAPTER 4 WELL COMPLETION AND MAINTENANCE

Fire Pump Plan Review March 2010

Tuesday, March 17, 2015 Houston, TX. Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY?

Directive 059: Well Drilling and Completion Data Filing Requirements

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version

Silicon Pyranometer Smart Sensor (Part # S-LIB-M003)

BOREHOLE SEALING IN A COAXIAL HEAT EXCHANGER BY BENTONITE TREATMENT

KWANG SING ENGINEERING PTE LTD

Annex A (normative) Supplementary Requirements

INDUSTRIAS G.E S.A. E n g ineering Solut i o n s

Lathe Milling Attachment

HORIZONTAL INSTALLATION

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

Lab 8: Ballistic Pendulum

Oil and Coolant Circulating Heating System. Model - OCSM

Installation Manual. Thermomax Solar Water Heater ... Installation Procedure for Flatroof and Ground. Revision 8

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

@balance Xpress. Mobile MPD services

BHA Design Best-drilling-practices.tk. All rights reserved.

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

Guide for Modified Assembly: Lightning McQueen. By: Collin Patterson, University of Delaware. Materials and Tools:

Transcription:

Presented at Short Course V on Conceptual Modelling of Geothermal Systems, organized by UNU-GTP and LaGeo, in Santa Tecla, El Salvador, February 24 - March 2, 2013. GEOTHERMAL TRAINING PROGRAMME LaGeo S.A. de C.V. GEOTHERMAL DRILLING Jaime Armando Arévalo Martínez, Perforadora Santa Bárbara, S. A. de C. V. (PSB) Prolongación Boulevard Sur y 15 Avenida Sur, Colonia Utila Santa Tecla, La Libertad EL SALVADOR C.A. jaarevalo@psb.com.sv ABSTRACT Geothermal drilling is considered as the phase which verifies the existence of an underground thermal resource which may be utilized for energy exploitation. The earlier phases of research relate largely to the study of hot springs, fumaroles and even the presence of volcanoes themselves, but after having carried out all these studies, it is the drilling of exploration boreholes, and, above all, deep exploration, which evidences the success or failure of the research. 1. INTRODUCTION 1.1 Drilling of a geothermal well This will be a short description of the different activities involving the drilling of a well, the different steps that must be performed to provide the final product; a completely finished well. The three components of geothermal drilling are: The rig, the personnel, and the work performed or the drilled well. 1.2 The drilling rig The drilling rig (Figure 1) can be considered as a plant consisting of several components that are used to create the ultimate goal; a completely finished geothermal well. It must always be taken into account that each component can be transported by land via trucks, hauling trailers, or low-bed trailers, whenever the rig is transported to the site where the well will be drilled. Generally, rigs are owned by private equity entities, which may have a sole proprietor or be owned by a partnership formed by several owners. The rig comprises hoisting, circulation, and rotation components, as well as a steel structure with a mast, and a power source. FIGURE 1: Massarenti 6000 rig 1

Arevalo 2 Geothermal drilling 1.2.1 The tower or mast It is a steel structure which must possess the capacity to house sufficient drill pipe, which can weigh up to several tons. It is erected on a steel base called the substructure, which holds the work-floor known as the rotary table. The work-floor is where the drilling crew is deployed. This substructure must also possess enough height so as to accommodate the arrangement of the blowout preventer valves. 1.2.2 Hoisting components The hoisting system is comprised by the main winch, the block and tackle pulley, the crown block and the drilling cable (Figure 2). 1.2.3 Rotation components This system is comprised by the rotary head, the hexagonal Kelly, and the rotary table. This also includes the drill string and drill bits. The drill bits (Figure 3) are the tools that cut the rock formation. There are several types of drill bits, such as: 1.3 Drilling personnel FIGURE 2: Travelling block and hook (left) and crown block (right) The personnel working in drilling consists of the drilling crew, where the driller is the leader and the person who operates the rig. The driller works with the derrickman, who is the person working in the mast and who is also in charge of monitoring and controlling the drilling fluid or mud tanks. There is also an assistant driller that provides support to the operations and management of the rig. Furthermore, there is a group of three people called roughnecks, who work on the floor to conduct tightening maneuvers on the drilling tools. The toolpusher is the person in charge of the drilling platform and the person who gives orders therein. This person is available at the drill site 24 hours a day, over a period of three to four weeks, until he is relieved from his duties. There is also maintenance personnel on site, such as the equipment mechanic, the electrician, and the welders. Each person has their respective assistant to aid them in operations that can sometimes last for long periods of time.

Geothermal drilling 3 Arevalo a) b) c) FIGURE 3: Drill bits: a) Tri-cone bits, b) Tri-cone bit, bearings, c) 12 ¼ Tri-cone bit 1.4 The drilled well The drilling of a geothermal well is performed with a hole of a larger initial diameter and ends with a smaller diameter hole. This means that the construction is telescopic. The reason for this is because of the expected penetration, seeing as the best penetration normally occurs at greater depths with smaller diameter bits. A typical description of a drilled well is shown in Figure 4. The first stage of drilling is carried out with the larger diameter formation cutting tool (for this particular case, 32 diameter). Drilling then continues with the second stage of 23, which is followed by a third stage of 17 ½ and ends with a 12 ¼ hole. For each of these drilling stages, a steel pipe casing is installed like so: for 32, a 24 ½ casing is provided; for 23, a 18 5/8 casing is provided; for 17 ½, a 13 3/8 casing is provided; and finally, for the 12 ¼ hole, the casing is a slotted liner (often simply referred to as liner ) which can be hung or supported until reaching the bottom of the well. FIGURE 4: A typical description of a drilled well

Arevalo 4 Geothermal drilling 2. DRILLING OPERATIONS 2.1 Mobilization and assembly of the rig The mobilization of the drilling rig is the transportation from its storage base to the place where the well will be drilled. Where there already exist drilled wells in the platform, some additional procedures must be considered, which depend on the space available for the rig. Sometimes it is necessary to assemble the rig in a place where it can be further skidded, depending on the space available. (Video of the skidding of the Massarenti 6000 rig in the TR-18B well, Berlín geothermal field, 2012) 2.2 Drilling 2.2.1 Vertical Drilling Vertical drilling is conducted in order to construct a vertical hole. The maximum permissible deviation should not exceed 5 degrees, and to verify this, tilt records (which mark the inclination angle of the borehole in a metal tablet) are performed every 100 drilled meters. To try to maintain the verticality of the well, it is necessary to monitor and control the drilling parameters, such as the weight applied to the string, the string rotation, and the pumping flow of the drilling fluid, which may all influence the inclination to some extent. 2.2.2 Directional drilling Directional drilling is used when the drill site is located in places where it is difficult to build platforms. It takes advantage of an existing well platform to drill directionally towards the objective, which may be a few meters away from the vertical axis of the well. It also serves to better intercept the faults or fractures which may exhibit characteristics of production or feeding areas for geothermal resources, whether it be steam or a geothermal water-steam mixture. To perform directional drilling of a well, one of the most widely used tools is called a downhole motor, which consists of a tubular tool that carries a helically shaped rotor in its interior, which in turn is rotated by the passing drilling fluid, also known as drilling mud. In regards to directional drilling measurements, inclination angles are measured as well as the direction or orientation of the drilling string. 2.2.3 Aerated drilling It is the drilling technique which uses air as a drilling fluid (Figure 5). Drilling is typically performed with a combination or mud-air, air-water, or air-foam, with the purpose of decreasing the weight of the hydrostatic head, as well as contributing to the reduction of circulation losses caused by fractures induced by the hydrostatic pressure of the drilling fluid column in the well. This type of drilling has been applied with the purpose of better maintaining cleanliness in the borehole, as well as maintaining a continuous circulation of drilling fluid when passing through large fracturing areas that prevent the collection of cuttings from the bottom of the well.

Geothermal drilling 5 Arevalo FIGURE 5: Test of the production of a geothermal well with compressed air equipment for aerated drilling REFERENCES Arévalo, 2011: Presentación para Maestría de Energía Renovable para la Universidad de El Salvador sobre Tecnología de Perforación [en. Presentation on Drilling Technology for the Master s Degree in Renewable Energy program from the University of El Salvador]. PSB, October.