Waterloo Campus Directorate of Estates & Facilities - Document No. HS14 V4.1 Dated January 2015

Similar documents
Strand Campus London Directorate of Estates & Facilities - Document No. HS13 V4 Dated January 2014

Site Induction Presentation

SBR FIRE RISK ASSESSMENT

Safety Systems Review Facilities Management Guidance and specification Version

School of Engineering University of Glasgow

FIRE EVACUATION PLAN. School of Mathematics & Statistics

Guidelines for. the employment EXTERNAL COMPANIES

Air Conditioned Office Space To Let From 3,800 sq ft 32,582 sq ft. 180 Borough High St London SE1

Fire alarm bells (and associated fire detection equipment) are tested on Wednesday mornings between

Introduction. Pre-Arrival. Arrival & Car Parking Facilities. Main Entrance, Reception & Ticketing Area

Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules

Design shops at Gabriel s Wharf

CITY OF LONDON SCHOOL FOR GIRLS FIRE SAFETY, PROCEDURE AND RISK ASSESSMENT POLICY

Car Park Management Plan SouthGate, Bath SouthGate Limited Partnership

BSH Exhibition Sample Risk Assessment for exhibitors / contractors

Safety and Health Office WORKPLACE SAFETY CHECKLIST

SITE CONTRACTOR PROCEDURES

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004

THE UNIVERSITY OF EDINBURGH. Alexander Graham Bell Building. King s Buildings

THE UNIVERSITY OF EDINBURGH. ECA Evolution House.

Hotel Accessibility Pack

Room Booking Agreement

Safety and Environmental Information for External Companies Koehler Oberkirch

Emergency Evacuation Plan: 232 King St.

Contents. Booking Transport Getting Around Building Plans Services & Facilities Food & Drink Daytime Visits Access List

The Imperial College Healthcare NHS Trust. A guide to your onsite key worker accommodation

THE UNIVERSITY OF EDINBURGH, Alexander Graham Bell Building, King s Buildings,

Medical Research Council Conference Centre

How To Evacuate The University Of California Building

THE UNIVERSITY OF EDINBURGH. Pleasance Sports Centre and Gym. The Pleasance.

Employee Health and Safety Induction Training Record

Fire Safety Risk Assessment

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

Policy for the Management of Asbestos in Buildings

713 Finchley Road London NW11 8DH

FIRE RISK ASSESSMENT WORKED EXAMPLE

BRO Roles & Responsibilities Form Page 1 of 9

Potential hazards are identified in a daily monitoring programme. They are isolated or rectified immediately.

Fire Risk Assessment Safety Checklist

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.

New College. School Of Divinity.

Safety and Environmental Information for External Companies

Guidance on Provision of Fire Wardens

Contractor Safety Management

Hire Agreement Offices

London s unique ACTION PACKED CORPORATE VENUE SITUATED ON THE SOUTH BANK. All play no work

HEALTH & SAFETY BICS ULTIMATE GUIDE HEALTH SAFETY

HEBDEN BRIDGE PICTURE HOUSE TECHNICAL INFORMATION FOR HIRERS UPDATED OCTOBER CAPACITY. Stalls: 257 Seats per row: 22(Max)

Security Policy and Procedures

CONTRACTOR INDUCTION HANDBOOK

RESTRICTED ACCESS AND CONFINED SPACES

THE UNIVERSITY OF EDINBURGH OLD COLLEGE

Compliance Schedules and Building Warrant of Fitness

SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl

Conditions of Hire (Rooms

RESIDENTS FIRE SAFETY INFORMATION PACK

FLA S FIRE SAFETY INITIATIVE

Hotel Accessibility Pack

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

RESIDENTS FIRE SAFETY INFORMATION PACK

Fire Safety In High Rise Building

HSE Requirements for Contractors

locations and outpatient centre London bridge hospital 31 old broad street 120 old broad street sevenoaks

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

UPP Residential Services Fire Risk Assessment

SKY BET CHAMPSIONSHIP PLAY-OFF SATURDAY 28 TH MAY 2016

SUPPLY CHAIN PREQUALIFICATION PACKAGE

NEW FIRE SAFETY LEGISLATION

The Occupant Handbook

CONTRACTOR INDUCTION

THE UNIVERSITY OF EDINBURGH. 16 Buccleuch Place.

Physical Security Policy

Safety and Environmental Information for External Companies

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12

Completed by: Technical Staff & Academic Staff. Adel Mitry, Michael Morris, Meloni Muir, Sharon Herkes, Isabel Arnaiz. Current version 01

FIRE RISK ASSESSMENT

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website

The Management of Asbestos containing Materials

Action required (Please tick) If you answered YES, record Action Points at STEP 4

Commercial Property Tenants Your rights and responsibilities

GUIDE TO CARRYING OUT A SUPERVISED FIRE EVACUATION DRILL

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

SAMPLE FORM FOR THE RISK MANAGEMENT PROCESS

Safety Training Document for contractors working at the Boehringer Ingelheim sites in Ingelheim, Biberach, Dortmund and Hannover. As at:

Transcription:

Contractor Site Induction Waterloo Campus Directorate of Estates & Facilities - Document No. HS14 V4.1 Dated January 2015

About King s College London King s College London is an international Higher Education institution. The Waterloo site buildings consists of a mix of teaching, office space, research facilities and libraries. For further information please visit: www.kcl.ac.uk 2

Building Addresses Main buildings James Clerk Maxwell Building, 57 Waterloo Road, London, SE1 8WA Waterloo Bridge Wing (Franklin-Wilkins Building), Waterloo Road, London, SE1 9NH Other site buildings include: K4 Gym, 127 Stamford Street, SE1 9NQ SS1 Lecture Theatre, 127 Stamford Street, SE1 9NQ 3

Campus Map NO PARKING on Campus. Nearest Tube: Waterloo (Bakerloo, Jubilee, Northern and Waterloo & City lines): 4 minute walk, Charing Cross (Bakerloo and Northern lines): 9 minute walk, Embankment (District, Circle and Bakerloo lines): 13 minute walk, Temple (District and Circle lines): 20 minute walk. Nearest Rail: Charing Cross: 9 minute walk. Waterloo: 4 minute walk. Waterloo East: 5 minute walk. Blackfriars: 17 minute walk. Nearest bus : Buses stopping outside the College: 381, RV1. Buses stopping near the College: 1, 4, 26, 59, 68, 76, X68, 77, 139, 168, 171, 172, 188, 211, 243 (24 hour), 341 (24 hour), 507 and 521. By boat - commuter river service From the west, Putney - Blackfriars: get off at either Embankment Pier or Blackfriars Pier. From the east, Woolwich Arsenal - Savoy: get off at Blackfriars Pier. By car There is no car parking available on this campus. There is an APCOA car park on Cornwall Road. Stamford Street is a red route. 4

5 Campus Detail

Contacts Estates & Facilities Desk: 020 7848 3357 Security Desk: 020 7848 3806 for WBW 020 7848 3501 for JCMB 020 7848 4664 for SS1 Lecture Theatre and K4 Gym Maintenance Team Leader (Hard Services): 020 7848 3357 Mobile: 07799 267 435 Emergency Out of Hours Contact Number: 020 7848 2222 Other Useful Numbers: Campus Operations Manager : 020 7848 1837 Assistant Campus Operations Manager (Maintenance & Energy): 020 7848 2506 Strand Campus Shift Office: 020 7848 2908 6

Site Information Waterloo Campus Site facilities available to contractors: Please note: For out of hours (works commencing after 16.00 on weekdays) and all weekend works, permits are issued and must be collected and returned to the Strand Campus Shift Office (King s Building, Room K-2.47, Ext. 2908). Delivery Point: James Clerk Maxwell Building Loading Bay via Stamford Street (no storage). Delivery Point: Waterloo Bridge Wing: Basement Loading Bay Goods Lift: Located at the back via the Loading Bay in JCMB Goods Lift: Located at the back of Waterloo Bridge Wing Toilets located on all floors, Ground Floor (Gents: nearest the river) Wireless Access: (by prior permission only) Local shops (Sainsbury s Local) and cafés within a 10 minute walk Cash machine located at Sainsbury s Local and Waterloo station 7

Fire Alarm Bell Test Waterloo Campus Fire Alarm Tests are carried out every Wednesday afternoon: Waterloo Bridge Wing: 12.00-12.15 James Clerk Maxwell Building: 12.15 12.30 K4 Gym and SS1 lecture Theatre: 12.30 12.45 8

Fire and Evacuation Waterloo Campus The Fire Alarm on this campus is Full hard wired fire alarm system with electronic sounders WHEN IT SOUNDS: STOP WORK AND EVACUATE TO THE FIRE ASSEMBLY POINT Foreman/Supervisors ENSURE THAT YOU HAVE ACCOUNTED FOR ALL PERSONNEL INFORM THE EVACUATION MARSHAL OF THIS AT THE FIRE ASSEMBLY POINT If the fire alarm sounds for more than 30 seconds it is a real fire alarm activation and you should evacuate. NEVER leave a FIRE DOOR OPEN ALWAYS keep FIRE ESCAPE ROUTES CLEAR 9

Evacuation Assembly Points James Clerk Maxwell Building Outside IMAX Cinema on the lower ground floor Waterloo Bridge Wing- Outside Schiller University (front), behind boarding to Doon Street (rear) SS1 Lecture Theatre and K4 Gym Outside Stamford Street Apartments or courtyard (depending on exit) 10

EMERGENCIES For Accidents/Incidents Including: SUSPICIOUS PACKAGES CHEMICAL/BIOLOGICAL SPILLAGES DISCOVERY/ACCIDENTAL DAMAGE OF SUSPECT ASBESTOS MATERIAL Contact SECURITY on 020 7848 3806 for WBW or 020 7848 3501 for JCMB or 020 7848 4664 for SS1 Lecture Theatre and K4 Gym for assistance Security Desks are located at: Ground Floor, Waterloo Bridge Wing (WBW) Ground Floor, James Clerk Maxwell Building (JCMB) Ground Floor, Stamford Street Lecture theatre and K4 Gym EXTERNAL INCIDENTS Telephone the emergency services 999 There is an A&E department in St Thomas Hospital ALL Accidents or incidents, including near misses must be reported through your own company s system and a copy sent to the Assistant Campus Operations Manager (Maintenance & Energy) 11

ESTATES & FACILITIES PROCEDURES The following work requires at least 24 hours notice Access to ceiling voids Work involving noisy or dusty procedures Work requiring isolation of fire detectors Working with or altering building fabric Do NOT move or disconnect any security devices without prior notification and approval of the ESTATES & FACILITIES and SECURITY Departments. Hand tools and plant must be 110v and PAT tested. Trailing leads must be covered in high visibility tape. ALL equipment must be provided by you and may NOT be left in any building. In the event of UNSCHEDULED WORK/UNFORESEEN CIRCUMSTANCES staff need to be aware of the conditions of the RISK ASSESSMENT. Please note: for out of hours (works commencing after 16.00 on weekdays) and all weekend works, contractors must report to the Strand Campus Shift Office (King s Building, Room K-2.47), Tel: 020 7848 2908 12

Permit to Work To obtain a Permit to Work You MUST supply a Method Statement and Risk Assessment to Estates & Facilities at least 24 hours prior to works commencing. You must have completed a contractors site induction within the last 12 months (this document). You must have authorisation from Estates to start work. Permits are issued from the Estates & Facilities Operations Office, the 1 st floor of James Clerk Maxwell Building balcony, Telephone 020 7848 3357 or 07799 267 435 Works requiring PERMIT TO WORK include: Work in confined spaces Work in operational laboratories Hot works Work on high or low voltage electrical systems Work on fire alarm or emergency lighting systems Work on roofs Work in an excavation Work with asbestos Work involving the erection of a scaffold or tower scaffold No such work should commence without authorisation from Estates & Facilities. 13

Permit to Work No works will be allowed to begin without: A RISK ASSESSMENT and a METHOD STATEMENT, specific to the task at hand; Viewing and discussing the ASBESTOS REGISTER with the Estates & Facilities Department on site; Wearing Personal Protective Equipment (PPE) suitable to the task, or as site rules indicate; The College CANNOT accommodate storage of materials/ tools within the buildings. Tools/materials should be stored in work area compounds. These are to be agreed and assigned (if necessary) in advance. ANY tools/materials left unattended can be disposed of WITHOUT notice Discuss any combustible or explosive articles with the Estates & Facilities Department before they are brought on site. Oxy/acetylene is NOT allowed on College premises 14

Permit to Access Permission to Access Permits are designed for managing contractors carrying out low risk activities around the College estate. Tasks that may be covered by Permission to Access Permit includes: Routine Planned Maintenance Visual Site Surveys Utility Meter Readings etc All activities are carried out on a risk based approach which will determine the level of controls required. To obtain a permission to access permit You must have completed a contractors site induction (this document). You must have authorisation from Estates & Facilities to start work. Permits are issued from the Estates & Facilities Operations Office, the 1 st floor of James Clerk Maxwell Building balcony, Telephone 020 7848 3357 or 07799 267 435 Contractors rules must be obeyed at all times 15

Site SECURITY You will be issued with an ID CARD upon completion of the Induction process. Your ID card must be visible at ALL times and returned to the Estates & Facilities Operations Office, the 1 st floor of James Clerk Maxwell Building balcony, Telephone 020 7848 3357 or 07799 267 435 upon leaving site. ACCESS CONTROL DO NOT leave external doors open and unattended. DO NOT let anyone in without asking them to produce their pass. Inform SECURITY on 020 7848 3806 for WBW ; 020 7848 3501 for JCMB ; 020 7848 4664 for SS1 Lecture Theatre and K4 Gym or if Access Control doors need to be kept open or if a Fire Door needs to be used. SECURITY Scaffolds and builders lifts must not be accessible out of hours, security measures must be agreed before erection of the equipment. Ladders must be secure when not in use Inform Security if you require out of hours or weekend working. DO NOT leave waste anywhere onsite e.g. in stairwells, corridors, cleaners cupboards etc.

USE OF SUB-CONTRACTORS If your contract with the College allows the use of sub-contractors the following is required: Your managers and/or foremen must ensure that all subcontracted personnel attend a King s College London Induction. Inductions may be arranged by contacting the Estates & Facilities on 020 7848 3357 (Monday Friday, 08.00 16.00). Personnel found working on site without having attended an induction and not covered by a valid permit may suspended from site without notice.

Safe System of Work Due to the age and nature of our buildings, many of them may contain asbestos containing materials (ACM s). Below gives an example of the type of activity which requires viewing the Asbestos Register: Access to ceiling voids Working with or altering building fabric Entering Plant Areas or riser spaces This list is not exhaustive, please discuss with your permit issuer prior to starting works. 18

Induction Acknowledgement (Waterloo) Company Name... FIRST NAME SURNAME INDUCTION DATE MOBILE NUMBER SIGNATURE Please complete this form in Capitals. A copy of the completed form must be returned to your College contact prior to employees attending site, or works may be delayed. 19