Kenyan Case Ephantus M.Kamau



Similar documents
Meeting of the Cooperation Arrangement for the Prevention of Spread of Communicable Diseases Through Air Travel

ICAO New FPL Format Interpretation of different set of rules -

Regional References on solution/ mitigation of FPL problems. (Presented by Secretariat) EXECUTIVE SUMMARY

International Civil Aviation Organization

NFPL IMPLEMENTATION ATS OPERATIONAL ASPECTS

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

CRV Terms of Reference. Chonlawit Banphawatthanarak CRV TF Chairman MID IP Network Workshop (Cairo, Egypt, January 2016)

International Civil Aviation Organization PERFORMANCE MONITORING OF ADS-B EQUPPED AIRCRAFTS IN INDIAN AIRSPACE

Block 0: Capabilities within our Grasp

Module B0-DATM: Service Improvement through Digital Aeronautical Information Management

European AIS Database

Considerations for Implementation & Lessons Learnt

Common Regional Virtual Private Network (CRV) Of Asia/Pacific Air Navigation Planning and Implementation Regional Group (APANPIRG)

Trends in Aeronautical Information Management

International Civil Aviation Organization

The SESAR programme: Making air travel safer, cheaper and more efficient

18/01/2012. This working MIDAD. The. Action by the - AIS/MAP. TF/6 Report Report. 1.1 The. Recovery, paper is based SUMMARY REFERENCES

ADS-B NRA deployment by DSNA

AERONAUTICAL TELECOMMUNICATION NETWORK PANEL WORKING GROUP 3 - FIFTEENTH MEETING. Agenda item: 4.2 Review Trials and Implementation Activities

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

ICAO HEALTH-RELATED DOCUMENTS Index

Adapting to air traffic growth in Europe

International Civil Aviation Organization. The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3)

Doc 9965 AN/483. Manual on Flight and Flow Information for a Collaborative Environment

ICAO Procurement Process Briefing

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.

Global Air Navigation System Performance Based Air Navigation eanp Framework

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

CLASS SPECIFICATION Systems Support Analyst I

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control

Automatic Dependent Surveillance Broadcast (ADS-B)

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

ALAMEDA DO AEROPORTO Caixa Postal, Maputo REGULATIONS NEW FORMAT FLIGHT PLAN

Australian Enhanced Flight Tracking Evaluation Performance Report. August 2015

CS5 EAIMS Call For Interest Technical annexe

SESAR Studies & Demonstration Projects on RPAS & Cyber-Security

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

MEAUSE Customer Relationship Management Pilot Project Executive Summary

MOROCCO AIR TRAFFIC SERVICES CONTINGENCY PLAN THE CASABLANCA FIR


International Civil Aviation Organization

CLASS SPECIFICATION Systems Support Analyst II

Airspace Change Communications and Consultation Protocol Protocol

( T A C T ) C A ) I A

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, July 2016

Part 175. Aeronautical Information Service Organisations Certification. CAA Consolidation. 1 February 2016

Air Traffic Service Providers Entry Control Procedures Manual. [Civil Aviation Safety Regulation (CASR) Part 172]

Air Traffic Management Solutions

Exhibit F. VA CAI - Staff Aug Job Titles and Descriptions Effective 2015

Key Points from CMAC/FUA Related Seminar/Workshop

The Total Economic Value. Its application to the Single European Sky 2nd Reference Period

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course

REQUEST FOR PROPOSAL FOR IT ASSET MANAGEMENT SERVICES

Software Centre 4 th June 2015

Thien Ngo Federal Aviation Administration Washington, DC

The Virtual Centre Model

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

ICAO FLIGHT PLAN MODIFICATIONS 2012

Quality Management System Manual. CAD Order

51 st CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

Choosing the right revenue management service

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

International civil aviation organization. COM CO-ORDINATION MEETING (Afghanistan, Islamic Republic of Iran and Pakistan)

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

Air Navigation Charges Services EUROCONTROL can provide

INTERNATIONAL CIVIL AVIATION ORGANIZATION THE 8TH NAFISAT SUPERVISORY COMMITTEE MEETING (Mahe, Seychelles, March 2013)

Translating the Region s Vision of a Seamless Sky into Reality Session. Soe Paing. Deputy Director Department of Civil Aviation Myanmar

First Edition 2009 International Civil Aviation Organization

Air Traffic Management

airsight Company Profile

SESAR RPAS R&D ROADMAP DEVELOPMENT

CNS/ATM SYSTEMS IN INDIA

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

Secure communications Reference

Quality Assurance Manual for Flight Procedure Design

NEWS. Offprint from News 201. Europe s air traffic control on the way to voice over IP

International Civil Aviation Organization. The Fourteenth Meeting of the Regional Airspace Safety Monitoring Advisory Group (RASMAG/14)

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

SES Safety and ATM/ANS Regulations - EASA activities related to MET services

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

Economic impact of airport: the Roissy Charles de Gaulle airport example

Overview of NM and CDM

TABLE OF CONTENTS. (2007 and planned).. 9

European AIS Database Developments of the EAD. Peter Matern Head of European AIM Unit

Surveillance in Canadian Airspace Today and in the Future

CIVIL AVIATION ADVISORY PUBLICATION CAAP 42

Air Traffic Controllers use StarCaster ATIS software to create, update and verify the contents of ATIS messages

2015 SIS e-invoicing Awareness Workshop 9/10 June, 2015 Beijing

SWAT Initial steps & thoughts in Europe

AGREEMENT BETWEEN THE PORTUGUESE REPUBLIC AND THE KINGDOM OF SPAIN ON THE ESTABLISHMENT OF THE SOUTH WEST FUNCTIONAL AIRSPACE BLOCK (SW FAB)

Performance management Identification of metrics

North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project CHANGE MANAGEMENT MANUAL

Transcription:

New ICAO flight plan Kenyan Case Ephantus M.Kamau

INTRODUCTION On 25 June 2008 ICAO issued State Letter AN13/2.1-08/50 amending the 15th edition of the PANS-ATM, Doc 4444. Although the format will remain relatively consistent with that being used today, numerous changes will be required in the abbreviations and various Field descriptors used in the ICAO Flight Plan form

INTRODUCTION Substantial system and work practice changes will be required by Airlines and Air Navigation Service Providers' alike. Airline systems will need to conform to the new data fields, sequence and alphanumeric coding

INTRODUCTION The main rationale for the new FPL format is to allow users to benefit from modern aircraft capabilities, such as PBN. Such changes are fully embraced by the airlines Changes to airline flight planning systems will entail major modifications to the automation, databases and formatting.

INTRODUCTION A large part of the reconstructed Field descriptors and sequence of entries will result in major software changes and/or system replacement, all with consequent financial implications.

New ICAO flight plan

Towards Flight Plan 2012 1 Preparation for the new flight plan 2 Measures Kenya has taken towards this issue 3 Measures being undertaken 4 Challenges 5 Recommendations 6 A vendor presentation

Preparation for the new flight plan On 25 June 2008 ICAO issued State Letter AN13/2.1-08/50 amending the15th edition of the PANS-ATM, Doc 4444 changes will be required in the abbreviations and various Field descriptors used in the ICAO Flight Plan form.

Preparation for the new flight plan At the beginning of 2010 Our flight plan system at JKIA started indicating an error to some flight plans received from Europe. That s when we realized that some countries have started implementing the new flight plan.

Measures Kenya has taken Accepting the flight plans sent on the AFTN without changing them Appointed a task force composed of a Briefing officer, Air traffic controller and an Engineer to coordinate the activities and Draw specifications of what we required

Measures Kenya has taken Started Negotiations with possible vendors with the intention of acquiring the correct system and software Invite some of the vendors to give a demonstration of what they could provide and how much it would cost Based on the vendors we were able to come up with a budget

Measures being undertaken Made budgetary provision for the installation and training Indentified a vendor to supply the required Software Negotiated for the training Preparing to train the officers who will be doing flight planning

Measures being undertaken Studying the present system and assessing its capability Compatibility between the NOF and BOF system Allocating sufficient funds Studying effects of the changes to the General aviation by sending out a questionnaire

Plans Procure the software Have the software installed in all our briefing units. Determine a date for the trial run Perform a trail run in one of the stations before going countrywide Ensuring all the briefing officers are aware of the expected changes (adequately trained)

Challenges Meeting the stringent transition targets However, supporting and maintaining two FPL systems for an extended period, as well as planning for a flight that crosses successive FIR s in different stages of implementation is impractical from a service and logistical point of view.

Challenges Changes to airline flight planning systems will entail major modifications to the automation, databases and formatting. This will result in major software changes and/or system replacement, all with consequent costs.

Challenges The challenge of accurately tracking Transition milestones - as States migrate from PRESENT to NEW, as well as Tracking States that have not or choose not to adopt the PANS ATM changes.

Recommendations More frequent meetings for the task force so that states can exchange challenges and how to solve them The AFI region should conform to the ICAO time table of implementation so that states can have a uniform transition.

Recommendations As it is now the flight plan format should be changed and ICAO come up with a standard format as recommended by Asia/Pacific ICAO Flight Plan and ATS Messages Implementation Task Force

Presentation from a vendor The following is a presentation made to KCAA by an interested vendor.

ATALIS Current Architecture Current Configuration AFTN Synchronization NOTAM Broadcast Local Servers on local IP network IP IP FPL NOTAM ATALIS Nairobi HKJK AFTN NOTAM IP ATALIS Briefing HKMO, HKNW IP

ATALIS Architecture Improvement New major feature : FPL multi-airports management Same IP network Global AIS server for several airports Same ATALIS MMI for all end-users IP IP FPL IP IP NOTAM ATALIS Nairobi HKJK, HKMO, HKNW

ATALIS Architecture Improvement Advantages No need for replicated servers Centralized Administration and Supervision No risk in NOTAM synchronisation Easy solution for small airport facilities Limitations Dedicated workstation Requires a permanent IP Network Available through VPN other Internet Not available for FDPS systems

ICAO INFPL2012 During the transition period when not all ANSPs affected by a flight have transitioned to NEW, the airspace user must ensure that PRESENT flight plan information is filed with ANSPs who have not transitioned. This can be achieved by the airspace user filing only PRESENT information with all ANSPs (as ANSPs supporting NEW will also support PRESENT during transition).

ICAO INFPL2012 The airspace user may choose to file NEW to ANSPs that have transitioned and PRESENT to ANSPs that have not transitioned.

ATALIS INFPL2012 Migration of ATALIS to FPL2012 Will accept both formats Will send FPL only one format depending on global parameter Available for Mid-2011 Paramete r

ATALIS FPL2012 When required automated conversion from NEW to OLD Based on official ICAO/CFMU conversion ICAO Convert

ATALIS Architecture Major Improvement Avantages Compatibility during migration phases Capacity to install ATALIS FPL2012 release in 2011 but still running in old mode Internal tests by KCAA in new mode Switch by basic configuration change No extra task or syntax correction for endusers ICAO Compliance with first level of migration

ATALIS WRAPPER INFPL2012 The airspace user may choose to file NEW to ANSPs that have transitioned and PRESENT to ANSPs that have not transitioned. Conditional FPL type broadcast Additional component to ATALIS called WRAPPER2012 Can be delivered separately from ATALIS Can be used for other systems than ATALIS

ATALIS WRAPPER INFPL2012 (2) On the fly AFTN conversion Dynamic table of AFTN address of migrated users AFTN «On the fly» conversion AFTN AFTN Users Migrated to NEW format AFTN

ATALIS WRAPPER INFPL2012 (3) Advantages Advanced compatibility during migration phases Work for all FPL messages, not only (FPL- Based on official CFMU/ICAO conversion specifications Can be used outside ATALIS for systems compatibility ICAO Compliance with second level of migration On demand, available for mid-2011

New ICAO flight plan Questions Thank you END E.M.Kamau