SITE SAFETY LOGISTIC PLAN



Similar documents
SECTION 5 DRAFTING STANDARDS

Using BIM to Eliminate Construction Site Hazards Life Cycle Safety Stage Repair, Operations, and Maintenance Brian Krause, Turner Construction Company

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

SITE IMPROVEMENT PLANS CHECKLIST

VERTICAL SPEED CONTROL DEVICES

DESCRIPTION OF WORK:

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Construction Management Plan (CMP) Application

Hanna delivers the technical and marketing expertise needed to produce a car wash that meets the car wash customer's expectations.

FIBER-OPTIC CABLE PLAN CHECK

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

ORDINANCE NO THE CITY COUNCIL OF ALEXANDRIA HEREBY ORDAINS:

ARTICLE IV. DRIVEWAYS

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

TEMPORARY TRAFFIC MANAGEMENT Operate as a Traffic Controller (TC) for low volume and Level 1 roads


FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

I. Project Initiation Sheet (if any information changed since Concept Plan submittal)

Street Audit Tool: Web 2.0 Tools

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

UDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD

TORONTO MUNICIPAL CODE CHAPTER 880, FIRE ROUTES. Chapter 880 FIRE ROUTES

Minor Accommodation Planning Review Application

Development Variance Permit Application Package

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Walking and Working Surface Checklist:

The City of Basehor, Kansas

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2

STANDARD SITE LICENCE CONDITIONS FOR RESIDENTIAL PARK HOME SITES IN GUILDFORD CARAVAN SITES AND CONTROL OF DEVELOPMENT ACT 1960 (AS AMENDED)

ADA Checklist for Polling Places

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP;

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

NYC Small Business Services Waterfront Permits Unit

Engineering Standard

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

17 East Main Street Cuba,NewYork Code Enforcement

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE

IV. INDUSTRIAL TRACK DESIGN

CONSTRUCTION SAFETY POLICY

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

CITY OF HILSHIRE VILLAGE NEW HOUSE AND HOUSE ADDITION PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

`Fall Protection Guidelines in Construction

ORDINANCE NO (As Amended)

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

SITE SPECIFIC FALL PROTECTION PLAN

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

New Home Construction Packet

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Guidelines for Fiber Optic Cable Permits

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, , ]

Gas Meter Clearances and Service Installation Requirements

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

LAND USE CODE CHAPTER GENERAL REGULATIONS

TYPES OF PROPERTIES ARE INCLUDED WITHIN THE T3 TRANSECT DESIGNATION?

BUILDING A FENCE? THE CITY OF CAMBRIDGE REQUIRES THAT ALL FENCES WITHIN THE CITY CONFORM TO THE REGULATIONS OF FENCE BY-LAW

1 RCNY CHAPTER 100. Subchapter A Administration

ARTICLE 32 - DOWNTOWN SIDEWALK DINING

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

VILLAGE OF RIDGEWOOD OUTDOOR CAFE CHECKLIST

PLANNING DIVISION STAFF REPORT February 23, Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

De Beers Canada Inc. OP 050 SLIPS, TRIPS, FALLS AND PEDESTRIAN SAFETY - SURFACE

A Guide for the Homeowner/Builder

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

SECTION SELECTIVE DEMOLITION

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

Washington City Subdivision Development Application Checklist

MINIMUM STANDARDS OF ACCURACY, CONTENT AND CERTIFICATION FOR SURVEYS AND MAPS ARTICLE I. TYPES OF SURVEYS

Trenching and Excavation Safety

BLOCK 400 PLANNED COMMUNITY DISTRICT

CERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

Site Layout & Traffic Plan

Crime Prevention through Environmental Design (CPTED) - Checklist

NAHB PRODUCT DEFINITION

CONFORMITY WITH PLANS; DRAINAGE.

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Transcription:

SITE SAFETY LOGISTIC PLAN SHEET #1 Title Sheet Site Safety Logistic Plan For Project name & Address as it appears on the NB permit Or as it appears in the BIS system, with Borough Also include the following; Block & Lot Zone & Map Number of stories & Height Buildings use and construction BIN # Company that does the drafting name and contact information SHEET #2 General information and notes sheet Construction Site 3301.9.2 Demolition Site 3301.9.3 Emergency Phone numbers (not 311 or 911) DOB (the borough where the job takes place) Ambulance BEST 212-669-7043 Fire local house DOT Police local precinct Owner of the property information Name Address with city and state Phone Contact person Contacts phone Contractor Same as the owner Tracking number Construction Superintendent Same as Owner License 1

Site Safety Coordinator/Manager Same as Construction Superintendent List all special Considerations including other agencies List all supporting applications: DOT, DOB including but not limited to NB, Fence, Sheds/ scaffolds, Hoist, Crane, Sheeting/ Shoring, Foundation/ Excavation, Transit, ETC. A Standard Legend (refer to the legend on each sheet) Standard symbols & abbreviations Instruction to request start of work For Demolition only; A call to BEST Demo Supervisor 24 hours before start date and fax over the copy of PW2 For Excavation only; Call to Excavation Unit 24 hours before you start work to obtain conformation #. Then send the BEST Squad there 24 hours notification. For all other Site safety jobs; 24 hours before work starts of work, on company letter head, send a letter of notification to the BEST Squad and copy of PW2. (to the attention of Best Supervisor Juan Arias) Close out instructions Horizontal netting Sidewalk sheds Site Safety Drawing Index List of all sheets provide & if approved or amended provide date All drawing must be to scale as per section 28-104.7.3 plans drawn to suitable scale SHEET#3 EGRESS PLAN (for the building and adjoining properties 3307) Article 110 of chapter 1 of title 28 Required: Key plan showing all; Cross street (3307.2, 3307.2.1, 3307.3) Side walks (3307.2, 3307.3) Temp walks (3307.2.1, 3307.3) North arrow Site in question Fire hydrant & Standpipe Lot Dims Signs (3301.10 & 3307.1.1) Fences (3307.3.3) Vehicular traffic flow on and off the site (3307.4.3) A copy of topographical survey Showing all lot DIM 2

Meets & Bounds Adjacent Building Grades optional Optional: Aerial photo Tax map Sand born SHEET#4 DEMOLITION PHASE (3306, 3310) Article 105 of chapter 1 of title 28 Notification3306.3, 3306.3.1 & 3306.3.2 Provide the following Dimensions: All building/structure on the lot or lots in question Distance from lot line to the street & adjoining building Distance of all adjacent building to shared lot lines Provide locations of the following: Show protection of pedestrians & adjoining property (3306.2) Show the site enclosed with a construction fence (331.9.3) Location of all existing services (i.e. water and street furniture, gas electric and sewer) Sidewalk shed if required (3307.3.1) Show and list all equipment to be used doing demolition work. Containers (3303.4.3) Stand Pipe (3303.8) Storage of Materials (3303.4) Temp electrical and water (3303.2) Traffic Flow (3303.3) Sanitary Facilities (3303.2) Chutes (3303.5.5) Watch person & Flag persons (3307.5) Signs (3307.1.1, 3301.9 & 3301.10) Means & Methods Air Pollution (3303.5.4) Standpipe (3303.3) No Propping (3303.5) Housekeeping (3304.4) Storage of Materials (3303.4.5) Order of demo operation Standard Details Sign Fence SHEET #5 EXCAVATION PHASE (3304) Notification (3304.3.1, 3304.3.2) 3

Site closed with construction fence (3304.4.3) All excavation must have ramps with a ratio of 1:4 to be used as egress: show second means of egress for workers (3315.1.2, 3315.1.3, 3315.1.4) provide widths of all road ways and sidewalks including dimensions of fence to property line and fence to curb line Show protection of utility poles, trees, etc (3309.11) Show direction of traffic flow both inside the site and outside the site show on legend) Show all street furniture (i.e. signs, HYD) Show gates with flagmen at each side and project signage. (show on DWS and on detail sheet) Show protection at all excavation railing and fencing (3304.4.4) Show extents of shoring, under pinning, auguring etc (3304.4, 3304.5) Refer to DOB application if possible Storage of materials (3304.4.5) Show and list all equipment to be used doing excavation work SHEET #6 FOUNDATION PHASE Site enclosed with construction fence (3304.4.3) Location of ramp with means of egress for the works (3315.1.2, 3315.1.3, 3315.1.4) Provide with s of all roadways and number of lanes, sidewalk including dimensions of fence to curb line. Show protection of utility poles, fence etc Show direction of traffic flow, both inside and outside the site Show all street furniture (i.e. sign, HYD, poles etc) Show gate for personal and vehicles with flagmen at cash side and project signage Show protection at all foundation exposures with railings and fences (3304.4.4) Show pads for further cranes and elevator bays Refers DOB application if possible Show storage of materials both inside and outside the foundation (3304.4.5) Show and list all equipment to be used doing foundation work SHEET #7 SUPERSTRUCTURE PHASE (3305) Site enclosed with construction fence (3304.4.3) dimension widths of all roadways and sidewalks including dimension of fence to property pole, fence to curb show protection of utility poles, trees, etc show dimension of traffic flow both inside and outside of the site show all street furniture (i.e. signs, pole, HYD) Show gates with flagmen each side and project signage show buildings including set back with height show distance to property line and adjoining properties both unimproved and improved 4

If improved show height and use of adjoining building with appropriate protections Show and list all equipment on site Show location of crane and maximum/ minimum radius of the boom & the radius of the counter weight. Standpipe SHEET #8 Plan showing adjoining property protection (3309) SHEET #9 Sections showing horizontal safety on the floors, this also is on standard detail sheet (all elevations) (3308) SHEET #10 Elevations showing vertical safety on the floors, this also should standard details (all elevations) (3309) SHEET #11 STANDARD DETAILS. (Sections and elevation when required) Signage for the gate The door and fence Jersey Barnes Movable timber barriers Typ. Window protection Hole coverage Type proof protection Fire HYD at construction fence Sidewalk shed SHEET #12 General notes CHAPTER 33 OR ANY NOTES THAT PERTAIN TO THE APPLICATION REVISED 8/11/09 5