ECTA-Cefic Guidelines for

Similar documents
T E C H N I C A L S P E C I F I C A T I O N. SUPER FUEL & LUB TRUCK Fuel tanker and lubrication truck (6x6)

Medical Air Systems: Scroll

Stainless Steel Valves For the Sanitary Industries

Working at height. What is the risk? How can you manage it?

MODEL T200-F18 MODEL T125-F18 Finish Nailers

20 TANK CONTAINER STANDARD SPECIFICATION MODEL NUMBER: 24 FSTD 2 QUOTATION NUMBER

Eurovacuum EV Series. Single Stage Oil Sealed Rotary Vane Pump

Not required for most applications Not required for most applications High pressure ( provided) High pressure ( provided)

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant).

INSTALLATION INSTRUCTIONS FOR VW MK5

ARTICULATED DUMP TRUCKS

Buy Karcher Parts Online: Need Technical Help? Call: Requests to:

Manual piston sampler...m 11

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)

TAS ITA. DA1, dual csatlakozásfor thermostat. For control of 2 heaters on 1 thermostat. * * * * * * * * Thermostat for CH 12/18

Product catalogue, pipe and sewer cleaning systems

SECTION GUARDA SECURITY WINDOW SCREENS

Mechanical shaft seal types and sealing systems

1000-LB. TRAILER JACK OWNER S MANUAL

SELECTION, APPLICATION & MAINTENANCE

TECHNICAL BULLETIN. Meritor WABCO Cab Leveling Valves and Chassis Leveling Valves. How the Cab Leveling and Chassis Leveling Valves Work

SECTION GROUND WATER STORAGE TANKS

1300 MAXTRAK SPECIFICATION

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

Kobelco Extended Warranty Program.

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

VAG Non-Return Valves

James M. Pleasants Company

NFPA31FuelOilPiping 1 Revised

Roof Curbs, Extensions and Equipment Supports

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

Air Conditioning Sign-Off Sheet

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

AIR CONDITIONING SYSTEM

TECHNICAL DATA. 2. LISTINGS AND APPROVALS See Tables 1 & 2.

Hose & Coupling Solutions Dixon Europe

Duplex Filters 40 FLDK 0008(C)-0120(C)

Aerospace and Defence

Waste Oil Handling, Spill Containment & Lighting

1/29/2008 DR70. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 43

QPM3 Low pressure pump for circulation of oil in hydraulic and lubricating systems

15GAL STEEL OIL DRAIN WITH 110V PUMP

Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity?

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)

RPV - RP - RA air handling units

IRS AUTOMATISMOS Y SISTEMAS. Avinguda Generalitat, 107 entresuelo 2 Tel: Fax: TORTOSA info@irs-as.

CRN5-5 A-FGJ-G-E-HQQE 3x230/400 50HZ

Material test chamber with mechanical convection

ISO-9001:2000 certified. EE300 Series Electromechanical Inventory Level Measuring System. Aplus Finetek Sensor, Inc.

Roofboxes ENITH. Zenith, Room for Prestige.

POLARIS AIR COMPRESSOR SERIES. engineering. excellence. stellar. performance. A World Leader for Centrifugal Compressors

Round Housing with Side Ports

Veenstra Group Your Partner

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Assembly and instructions

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

Drive shaft, servicing

Threaded Inline Air Heaters

XL PREMIUM OIL COOLER KIT

Rental Services Temporary Cooling - Flexible Water Hose

Vacuum drying oven for non-flammable solvents

39HQ Airovision Air Handling Units

Speedflow Undersink Unvented Water Heater. Models SF10K and SF15K. Instruction Manual

COOLING SYSTEM Section Page

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

Ref: GA13UK Glass Awning Support System

INSTALLATION INSTRUCTIONS FOR INTERNATIONAL 9000 SERIES ROOF TOP AIR CONDITIONERS

DR90. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PART NUMBERS AND PRICES ARE SUBJECT TO CHANGE 1 of 51

Arctic Leash Instruction Manual Alaskan Products Company LLC.

Söll GlideLoc Aluminium Ladders. Vertical fall protection system Certified according to EN 353-1:2002 and CNB/P/11.073

Rotary Screw Compressors UP-Series 4 & 5.5 kw

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Installation Detailed installation instructions are provided which should be strictly followed.

BUGGY SETUP GUIDE. Volume GOKARTSUSA GY6 150, CN250. Buggy Setup Guide

CSF16 and CSF16T Stainless Steel Steam Filters

ECOCIAT. Domestic hot water heat recovery unit

Model # 940P-V6. Page 1 of 11

SELF-STEERING AXLE TABLE OF CONTENTS

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

LINDGREN-PITMAN, INC. Super Spool III Installation Instructions

Operating Instructions Drill rig DRU160

PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES

K17.12 Door closers K17. Doors

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

REMOVAL AND INSTALLATION

Pneumatic actuators The Original! Technics of the top class.

Installation Manual Gravity Solar Water Heater Evacuated Tube Integrated (Direct) System, unpressurized

SureSite Magnetic Liquid Level Indicator

1/29/2008 DR50. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 45

SUSPENSION AND STEERING OVERVIEW

Heavy-Duty Lube and Fuel Truck Sales Tool

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

V47 Series Temperature Actuated Modulating Water Valves

M E T A L D E T E C T O R S... S E E T H E U N S E E N

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

Transcription:

ECTA-Cefic Guidelines for equipment for the transport of dry bulk cargo, to be discharged by tipping

DISCLAIMER This document is intended for information only and sets out guidelines for equipment for transport of dry bulk cargo, to be discharged by tipping. The information contained in these guidelines is provided in good faith and, while it is accurate as far as the authors are aware, no representations or warranties are made with regard to its completeness. It is not intended to be a comprehensive guide to all the transport equipment used for dry bulk cargo. No responsibility will be assumed by the participating associations, Cefic and ECTA, in relation to the information contained in these Guidelines. 2 EQUIPMENT FOR THE TRANSPORT OF DRY BULK CARGO, TO BE DISCHARGED BY TIPPING

TABLE OF CONTENTS TABLE OF CONTENTS Disclaimer 2 INTRODUCTION 4 OBJECTIVE AND SCOPE 4 1. EQUIPMENT SPECIFICATIONS FOR TIPPING SILO ROAD TANKERS AND PRESSURISED SILO / BOX CONTAINERS 6 1.1 General specifications for tank and accessories 6 1.2 Top manholes 6 1.3 Handrail / walkway 6 1.4 Blower / compressor 7 1.5 Discharge filter equipment 7 1.6 Thermometer 8 1.7 Air conducts 8 1.8 Discharge manhole and valve 8 1.9 Hoses and couplings 8 2. EQUIPMENT SPECIFICATIONS FOR UNPRESSURISED DRY BULK BOX CONTAINERS 9 2.1 General specifications for the body of the container and accessories 9 2.2 Gaskets and valves 9 2.3 Top manholes 9 2.4 Handrail / walkways 10 2.5 Hoses / blower / compressor / discharge air filter / air supply lines / couplings 10 3. TIPPING CHASSIS 10 3.1 Twist locks and landing legs 10 3.2 Rotary feeder 10 3.3 Earthing wire on the chassis 10 Contacts 11 ECTA-CEFIC GUIDELINES 3

INTRODUCTION / OBJECTIVE AND SCOPE INTRODUCTION The effort to continually improve safety during transport and the associated handling of chemicals is part of the overall objective of both the chemical industry and the transport industry to operate in accordance with the Guiding Principles of Responsible Care. These Guidelines have been developed with the aim of offering guidance regarding specifications for transport equipment specifically designed for the transport of dry bulk cargo, which is to be discharged by tipping. Companies may decide to apply the guidelines either in full or in part, taking into account specific circumstances and own requirements. Compliance with any applicable national and international regulations always takes precedence over adhering to the recommendations made in the present Guidelines. OBJECTIVE AND SCOPE The objective of these Guidelines is to describe the equipment designed for the transport of dry bulk chemical cargo, which is discharged by tipping, such as silo trailers and dry bulk containers. The following types of equipment are included in the scope of these Guidelines: Silo tankers Tipping silo road tanker: a road trailer carrying dry bulk cargo in a single compartment vessel. The trailer is designed for top loading and for discharge by air pressure and tipping of the vessel. Containers Pressurised cylindrical silo container: a single-compartment vessel built into a container frame and designed for top loading and for discharge by air pressure and tipping. Pressurised dry bulk box container: a single-compartment tank container designed for top loading and for discharge by air pressure and tipping. 4 EQUIPMENT FOR THE TRANSPORT OF DRY BULK CARGO, TO BE DISCHARGED BY TIPPING

OBJECTIVE AND SCOPE Unpressurised dry bulk box container: a freight container specifically adapted to carry dry bulk cargo e.g. alu-box containers and bag-in-box containers. Bag-in-box dry bulk containers contain a liner (i.e. a bag with the size of the container), equipped with fill and discharge spouts. Whereas loading is done over the top, discharge is usually done by gravity by tipping the container and using rotary valves. Container: a container attached to a chassis / trailer with the use of twist locks. The tipping chassis is designed to raise the container to an angle of 35-40 degrees. These Guidelines do neither cover dry bulk transport equipment discharged without tipping nor ISO containers, with liner bags, on a tipping chassis. Also tractor units and dedicated product specific equipment are outside of the scope of these Guidelines. Other guidance Additional guidance on the responsibilities and roles of persons involved in loading and unloading operations can be found in the Cefic-ECTA Behaviour Based Safety Guidelines for the Safe Loading and Unloading of Road Freight Vehicles (Issue 2, March 2007). Separate Best Practice Guidelines for Transport Equipment for Chemical Packed Cargo have already been published in March 2007. ECTA-CEFIC GUIDELINES 5

EQUIPMENT SPECIFICATIONS 1 EQUIPMENT SPECIFICATIONS FOR TIPPING SILO ROAD TANKERS AND PRESSURISED SILO / BOX CONTAINERS 1.1 GENERAL SPECIFICATIONS FOR TANK AND ACCESSORIES The equipment should comply with the following specifications: is made of aluminium or stainless steel is fit for a working pressure of minimum 0.5 bar bearing an indication of the maximum allowed overpressure on the exterior of the tank bearing an indication of the content (in m 3 ) on the exterior of the tank the inner walls of the tank, including all welds and connection pieces, have a smooth surface has one compartment the tank has at least one entrance with a diameter of minimum 450 mm if dislodged, any appendages affixed to the equipment cannot mix with the product has properly identified earthing points and / or earthing wire all openings are designed and constructed to allow sealing It is further recommended that: for the unloading of powders (except in the case of explosion-sensitive powders) a fluidization system is installed if applicable, the rear landing legs are specifically designed for tipping equipment and the inner mechanism of the rear landing legs is protected against corrosion the earthing wire has a minimum length of 8 m and a minimum diameter of 10 mm 2, has a maximum resistance of 3,5 Ohm, is winded on a reel and is fitted with crocodile clamps. 1.2 TOP MANHOLES Manholes should comply with the following specifications : are located above the center line rims are free of damages and dents have swing bolts or equivalent fasteners manhole covers pivots or opens to 180 degrees gaskets are made of synthetic rubber or of material that is compatible with the product 1.3 HANDRAIL / WALKWAY Handrail and walkway are not sufficient to guarantee a safe access to the top manholes. Therefore at loading and unloading sites all necessary measures, in addition to a handrail and walkway, should be taken in order to ensure that personnel can safely work on top of the tank. Attaching the protection gear of a fall arrest system to the handrail is not considered to be a safe practice. 6 EQUIPMENT FOR THE TRANSPORT OF DRY BULK CARGO, TO BE DISCHARGED BY TIPPING

EQUIPMENT SPECIFICATIONS If the top of the tank is not flat, the tank must be fitted with an access ladder and a safety handrail along the walkway. Walkways need to have an anti-slip surface or structure. When equipped with a handrail and walkway, the following minimum specifications should be complied with: the minimum width of the walkway is 400 mm the minimum height of the handrail is 1000 mm along the entire walkway additional protection exists at half of the height of the handrail (e.g. a steel cable) the handrail is capable to withstand a horizontal tension of 300 N in all directions the handrail is erected before stepping on the walkway. Note: As the majority of pressurised box containers is not fitted with a handrail, it is necessary that loading and unloading sites take all necessary measures (e.g. safety harness, safety platform) in order to ensure that personnel can safely access and work on top of the container. 1.4 BLOWER / COMPRESSOR The safest and the best solution for guaranteeing product integrity is the use of a productdedicated blower / compressor, supplied by the loading or unloading site. If a blower / compressor is however provided with the vehicle, it should comply with the following specifications: does not contain oil all moving parts are properly protected by a safety cover is fitted with a filter, filtering the incoming air (to be inspected at least once a year) of which the air inlet is placed away from the exhaust of the vehicle engine Note: Attention is to be paid to the noise level resulting from the whole unloading process and possible improvements should be discussed with the unloading sites. 1.5 DISCHARGE FILTER EQUIPMENT The following specifications should be complied with: 1.5.1 DISCHARGE AIR FILTER is made of stainless steel or aluminium is installed in the air supply line after the compressor but before the manifold is sealable FILTER ELEMENT is made of sintered stainless steel is shock-proof and retains particles larger than 5 microns can be easily removed for cleaning and inspection purposes ECTA-CEFIC GUIDELINES 7

EQUIPMENT SPECIFICATIONS 1.5.2 MANOMETER A manometer is installed between the discharge air filter and the manifold and also the tank is equipped with a manometer. Note: Some products may require specific unloading conditions related to temperature and pressure. Compressors with intercoolers or the use of a tank by-pass may be considered as best practice alternatives. The manometer is adapted to the flow rate of the compressor. 1.6 THERMOMETER A thermometer is installed close to the manifold. 1.7 AIR CONDUCTS Air conducts after the discharge air filter, whether flexible or fixed to the equipment, should meet the following specifications: are made of aluminium, stainless steel or synthetic rubber are constructed in such a way as to allow visual inspection at all points at least one safety relief valve is installed between the filter and the tank with an adequate capacity, and with pressure settings in line with the design of the tank at least one non-return valve is installed after the discharge air filter in order to prevent product particles entering the filter when the blower is turned off 1.8 DISCHARGE MANHOLE AND VALVE The following specifications should be complied with: 1.8.1 DISCHARGE MANHOLE is located in the center line of the tank has a diameter of at least 450 mm rims are free of damages and dents is closed with at least four swing bolts is properly secured when opened gaskets are made of synthetic rubber or of material that is compatible with the product 1.8.2 DISCHARGE VALVE is a butterfly valve made of stainless steel or aluminium allows for easy inspection valve gaskets, if present, are made of synthetic rubber or of a material that is compatible with the product 1.9 HOSES AND COUPLINGS 1.9.1 HOSES The safest and the best solution for guaranteeing product integrity is the use of productdedicated hoses and couplings, supplied at the unloading location. 8 EQUIPMENT FOR THE TRANSPORT OF DRY BULK CARGO, TO BE DISCHARGED BY TIPPING

EQUIPMENT SPECIFICATIONS However, all hoses provided with the vehicle, should comply with the following specifications: meeting at least the test pressure of the tank made of a material that is compatible with the product equipped with dust caps on the coupling or stored in closed compartments made to prevent transfer of electrostatic charges having a length (assembled) of approximately 10 m and allowing for easy visual inspection having a diameter of at least 80 mm 1.9.2 COUPLINGS Couplings should comply with the following specifications: all gaskets that come into contact with the product are made of neoprene rubber, PTFE, silicon rubber or a material that is compatible with the product gaskets do not protrude into productlines or air supply lines couplings exactly fit to the size of the discharge hose the connection between coupling and hose is made in such a way so that no granules can remain in the connection have a securing system, which prevents the unintended opening through vibration or shock (e.g. clamp, safety lock) are easy to handle and clean 2 EQUIPMENT SPECIFICATIONS FOR UNPRESSURISED DRY BULK BOX CONTAINERS 2.1 GENERAL SPECIFICATIONS FOR THE BODY OF THE CONTAINER AND ACCESSORIES The equipment should comply with the following specifications : bearing an indication of the content (m 3 ) on the exterior of the tank the inner walls have a smooth surface has one compartment has at least one 450 mm opening if use is made of an inner liner there are fixing points on the top as well as on the bottom of the inside of the container. The use of a safety liner, which is designed for bottom sampling and equipped with incorporated document pouch, is recommended as it reduces the need to access the top of the container and the need for untying the liner. if dislodged, any appendages affixed to the equipment cannot mix with the product all openings are designed and constructed to allow sealing 2.2 GASKETS AND VALVES All gaskets that come into contact with the product are made of synthetic rubber or of a material that is compatible with the product 2.3 TOP MANHOLES Top manholes should comply with the following specifications: are located above the center line of the tank rims are free of damages and dents have swing bolts or equivalent fasteners manhole covers open to 180 degrees gaskets are made of synthetic rubber or of material that is compatible with the product ECTA-CEFIC GUIDELINES 9

TIPPING CHASSIS 2.4 HANDRAIL / WALKWAYS Loading and unloading sites should take all necessary measures to ensure that personnel can safely work on top of the container. Handrail and walkway are not sufficient to guarantee a safe access to the top manholes. The majority of this equipment is not fitted with a handrail. Walkways should have an anti-slip surface or structure. 2.5 HOSES / BLOWER / COMPRESSOR / DISCHARGE AIR FILTER / AIR SUPPLY LINES / COUPLINGS Requirements as described in Chapter 1 are applicable. 3 TIPPING CHASSIS 3.1 TWIST LOCKS and LANDING LEGS Rear landing legs on the tipping chassis are specifically designed for tipping operations and the inner mechanism is protected against corrosion Further information can be found in the ECTA brochure Recommendation for tipping equipment (see www.ecta.be). 3.2 ROTARY FEEDER If present, the rotary feeder should comply with the following specifications: inner parts do not have sharp corners is made of material that is compatible with the product is easy to clean and to inspect The feeder rotor shall have bearing outboard and have air- and dust-tight seals. The connection between the container or the liner and the rotary feeder is designed to prevent product contamination and to avoid obstructing the steady flow of the product. The air vent of the rotary feeder is equipped with a venting bag to retain dust. 3.3 EARTHING WIRE ON THE CHASSIS The earthing wire should comply with the following specifications: have a minimum length of 8 m have a minimum diameter of 10 mm 2 have a maximum resistance of 3,5 Ohm be wound on a reel be fitted with crocodile clamps. 10 EQUIPMENT FOR THE TRANSPORT OF DRY BULK CARGO, TO BE DISCHARGED BY TIPPING

CONTACTS Sergio Menegazzi LyondellBasell Industries Brühler Straße 60 50389 Wesseling Germany T + 49 (0) 2236 72 6227 F + 49 (0) 2236 72 46227 sergio.menegazzi@lyondellbasell.com Jos Ooms ExxonMobil Biezenhoed 2 2450 Meerhout Belgium T + 32 (0) 14 863150 F + 32 (0) 14 867088 jos.ooms@exxonmobil.com Frank Huysmans Bruhn Spedition NV Sint Pietersvliet 3 bus 6 2000 Antwerpen Belgium T + 32 (0) 3 224 84 84 F + 32 (0) 3 226 26 45 f.huysmans@bruhnsped.be Marc Houtermans SABIC EuroPetrochemicals B.V. P.O. Box 5151 6130 PD Sittard The Netherlands T + 31 (0) 46 476 8205 F + 31 (0) 46 476 2255 marc.houtermans@sabic-europe.com Klaus Wessing Alfred Talke GmbH & Co. KG Max-Planck-Str. 20 50354 Hürth Germany T + 49 (0) 2233 599 555 F + 49 (0) 2233 599 263 k.wessing@talke.com Frans Schuitemaker Nijhof-Wassink B.V. P.O. Box 22 7460 AA Rijssen The Netherlands T + 31 (0) 548 538000 F + 31 (0) 548 538001 frans.schuitemaker@nijhof-wassink.com Stefan Seibel Evonik Services GmbH Procurement Services Logistics Weissfrauenstr. 9 60287 Frankfurt / Main Germany T + 49 (0) 6921 82 575 F + 49 (0) 6921 862 575 e mail stefan.seibel@evonik.com ECTA-CEFIC GUIDELINES 11

CEFIC AISBL - EUROPEAN CHEMICAL INDUSTRY COUNCIL Avenue E. van Nieuwenhuyselaan 4 1160 Brussels - Belgium T +32 2 676 72 11 F +32 2 676 73 00 www.cefic.org EUROPEAN CHEMICAL TRANSPORT ASSOCIATION - AISBL Avenue de Tervurenlaan 270 1150 Brussels - Belgium T +32 2 741 86 67 F +32 2 741 86 82 www.ecta.be