GUARDRAIL CHECKLIST. (most of this information can be found in the Design Scene)

Similar documents
CHAPTER 14: GUARDRAIL and BARRIERS

SKT-SP Tangent Terminal

Summary of ET Plus Guardrail End Treatment Inspections

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

Exhibit A Scope of Work

Capital Costs for Roadside/Median Barrier Systems

SECTION GUARDRAILS

X-Tension TM Guardrail End Terminal

Session 3: Guardrail Design and Sitespecific. Considerations

ARIZONA DEPARTMENT OF TRANSPORTATION

HIGH TENSION CABLE BARRIER

ENERGY ABSORPTION SYSTEMS

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

VDOT 2001 Road and Bridge Standards Section Guardrail, Fences, and Markers

City of Shelbyville Site Inspection Checklist

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Vehicle Tracking Pad

Executive Summary. In December of 2001, the Region of Durham retained Synectics Transportation Consultants Inc. (Synectics) to prepare a report to:

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

High Strain Dynamic Load Testing of Drilled Shafts

GUARDRAIL INNOVATION FLOWS FROM HERE

Storm Drain Inlet Protection - IP

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

DESCRIPTION OF WORK:

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Steel Door Frame Installation in Steel Stud Construction

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

SECTION 1 GENERAL REQUIREMENTS

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

CABLE MEDIAN BARRIER

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Gas Meter Clearances and Service Installation Requirements

Fiberstars Mini Lighted Laminar Flow Fountains

BRIDGES ARE relatively expensive but often are

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Bridge Type Selection

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Concrete Waste Management

Chapter 3: Fall Protection/ Scaffolding Safety

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

LS 2540 SEWER LATERALS AND INSPECTION TEES

SECTION SELECTIVE DEMOLITION

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

Table of Contents (Continued) Warrants (1) Median Barrier Types (1)

CONSTRUCTION COST ESTIMATES

Gas Meter Clearances and Service Installation Requirements

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Safety Performance of the Median Cable Barrier. Deerfoot Trail, Calgary, Alberta UPDATE

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

SECTION STORM DRAINAGE TABLE OF CONTENTS

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

62 nd Annual Missouri Traffic and Safety Conference. M.A.S.H.: The New Safety Hardware Crash Testing Criteria

Special Specification 7021 Water Main and Sewer Line Replacements

Storm Drainage Systems

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR

DESIGN OF A TL-4 MEDIAN CABLE BARRIER FOR DEERFOOT TRAIL, CALGARY

How To Build A Road In A Townhouse

Outlet stabilization structure

Virginia Department of Transportation Guardrail System Upgrade Guidance

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

Unit Price Averages Reports

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

Maryland Department of Transportation. Guidelines for Traffic Barrier. Placement and End Treatment. Design

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

Chapter 22. Lump Sum Project Guidelines

Acceptance Codes APPENDIX - A. Acceptance Criteria

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 7 INDEX APPURTENANCES

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION GROUND WATER STORAGE TANKS

SECTION SITE PREPARATION

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Table 4.9 Storm Drain Inlet Protetion Applicable for

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

DIY ALL STEEL SHED FRAMES

Guidelines for Fiber Optic Cable Permits

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

VDOT 2001 Road and Bridge Standards Section Drainage Items

Chapter 10 - Scaffolding Systems

Pro-Lift Steel Pile Foundation Repair

ITD Pipe Materials Selection & Specification Procedures. July 2011

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

High Capacity Helical Piles Limited Access Projects

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

CITY UTILITIES DESIGN STANDARDS MANUAL

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

Transcription:

GUARDRAIL CHECKLIST (most of this information can be found in the Design Scene) - When Salvaging Guardrail you need to pay attention to the pay item and what is actually being salvaged. (see other section for how to salvage/install end treatments) When the district wants to salvage, plate beam guardrail and, if this is the case use the following items: 2104.521 SALVAGE GUARDRAIL-PLATE BEAM by the LIN FT 2554.511 INSTALL TRAFFIC BARRIER DESIGN B8338 by the LIN FT if Steel posts, 8307 if wood posts When there is a run of plate beam guardrail with wood posts and the rail is in good condition (salvage rail only), the District may opt for salvaging the rail and replace the wood posts with steel posts, if this is the case use the following items: (providing there is one inplace) 2104.521 SALVAGE GUARD RAIL by LIN FT, add note to SEQ or tab: Includes the removal of the wood posts. 2104.521 ANCHORAGE ASSEMBLY PLATE BEAM by EACH (if required) 2554.603 INSTALL GUARD RAIL by LIN FT, add note to SEQ or tab: Includes the Furnish and Install of steel posts. When removing plate beam rail only (posts remain) and will not reuse the rail (this is used if the rail was hit or in poor condition and the District has decided that the posts are in good condition and would like to keep the post system),, if this is the case use the following items: 2104.501 REMOVE GUARDRAIL by LIN FT 2104.509 REMOVE ANCHORAGE ASSEMBLY by EACH (providing there is one inplace) 2104.521 ANCHORAGE ASSEMBLY PLATE BEAM by EACH (if required) 2554.602 GUARDRAIL POST by EACH (if required) 2554.603 PLATE BEAM RAIL by LIN FT - When removing plate beam guardrail (including posts and end treatment) and will not be reusing the guardrail but replace the existing system with new (removing guardrail plate beam complete system), if this is the case use the following items: 2104.501 REMOVE GUARD RAIL PLATE BEAM by LIN FT (providing there is one inplace) 2104.509 REMOVE specify end treatment (i.e. twisted end, energy absorbing, etc ) by EACH (see section on end treatments) 2554.501 TRAFFIC BARRIER DESIGN B8338 by LIN FT for steel posts 2554.501 TRAFFIC BARRIER DESIGN B8307 by LIN FT for wood posts Guardrail Checklist Page 1

2554.521 ANCHORAGE ASSEMBLY PLATE BEAM by EACH (if required) 2554.521 END TREATMENT specify (see section on end treatments) - When plate beam meets cable the plan should include: 2554.523 END TREATMENT-ENERGY ABSORBING TERMINAL by the EACH, Add the note Shall be flared and have steel posts. Need to also reference Standard Plate 8340 for steel posts, Do NOT put the detail in the plan for the FLEAT-350. - When removing twisted end treatments the designer needs to state if in it includes anchorage blocks. Twisted end treatments are 50 removal of guardrail unless really, really old then 25. - When salvaging Design Special It can only be salvaged if the existing design special is up to present standards. Use 2104.521 SALVAGE GUARDRAIL PLATE BEAM by LIN FT and add a note: INCLUDES DESIGN SPECIAL If you are able to INSTALL the design special then use 2554.511 INSTALL TRAFFIC BARRIER DESIGN B8338 by LIN FT and add a note: INCLUDES DESIGN SPECIAL Design Special can only be installed on the same structure it was salvaged from. - When removing Design Special pay for it as 2104.501 REMOVE GUARDRAIL PLATE BEAM by LIN FT and add a note: INCLUDES DESIGN SPECIAL. - When using 2554.501 TRAFFIC BARRIER DESIGN SPECIAL by LIN FT it includes the bridge connection 8318. When placing on the downstream side of the bridge rails and you don t need a design special use 2554.602 T-BARRIER BRIDGE CONN DES 8318 by EACH. - When removing end treatments use the following items 2104.509 REMOVE ENERGY ABSORBING TERMINAL by EACH, note what it is (i.e. ET-2000, SKT-350, etc) 2104.509 REMOVE TWISTED END TREATMENT by EACH, note if it includes the removal of anchorage blocks. 2104.509 REMOVE ECCENTRIC LOADER BCT by EACH 2104.509 REMOVE SLOTTED RAIL TERMINAL by EACH 2104.509 REMOVE ANCHORAGE ASSEMBLY CABLE by EACH - When salvaging & install End Treatments, when wood posts can NOT be replaced with steel posts on end treatments. If that is desired then it would have to be a new system not an install. - When salvaging an existing guardrail end treatment then use the following items. 2104.523 SALVAGE ANCHORAGE ASSEMBLY CABLE by EACH Guardrail Checklist Page 2

2104.523 SALVAGE ANCHORAGE ASSEMBLY PLATE BEAM by EACH 2104.523 SALVAGE ENERGY ABSORBING TERMINAL by EACH. This is used on existing treatments. Add a note to the SEQ or TAB stating what it is (e.g. 4=FLEAT 350 & 3=SKT 350). 2104. 523 SALVAGE SLOTTED RAIL TERMINAL by EACH 2104. 523 SALVAGE ECCENTRIC LOADER BCT by EACH, This can only be salvaged for parts, it cannot be re-installed. 2104.523 SALVAGE ANCHORAGE ASSEMBLY PL BEAM by EACH 2104.523 SALVAGE ANCHORAGE ASSEMBLY CABLE by EACH 2554.602 INSTALL ANCHOR ASSEMBLY 3 CABLE by EACH 2554.602 INSTALL ANCHOR ASSEMBLY PLATE BEAM by EACH 2554.602 INSTALL ENERGY ABSORBING TERMINAL by EACH. This is used on existing treatments. Add a note to the SEQ or TAB stating what it is (e.g. 4=FLEAT 350 & 3=SKT 350). 2104.602 INSTALL SLOTTED RAIL TERMINAL by EACH - If, however it is an instance where the contractor will be salvaging a guardrail end treatment as a result of staging cross traffic. Then use the following items 2104.523 SALVAGE TANGENT TERMINAL by EACH * 2104.523 SALVAGE FLARED TERMINAL by EACH ** 2554.602 INSTALL TANGENT TERMINAL by EACH * 2554.602 INSTALL FLARED TERMINAL by EACH ** *Note shall be SKT-350 or ET-PLUS ** Note shall be either SRT-350 or FLEAT-350. Include a detail in the plan for possible options. - When furnish & install new end treatments then use the following items. 2554.521 ANCHORAGE ASSEMBLY CABLE by EACH 2554.521 ANCHORAGE ASSEMBLY PLATE BEAM by EACH 2554.523 END TREATMENT - TANGENT TERMINAL by EACH (Include details in plan and note that is shall be SKT-350 or ET-PLUS) 2554.523 END TREATMENT - FLARED TERMINAL by EACH (Include details in plan and note that is shall be either SRT-350 or FLEAT-350 ) An EXCEPTION to this would be (FLARED TERMINAL ONLY): The SRT-350 with wood posts, is the only SRT terminal currently approved. The FLEAT-350 is the only approved flared treatment that has steel posts and is energy absorbing. So, if the District wants to have an energy absorbing flared terminal with steel posts, then the following pay item should be used: 2554.523 END TREATMENT - ENERGY ABSORBING TERMINAL by EACH, add note to SEQ or tab: Shall be flared and have steel posts. If this situation is used alone (no other end treatments) in your plan then Do NOT include the detail in plan for a flared terminal. If you are using this item along with the End Treatment Flared Terminal pay item then the details for the flared terminals should be included in the plan. Guardrail Checklist Page 3

- When salvaging and installing end treatments you can t replace wood posts with steel posts. You must put in a new system instead. - Use 2554.501 TRAFFIC BARRIER DESIGN B8338 by LIN FT when plate beam with steel posts. - Use 2554.501 TRAFFIC BARRIER DESIGN B8307 by LIN FT when plate beam with wood posts. - Use 2554.501 TRAFFIC BARRIER DESIGN 8330 by LIN FT when cable with wood posts. - Use 2554.501 TRAFFIC BARRIER DESIGN 8331 by LIN FT when cable with steel posts. - Need to check the guardrail tab against the video log and the removal and construction plans to make sure the stationing and items agree. Need to notice if both ends of the guardrail are addressed as it always works in tension. By that I mean if there aren t end treatments then are there anchorage assemblies? - If attaching a design special to a flat wall include standard plan sheet 5-297.619 (see below). The designer needs to contact the bridge office to determine if a new concrete end post is needed. If it is then Make sure the plan includes the correct Design Special Detail. For flat face rail include Standard Plan 5-297.619 and add a note on the plan that CONCRETE END POST IS NOT REQUIRED. If a detail is needed make sure you have one in the plan Paid for as part of the F-Barrier - If there are several types of design specials used make sure that the appropriate standard plan sheets are included in the plan and that the tabulation identifies which detail pertains to which design special. - If using a post seat the plan when the posts can t go deep due to culver depth, they will need to either Reference standard plate 8316 which must use wood posts, or Add a detail for the post seat using steel posts. Paid for as 2554.602 GUARDRAIL POST SEAT by the EACH. - When they have a curved section of guardrail you need to make sure they have the short radius detail in the plan. You must include wood posts, use 2554.501 TRAFFIC BARRIER DESIGN B8307 by the LIN FT for the weak posts. You CANNOT use steel posts for these. - Impact Attenuator Assembly These are things such as CAT, NEAT, QuadGuard, etc.. Barrel assemblies are paid for as 2554.602 IMPACT ATTENUATOR BARRELS by the EACH. Barrel assemblies are Guardrail Checklist Page 4

NOT paid for as Impact Attenuator assemblies because if you damage a few barrels you don t want to have to pay for all new barrels. Need to add a note to the SEQ if the attenuator assembly is a permanent or temporary installation as that will affect the price. - When the plan has High Tension Cable it will need to include the following: Standard Plan 5-297.688 Standard Plate for HTCB/Line Post Foundation/Concrete Design 8342 Standard Plate for HTCB/Line Post Foundation/Steel Design 8343 (Pending, check with Design Standards for a detail if needed) Consider the following or similar construction notes for use on HTCB projects, if not already covered elsewhere within your project: All drainage inlets within 200 feet of any disturbed soil in the median shall be o Provided with appropriate inlet protection prior to disturbance. Inlet protection o Shall be incidental unless otherwise specified in the contract. All material removed and not reused on this project shall become the property of the contractor and be disposed of outside MnDOT Right of Way in accordance with Spec. 2106. Salvage and installation of culvert marker posts are incidental. Any required grading for HTCB shall be done before guardrail posts are set. Roads shall be kept clean of sediment. Use a street sweeper with pick-up type, o non-dust generating power broom as often as necessary to keep roads visibly o clean within 24 hours of activity that generates sediment tracking or before o opening the affected lane to traffic, whichever comes first. All street sweeping o work, including street sweeper, shall be incidental. Post foundations shall be flush with the ground line posts shall be placed plumb. For all construction activities within designated noxious and invasive weed infested areas as shown in the plan, see special provisions. Any required mowing for High Tension Cable Barrier (HTCB) construction is incidental. Do NOT place the tension cable guardrail in the bottom of the ditch. There has been some problems with the weld not being done properly in the plans and in the field. Make sure that the latest detail is in the plan. Guardrail Checklist Page 5