FIRE ALARM APPLICATION

How To Get A Fire Alarm Permit In Vail

Fire Alarm Submittal Requirements and Acceptance Testing

Commercial Fire Alarm Standards July 1, 2010 Edition Page 1 of 14

FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST

Fire Alarm Systems Certification

EXHIBIT A SCOPE OF WORK

BELMONT FIRE DEPARTMENT FIRE ALARM SYSTEM REQUIREMENTS BFD-OFM

City of Temple Burglar Alarm Permit Process Information Sheet

City of Columbus Department of Building and Zoning Services

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

Invitation to Bid FIRE ALARM & DETECTION SYSTEM

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

STATEMENT OF WORK FOR FIRE ALARM SYSTEM TESTING & MAINTENANCE. Project No. SAQMMA-07-C0060 ***OUAGA, BURKINA FASO***

Original Document 10/16/07 Revised 01/30/09 2 nd Revision rd Revision- 12/18/14

HERNANDO COUNTY FIRE ALARM GUIDELINES

1.0 General. Inspection, Testing, and Maintenance 1 of 8

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Danville, IN Code of Ordinances CHAPTER 90: ALARM SYSTEMS, SMOKE DETECTORS AND THE LIKE. Alarm Systems. Smoke Detectors. Key and Data Storage Boxes

General Fire Code Requirements Within Commercial Tenant Spaces

MOVE-IN/MOVE-OUT PROCEDURES

SUBCHAPTER F. SMOKE ALARMS AND FIRE EXTINGUISHERS

OBOA 2009 Huntsville, ON Overview of ULC Standards Affecting Building Occupancy Alan Cavers Area Manager Fire & Security Systems Group

BUILDING MOVE PROCESS INSIDE CITY LIMITS

The Mission Critical Fire Protection Experts

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

Understanding Fire Alarm Requirements & Inspections. Presented By Bill Conroy Technical Sales For Briscoe Protective Systems Inc

GOLDEN FIRE DEPARTMENT FIRE & LIFE SAFETY DIVISION

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

AMERICAN SOCIETY OF CERTIFIED ENGINEERING TECHNICIANS

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

Fire Alarm and Detection Systems And Central Station Monitoring Plan Submittal Guidelines

COMMISSIONING OF FIRE ALARM SYSTEMS

Black River-Matheson Fire Department

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

Electrical Contractor Registration

University Design Standard. Fire Alarm Systems

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

Michael Catalano 24 Nassau Avenue, Islip NY Phone (631) Chief Fire Marshal Fax (631)

ORDINANCE REGARDING ALARMS IN THE TOWN OF PLAINVILLE

Solar Panel Installations

2014 Limited Plan Submittal Checklist

Module 4, Lesson 12 Fire Alarm Systems

REQUEST FOR PROPOSAL FOR: Fire and Security Alarm Service and Monitoring

Telluride Fire Protection District Fire Alarm Systems Policy Version 03/2007

SMOKE ALARM MAINTENANCE PROGRAM

City of St. Charles Basement Finish or Remodel

Smoke Detector/Carbon Monoxide Detector Inspections

Sam Docknevich, PSP, Security Service Portfolio Manager. Are You Prepared? The impending impact of Code on Servicing Security Systems

Program No Section Heading

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline

SMOKE ALARM MAINTENANCE PROGRAM

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

CSC-DIVISION 1-MASTER SECTIONS Description

FIRE ALARM SYSTEMS INFORMATION PACKET

How To Get A Job Done

SITE PLAN APPROVAL PROCESS INTRODUCTION

H.V.A.C. Design Plumbing Design

C. Conform to requirements of Americans with Disabilities Act (ADA).

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

Amendments to the 2012 INTERNATIONAL FIRE CODE

MONTGOMERY COUNTY ALARMS RULES GOVERNING ALARMS RESPONDED TO BY LAW ENFORCEMENT SECTION 1. PURPOSE SECTION 2. DEFINITIONS

Instructions for Obtaining a Certificate of Smoke Detector, Carbon Monoxide Alarm, and Kitchen Fire Extinguisher Compliance

PRIVATE ALARM CONTRACTOR LICENSURE EXAMINATION INFORMATION

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

dpd Seattle Permits Tip Small Business: Getting Your Use and Building Permit from DPD RESEARCH RESOURCES

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

Austin Independent School District Police Department Policy and Procedure Manual

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

PLAN REVIEW GUIDE FOR FIRE ALARM

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS

ARTICLE III. FIRE ALARMS. Sec Purpose. Sec Definitions.

JULY 2013 UCB STANDARDS

SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST

FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE

The Pennsylvania State University Physical Security Office. Intrusion Alarm. Performance Specification

FIRE ALARM SYSTEM RECORD OF COMPLETION

Residential Plan Routing Information

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

CONTRACT MONITORING SERVICES NEW DEALER INFORMATION AND PROCEDURES

FIRE ALARM SYSTEM RECORD OF COMPLETION

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

Building Permits Permit Counter

Business Checklist for Severe Weather

SECTION ZONED (DC LOOP) FIREALARM SYSTEM

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

946 CMR: MASSACHUSETTS DEVELOPMENT FINANCE AGENCY 946 CMR 7.00: DEVENS REGIONAL ENTERPRISE ZONE FIRE AND POLICE RULES

CHAPTER 277 CERTIFICATION OF ALARM SYSTEM CONTRACTORS AND INSTALLERS (100C) Establishment of program. There is established within the fire

NUNAVUT HOUSING CORPORATION. Home Repair Program (HRP)

Transcription:

Gypsum Fire Protection District Fire Alarm System Submissions As of July 1 st, 2007 all Fire Alarm Submissions will be required to be signed by a NICET Level 3 or higher. Fire Alarm System Submissions for permit will fall under one of two categories: new installations or remodels. New installations or remodels of significant impact will require a full Submission for review. Remodels of limited scope, remodels of relatively minor impact and tenant finishes may be submitted in the form of a Scope of Work application. If you are unsure about your project, you may call us to discuss the project. The following documents are to be included in the Submission with the exception of the permit fee schedule: 1)Application Form 2)No Work Without Permit Form To ensure your Submission is complete and can be processed in the shortest time possible, please review the following fire alarm checklist. All Submissions must be delivered to Justin Kirkland at the Gypsum Fire Protection District offices located at 511 Second Street, Gypsum, CO 81637. Submissions may also be mailed to PO Box 243, Gypsum, CO 81637. We will not accept incomplete Submissions. All incomplete Submissions will be returned without review. Submissions which have been reviewed, rejected and returned to the contractor will be subject to a re-submission fee. Please Note: No work of any kind on any project will be allowed until the Gypsum Fire Protection District has issued a permit for the project. Any work done without a permit will be subjected to fines of four times the permit fee plus the actual permit and review fees. Gypsum Fire Protection District Fire Prevention will make every effort to review, comment, and issue approval on complete Submissions within 10 working days. More complex or special use projects may require a longer review process. Please plan your project accordingly. Reviews beyond a normal scope will be forwarded to our Fire Protection Engineer for review at a set hourly rate. You will be advised of this and invoiced for charges including shipping. Any such charges must be paid in full prior to any rough or final fire alarm inspections. If you require a rush review the Submission will be forwarded to our Fire Protection Engineer. You will be invoiced at the hourly review rate for rush review, and any other charges including shipping. Any such charges must be paid in full prior to any field inspections. - 1 -

Fire Alarm Plan Submission Check List Several forms require an original signature. All Submissions must be presented with original ink signatures. Faxes, emails, or copies without original ink signatures will be returned. Illegible materials will result in the return of the Submission for correction. If you are submitting under a Scope of Work permit, you must provide those materials with an asterisk (*). o *A completed permit form. All requested information must be provided. o *A copy of the building permit. o *A copy of the No Work to be Done form. o *A copy of your local business license, if applicable. o *A check or money order for the correct fee. o *Complete battery calculations or a statement of impact of the project on existing systems. o *Voltage drop calculations or a statement of impact on existing systems. o *A complete set of manufacturer s cut sheets for all devices used. A statement of compatibility may be required if using devices manufactured by several companies. All model types must be indicated on the cut sheets. o *Identification on the plans (or Scope of Work letter) of the engineer of record and the system designer (including the level of training if applicable). o *For Scope of Work projects: a complete and detailed outline of the work to be done, including anticipated relocation of devices, deletion or addition of devices (including number of devices) must be submitted. The letter must include information on the impact of system changes on existing battery or other back-up power supplies. Device compatibility must be documented. o At least one copy of the reflected ceiling plan. o At least one copy of scale interior elevations. Be sure all ceiling heights are called out. o At least one site plan. o At least three (3) complete sets of plans in ¼ inch scale. o Electronic copy of plans submitted via PDF for archiving. o At least three (3) complete sets of manufacturer s cut sheets for ALL devices used. A statement of compatibility may be required if using devices manufactured by several companies. All model types must be indicated on the cut sheets. o Measured or estimated ambient sound levels used for design. o Once a Submission has been received, reviewed, and a permit issued, the permit holder may call for rough inspections as necessary for the project. - 2 -

Fire Alarm Rough Inspection Any work done on a fire alarm project must be inspected. Usually these inspections will fall under one of two categories: fire alarm rough (construction) and fire alarm final acceptance. These inspections must be conducted regardless if the project is a newconstruction fire alarm system or a minor remodel. Any questions regarding scheduling or conducting inspections should be directed to either Justin Kirkland or Wade Droegemeier. Requests for fire alarm rough inspections must be placed at least twenty-four (24) hours in advance. An approved set of plans and cut sheets MUST be available during the inspection. Should the job be a Scope of Work, an approved copy of the letter and appropriate cut sheets must be available. On all jobs, a copy of the signed permit must be present at ALL times. A representative of the fire alarm permit holder s company, familiar with the job must be on-site and available to walk with the inspector. All necessary tools, personnel and equipment shall be present and available. Prior to calling for a Fire Alarm Rough Inspection, ensure that the following issues have been addressed: All device locations are laid out per plans and NFPA 72, and all device boxes have been installed. The correct size and type of fire alarm wire must be installed and visible for inspection. All work has been done in accordance with the NFPA 70 (the NEC) and in a workman-like manner. Please note: Smoke detectors or heat detectors are not to be installed during construction. Any minor changes from approved plans are documented on a field copy (red lines) for review. Any major changes must have been submitted and approved prior to inspections. Any work that has been inspected and changed must have been submitted for review and re-inspection. All inspections are based on the call-in information. Should an installation be denied, a re-inspect time will be rescheduled for a later time. - 3 -

Fire Alarm Final Acceptance Inspections A representative of the fire alarm permit holder s company, familiar with the job must be on-site and available to walk with the inspector. All necessary tools, personnel and equipment shall be present and available. Prior to final acceptance, all devices must have been checked and tested according to the manufacturer s instructions the permit holder will have conducted a 100% pre-test of the system, and has programmed the system per Gypsum Fire Protection District and the sequence of operations requirements. A memo stating the system has been 100% pre tested must be available at the time of the inspection. Calls for final inspections must be made at least twenty-four (24) hours in advance. An approved set of plans and cut sheets MUST be available during the inspection. All asbuilts or red-lines must be available for the inspection. Should the job be a Scope of Work, an approved copy of the letter and appropriate cut sheets must be available. On all jobs, a copy of the signed permit must be present at ALL times. Final acceptance testing is conducted concurrently with other life safety systems if present. It is the permit holder s responsibility to coordinate with other trades as necessary for final inspections. The construction site must be substantially clean and free of debris, minimal construction activity is present, and arrangements have been made to protect devices after the test have been made if necessary. There shall be no smoke detectors installed prior to final cleaning of the project. All detectors installed prior to final cleaning must be removed, cleaned and calibrated in accordance with manufacturer s instructions. Documentation of such must be submitted. All phone lines or other approved communications equipment must be installed and a copy of a monitoring contract must be made available for review. The call list has been submitted to the monitoring company and all signal types have been tested and verified prior to the acceptance test. The Fire Department Dispatch Center must be listed as first notified for water flow and alarm signals. The alarm sequence of operations must be verified as correct by the permit holder. A Knox Box has been installed in an approved location and all necessary keys are on-site and have been physically tested. Any required paperwork issues have been resolved. The permit holder has completed and signed all required completion paperwork. For new systems and major remodels, an NFPA form of Completion is required. For Scope of Work projects, a signed, company letterhead stating that the work is complete and in accordance with that called out in the permit and has been done to code. Electronic copy of As Builts submitted in PDF format for Fire Dept archiving. - 4 -

Fire Alarm Systems Annual Test and Inspection Requirements Fire Alarm Systems must be maintained and tested regularly. A quality maintenance program will increase the likelihood that the system will operate as it is designed in the event of a fire. The Gypsum Fire Protection District requires fire alarm systems to undergo an annual test and inspection in accordance with NFPA 72. Upon completion of the inspection process and all repairs, the appropriate documentation must be completed and copies forwarded to the property owner, property management, and the Gypsum Fire Protection District Fire Prevention. Should discrepancies or conditions be found that prevent the system from operating as designed, repairs must be scheduled and completed in a timely manner. Major repairs or situations that require that the system be taken out of service for any reason must be reported to the Fire Marshal for review and approval prior to conducting the work. All Annual Tests and Inspections must be recorded and submitted to the Fire District on the most current National Fire Protection Agency Inspection and Testing (NFPA) form. Other forms will not be accepted. If such forms are submitted they will be returned and the property in question will be recorded as not in compliance with code until such time the proper documentation is submitted. - 5 -