UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Topographical Survey. Design Evaluation. Construction Submittals



Similar documents
SECTION 5 DRAFTING STANDARDS

University of Northern Iowa Design Documents Standards. October 2014

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

CAD Standards Guideline For Facility Documentation and Construction Projects

CAD Standards Guideline For Facility Documentation and Construction Projects

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

5.2 Drawing Information Consultants Procedure Manual. 5.2 Drawing Information: Large Format Document Standards: Page 1 of 5

SECTION AS-BUILT DOCUMENTATION

Requirements for Building Application Submission

SITE IMPROVEMENT PLANS CHECKLIST

Guidelines for Fiber Optic Cable Permits

CHAPTER 3 PROJECT CONTROL

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

Washington City Subdivision Development Application Checklist

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Maps A Primer for Content & Production of Topographic Base Maps For Design Presented by SurvBase, LLC

Brevard County Public Works Finance and Contracts Administration

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Specialised Data Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER. GENERAL SURVEY INSTRUCTIONS EASEMENTS Authority 11 AAC 53

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

G.S Mapping Requirements for Recordable Maps

THURSTON COUNTY PUBLIC WORKS DEPARTMENT Design and Construction Division. CADD & Civil 3D User Guidelines. v2.0_12_12_09

CITY OF TUCSON, WATER DEPARTMENT DESIGN STANDARD NO WATER PLAN DRAFTING STANDARDS TABLE OF CONTENTS

Create a folder on your network drive called DEM. This is where data for the first part of this lesson will be stored.

FIBER-OPTIC CABLE PLAN CHECK

Weekend Cabin Retreat Project Site Plans

Site Development Information Worksheet for single family residential development

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

SEWER LINE EXTENSION DESIGN CHECKLIST

Designer Quality Control Plan Guidelines

Survey Ties Guidelines

CHAPTER 4 LEGAL DESCRIPTION OF LAND DESCRIBING LAND METHODS OF DESCRIBING REAL ESTATE

Basic Elements of Reading Plans

LS 2540 SEWER LATERALS AND INSPECTION TEES

Close-Out Documents... 9

CHAPTER 9 SURVEYING TERMS AND ABBREVIATIONS

Preliminary Plan Application and Checklist

Transbay Transit Center Program. CADD Standards Manual. Revision 2. November 2010

CAD and Drawing Style Procedure

Model Virginia Map Accuracy Standards Guideline

SECTION GROUND WATER STORAGE TANKS

Atlanta BeltLine, Inc. Request for Proposals Arthur Langford Jr. Park Survey

DESIGNING YOUR LANDSCAPE

Request for Proposals for Topographic Mapping. Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming

Chapter 23: Drafting in Worksheet View

2005 MINIMUM STANDARD DETAIL REQUIREMENTS FOR ALTA/ACSM LAND TITLE SURVEYS

CLEANING, INSPECTION, AND TESTING OF SEWERS

4.03 Vertical Control Surveys: 4-1

WE OFTEN BELIEVE artists

Layout Tutorial. Getting Started

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

House Design Tutorial

ORDINANCE NO

SECTION STORM DRAINAGE TABLE OF CONTENTS

Roof Tutorial. Chapter 3:

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

City of Houston Department of Public Works and Engineering INFRASTRUCTURE DESIGN MANUAL JULY 2009 TABLE OF CONTENTS

CHAPTER 5. Storm Sewer

Drawing a Bedroom Floorplan

SANITARY SEWER SPECIFICATIONS

How To Create A View Frame In 3D

I. Project Initiation Sheet (if any information changed since Concept Plan submittal)

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SECTION EARTH MOVING

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

FUNDAMENTALS OF LANDSCAPE TECHNOLOGY GSD Harvard University Graduate School of Design Department of Landscape Architecture Fall 2006

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Autodesk Civil 3D Styles: A Guide to the Fundamentals

Elev. A = , Elev. B = , horizontal distance = 1625 feet a. 7.7 b..077 c d. 1.28

Survey Field Note Standards

CITY OF HILSHIRE VILLAGE NEW HOUSE AND HOUSE ADDITION PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

AutoCAD Civil 3D 2008

SketchUp Instructions

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

MINIMUM STANDARDS OF ACCURACY, CONTENT AND CERTIFICATION FOR SURVEYS AND MAPS ARTICLE I. TYPES OF SURVEYS

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow

Layout Tutorial. Chapter 10: Getting Started

Chapter 9 Sanitary Sewers

CHAPTER 2 HYDRAULICS OF SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Section 2100-Trenching and Tunneling

SECTION SHEETING, SHORING AND BRACING

LIDAR and Digital Elevation Data

University of Arizona THE CAMPUS SPATIAL DATA INITIATIVE

SECTION PRECAST CONCRETE UTILITY STRUCTURES

MUNICIPAL ENGINEERING RESIDENTIAL SUBDIVISON STANDARDS

Floodplain Development Land Use Review

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

Introduction to Structural Drafting

CITY OF FARMERSVILLE, TEXAS

Microsoft Excel 2010 Charts and Graphs

Pro/ENGINEER Wildfire 4.0 Basic Design

Transcription:

This section applies to design standards and procedures involved in the field location and plotting of all natural objects and surface improvements. This section also includes the requirements for submittal of plans and files to the University. Surveying All topographic surveys must be stamped by a Professional Surveyor licensed in the State of Washington. Horizontal Datum shall be NAD 83/91. Vertical Datum shall be NAVD 88. Mapping On the survey, note any University control monuments encountered. These monuments are designated by a number as shown on record drawing 915-C-09. Physically locate baseline in the field and show on the topographic map. Reference baseline by coordinates and a bearing. Establish baselines parallel to a face or major axis of the proposed or existing building. Preferred mapping scale is 1 inch to 20 feet. Symbol size should be computed based on this scale. Contour interval shall be 1 foot; 2 feet is allowable on steep slopes for clarity of the drawings. Hard surface (ie. pavement, concrete) spot elevations shall be 0.01 accuracy. Soft surface (ie. grass, dirt) spot elevations shall be 0.1 accuracy. Include all ground floor elevations of existing buildings and slab structures on the survey Verify and show all storm and sanitary sewer inlet and outlet invert elevations at manholes by field measurement as well as rim elevations. Show all underground utilities. Provide a note on the survey which clearly states all assumptions and limitations in the survey. Identify all buildings shown wholly or partially on the finished drawings by name and accented by shading or crosshatching. When feasible include at least two points upon the building face as far apart as practical. These points will assist the University in locating and rotating floor plans onto the campus map. Field-locate all trees and major vegetation and record location on the map. Identify tree size, type and ID tag numbers on the map. Note the actual canopy of the tree. (Protect existing shrubs, trees and lawn areas during the progress of fieldwork; under no circumstances will their removal be permitted.) Canopies are to be drawn to scale. Do not use one symbol of one size for all trees within the survey unless preapproved by Campus Engineering. Locate all tunnels and tunnel manholes. Show floor elevations of tunnels. Show coordinates of University of Washington monuments along with monument ID. Include a general vicinity map, small scale, on the finished drawings. Use abbreviations as shown in City of Seattle standard plan 002. Design Evaluation The surveyor may provide an advance copy of the survey to Campus Engineering for comment if they wish. An electronic AutoCAD version of the survey is to be provided to Campus Engineering when completed. Construction Submittals REV:07 JUN2015 2H - 01

Provide standard industry submittal requirements. Product, Materials and Equipment Map on paper with Professional Surveyors wet signature. Use a minimum of 20 pound paper. (2) copies. If the survey map is generated by Computer Aided Drafting (CAD), provide to the University a copy of each drawing CD. Provide labels completely identifying the contents of each CD. Include the survey in PDF format along with the original survey in AutoCAD form. The surveyor may delete their titleblock and professional seal from the CAD file if they wish. All CAD files are to be purged of unused blocks, layers, linetypes, etc. All externally referenced drawings are to be inserted into the drawing (bond) and any special fonts included on the CD. Under no circumstance should the CAD drawing modify the standard styles. All modified styles should have a unique name. For CAD files include the exact limits of the survey. Providing the triangulated irregular network (TIN) boundary as a closed polyline will satisfy this requirement. This linework should be turned off and not plotted on the paper copy. This will be used by the University to cookie cutter surveys into the campus basemap. Topographic Map Details Drafting and layout standards 1) All lettering on drawings shall be 1 /8 inch minimum height.. (a) Major callouts such as building names, street names, elevations, and dimensions require use of single-stroke vertical Gothic lettering. (b) All lettering to be clear and uniform in appearance and line density. (c) Use leroy or other lettering devices where applicable, but in no instances place lettering, either pencil or ink, over or through any prior notes, callouts, or legends. (d) Do not use stick-on letters, lines and shading on drawings. 2) Diazo sepia, sepia mylar, slicks, or sticky back on mylar are not acceptable. 3) Provide a ½ inch border on the top, bottom and right side of the sheet. 4) Provide a 1-inch binding edge on the left side of the sheet. 5) Preferred sheet sizes for the University of Washington Facility Management Office standard sizes. Typical sheet sizes to trim lines are as follows: (a) 18" x 24" (b) 30" x 42" (c) 36 x 48" (d) Do not provide sheet size larger than 36" x 48" (e) Provide identical size for all sheet sizes for any given survey. 2H - 02 REV:07 JUN2015

6) Surveyors shall consult with the Architect/ Engineer project consultants to ensure that the topographic drawings will be the same size as the design drawings. State any departures from these standards in writing. Installation, Fabrication, and Construction See Monument in Case See Monument Plug Marker drawing. END OF DESIGN GUIDE SECTION REV:07 JUN2015 2H - 03

Monument In Case 2H - 04 REV:07 JUN2015

Monument Plug Marker REV:07 JUN2015 2H - 05