CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version



Similar documents
How to Install UnderDeck The Original.

Tips for Professional Ceiling Installers

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

PANELIZED HOME INSTALLATION GUIDELINE

Wall. Between us, ideas become reality. Acoustical Wall, Baffle, and Diffuser Systems

WOODWORKS Linear. Assembly and Installation Instructions 1. GENERAL

Ceiling Mounted Folding Attic Ladders Installation Instructions

HOW TO ESTIMATE THE COST OF T-BAR

DE Frame with C Series Sidelight

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

Basement Window Installation Guide Hopper and Sliding

Classic Products, Inc. ClickLock Standing Seam Installation Manual

Owner's Manual & Assembly Instructions

Chapter 9: INSTALLING ROOFING

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

2.9 WINDOW & DOOR BUCKS

4 Installation Requirements

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

Brick Veneer Construction

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Sash Replacement Guide

Set-Up Instructions. (Liner-Based System) UL LISTED. Important Read set-up instructions before assembly. Report any shortages within 72 hours

How To Level A Subfloor

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Happily PHOTOGRAPHY BY MICHAEL ANDERSON AND LARRY OKREND

Guidelines for Earthquake Bracing Residential Water Heaters

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Best Barns USA Assembly Book

AMERICAN GOTHIC PLAYHOUSE

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors

Guidelines for Earthquake Bracing of Residential Water Heaters

Sun Windows General Information Sun New Construction Window Installation Instructions

Celebration Ceiling System

Steel Door Frame Installation in Steel Stud Construction

IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

Window Installation Instructions

DIY CABINET REFACING INSTALLATION GUIDE

UNIT 3: ROOF TRUSSES KEY CONCEPTS 1. Identify tools needed for rolling trusses 2. Identify proper nails and sizes 3. Setting roof trusses 4.

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

MGB Chrome Bumper Conversion

Installation Instructions

HVAC Vents & Diffusers

How to Build a Poker Table

KITCHEN INSTALLATION GUIDE

Composite Stone Veneer

Installation Instructions

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

WILDING WALLBEDS BUNK BED INSTALLATION INSTRUCTIONS

How to Install GoBoard:

CEILING SYSTEMS. CI/SfB (35) Xy April [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design

Beadboard Wall Bookcase


Total Quantity: IMPORTANT: Plans are to be used with 3 x6 Plexiglass (SKU # ).

Installing Window and Door Mouldings

POST AND FRAME STRUCTURES (Pole Barns)

The JIG is UP Or A couple hours up front pays in the long run.

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

STAIR TREAD & RISER INSTALLATION GUIDELINES

All-Season Sunroom Sliding Glass Door Installation Instructions

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

New Employee / Applicant - Information Pack (Includes: Driver Back round Release Form, Skills & Tools Assessment

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Asbestos Management Program

Protecting Your Home From Hurricane Wind Damage

BUILD A TABLETOP LOOM

Installation Guide for Andersen Architectural Wood Inswing Entry Doors

9.0 Strengthening and Bracing Gable End Walls

Installation Guide. Bath and Wall Surrounds SERIES B

INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin

How to Build Your Own CornHole Game

AwanaGames Circle. Official. Diagram 1. Key to diagram: Pin & Striped Bean Bag C Diagonal or Starting Line. B Scoring Pins, or Center.

Plans will call for one of two soffit/fascia details:

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SUPER SHED. Indoor shelter for your outdoor tools.

Owner's Manual & Assembly Instructions

Basic Spring Motor Roller Shades

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

HOW TO INSULATE A CRAWLSPACE

NATIONAL INSTITUTE OF BIOLOGICALS

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

Your Basement Remodeling Specialist LLC

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:

Installation Instructions

FORM DESIGN. easy to work with, and generally available.

Owner's Manual & Assembly Instructions

Installation Instructions

Combination Unit 5'6" Windows a i o P t

How To Repair A House

Acrylic Walls Installation Instructions

Clad Direct Glaze Window Installation Instructions

DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS MOISTURESHIELD.COM limited lifetime warranty

Tundra Series Windows January 2016

Transcription:

CEILING SYSTEMS Between us, ideas become reality Installing Suspended Ceilings North America Version 1

Installing Armstrong Suspended Ceilings An Armstrong suspended mineral fiber ceiling is functional, attractive and provides easy access to the plenum. This ceiling system installation brochure is intended as a general application overview, covering essential steps of a basic suspended ceiling installation. The ceiling system is made up of Armstrong panels (either 2 x 4 or 2 x 2 ) which are supported by a suspension system (main beams, cross tees and hangers), and perimeter molding. The integrity of the entire suspended ceiling depends on the hangers Armstrong Ceiling System commonly wires which are used to support the suspension system main beams. Sections of main beams are spliced together and are connected by cross tees. The ends of the main beams and cross tees rest on the wall molding which runs around the perimeter of the space. Before You Start Although temperature and humidity recommendations vary by product, the space must be cleared of debris and, in general, should be enclosed. The ceiling panels should be kept clean, dry, and protected from the elements. Panels should be removed from cartons 24 hours before installation to allow them to adjust to interior conditions. 2 The tools you will need will vary depending on the type of hangers used, but generally, you will need: ladders or scaffolding; a tape measure; pencil; chalk line; hammer; powderactuated fastener; awl; pop-rivet gun; screw driver or drill; sheet metal punch; aviation snips; wire cutting pliers; utility knife; level (water level or laser); string; key hole saw; and compass or dividers. Most jobsites also require some safety equipment like a hard hat or safety glasses.

Determine Panel Direction Ceiling panels can run in the direction that yields the most pleasing finished appearance. In spaces with bar or wood joists, main beams must be oriented perpendicular to the joists. (You must locate and mark all joists if they have been covered with a drywall ceiling.) Main beams must be oriented perpendicular to bar or wood joists Determine Border Panel Sizes (2 X 2 panels) To determine the border panel sizes, divide one dimension of the space by 2. Our example shows a space that is 10 8 by 14 2 and the deck joists run in the 10 8 direction. 10 8 2 = five full panels + remaining 8. You can t start with a full panel against one wall and leave one 8 border on the other semi side; it will look unbalanced (and two border panels of 4 would be too small). So, add 24 to the 8 dimension, which equals 32. Divide that number by 2 to equal 16. The room would be divided into four full panels, plus two 16 border panels. 32" 2' = Four full panels plus two 16" border panels Determine width of border panels (2 x 2 panels) 26" 2' = Six panels plus two 13" border panels Determine width of border panels (2 x 2 panels) In the other direction: 14 2 2 = seven panels + remaining 2. Add 24 to the 2 dimension, which equals 26. Divide that number by 2 to equal 13. This side of the room would have six full panels and two 13 border panels. 3

Determine Border Panel Sizes (2 X 4 panels) 74" 2 = 37" Two full panels plus two 37" border panels Determine width of border panels (2 x 4 panels) For 2 x 4 panels, divide one room dimension by 2 as stated above. Divide the other room dimension by 4 and add 48 to remaining dimensions to avoid unsightly small border panels. Install Perimeter Trim Allow at least three inches below the old ceiling, ducts, pipes or wiring as clearance to maneuver a lay-in panel into the opening of the grid. Mark the desired height for the new ceiling, adding the height of the wall molding. Mark a level line around all three walls and snap a connecting chalk line on the fourth wall. Mark desired height for new ceiling Attach the molding securely. Screws or 6d (1-1/2 ) nails work well for wood; use screws for metal; use powder-actuated fasteners or expanding anchors for concrete and stone walls. Joints between inside and outside corners of molding must be tight. 4

Install Hangers and Fasteners Hangers need to be installed above the main beams typically every four feet. Snap a chalk line for each of the main beams. Attach hangers and wires to the deck above the first row of main beams at four-foot intervals. Stretch a guide string from one end of the room to the other, below the molding where the first main beam will hang. Stretch a leveling string from one side to the other 7/8 above the bottom of the wall molding. Bend the wires at the height of the string so that the main beam is held at the correct height. Wrap hanger wire securely around itself three times. Bend hanger wires at height of guide string Install the First Main Beam Install the first section of main beam. (Cut the end so that a cross tee route hole is located the border distance in from the end wall.) Insert a hanger wire into a hanger wire hole near the other end of the main beam. Bend the wire up and wrap it around itself three times. Continue to insert all other hanger wires. Install first main beam 5

Install Border Cross Tees Find the location of the first border cross tee. Install border cross tees Place the end of the white face of the cross tee against the edge of the wall molding at the side, and cut the cross tee where it crosses the guide string. Insert the uncut end of the cross tee into the main beam, and rest the cut end of the cross tee on the molding. (The far edge of the main beam should be directly above the string.) Repeat the process for the next cross tee. Temporarily fasten the cross tees to the wall molding so they do not move. Square the Grid Join additional sections of main beam as required to reach the other end wall. Attach hangers and check level as the installation proceeds. Join sections of main beam Use leftover piece of main beam from the first row to start the next row. Install two four-foot cross tees between the two main beams, in line with the first two border cross tees. Square the grid by measuring across the diagonal of the grid opening Measure across the diagonals of the 2 x 4 opening. The measurements will be the same if the grid is square. If the grid is not square, shorten one of the main beams until the diagonals are equal. 6

Install Remaining Main Beams and Cross Tees Complete the installation of rows of main beams. Note: If you have additional rows of main beams to install, stretch a second string from one side of the room to the other, aligning it with the first four-foot cross tee as shown. This second string will be your guide for cutting the remaining rows of main beams. Just measure from the end wall to the string to determine the distance for the first cross tee slot you will use. You must line up all cross tee slots for the grid to be square. Align second guide string with first four-foot cross tee Install Panels Slightly tilt panels, lift above framework, and gently rest on cross tee and main beam edges. Measure and cut border panels individually. Using a leftover cross tee or main beam section as a straight edge, cut panels face up with a very sharp utility knife. Border panels may require field cutting of Tegular edge details. All field cut edges exposed to view should be colored to match the factory finish. Armstrong SuperCoat Ceiling Panel Touch-up Paint is recommended. Lighting and Other Fixtures Lighting and other fixtures must be supported by the grid, not by the ceiling panels. Depending on the size and weight of the fixtures, extra hangers may be required. For more information and details about installing Armstrong Suspended Ceilings, call your local Armstrong representative or visit armstrong.com/ceilings. Tilt panels above frame and drop into place Tegular-edge border panels may require field cutting. Cut border panels face up Grid may require extra hangers to support weight of lighting fixtures 7

CEILING SYSTEMS 1 877 ARMSTRONG (276-7876) Name of your Inner Circle Contractor, Gold Circle Distributor or Sales Representative Customer Service Representatives 7:30 a.m. to 5:00 p.m. EST, Monday through Friday TechLine SM Technical information 8 a.m. to 5:30 p.m. EST, Monday through Friday FAX 1-800-572-8324 or email: techline@armstrong.com Product literature and samples Express service or regular delivery Request a personal copy of the Armstrong Ceiling Systems catalog armstrong.com/ceilings Latest product and program news Real time selection and specification information Glossary of technical terms Contacts reps, where to buy, who will install Submittal pages Specification writing tool Literature and samples information Perimeter and Corridor Design Solutions, CAD rendering CS-3592-609 Printed in the United States of America 2009 AWI Licensing Company 1