Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)



Similar documents
BENTLEY ELEMENTS COLLECTION LVT

Carpet Tile Installation Guidelines

How to Install Hardwood Flooring Over a Sub Floor

12 POLYURETHANE ADHESIVE (PU 105)

Moisture and Resilient Floor Covering

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

VINYL CLICK FLOORING INSTALLATION GUIDE

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Laminate Flooring T-Lock Angle-Drop Installation Instructions

Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation

Division 9. SignaFlor Pad and Pour Flooring System

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

INSTALLATION THE SIMPLIFIED VERSION

Installation Guidelines for Modular Carpet

Minor Cracks in Horizontal Surfaces

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING

RESILIENT TILE FLOORING INCLUDING SOLID VINYL AND LINOLEUM FLOOR TILE

Herringbone Pattern Flooring

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Installation System. Existing Resilient Sheet Floors

Shower Walls and Tub Surrounds

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

INSTALLATION IMPORTANT INSTALLER/OWNER RESPONSIBILITY TOOLS & EQUIPMENT NEEDED FOR INSTALLATION PRE-INSTALLATION PROCEDURES & JOBSITE CONDITIONS

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

Armstrong Do-It-Yourself Tile Installation System

Vinyl Composition Tile Installation System

SECTION POLISHED CONCRETE FINISHING

Resurfacing Concrete. Page 1 of 5

ENGINEERED FLOORING INSTALLATION

CHAPTER 3 MOISTURE TESTING

COMMERCIAL RESILIENT INSTALLATION GUIDELINES

Installation guide. ENGINEERED and LOC. 1/2 in and 3/4 in (13 mm and 19 mm) INNOVATION TRADITION PERFECTION

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

How To Level A Subfloor

GigaCrete Specification PlasterMax

Installation for Wood Flooring

Guide Specifications for Maple Flooring Systems

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SC2000 CEMENT BONDING PROCEDURES

Engineered Hardwood Flooring Installation Instructions

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

installation Mannington Works manningtoncommercial.com Mannington Commercial Luxury Vinyl Tile Installation Instructions GENERAL

Aspect Metal Peel & Stick Tile Installation Guide

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

Commercial/Residential Linoleum Sheet Installation System

Installation Instructions for staple/nail down applications

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

CA-48 TECHNICAL SPECIFICATION

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

Grand Mesa Plus LAMINATE - WIRE BRUSHED. GAGVGM81012A Prairie. GAGVGM80012NA Colorado. GAGVGM84012A Pecan Rustic. GAGVGM85012A Saddle Walnut

The Mohawk Group Installation Guidelines for

Hardwood Flooring. Urbania Flooring

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

installation Mannington Works manningtoncommercial.com Mannington Commercial Hardwood

Wecryl Waterproofing System under surfacing supplied by others

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

Solvent Cementing Instructions For Plastic Pipe & Fittings

PANELIZED HOME INSTALLATION GUIDELINE

Guide Specification SECTION SHEET CARPETING PART 1 - GENERAL 1.1 SUMMARY. A. This Section includes broadloom carpet. 1.

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration

PREFINISHED SOLID-STRIP BAMBOO FLOORING SIGNATURE NATURALS + SIGNATURE COLORS Multiple Precise Lengths

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

Fiberglass-Reinforced Sheet Flooring Installation System

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

HVAC Vents & Diffusers

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

Shingle Installation Guide

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

INSTALLING LINOLEUM FLOORING

SECTION POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

DMS REINFORCED CONCRETE PIPE AND MACHINE-MADE PRECAST CONCRETE BOX CULVERT FABRICATION AND PLANT QUALIFICATION

INSTALLATION GUIDE. Imago Installation Guide - January

CLEAR-DIVISIONS APERTO

AC Tech Project Survey

PRE INSTALLATION MANUAL

SECTION PLAYGROUND SURFACING TILES

CLEAR-DIVISIONS CENTERFOLD

Development COMMERCIAL CARPET TILE. Lifetime Commercial Warranty. 18oz/sy - Solution Dyed Twisted Polypropylene JUNE 2014.

INSTRUCTIONS FOR COORDINATION SECTION SOLID SURFACE FABRICATIONS

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

M50 RUBBER/PLASTICS/CORK/LINO/CARPET TILING/ SHEETING

Daybreak Acacia. 25yr Residential Wear Warranty

Best Barns USA Assembly Book

Wastewater Capital Projects Management Standard Construction Specification

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

Installing Window Trim and Door Trim

Acrylic Walls Installation Instructions

Section EXTERIOR STONE VENEER Full Mortar

Sample Specification Guideline for Installing a Polished Overlay Using Rapid Set TRU Self-Leveling SECTION POLISHED CONCRETE TOPPING

Transcription:

INSTALLATION INSTRUCTIONS FOR GTI CONNECT TILES This document refers to the following products: Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking) 635 X 635 mm 25.5 x 25.5 Same Heat welded in specific areas Note: This document refers to the following standards: ACI 302.1R Guide for Concrete Floor and Slab Construction. ACI 302.2R Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring Materials ASTM F710-11 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring ASTM F1869-11 Standard Test Method for Measuring Moisture Evaporation Rate of Concrete Subfloor Using Anhydrous Calcium Chloride. ASTM F2170-11 Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using In-Situ Probes. Recommended Work Practices for Removal of Resilient Floor Coverings of Resilient Floor Covering Institute (RFCI). 1. STORAGE AND HANDLING Stack GTI CONNECT tiles not higher than 36 with the edges of the boxes flush to one another. Overhanging edges may curl the tiles or the planks. Handle all materials carefully and safely. 2. SUBFLOOR PREPARATION The General Contractor will supply a smooth, flat concrete finish ready to receive the new resilient sheet flooring in accordance with ACI 302.1R Guide for Concrete Floor and Slab Construction and ACI 302.2R Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring Materials. The concrete subfloor will be cured for a minimum of at least thirty (30) days. The slab will have a tolerance of 3/16 in a 10 radius. Prepare substrate as per ASTM F710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring. The concrete floor temperature will have to be maintained at a minimum of 65 F for 48 hours prior, during, and 48 hours after the installation. The concrete slab, new or old, must be tested for moisture. We recommend having the tests performed by a recognized certified floor covering inspector. The ICRI website (International Concrete Repair Institute) has a list of certified technicians for the USA: http://www.icri.org/certification/find-ccsmtts.asp The moisture tests must be performed as per ASTM F1869-11 Standard Test Method for Measuring Moisture Evaporation Rate of Concrete Subfloor Using Anhydrous Calcium Chloride and/or ASTM F2170-11 Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using In- Situ Probes. Substrate shall not exceed 10lbs/1000 sq ft/24 hrs per ASTM F1869-11 and not to exceed 92% RH per ASTM F2170-11. Gerflor GTI CONNECT Tiles Installation Instructions 20150817 Page 1 of 8

Prohibit circulation of other trades in the installation area. Technical Services Before proceeding with any work, inspect the subfloor surface and report in writing to the Project Manager and the General Contractor any visible defects on the surface such as cracks, bumps, rough areas or variations in evenness. Check the subfloor for grease, oil, paint, marker, spills, dust or any contamination that may adversely affect the adhesion of the flooring. Clean the subfloor according to the existing conditions. Sanding of the subfloor will be mandatory in many cases; especially in areas where the subfloor has been contaminated with foreign products. It may be necessary to scarify or bead-blast concrete surface to remove existing adhesives, paint, concrete sealers or other surface applied materials. Curing compounds of any types have to be completely removed by means of sanding, scarification or bead-blasting. Self-dissipative curing compounds must be removed using the same methods. The Contractor shall patch and repair all cracks, voids and other imperfections of concrete with high strength Portland cement based patching compounds such as Mapei Ultraplan, Ardex K-15, Ardex Feather Finish, Mapei Planipatch or equal, approved by the manufacturer. Do not use gypsum based patching materials. After completion of sanding, patching and leveling, vacuum or sweep entire surface of concrete to remove loose dust and dirt before starting the installation of material. For installation where a Gypsum Concrete has been poured, contact Gerflor Technical Services. 2.1. SUBFLOORS WITH RADIANT HEATING SYSTEMS IMPORTANT: GTI CONNECT tiles have to be completely glued down when installed over radiant heating system. Gerfix TPS+ adhesive and Gerfix LVT & Plank Spray adhesive are recommended for such installation. Gerflor GTI tiles can be installed over subfloors with radiant heating systems. To ensure proper installation and enable proper adhesion, respect the following conditions: In all cases, it is necessary to respect the curing time of the concrete slab. Before the installation, the radiant heating system must have been turned on for at least 4 weeks to stabilize the moisture content of the concrete slab and to avoid any moisture peak when the system will be in service after the installation of the flooring. A certified technician should turn on the system as per the manufacturer recommendation. The temperature must be kept at its maximum of 85 F for 8 days prior to the installation of the floor covering. At all time, the maximum temperature of the concrete slab shall not exceed 85 F. To install on a subfloor with a radiant heating system, the system has to be turned off 48 hours before, during and 72 hours after the installation. Always verify that the room temperature is not less than 65 F (18 C) during that period of time. The heating system should be turned on gradually only 72 hours after the installation. Turning on the heat gradually will allow the substrate and the flooring to adapt to the temperature change together. A sudden temperature change could result in adhesion problems. Moisture tests for subfloors with Radiant Heating Systems shall not exceed 75% RH per ASTM F2170-11 and 3-lbs/ 1000sq.ft./24hrs per ASTM F1869-11 when using Gerfix TPS + adhesive. Gerflor GTI CONNECT Tiles Installation Instructions 20150817 Page 2 of 8

Settings of the radiant heating system prior and during the installation: 28 days to 2 days prior at 85 F 48 hours prior to the installation turned-off Turned-off during the installation 72 hours after installation the system remains turned-off Gradually turn on the system 2.2. MATERIAL INSPECTION Pallets are clearly marked with batch numbers and the product should be checked for match before installing. Inspect all materials carefully to verify that correct colors, lot number, patterns, quality and quantities have been shipped as ordered. Do not install, cut, or fit any material that has visible defects. A contractor that installs material that has visible defects or damage without prior consent of Gerflor deems the product acceptable for installation and therefore accepts full responsibility for said material. 3. INSTALLATION OF GERFLOR GTI CONNECT TILES Note: Gerflor GTI CONNECT tiles are interlocking; Although they are installed loose-laid, some areas will need adhesive to secure the tiles. See drawings below: For surfaces where pallet jack and/or fork lift will be used, adhesive or double face tape must be applied every 30 linear feet in both directions. Drawing 1 Gerflor GTI CONNECT Tiles Installation Instructions 20150817 Page 3 of 8

For any long corridors, the GTI tiles must be glued down every 25-30 ft. (12-15 Tiles) Drawing 2 For areas greater than 5000 sq. ft. we recommend to glue down or double face tape specific areas of the surface: o A gap of ¼ minimum must be left on the perimeter of the walls. o Tiles must be heat-welded where different lots are meeting (dotted lines). o The white areas in drawing 3 have to be glued with either double face tape or adhesive. o DO NOT mix batches of tiles. Gerflor GTI CONNECT Tiles Installation Instructions 20150817 Page 4 of 8

3.1 LAYOUT AND INSTALLATION SEQUENCE OF THE GTI CONNECT TILES Notes: Install tiles in the same direction. DO NOT mix batches of tiles Drawing 4 Chalk the center lines of the work area in both directions so that one line is parallel to the length of the room and that the second line is on a 90 angle to the first line. Position center lines to allow the perimeter tiles to be to ½ tile. Use a composite dead blow hammer to interlock the tiles properly. Gerflor GTI CONNECT Tiles Installation Instructions 20150817 Page 5 of 8

Keep the tiles in the same direction while installing. 3.2 CUTTING THE PERIMETERS Use a Bullet cutter to ease the process: Bullet RCT 26" shear (#526) 3.3 ADHESIVES RECOMMENDED: GERFIX LVT & PLANK SPRAY ADHESIVE o Use as shown on Drawings 1, 2 and 3 where some areas need to be glued for stability purpose. o Follow usage recommendation for the adhesive. GERFIX TPS+ ADHESIVE o Use as shown on Drawings 1, 2 and 3 where some areas need to be glued for stability purpose. o Follow usage recommendation for the adhesive. MAPEI G21 POLYURETHANE ADHESIVE o Use in areas that are subject to be wet (i.e. commercial refrigerators, reception areas, etc.) o Follow usage recommendation for the adhesive. 3.4 Threshold H202 model type 5/16 ¼ ---------- Gerflor GTI CONNECT Tiles Installation Instructions 20150817 Page 6 of 8

4. HEAT WELDING BETWEEN BATCHES of GTI CONNECT (Refer to our document: Verification of Heat Welded Seams) 4.1. ROUTING: Use an electric routing machine for major installation such as Leister or equal, approved by manufacturer. The Master Turbo Groover is a great tool and is highly recommended to groove our products. http://turboheatweldingtools.com/shop/ The Pico groover is a great tool to groove our products. The use of a straight edge and hand groover will provide good results for smaller installations. Maintain a uniform width and depth of groove for a uniform welded seam. Rout no deeper than the 2mm wear layer. 4.2. MANUAL WELD: Note: Always practice on a scrap piece of material first to assure proper temperature and speed. Welding tests and adjustment of welder must be done every day there is welding to be done on the job site. Doing so will prevent failures. Groove only 16-24 hours after the installation. This must be done with a heat welding gun with variable temperature control and a speed weld nozzle by Leister or equal, approved by manufacturer. Turbo Precision Nozzle # 22-3 is highly recommended as well for proper welding. http://turboheatweldingtools.com/shop/turbo-precision-nozzle-45mm/ Nozzle size is 5mm as the Romus Rapid Nozzle 95027. The use of a non-recommended tip will jeopardize proper welding and could damage the flooring. Always keep the tip clean. 4.3. WELDING ROBOT (REQUIRED ON LARGE PROJECT) Note: Always practice on a scrap piece of material first to assure proper temperature and speed. This should be done every day there is welding to do on the job site. Doing so will prevent failures. Do not let the robot operate without surveillance. Turbo Welding Gun #25 is the recommended welding robot as it comes with the right welding tip. http://turboheatweldingtools.com/shop/chiquita/ Note: Should another type of welding robot be used, such as Leister robot, care must be taken in the choice of tip as for most cases Gerflor GTI CONNECT Tiles Installation Instructions 20150817 Page 7 of 8

the opening of the tip is more than 2mm. This could damage the flooring and lead to a seam failure. The recommended tip for the Leister Robot is Romus 95253 2mm. WARNING: Do not weld the flooring using the Leister robot without the proper tip. Verify not to reduce the power with electrical cords that are too long. Frequently verify the weld. The ambient temperature, open windows and doors and other electrical equipment plugged in the same electrical outlet may influence proper welding. Notes: For any type of installation, do not heat weld resilient flooring for a minimum of 16 to 24 hours after the material has been placed into the adhesive. Refer to ASTM F1516-13 "Standard Practice for Sealing Seams of Resilient Flooring by the Heat Weld Method". 4.4. TRIMMING WELDED ROD Note: Trimming is done once the welding rod and material have completely cooled. Trimming must be done in two passes. The Turbo Plane tool is recommended and will trim in one pass. http://turboheatweldingtools.com/shop/ Use trimming tools sharpen in the middle only, such as the Mozart trimmer. This type of trimmer will not damage the flooring. The first trim has to be done with the thickness guide. The second trim has to be done with the trimmer only. Always verify the trimmed weld to ensure that the welding rod is bonded properly and is flush with the top wear layer. 5. ONCE THE INSTALLATION IS COMPLETED Do a visual inspection of the project. Verify every welded seam. Repair every imperfection before leaving the project. Make sure that every vertical obstacle such as doorframes is well trimmed and sealed with a silicone sealer or an equivalent product. For any information, please refer to Gerflor Technical Services. End of Document Gerflor GTI CONNECT Tiles Installation Instructions 20150817 Page 8 of 8