SESSION: MARCH 2012-SEPTEMBER 2012 NIPS COLLEGE OF IT AND MANAGEMENT ALLAHABAD [Synopsis and Project Guidelines] MCA-6 th Semester BCA-6 th Semester And PGDCA-2 nd Semester IMPORTANT DATE Synopsis Approval Last Date : 21/5/2012 Project Submission Date : 30/07/2012 IMPORANT INFORMATION MCA-6 th Sem Project Coordinator PGDCA-2 nd Sem Project Coordinator BCA-6th Sem Project Coordinator : Mr.Deepak Mishra : Mr.Arun Kumar Maurya : Mrs Seema Srivastava And : Mr.Sanjeev Dwivedi.
MCA-6 th BCA-6 th & PGDCA-2 nd Synopsis Format 1. Introduction Of Project 2. Objective Of The Project 3. Scope Of The Project 4. Project Plan 5. The Existing System 6. Background Of The Organization 7. Current Problems 8. Areas For Improvement 9. Proposed System 10. Input/Output Requirement 11. Hardware And Software Requirement 12. Database Requirement 13. System Design 14. Tables And Fields For Database 15. Database Dictionary 16. E-R Diagram 17. 0 Level DFD 18. 1 Level DFD 19. Security Control 20. Future Scope Of The Project 21. Conclusion 1
22. Reference Or Bibliography Some Suggested Project Title 1. Bank Transactions Management 2. Hotel Management 3. Gas Agency Management 4. Office Automation 5. Railway Reservation 6. Computerization Course Registration 7. Hostel Management 8. Hospital Management 9. Inventory Management 10. Competitive Examination Database 11. Air Line Reservation 12. Transport Management 13. College Admission 14. Library Management 15. On Line Examination 16. Social Networking Sites 17. E-Shopping System 18. E-Mailing System Note: Any Relational Database System Can Be Used As Back End. 2
BCA-6 th & PGDCA-2 nd Project Report Format 1. Title Cover 2. Certificate from organization about your stay (Project Duration) at that place and about submission of work done under external guide at the place of training. 3. Certificate from your guide about the submission of work done under his/her guidance, Internal Supervisor. 4. Table of Contents, abstract of the project (abstract of actual work done). 5. A brief overview of the organization (regarding function area, location, division in which you are working, turnover) 6. Profile of problems assigned. 7. Study of existing system, if any. 8. System requirements 9. Product Definition 10. Problem Statement 11. Function to be Provided 12. Processing Environment: H/W, S/W. 13. Solution Strategy 14. Acceptance Criteria 15. Feasibility Analysis 16. Project Plan 17. Team Structure 3
18. Development Schedule 19. Programming Languages And Development Tools 20. System Requirement Specifications 21. Developing / Operating / Maintenance Environments 22. External Interface And Data Flows 23. User display and report format, user command summary 24. High level DFD and data dictionary 25. Functional and performance specifications 26. Design 27. Detailed DFD s and structure diagrams 28. Data structures, database and file specifications 29. Pseudo code 30. Test Plan 31. Functional, Performance, Stress tests etc. 32. Implementation / Conversion Plan 33. Project Legacy 34. Current status of project 35. Remaining areas of concern 36. Technical and managerial lessons learnt 37. Future recommendations 38. Bibliography 39. Source Code Note: - The above is meant to serve as a guideline for preparation of your project report. You may add to, modify or omit some of the above-mentioned points depending upon 4
their relevance to your project. You may also consult your internal supervisor for the same. Viva of Full syllabus studied under BCA/PGDCA course. MCA-6 th Semester Project Report Format 1. Title Cover 2. Certificate from organization about your stay (Project Duration) at that place and about submission of work done under external guide at the place of training. 3. Certificate from your guide about the submission of work done under his/her guidance, Internal Supervisor. 4. Table of Contents, abstract of the project (abstract of actual work done). 5. A brief overview of the organization (regarding function area, location, division in which you are working, turnover) 6. Profile of problems assigned. 7. Study of existing system, if any. 8. System requirements a. Function to be Provided 5
b. Product Definition c. Problem Statement d. Processing Environment: H/W, S/W. e. Solution Strategy f. Acceptance Criteria 9. Feasibility Analysis 10. Project Plan a. Team Structure b. Development Schedule c. Programming Languages And Development Tools 11. System Requirement Specifications a. Developing / Operating / Maintenance Environments b. External Interface And Data Flows c. User display and report format, user command summary d. High level DFD and data dictionary e. Functional and performance specifications 12. Design Phase a. Detailed DFD s and structure diagrams b. Data structures, database and file specifications c. Pseudo Code 13. Test Plan a. Functional, Performance, Stress tests etc. 14. Implementation / Conversion Plan a. Project Legacy b. Current status of project 6
c. Remaining areas of concern d. Technical and managerial lessons learnt e. Future recommendations 15. Bibliography 16. Source Code Note: - The above is meant to serve as a guideline for preparation of the project report. The students may add to, modify or omit some of the above-mentioned points depending upon their relevance to the project and with the consultation of the project guide for the same. Joint project will be allowed and joint project report will be also being accepted. In case of Joint Project the team should not consist of more than 3 members. Individual project will be recognized and the student should highlight their contribution in a joint project report. Viva of Full syllabus studied under MCA course. THE-END END 7