K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11



Similar documents
FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

DE Frame with C Series Sidelight

Steel Door Frame Installation in Steel Stud Construction

PART 1 GENERAL 1.1 SECTION INCLUDES

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

Window Installation Instructions

INSTALLATION INSTRUCTIONS

Installation S D I TECHNICAL DATA SERIES. and Troubleshooting Guide. for Standard Steel Doors and Frames STEEL DOOR INSTITUTE

Premier & Deluxe 3-Season Room Sliding Glass Door

Clad Direct Glaze Window Installation Instructions

BASIC FIRE DOOR REQUIREMENTS TECHNICAL DATA SHEET NO. 401

Sash Replacement Guide

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Ceiling Mounted Folding Attic Ladders Installation Instructions

Installation Guide. Bath and Wall Surrounds SERIES B

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

PANELIZED HOME INSTALLATION GUIDELINE

Brick Veneer Construction

Sun Windows General Information Sun New Construction Window Installation Instructions

Guidelines for Earthquake Bracing of Residential Water Heaters

Eggers meticulously-crafted door frames are rivaled only by their beauty, quality and lasting performance. Turning nature s beauty into works of art

DIY CABINET REFACING INSTALLATION GUIDE

WINDOW PANNING AND TRIMS

DISTRIBUTOR TECH DATA

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

INSTALLATION OF A BAY WINDOW

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

How To Install Your Frameless Shower Enclosure

Guidelines for Earthquake Bracing Residential Water Heaters

CRASH RAIL INSTALLATION HEIGHT

WINDOW REPAIR MANUAL & REFERENCE GUIDE

All-Season Sunroom Sliding Glass Door Installation Instructions

Superform Products Ltd.

Basement Window Installation Guide Hopper and Sliding

ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Installing Window and Door Mouldings

Information Technology Solutions

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

MGB Chrome Bumper Conversion

450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

March 14, Installation of Bay, Bow and Garden Windows

SECTION 6. Glass Storefront Doors:

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO

Hinge Replacement & Hinge and Hardware Adjustment Guide for Andersen Frenchwood Hinged Patio Doors Manufactured Before November 2005

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS

Packaged Terminal Air Conditioner Wall Sleeve Installation

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Tundra Series Windows January 2016

4 5/16 Subframe Installation

Installing Shutters using Fasteners

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Hollow or Cinder Block Wall Mount Job Aid

Installation Instructions

Important Information for Installer & Homeowner

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

Installation Instructions

SPIRAL STAIR KIT INSTALLATION MANUAL

Heavy Glass Frameless Shower Door With Return Panel

Slide the new steering column shaft through the steering column from the driver compartment.

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

2.9 WINDOW & DOOR BUCKS

Base Cabinet with Self-storing Folding Doors and Floor

SERIES 238 WINDOWS. NOTE: Read instructions completely before attempting any installation.

Speed-Mat Rectangle Cutter

Basic Spring Motor Roller Shades

OWNER S MANUAL Table Tennis Table Patent Pending

BUILD A TABLETOP LOOM

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Wood Sound Retardant Door Hardware Information Bulletin

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

Installation Instructions and Ordering Information

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Balance Shoe and Balance Replacement

Installation Instructions

FORM DESIGN. easy to work with, and generally available.

Installation Instructions For Slider Casement Air Conditioners

WINDOW INSTALLATION GUIDE

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

6.0 Implementation: Retrofitting Gable End Walls with L-Bent Straps

Casement/Awning Window Parts Reference Catalog

InsulView Window Installation Instructions

Entry Door System Installation Instructions

Installation Guide for Andersen Architectural Wood Inswing Entry Doors

How to Install UnderDeck The Original.

Installation Instructions

Transcription:

K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins 4 INSTALLING FRAMES EQUIPPED WITH EMA S.............................Ins 5 K. D. FRAME ASSEMBLY FOR WOOD STUD WALLS..........................Ins 6 FRAME INSTALLATION DETAILS FOR WOOD STUD WALLS.....................Ins 7 K. D. FRAME ASSEMBLY FOR OPEN STEEL STUD WALLS.....................Ins 8 FRAME INSTALLATION DETAILS FOR OPEN STEEL STUD WALLS.................Ins 9 K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS....................Ins 10 FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...............Ins 11 UNIVERSAL ANCHOR INSTALLATION FOR F SERIES FRAMES...................Ins 12 UNIVERSAL ANCHOR INSTALLATION FOR MU SERIES FRAMES.................Ins 13 1 FACE KD FRAME ASSEMBLY FOR STEEL OR WOOD STUD WALLS..............Ins 14 1 FACE KD FRAME INSTALLATION DETAILS FOR STEEL OR WOOD STUD WALLS......Ins 15 MU SERIES FRAME ASSEMBLY........................................Ins 16 MU SERIES FRAME INSTALLATION DETAILS FOR STUD WALLS.................Ins 17 3-HOUR FIRE RATED FRAMES IN DRYWALL CONSTRUCTION - F & MU SERIES......Ins 18 EASY SET DW SERIES DRYWALL FRAMES INSTALLATION DETAILS..............Ins 19 ADDITIONAL STEPS FOR EASY SET DW SERIES FIRE RATED FRAMES............Ins 20 ADDITIONAL STEPS FOR 4 FACE HEADS SECURITY STUD ANCHOR INSTALLATION EASY SET DW SERIES BORROWED LITE FRAMES INSTALLATION................Ins 21 PS 074 SURFACE APPLIED WEATHERSTRIP INSTALLATION...................Ins 22 CLOSER REINFORCEMENT KIT INSTALLATION (SLEEVES).....................Ins 23 TEMPORARY SPREADER BARS........................................Ins 24 Shop Manual Effective September, 2004 Ins 1

1 2 INSTALLATION K.D. FRAME ASSEMBLY FOR MASONRY WALLS Layout heads and jambs. For 4 (102 mm) face frames (See Step 5). Slide head on jambs, engaging jamb tabs in head slots. 3 4 Bend tabs within head first (see Steps 4 and 5). Bend tabs in direction of corresponding arrows (away from the center of the head). For 2 (50 mm) face frames bend all tabs flat against head. For 4 (102 mm) face frames (see Step 5). Install No. 5 6 8 x 2 1/2 drywall screws 4 HEADS ONLY Bend top portion of corner tab as shown. Assemble head to jambs (see Step 2) and bend rabbet tabs flat against the head. Install #8 x 2 1/2 (63 mm) long drywall screw through head into corner tab. Bend inside tabs Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required Ins 2 Shop Manual Effective September, 2004

STEEL FRAME INSTALLATION DETAILS FOR MASONRY WALLS Wire Masonry Anchor 1 2 Adjust anchor to fit tight within jambs Wire anchors for masonry construction (3) per jamb through 7 6 high (4) per jamb 7 7 to 12 0 high (1) base anchor per jamb Locate frame. Spreader bar length = Door width 30 (2 6 door) 32 (2 8 door) 36 (3 0 door) Place a wood spreader at base of frame. If frame has threshold installed spreader bar is not needed. 3 4 5 Support frame. Fasten base anchors to the floor with nails. Level head. 6 7 8 Plumb jambs. 9 Square corners. Place and support a wood spreader at the center of frame. See Step 4 for spreader size See Step 2 above. Place wire anchor in jamb and wall equally spaced, as wall is erected. Check frame during wall erection to keep frame plumb and square. An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb. Shop Manual Effective September, 2004 Ins 3

EXISTING MASONRY WALL ANCHOR INSTALLATION DETAILS: Details are for non-label and label frames unless otherwise noted. ANCHOR SPACING: Non-label frames: one anchor must be provided for each 30 of jamb height. Label frames: anchors must be located a maximum of 6 from each end of jamb and a maximum of 26 on center. INSTRUCTIONS: A. PLACE ANCHOR IN FRAME. If frame anchors are already welded-in, proceed to installing frame as shown on page Ins 5. Welded-in anchors may be the same design as shown on this instruction sheet or may be tube/strap, channel/strap, or hat shaped design. 1. Flex anchor wings to fit anchor through throat of frame. 2. Nest anchor tube over dimpled hole. Caution: Keep anchor wings turned upward. INSTALLATION EXISTING MASONRY WALL ANCHOR INSTALLATION B. LOCK IN ANCHOR 1. Press anchor toward dimpled hole so that wings can be hooked under jamb backbends. 2. Spread anchor wings to lock in place. Note: Use a hammer to place the anchor in the frame. Existing Masonry Wall Anchor Tube/Shop Keep anchor wings turned upward Channel Strap Hat Shaped Ins 4 Shop Manual Effective September, 2004

INSTALLING THE FRAME: Details are for frames using a combination shield and screw supplied by Steelcraft. INSTALLING FRAMES WITH EMA ANCHORS If using a combination shield and screw not supplied by Steelcraft, or, if you are using separate expansion shields and machine screw, please see the instructions accompanying the fasteners. Rough Opening The rough opening instructions shown at the left should give you adequate clearance to install the frame (See page Ins 4). 1/4 greater than frame Install Frame 1. Place frame in opening. Roughly check frame for squareness and plumbness. 2. Using frame as a template*, drill 3/8 dia. x 2 1/2 deep hole in wall. Alternate method: using frame as a template, mark wall through holes in jambs. Remove frame and drill 3/8 dia. x 2 1/2 deep holes at marks*. Replace frame in opening. 3. Install anchors (combination shield and screw) and tighten as required. 4. Shim jambs behind anchors above screws to obtain proper door opening width. Make shims from 16 and/or 12 gage galvanized steel. Shims should be 2 wide x frame jamb depth minus (-) 1/8. *Hole specified is for shield supplied by Steelcraft. If another fastener is being used, drill wall as specified for that shield. Alternate with separate expansion shield and machine screws. 1. Place frame in opening. Roughly check frame for squareness and plumbness. 2. Using frame as a template mark wall through holes in jambs. 3. Remove frame and drill holes at marks on wall (hole dia. and hole depth as specified for fastener). 4. Install expansion shields in wall. 5. Replace frame in opening and anchor to wall with machine screws through dimpled holes. 6. Shim jambs behind anchors as described above. General Notes: Methods of sealing opening (gap) between frame and wall. 1. Apply bead of caulking. Label frames may require listed caulking. 2. Grout gap with mortar. Place frame in opening Shim Fill gap with approved caulking Shim jambs behind anchors above screws An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb. Shop Manual Effective September, 2004 Ins 5

1 2 INSTALLATION K.D. FRAME ASSEMBLY FOR WOOD STUD WALLS Layout heads and jambs. For 4 (102 mm) face frames see Step 5. Slide head on jambs, engaging jamb tabs in head slots. 3 4 Bend tabs within head first (see Steps 4 and 5). Bend tabs in direction of corresponding arrows (away from the center of the head). For 2 (50 mm) face frames bend all tabs flat against head. For 4 (102 mm) face frames see Step 5. Install No. 5 6 8 x 2 1/2 drywall screws 4 HEADS ONLY Bend top portion of corner tab as shown. Assemble head to jambs (see Step 2) and bend rabbet tabs flat against the head. Install #8 x 2 1/2 (63 mm) long drywall screw through head into corner tab. Bend inside tabs Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required Ins 6 Shop Manual Effective September, 2004

STEEL FRAME INSTALLATION DETAILS FOR WOOD STUD WALLS 1/4 greater 1 2 than frame Jamb anchors Anchor for Wood Stud Construction Assemble frame per details on page Ins 4 1/2 greater than frame Build rough opening. Install anchors. Insert Twist Attach base anchors with S.M. screws 3 4 5 Place frame in rough opening. Support frame. Level head. 6 7 8 9 Bend base anchor tabs around wood studs. Attach base anchors to floor plate. Plumb jambs. Place and support wood spreader at center of frame. 10 Bend jamb anchor tabs around wood studs. Attach jamb anchors to wood studs. Square corners. An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb. Shop Manual Effective September, 2004 Ins 7

1 2 INSTALLATION K.D. FRAME ASSEMBLY FOR OPEN STEEL STUD WALLS Layout heads and jambs. For 4 (102 mm) face frames see Step 5. Slide head on jambs, engaging jamb tabs in head slots. 3 4 Bend tabs within head first (see Steps 4 and 5). Bend tabs in direction of corresponding arrows (away from the center of the head). For 2 (50 mm) face frames bend all tabs flat against head. For 4 (102 mm) face frames see Step 5. Install No. 5 6 8 x 2 1/2 drywall screws 4 HEADS ONLY Bend top portion of corner tab as shown. Assemble head to jambs (see Step 2) and bend rabbet tabs flat against the head. Install #8 x 2 1/2 (63 mm) long drywall screw through head into corner tab. Bend inside tabs Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required Ins 8 Shop Manual Effective September, 2004

STEEL FRAME INSTALLATION DETAILS FOR OPEN STEEL STUD WALLS 1 Jamb 2 anchors Twist Anchor for Open Steel Stud Construction Assemble frame per details on page Ins 8 Install anchors. Insert Attach base anchors with S.M. screws Locate frame. 3 4 5 Spreader bar length = Door width 30 (2 6 door) 32 (2 8 door) 36 (3 0 door) Place a wood spreader at base of frame. Fasten base anchors to the floor. Set floor channels and install steel stud channels. 6 7 8 Place and support wood spreader at center of frame. Plumb jambs. Level head. 9 An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb. Plumb jambs. Shop Manual Effective September, 2004 Ins 9

1 2 INSTALLATION K.D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS Layout heads and jambs. For 4 (102 mm) face frames see Step 5. Slide head on jambs, engaging jamb tabs in head slots. 3 4 Bend tabs within head first (see Steps 4 and 5). Bend tabs in direction of corresponding arrows (away from the center of the head). For 2 (50 mm) face frames bend all tabs flat against head. For 4 (102 mm) face frames see Step 5. Install No. 5 6 8 x 2 1/2 drywall screws 4 HEADS ONLY Bend top portion of corner tab as shown. Assemble head to jambs (see Step 2) and bend rabbet tabs flat against the head. Install #8 x 2 1/2 (63 mm) long drywall screw through head into corner tab. Bend inside tabs Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required Ins 10 Shop Manual Effective September, 2004

STEEL FRAME INSTALLATION DETAILS FOR OPEN STEEL STUD WALLS 1 Jamb 2 anchors Twist Anchor for Closed Steel Stud Construction Assemble frame per details on page Ins 10 Install anchors. Insert Attach base anchors with S.M. screws Locate frame. 3 4 5 Spreader bar length = Door width 30 (2 6 door) 32 (2 8 door) 36 (3 0 door) Place a wood spreader at base of frame. Fasten base anchors to the floor. Set floor channels and install steel stud channels. 6 7 8 Place and support wood spreader at center of frame. 9 Plumb jambs. Plumb jambs. 10 Wall framework is now ready for wall finish. Gypsum Board Some typical wall conditions. Level head. An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb. Shop Manual Effective September, 2004 Ins 11

UNIVERSAL ANCHOR INSTALLATION - F SERIES FRAMES TYPICAL ANCHOR Steelcraft supplies an adjustable Universal anchor with their frames. The anchor is designed to work in the F and MU series frames, and the same anchor can be used in a wood stud or steel stud partition. The anchor can be adjustable to work in other jamb depths by bending the outside flanges of the anchor. To bend a flange, engage one ear of an anchor with another and bend the ear in or out as required. ADJUSTING ANCHOR INSTALLATION INTO F SERIES FRAME The anchor as supplied, adjusted for the jamb depth, can be installed into a F series frame without modification. The installation of the anchor into a F frame is as illustrated below. Place anchor into the throat opening of the frame. Rotate the anchor, locking it into a horizontal position between the frame faces. A hammer will aid in this operation. Install the frame in accordance with Steelcraft Frame Installation Instructions. Ins 12 Shop Manual Effective September, 2004

UNIVERSAL ANCHOR INSTALLATION - MU SERIES FRAMES The Universal Anchor will not fit into a MU series frame without pre-forming. The pre-forming will allow the anchor to be inserted into the throat opening. Determine the type stud condition, wood or steel and pre-form the anchoring straps as shown below. WOOD STUD STEEL STUD The universal anchor will not fit into MU series frames without pre-forming. Anchoring straps formed for wood stud condition. Anchoring straps formed for steel stud condition. Place anchor into jamb as shown. Rotate the anchor so it is in a horizontal position. A hammer will be required to rotate the anchor. Install the frame in accordance with Steelcraft Frame Installation Instructions. Using a hammer, rotate the anchor so that the attaching ears are extending out of the frame throat opening. This is done by striking the anchor on the back leg. Do not strike the anchor on the flat portion. Rotate the anchor until it is firmly locked into place with the flat portion of the anchor parallel to the bottom of the frame. Shop Manual Effective September, 2004 Ins 13

1 FACE K.D. FRAME ASSEMBLY FOR STEEL OR WOOD STUD WALLS 1 2 Layout heads and jambs. Slide head on jambs, engaging jamb tabs in head slots. 3 4 Bend tabs within head first (see Steps 4 and 5). Bend tabs in direction of corresponding arrows (away from the center of the head). For 2 (50 mm) face frames bend all tabs flat against head. 5 Special Wood Stud strap anchor is to be welded in to the base of the frame. Ins 14 Shop Manual Effective September, 2004

1 FACE K.D. FRAME INSTALLATION DETAILS FOR STEEL OR WOOD STUD WALLS 1 2 Special Anchor for Steel or Wood Stud Construction Assemble frame per details on page Ins 14. Jamb anchors are welded in Locate frame. 3 4 5 Place a wood spreader at base of frame. Spreader bar length = Door width 30 (2 6 door) 32 (2 8 door) 36 (3 0 door) Note: Special Anchors must be ordered separately - they do not ship automatically Jamb anchors are used as base anchors. Set floor channels (or floor plate) and install steel stud channels (or wood studs). 6 7 8 Place and support wood spreader at center of frame. Plumb jambs. Level head. 9 An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb. Plumb jambs. Shop Manual Effective September, 2004 Ins 15

1 2 INSTALLATION FRAME ASSEMBLY FOR MU SERIES FRAMES Layout heads and jambs. Slide head on jambs, engaging jamb tabs in head slots and interlock head under corner tab. 3 4 Connect jamb and head together using sheet metal screws provided. Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required. Ins 16 Shop Manual Effective September, 2004

MU SERIES STEEL FRAME INSTALLATION DETAILS FOR STUD WALLS Universal Anchor MU Series frame Adjustable Anchor 1 2 Jamb anchors Wood Stud Steel Stud Insert Twist Attach base anchors with S.M. screws 1/4 greater than frame Install anchors. 1/2 greater than frame Place frame in rough opening. 3 Wood Stud 4 5 6 Steel Stud Spreader bar length = Door width 30 (2 6 door) 32 (2 8 door) 36 (3 0 door) Bend base anchor tabs around wood studs Place a wood spreader at base of frame. Level head. Fasten base anchors Steel Stud Fasten base anchors to the floor Set floor channels and install steel stud channels. 7 8 9 Wood Stud Steel Stud Sheet metal screws Bend jamb anchor tabs around wood studs. Attach jamb anchors. Place and support wood spreader at center of frame. Square and plumb frame. 10 Wood Stud Gypsum Board Steel Stud Gypsum Board Wall framework is now ready for wall finish. An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb. Shop Manual Effective September, 2004 Ins 17

ADDITIONAL STEPS FOR 3 HOUR FIRE RATED FRAMES IN DRYWALL CONSTRUCTION - F and MU SERIES INFORMATION: Quantity of Z Spacers 1. One (1) spacer for door openings 3 6 (1067 mm) wide and less. 2. Two (2) spacers for door openings over 3 6 (1067 mm) wide up to and including 5 6 (1676 mm) wide. 3. Three (3) Spacers for door openings over 5 6 (1676 mm) wide up to and including 8 0 (2438 mm). Set horizontal runner inside head and attach runner to vertical steel stud framing members. A Section AA Z Spacers in head of frame. Do not attach Z spacers to steel stud framing system. A Vertical studs are to be centered over each welded-in Z spacer and attach vertical studs to horizontal runners (see Section A-A) Vertical studs not to exceed 24 (610 mm) on center. Ins 18 Shop Manual Effective September, 2004

PREPARE ROUGH OPENING EASY SET DRYWALL FRAME INSTALLATION INSTRUCTIONS Steel Stud Notch gypsum for base anchor attachment (DW Series frames only) Steel Track Wood Block Opening Width: door opening size plus min. 1 1/2, max. 2 Opening Height 2 Face: door opening size plus min. 1/2, max. 1. 4 Face: door opening size plus min. 2 1/2, max. 3 1 2 3 Not required for K Series Twist base anchors into strap at base of jamb. (See Steps 6A and 6B) Notch drywall at base for attachment of base anchor. Install frame head. Center in rough opening. 4 5 6 Insert tab on jamb in slot in head. Pivot jamb into place. This will engage corner clips. Repeat Step 4 with other jamb. A. Base anchors can be installed at this time following directions in Step1. B. For K-Series frames, attach base of jamb to the wall with drywall screws through holes in jambs. 7 8 9 Wood spreader bar Place spreader bar between jambs at base. This will insure proper opening width at base of frame. Level head. Screw base anchors to floor runner or studs. Plumb frame by adjusting anchors at top of jambs. Make certain anchors are pressed tightly against rough opening. Frame is now ready to receive a door (baseboard is attached after frame is installed). Shop Manual Effective September, 2004 Ins 19

ADDITIONAL STEPS FOR FIRE RATED EASY SET FRAMES ONLY All fire rated frames After installing frame, connect jamb and head using sheet metal screws supplied. ADDITIONAL STEPS FOR 4 (102 MM) FACE HEADS #8 x 2 1/2 (63 mm) drywall screws 2 screws per frame corner Install the frame following Steps 1 through 8 shown on Page Ins 19. After installing the frame, connect jamb and head using #8 x 2 1/2 (63 mm) long drywall screws. SECURITY STUD ANCHOR INSTALLATION Press base of anchor towards face of frame until anchor snaps into position shown. A Elevation Section A 1. Locate security anchor immediately above or below strike reinforcement, and/or above or below hinge reinforcement. 2. For additional security, use security anchor on both sides of the jamb. 3. Security anchors cannot be used with Vinyl Throat Filler. Pre-assembly of anchor in frame Drywall screws by others Anchor assembled in frame. Security anchor (2) studs recommended for proper anchoring Frame installed in opening - leg of security anchor is to fit between gypsum and studs. Mark the centerline of anchor on outside face of gypsum board before installing frame in opening. Install self drilling drywall screw through gypsum board, at mark, into security anchor and stud. Ins 20 Shop Manual Effective September, 2004

EASY SET K.D. DRYWALL BORROWED LITE FRAME INSTALLATION INSTRUCTIONS NOTES: 1. Frames are equipped with compression anchors in the head and sill sections only. 2. After completing the installation of the Borrowed Lite frame, attach the cut-to-length glazing bead using self-drilling screws or oval head sheet metal screws. 1 Rough opening: finished opening plus 2 3/4 (70 mm (+ 1/4 [16 mm]). Rough opening: finished opening plus 2 3/4 (70 mm (+ 1/4 [16 mm]). Make rough opening finished opening plus 2 3/4 (70 mm (+ 1/4 [16 mm]) wider and 2 3/4 (70 mm (+ 1/4 [16 mm]) higher than finished opening. 2 3 4 Tab Slot Install jambs tightly against edges of opening making width, or opening, as wide as possible. Retract anchors all the way within sill. Insert mitered end of sill into corner of opening and pivot to horizontal position. Repeat same operation for head. Assemble frame by pushing jamb tabs into sill slots. Push head slots down into jamb tabs. 5 6 CAUTION: Raise and level sill to desired height with adjusting anchors. Square corners and adjust anchors in head tightly against rough openings. Glaze and install glazing in standard manner. When borrowed lite frames are located near 3-sided frames, locate the top of the borrowed lite rough opening 1/2 (3 mm) above the top of the 3-sided frame rough opening. Shop Manual Effective September, 2004 Ins 21

SURFACE PREPARATION: Thoroughly clean surfaces of frame where weatherstrip is to be applied. Use a solvent cleaner such as mineral spirits or a detergent cleaner. Remove any irregularities or loose paint from the surface area. It is recommended that the weatherstrip be applied after finish painting door and frame. Do not paint weatherstrip. Paint will not hurt the weatherstrip, but could leave it with a non-acceptable appearance. INSTALLATION PS 074 SURFACE APPLIED WEATHERSTRIP INSTALLATION HELPFUL HINTS: 1. The best tool to use in cutting weatherstrip is a pair of scissors. 2. Ideal temperature range to apply weatherstripping is 70 to 90 F (21 to 32 C). Weatherstripping should not be applied when temperature is below 50 F or above 100 F (10 to 38 C). 3. To remove paper liner, fold one end of liner back against itself and peel liner down weatherstrip. This will help eliminate danger of pulling the adhesive film from the weatherstrip. INSTALLATION: 1. Determine position that weatherstrip is to be applied on the strike jamb, head and hinge jamb. See Fig 1. 2. Install head weatherstrip first. a. Measure head width (rabbet to rabbet) and cut weatherstrip to that dimension. b. Remove paper liner (see Helpful Hint 3). c. Install head weatherstrip. Start at one end and work to the other end. Align and press strip to head while working from one end to the other. 3. Install strike jamb weatherstrip (see Fig. 2). a. Fold paper liner back at top end (approx. 2 ). Lap top end of weatherstrip about 1/8 over back leg of head strip and stick in place. See corner detail in Fig. 2 b. Peel paper liner loose (see Helpful Hint 3). Align and press strip on jam as you remove liner. c. Cut off excess weatherstrip at bottom of jamb. 4. Install hinge jamb weatherstrip. a. Fold paper liner back at top end (about 2 ). Butt strip to head rabbet and stick in place. b. Peel paper liner loose (see Helpful Hint 3). Align and press strip on jamb as you remove liner. c. Cut off excess weatherstrip at bottom of jamb. 5. After installation of the weatherstrip is complete, run a finger back over the base strip to make sure that it is pressed tight against the frame. Put paper liner parallel with weatherstrip 4. Storage: do not store weatherstrip in high temperature areas. Use weatherstrip within a year after receipt. If weatherstrip is stored for continuous use, stock should be rotated upon receipt of new material. Fig. 1 Fig. 2 Butt here Hinge Jamb Butt here Head and Strike Jamb Approx. 1/8 lap Strike Corner Weatherstrip Detail Ins 22 Shop Manual Effective September, 2004

CLOSER REINFORCEMENTS: Closer reinforcements can be added to Steelcraft frames using one of the following sleeves. Sleeves provide reinforcement for regular arm, parallel arm and top jamb mounted closers. FULL CLOSER SLEEVE: Installation 1. Install sleeve in head. 2. Slide sleeve to position required. See closer manufacturer s template for location. 3. Bend tab over end of head. If tab will not extend far enough to bend, tackweld sleeve into position. Note: Sleeves can be used in label frames. HALF CLOSER SLEEVE: Installation: 1. Hook sleeve under backbend. 2. Slide sleeve to position required. See closer manufacturer s template for location. 3. Push down into soffit, locking sleeve into position. A screw driver and hammer can be used to put sleeve into position. Note: Sleeves can be used in label frames. FRAME KIT INSTALLATION DETAILS 16 14 gage 8 Full Closer Sleeve Typical Installation Half Closer Sleeve Install in head prior to assembling the head to the jamb. 14 gage Hook Sleeve Push and lock sleeve into position Sleeve can be installed before or after assembling the frame Shop Manual Effective September, 2004 Ins 23

TEMPORARY SPREADER BARS The temporary installation of the spreader bars shown below is designed to snap into position and establish the proper door opening width at the bottom and center of the frame. IT IS RECOMMENDED THAT A TEMPORARY SPREADED BAR BE USED IN BOTH RABBETS TO PREVENT FRAME TWISTING. After the frame has been properly anchored, the temporary spreader bars can be removed and reused in the installation of another opening. Overall Frame Width Nominal Door Size Door Opening Spreader Bars Bottom of Frame Spreader Bars Typical Jamb Typical Frame NOTES: 1. Temporary spreader bars can be fabricated from 16 gage galvannealed steel. 2. DO NOT Paint the spreader bars. 3. These units are designed to be used with 2 face frames only, and can be used on both 1 15/16 and 1 9/16 rabbets. 4. When using to square a frame in an opening, avoid all hardware preparations where possible. 5. It is recommend to use temporary spreader bars on frames being installed in both masonry and drywall applications. Ins 24 Shop Manual Effective September, 2004