The cost of British nuclear weapons



Similar documents
The Economics of the UK-Iraq Conflict Keith Hartley Centre for Defence Economics University of York

EXPERT EVIDENCE REPORT

Overview of US and UK Cooperation to Address Technical Challenges in Verification of Nuclear Disarmament

The Nuclear Weapons Debate

Defence Expenditure: Trends and International Comparisons

UNIDIR RESOURCES IDEAS FOR PEACE AND SECURITY. Disposition of Excess Military Nuclear Material February Overview. Pavel Podvig UNIDIR

Headline Findings. Public Opinion on UK Nuclear Energy

Assurance. Skills for Nuclear Defence. The Renaissance series:

= A CND briefing by Davida Higgin, April The links between nuclear power = and nuclear weapons

NATIONAL NUCLEAR SECURITY ADMINISTRATION

Tax Credit expenditure in Great Britain

a V e N als enting/gee Mers IGN rse amp Nuclear a can Ica

Topic 4: Different approaches to GDP

Section A: Introduction, Definitions and Principles of Infrastructure Resilience

Estimation of Nuclear Fuel Cycle Cost and Accident Risk Cost (Statement)

COMMISSION DECISION C(2013)343. of 22 January 2013

CBO. Federal Funding for Homeland Security: An Update. What Is Homeland Security?

Context and Background 5. The Equipment Budget 5. Summary of equipment spending plans 7. Sector analysis where does the money go? 9.

BT s supply chain carbon emissions a report on the approach and methodology

BRUNEI DARUSSALAM'S SECURITY CONCEPTS AND PERCEPTIONS

The different types of cost of alcohol

National Insurance Fund - Long-term Financial Estimates

The UK cyber security strategy: Landscape review. Cross-government

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope.

The United States of America and the Russian Federation, hereinafter referred to as the Parties,

Helping consumers to manage their money

Ministry of Defence. Managing the defence inventory. Methodology

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES

Scotland s Balance Sheet. April 2013

YOU GET WHAT YOU PAY FOR WOMEN S INTERNATIONAL LEAGUE FOR PEACE & FREEDOM

Chinese Nonproliferation Policy and Export Control Practice Taibei August 28, 2013

Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations

THE HIDDEN COST OF OIL

THE CERTIFICATE OF THE COMPTROLLER AND AUDITOR GENERAL TO THE HOUSE OF COMMONS

Housing Investment: Part 1

Financial Planning Report

Study Questions for Chapter 9 (Answer Sheet)

Transition to ESA2010: Capitalising Government Spending on Military Weapons

We endorse a comprehensive approach to address all greenhouse gas emissions. We recognise the importance of increasing energy efficiency

Benefit and Tax Credit expenditure in Great Britain

Translated from Spanish. Permanent Mission of the Dominican Republic to the United Nations MPRDNY November Sir,

MINISTRY OF NATIONAL DEFENCE BUDGETARY DEPARTMENT. BASIC INFORMATION ON THE MoND BUDGET FOR 2016

ANSWERS TO END-OF-CHAPTER QUESTIONS

E VIRO ME T Council meeting Luxembourg, 14 October 2013

8 Aerospace and Defense

In recent years, fiscal policy in China has been prudent. Fiscal deficits

INTANGIBLE TRANSFER OF TECHNOLOGY (ITT) : Regulatory Perspective. Presented by Hjh Nuraffiza Ahmad Strategic Trade Division SKMM

EU renewable energy and biofuel targets what will they mean?

United States Nuclear Forces

Private Finance Initiative and Private Finance 2 projects: 2015 summary data

ANALYSIS OF SCOTLAND S PAST AND FUTURE FISCAL POSITION

2014 No ELECTRICITY. The Contracts for Difference (Standard Terms) Regulations 2014

Businesses are affected by the economy An economy describes how a country spends its money This is determined by 5 factors

The European and UK Space Agencies

G-MOSAIC. Project introduction Luboš Kučera Gisat. Project managed by Sergio Proietti Telespazio S.p.A.

Chairman's Draft Paper 3 March 2010

Shared service centres

A housing stock fit for the future: Making home energy efficiency a national infrastructure priority

1, What are we doing? :Brief Introduction of the Study Group Research Design

1. What types of organisation do you fund? 2. Do you give grants for individual children and young people?

THE STATUS OF NUCLEAR INSPECTIONS IN IRAQ: AN UPDATE. Meeting of the United Nations Security Council. New York 7 March 2003

Future funding outlook for councils 2019/20

Australia No. 1 (2013) TREATY

Brief on Climate Change Finance

TRANSPORT FOR LONDON BOARD CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER

Recruitment of Procurement staff for the MOD Commercial Function

Countering Fraud For Competitive Advantage

Charities & Not for Profit Protecting your organisation, supporting its success. Risk Management Insurance Employee Benefits Investment Management

DO NOT WRITE ANY ANSWERS IN THIS SOURCE BOOKLET. YOU MUST ANSWER THE QUESTIONS IN THE PROVIDED ANSWER BOOKLET.

PEOPLE'S REPUBLIC OF CHINA. (New York, May 4, 2010) Please Check Against Delivery MISSION TO THE UNITED NATIONS

Economic Planning in China by Gregory C. Chow, Princeton University CEPS Working Paper No. 219 June 2011

Jane's Defence Weekly. Making the break

2016 No. 253 HEALTH AND SAFETY. The Health and Safety and Nuclear (Fees) Regulations 2016

WHERE DOES WORKING TAX CREDIT GO?

Efficiency and reform in government corporate functions through shared service centres

The early part of the article explains in detail the nature and purpose of Depreciation as a book-keeping and accounting concept.

LEADERSHIP AND EXECUTIVE SKILLS DEVELOPMENT. ADRg Ambassadors LLP 180 Fleet Street, London EC4A 2HG

Commercial leases and insurance claims

Chapter -5 Appropriations and Re-Appropriation

Report. by the Comptroller and Auditor General. Ministry of Defence. Army 2020

THE U.S. COST OF THE AFGHAN WAR: FY2002-FY2013

DEPARTMENTAL INTERPRETATION AND PRACTICE NOTES NO. 24 (REVISED) PROFITS TAX SERVICE COMPANY TYPE II ARRANGEMENTS

Guided Study Program in System Dynamics System Dynamics in Education Project System Dynamics Group MIT Sloan School of Management 1

Transcription:

The cost of British nuclear weapons Campaign for Nuclear Disarmament www.cnduk.org

The cost of British nuclear weapons Cost of Trident Replacement Procurement: up to 25 billion Although the Defence White Paper estimates the cost as 15-20 billion, CND believes that a figure of up to 25 billion is more realistic taking into account inflation and increased costs of military equipment as suggested by a leading Defence Economist 1. Running costs of replacement system from 2024: Running costs of existing Trident 2007-2023: 49-59 billion 26-31 billion Total: 50 more years of UK nuclear weapons: up to 115 billion Additional costs As well as 25 billion procurement costs, and yearly running costs of 1.6-2 billion (5-6% of the annual Defence Budget as cited in the Defence White Paper) adding up to 49-59 billion over a 30 year lifespan, the White Paper has also stated additional costs of: Joining US Missile life extension programme: Future replacement of missile: Atomic Weapons Establishment (AWE) investment (2005-2008): 250 million 1.5 billion 1.05 billion

Hidden costs Future Investment in the Atomic Weapons Establishment, Aldermaston The White Paper suggests that even more investment in AWE will be necessary; the next Comprehensive Spending Review 2008-2011 will cover some of this. AWE costs (operating and capital) will peak from a current 2.5% of the Defence Budget to 3% early in the next decade. Investment over ten years for a project on such a scale would be realistic. If the operating costs remain the same this suggests as much as 5 billion extra investment of which only 1.05 billion (see above) has been accounted for. Conventional Forces The White Paper does not refer to any costs relating to the conventional military forces which the Trident system relies upon for its protection, such as the hunter killer subs at Faslane and Devonport. The annual operating cost of forces committed to this role was 125 million in 1998 and the operating cost of additional forces with a contingent role was 176 million 2. Nuclear Capabilities The total costs for the MoD s nuclear liabilities have been stated as nearly 10 billion 3. Certainly some of these costs can be attributed to the nuclear weapons programme. According to the White Paper, The disposal of the Vanguard class submarines is still some way off, and it is therefore too early to estimate the possible decommissioning costs. But a breakdown of the MoD s nuclear liabilities has previously been given, although there is no attempt to separate the costs of decommissioning the Trident SSBN submarines from the costs of decommissioning the other nuclear-powered submarines (SSNs). Just some of the figures given are: Decommissioning costs for both SSNs and SSBNs: 1.75 billion AWE nuclear liability costs including decommissioning of redundant facilities and dismantling of warheads: over 3.5 billion

These costs are spread over the next fifty years and this means millions of pounds spent every year on decommissioning alone. Moreover, a replacement Trident system, plus all of the massive new infrastructural developments at Aldermaston, will incur hundreds of millions of pounds of further decommissioning costs for future generations to bear. Where will the money come from? The White Paper claims that the enormous investments required to maintain our possession of nuclear weapons will not come at the expense of the conventional capabilities our armed forces need, and that decisions on the levels of investment needed will be taken in the Comprehensive Spending Review. Armed Forces have already been described as overstretched. According to a recent Defence Select Committee report 4, What is certain is that they are operating in challenging conditions in insufficient numbers and without all the equipment they need. With problems of undermanning continuing, there is a clear danger that the Armed Forces will not be capable of maintaining current commitments over the medium-term. If possessing nuclear weapons over another 50 years is not to come at the expense of the Armed Forces, is the investment to be at the expense of public services such as the NHS or education? Instead of Trident Replacement The large sums to be spent on a replacement could be better spent on the alleviation of poverty at home and abroad and the improvement of employment, education and health provision. The UK could also divert the money into funding measures to address the problem of climate change. This would be a popular option as a recent Populus poll 5 shows that 36% of the British public believes climate change is the greatest threat to the security of the UK now, second only to terrorism. Indeed, the same poll shows that 58% believe climate change will be the greatest threat to our security in 20 years time. The Stern report suggests that an annual expenditure of 1% of GDP (around 12 billion every year for the UK) would technically and economically mitigate the effects of climate change by reducing greenhouse gas emissions by 75%.

The legal situation The nuclear Non-Proliferation Treaty does not recognise the right of Britain, or any other country, to possess nuclear weapons. On the contrary, nuclear weapon states are legally obliged under the Treaty to begin the process towards nuclear disarmament. A replacement of Trident can only be described as re-armament. CND calls on the government to decommission the Trident programme and rule out any plans for future nuclear weapon systems.

Cumulative Costs of British Nuclear Weapons 140 120 100 billions 80 60 40 20 0 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 2055 Years

AWE Trident replacement Missiles Trident Procurement = 15.2 billion (2006 figures) Additional investment 2005-08 Possible replacement Life extension programme + Running costs Procurement + Running costs Over 1 billion Vengeance Vigilant Victorious Vanguard 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 1.5 billion 250 million 49-59 billion for 30 year lifespan ( 1.62 1.95 billion per year) Up to 20 billion according to government figures (said to fall principally over these years) 2 40-59 billion 1 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050 2051 2052 2053 Cost over time of British nuclear weapons 2054 2055 2056 2057 2058 2059 2060 2061

Diagram Notes: Cost over time of British nuclear weapons 1. Government sources have always previously quoted between 2-4% of the annual Defence Budget (around 1 billion per year) for Trident s running costs. The White Paper revised this figure to 5-6%. Defence Secretary, Des Browne, giving evidence to the Defence Select Committee explained that we went through an exercise recently to make sure that we were identifying as accurately as we could the costs that are associated with our nuclear weapon systems and that caused us to revise information that previous governments may have put into the public domain. He said this even though, on more than one occasion, his own government has also quoted the lower 2-4% figures. For the purpose of this diagram, and with no further information forthcoming on whether, and for how long, previous costs have been underestimated, annual Trident running costs will be estimated for a 30 year lifespan as 1-2 billion for every year up to 2007 and thereafter from 1.6-2 billion per year. 2. According to the White Paper, this figure will include 11-14 billion for the submarines, 2-3 billion for infrastructure (at Faslane, Coulport and Devonport but not at Aldermaston), and 2-3 billion for refurbishment or replacement of the warheads. CND believes a cost of up to 25 billion is more realistic with 10% inflation adjusted figures suggested by Hartley to take into account the general trend of increasing costs for military equipment. 1 Keith Hartley, The Economics of UK Nuclear Weapons Policy, International Affairs, Vol. 82, No.4, pp. 675-684, for military equipment a 10% rise in real terms each year is suggested, p. 684 2 House of Commons, Written Questions, 2 nd November 1998 3 House of Commons, Written Questions, 24 th July 2006 4 House of Commons Defence Committee, Ministry of Defence Annual Report and Accounts 2005 06, Second Report of Session 2006 07 5 Populus poll published by More 4 News February 21st - February 22nd 2007: http://www.populuslimited.com/ Campaign for Nuclear Disarmament 162 Holloway Road, London N7 8DQ 020 7700 2393 enquiries@cnduk.org www.cnduk.org March 2007