Progress of Landside Impermeable Wall freezing: Phase 2 of the first stage



Similar documents
Closure of the Landside Impermeable Wall (Ice Wall) Commencement

Unit 4. Storage and handling. Fuel debris removal. Scenario development & technology consideration. Design and manufacturing of devices/ equipment

Unit 4. Storage and handling. Fuel debris removal. Scenario development & technology consideration. Design and manufacturing of devices/ equipment

Provisional Translation Basic Policy for the Contaminated Water Issue at the TEPCO s Fukushima Daiichi Nuclear Power Station

T s u n a m i s a n d S t o r m S u r g e s

Construction Industry adaptive to Global Warming

Unit 4. Storage and handling. Fuel debris removal. Design & Manufacturing of devices/ equipment. Scenario development & technology consideration

Grant Request Form. Request Form. (For continued projects)

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

NSSU100CT Pb-free Reflow Soldering Application Built-in ESD Protection Device RoHS Compliant

The Effects of Trees On Buildings And Their Characteristics - Part 2

Water Recycles poster

Building Foundation and Structure

PETROLEUM STORAGE TANK SYSTEM UNDERGROUND AND/OR ABOVEGROUND REMOVAL REPORT

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

opti-drän system Keeps your basement and building dry

CONTAMINANT SOURCES. JUNE 1998 Printed on recycled paper

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

Underground Injection Control Storm Water Information

NS9L153AMT-H3 Pb-free Reflow Soldering Application Built-in ESD Protection Device RoHS Compliant

Local production for local consumption( 地 産 地 消 ) Worksheet 1. Task: Do you agree with this idea? Explain the reasons why you think so.

NSPU510CS Built-in ESD Protection Device RoHS Compliant

A Guide to Structural Waterproofing

District Cooling Best Practices Piping Systems

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

Construction sites are dewatered for the following purposes:

BUTE Department of Construction Management and Technology

Arctic King Fuel Tanks meet the Environment Canada TECHNICAL REQUIREMENTS FOR COLLAPSIBLE FABRIC STORAGE TANKS (BLADDERS) - December 17, 2009

JAXA's research strategy to orbital debris mitigation

Groundwater Temperature Survey for Geothermal Heat Pump Application in Tropical Asia

EXPLAINING GROUNDWATER AND WATER WELLS

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

ALL GROUND-WATER HYDROLOGY WORK IS MODELING. A Model is a representation of a system.

Buildings Construction Procurement Strategy

Module 3 : Sewer Material. Lecture 3 : Sewer Material

Handbook for Basement

California Subject Examinations for Teachers

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Global Observation Data Integration with Lexicographic and Geospatial Ontology

Application Guidelines for International Graduate Programs in Engineering

INTERNATIONAL PACIFIC RESEARCH CENTER APRIL 2005 MARCH 2006 REPORT

ENERGY SERVICE -> GREEN ECONOMICS

Status of Contaminated Water Treatment and Tritium at Fukushima Daiichi Nuclear Power Station

Technical Update TAA.TU Rev. 1

UNIT 6a TEST REVIEW. 1. A weather instrument is shown below.

Basements and Deep Building Construction Policy 2014

GHS Flood Final Report CTA Architects Engineers March 31, 2011

LC Paper No. PWSC269/15-16(01)

User Tutorial on Changing Frame Size, Window Size, and Screen Resolution for The Original Version of The Cancer-Rates.Info/NJ Application

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures

Principles of groundwater flow

Hydrogeology Experiment on Surface-Groundwater Interactions: How Do Our Actions Affect Water Quantity and Quality?

Study on the Diagnostics and Projection of Ecosystem Change Associated with Global Change

Shop Fabricated Aboveground Tank Construction Standards

Section SEWER PIPE INSTALLATION AND TESTING

How to Use Boston Private Bank s Secure Mail Service

SHAU KEI WAN GOVERNMENT SECONDARY SCHOOL

Exam : FM0-308 日 本 語 版 Title : Developer Essentials for FileMaker 13 Vendor : FileMaker Version : DEMO 1 / 4


Quality of. Leadership. Quality Students of Faculty. Infrastructure

TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA

Chapter 9 Remedial Measures

NF2L757DRT-V1 Pb-free Reflow Soldering Application Built-in ESD Protection Device RoHS Compliant

Embankment Consolidation

COST AND PERFORMANCE REPORT

PROTECT YOUR HOME WITH SANDBAGS DURING FLOODS By Giuseppe Bolzoni

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

Alberta Onsite Wastewater Management Association Installer Training Program

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

Methods for Land Reclamation using Soft Soil and Waste

15 April 2015 Nuclear Regulation Authority, Japan. 1. Overview

WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST. Which graph best shows the relative stream velocities across the stream from A to B?

Traveling on the Water Cycle

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Neutrino beam line. Yoshikazu Yamada (KEK) Contents. Talk at Neutrino Super Beams, Detectors and Proton Decay BNL, March 3, 2004

Procedures to file a request to the JPO for Patent Prosecution Highway Pilot Program between the JPO and the HPO

Leica 3D Disto Application Veranda / Conservatory

How To Preserve Trees

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities

Part 9 SUBDRAIN DESIGN AND LAYOUT

Part 7 GEOTEXTILE FILTER FABRICS

2, The "Leading Initiative for Excellent Young Researchers" application screen (Home)

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Analysis One Code Desc. Transaction Amount. Fiscal Period

Designed and produced by geo-graphicsdesign.com DP 300 3/02

High Capacity Helical Piles Limited Access Projects

JPShiKen.COM 全 日 本 最 新 の IT 認 定 試 験 問 題 集

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

英 語 上 級 者 への 道 ~Listen and Speak 第 4 回 ヨーロッパからの 新 しい 考 え. Script

SECTION SHEETING, SHORING AND BRACING

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

understanding medium frequency induction melting furnace and its components

2015 年 12 月 期 年 次 決 算 短 信

Chapter 7 Plumbing Connections

Transcription:

<Reference> June 30, 2016 Tokyo Electric Power Company Holdings, Inc. Progress of Landside Impermeable Wall : Phase 2 of the first stage The purpose of the Landside Impermeable Wall construction lies not in soil to form an underground wall but in keeping groundwater from flowing into the reactor/turbine buildings and preventing new contaminated water from being generated. By closing less than 95 percent of the mountain side of the Landside Impermeable Wall in Phase 2 of the first stage, it is expected that the amount of groundwater flowing into the areas around the reactor/turbine buildings will be reduced. This will help keep groundwater from being contaminated during the first stage. Throughout the first stage, how of the Landside Impermeable Wall has progressed will be checked by monitoring the difference in groundwater levels inside and outside of the wall and the amount of groundwater pumped up by the subdrain and groundwater drain systems and the well point system.

Changes in soil temperatures over time Note Average Soil Temperature (AST) of medium-grained sandstone layer (blue line): average value of thermometer temperatures measured at 1m intervals except for the areas between ground surface and Ground Level 2m and the areas around the first muddy layer boarder. Average Soil Temperature (AST) of alternating strata layer (red line): Average value of thermometer temperatures measured at 1m intervals except for the areas around the upper and lower parts of the alternating layer boarder. 1

Groundwater levels and hydraulic heads (in the medium-grained sandstone layer 1 on the seaside) 1. Landside Impermeable Wall (groundwater levels around the seaside and the operations of Subdrain pumping system) The wells for the medium-grained sandstone layer are grouped together to show the difference in water levels close to each Unit, except for non- areas (the bottom of Unit 4 seawater piping trench). RW (Water injection well) Ci, Co (Observation well) Groundwater level The lowest level (from Dec.1, 2015 to Mar. 14, 2016) + more than 1m The lowest level (from Dec.1, 2015 to Mar. 14, 2016) + more than 0.5m Over the lowest level (from Dec.1, 2015 to Mar. 14, 2016) Less than the lowest level (from Dec.1, 2015 to Mar. 14, 2016) 2. Groundwater levels inside and outside of the Landside Impermeable Wall 地 下 水 位 は6/28 12:00 時 点 のデータ The data of groundwater levels as of 12 p.m. on June 28. 2

Groundwater levels and hydraulic heads (in the medium-grained sandstone layer 2 on the landside) 3. Landside Impermeable Wall (groundwater levels around the seaside and the operations of Subdrain pumping system) The wells for the medium-grained sandstone layer are grouped together to include two wells outside the non- area and one well inside, for each Unit. RW (Water injection well) Ci, Co (Medium-grained sandstone layer) Groundwater level Landside Subdrain the lowest level + more than 2m Landside Subdrain the lowest level + more than 1m Landside Subdrain over the lowest level Landside Subdrain less than the lowest level 4. Groundwater levels inside and outside of the Landside Impermeable Wall 地 下 水 位 は6/28 12:00 時 点 のデータ The data of groundwater levels as of 12 p.m. on June 28. 3

Groundwater levels and hydraulic heads (in the alternating strata layer and the fine- and rough-grained sandstone layer 1 on the seaside) 5. Landside Impermeable Wall (groundwater levels around the seaside and the operations of Subdrain pumping system) The wells for the alternating strata layer and the fine- and rough-grained sandstone layer are grouped together to show the difference in water levels close to each Unit, except for non- areas (the bottom of seawater piping trench for each Unit). Gi, Go (Alternating strata layer) Si, So (fine-and rough-grained sandstone layer) Groundwater level The lowest level (from Apr. 1 to Apr. 11, 2016) + more than 1m The lowest level (from Apr. 1 to Apr. 11, 2016) + more than 0.5m Over the lowest level (from Apr. 1 to Apr. 11, 2016) Less than the lowest level (from Apr. 1 to Apr. 11, 2016) 6. Groundwater levels inside and outside of the Landside Impermeable Wall 地 下 水 位 は6/28 12:00 時 点 のデータ The data of groundwater levels as of 12 p.m. on June 28. 4

Groundwater levels and hydraulic heads (in the alternating strata layer and the fine- and rough-grained sandstone layer 2 on the landside) 7. Landside Impermeable Wall (groundwater levels around the seaside and the operations of Subdrain pumping system) The wells for the alternating strata layer and the fine- and rough-grained sandstone layer are grouped together to include two wells outside the non- area and one well inside, for each Unit. Gi, Go (Alternating strata layer) Si, So (fine-and rough-grained sandstone layer) Groundwater level Landside Subdrain the lowest level + more than 2m Landside Subdrain the lowest level + more than 1m Landside Subdrain over the lowest level Landside Subdrain less than the lowest level 8. Groundwater levels inside and outside of the Landside Impermeable Wall 地 下 水 位 は6/28 12:00 時 点 のデータ The data of groundwater levels as of 12 p.m. on June 28. 5

[Reference] Location map of groundwater level observation wells (as of April 2016) Groundwater drain and Subdrain Water injection well Observation well located in the medium-grained sandstone layer Observation well located in the alternating strata layer Observation well located in the fine-and rough-grained sandstone layer 6

[Reference] Distribution map of soil temperatures (north side of Unit1) Distribution map of soil temperatures : Thermometer pipe for the outside of frozen soil line : Thermometer pipe for the inside of frozen soil line : RE (recharge well) : Ci (medium-grained sandstone layer in the inside of frozen soil line) (6) Seaside of Seaside (East) (5) Seaside of Frozen soil line North side of Unit 1 (a view from the north side) ((The 温 temperature 度 は6/28 data as of 7 時 a.m. 点 on のデータ) June 28.) : Diagonally installed thermometer pipe for the soil pipes installed on multiple line : Thermometer pipe for no areas : Corner of frozen soil line : Soil pipes installed on single line (advanced ) : Soil pipes installed on multiple lines (advanced ) : Freezing areas for the seaside and a part of the north side (1) North side of Unit 1 Unit 1 T/B Unit 2 T/B Unit 3 T/B Unit 4 T/B Unit 1 Unit 2 Unit 3 Unit 4 South (4) South side of Unit 4 No, W.2 No, W.3 No W.4 No, S. No, N. East No, W.1 (2) Landside of Landside (West) No, W.5 (3) Landside of *The red arrow indicates the direction from which the ICE WALL is looked at. Temperature ( C) West (leading to the landside of Units 1-2 (2)) *No measurement: white 7

[Reference] Distribution map of soil temperatures (west side of Units 1-2) Distribution map of soil temperatures : Thermometer pipe for the outside of frozen soil line : Thermometer pipe for the inside of frozen soil line : RE (recharge well) : Ci (medium-grained sandstone layer in the inside of frozen soil line) (6) Seaside of Seaside (East) (5) Seaside of Frozen soil line Landside of Units 1-2 (a view from the west side) (The temperature data as of 7 a.m. on June 28.) ( 温 度 は6/28 は6/21 時 点 のデータ) : Diagonally installed thermometer pipe for the soil pipes installed on multiple line : Thermometer pipe for no areas : Corner of frozen soil line : Soil pipes installed on single line (advanced ) : Soil pipes installed on multiple lines (advanced ) : Freezing areas for the seaside and a part of the north side North (1) North side of Unit 1 Unit 1 T/B Unit 2 T/B Unit 3 T/B Unit 4 T/B Unit 1 Unit 2 Unit 3 Unit 4 South (4) South side of Unit 4 No, W.2 No, W.3 No W.4 No, S. No, N. North (leading to the north side of Unit 1 (1)) No, W.1 No, W.5 (2) Landside of (3) Landside of Landside (West) *The red arrow indicates the direction from which the ICE WALL is looked at. Temperature ( C) South (leading to the landside of Units 3-4 (3)) *No measurement: white 8

[Reference] Distribution map of soil temperatures (west side of Units 3-4) Distribution map of soil temperatures : Thermometer pipe for the outside of frozen soil line : Thermometer pipe for the inside of frozen soil line : RE (recharge well) : Ci (medium-grained sandstone layer in the inside of frozen soil line) (6) Seaside of Seaside (East) (5) Seaside of Frozen soil line Landside of Units 3-4 (a view from the west side) ( 温 度 は6/28 は6/21 時 点 のデータ) (The temperature data as of 7 a.m. on June 28.) : Diagonally installed thermometer pipe for the soil pipes installed on multiple line : Thermometer pipe for no areas : Corner of frozen soil line : Soil pipes installed on single line (advanced ) : Soil pipes installed on multiple lines (advanced ) : Freezing areas for the seaside and a part of the north side North (1) North side of Unit 1 Unit 1 T/B Unit 2 T/B Unit 3 T/B Unit 4 T/B Unit 1 Unit 2 Unit 3 Unit 4 South (4) South side of Unit 4 No, W.2 No, W.3 No W.4 No, S. No, N. North (leading to the landside of Units 1-2 (2)) No, W.1 (2) Landside of (3) Landside of No, W.5 Landside (West) *The red arrow indicates the direction from which the ICE WALL is looked at. Temperature ( C) South (leading to the south side of Unit 4 (4)) *No measurement: white 9

[Reference] Distribution map of soil temperatures (south side of Unit 4) Distribution map of soil temperatures South side of Unit 4 (a view from the south side) (The temperature data as of 7 a.m. on June 28.) ( 温 度 は6/28 は6/21 時 点 のデータ) : Thermometer pipe for the outside of frozen soil line : Thermometer pipe for the inside of frozen soil line : Diagonally installed thermometer pipe for the soil pipes installed on multiple line : Thermometer pipe for no areas : Corner of frozen soil line : RE (recharge well) : Ci (medium-grained sandstone layer in the inside of frozen soil line) : Soil pipes installed on single line (advanced ) : Soil pipes installed on multiple lines (advanced ) : Freezing areas for the seaside and a part of the north side North (1) North side of Unit 1 Seaside (East) (6) Seaside of (5) Seaside of Unit 1 T/B Unit 2 T/B Unit 3 T/B Unit 4 T/B Unit 1 Unit 2 Unit 3 Unit 4 Frozen soil line (4) South side of Unit 4 No, W.2 No, W.3 No W.4 No, S. No, N. West (leading to the landside of Units 3-4 (3)) No, W.1 (2) Landside of Landside (West) No, W.5 (3) Landside of *The red arrow indicates the direction from which the ICE WALL is looked at. Temperature ( C) East (leading to the seaside of Units 3-4 (5)) East *No measurement: white 10

[Reference] Distribution map of soil temperatures (east side of Units 3-4) Distribution map of soil temperatures Seaside of Units 3-4 (west side: a view from the inside of frozen soil) (The temperature data as of 7 a.m. on June 28.) ( 温 度 は6/28 時 点 のデータ) : Thermometer pipe for the outside of frozen soil line : Thermometer pipe for the inside of frozen soil line : Diagonally installed thermometer pipe for the soil pipes installed on multiple line : Thermometer pipe for no areas : Corner of frozen soil line : RE (recharge well) : Ci (medium-grained sandstone layer in the inside of frozen soil line) : Soil pipes installed on single line (advanced ) : Soil pipes installed on multiple lines (advanced ) : Freezing areas for the seaside and a part of the north side North (1) North side of Unit 1 Seaside (East) (6) Seaside of (5) Seaside of Unit 1 T/B Unit 2 T/B Unit 3 T/B Unit 4 T/B Unit 1 Unit 2 Unit 3 Unit 4 Frozen soil line South (4) South side of Unit 4 No, W.2 No, W.3 No W.4 No, S. No, N. North (leading to the seaside of Units 1-2 (6)) No, W.1 (2) Landside of Landside (West) No, W.5 (3) Landside of *The red arrow indicates the direction from which the ICE WALL is looked at. Temperature ( C) South (leading to the south side of Unit 4 (4)) *No measurement: white 11

[Reference] Distribution map of soil temperature (east side of Units 1-2) Distribution map of soil temperatures Seaside of Units 1-2 (west side: a view from the inside of frozen soil) (The temperature data as of 7 a.m. on June 28.) ( 温 度 は6/28 は6/21 時 点 のデータ) : Thermometer pipe for the outside of frozen soil line : Thermometer pipe for the inside of frozen soil line : Diagonally installed thermometer pipe for the soil pipes installed on multiple line : Thermometer pipe for no areas : Corner of frozen soil line : RE (recharge well) : Ci (medium-grained sandstone layer in the inside of frozen soil line) : Soil pipes installed on single line (advanced ) : Soil pipes installed on multiple lines (advanced ) : Freezing areas for the seaside and a part of the north side North (1) North side of Unit 1 Seaside (East) (6) Seaside of (5) Seaside of Unit 1 T/B Unit 2 T/B Unit 3 T/B Unit 4 T/B Unit 1 Unit 2 Unit 3 Unit 4 Frozen soil line South (4) South side of Unit 4 No, W.2 No, W.3 No W.4 No, S. No, N. North (leading to the north side of Unit 1 (1)) No, W.1 (2) Landside of Landside (West) No, W.5 (3) Landside of *The red arrow indicates the direction from which the ICE WALL is looked at. Temperature ( C) South (leading to the seaside of Units 3-4 (5)) *No measurement: white 12

[Reference] Changes in the water levels of the vertical shaft B of Unit 1 seawater piping trench and the amounts of water transferred T.P.(m) 5.00 トレンチ 坑 B 位 & 移 送 量 Water levels of the vertical shaft B and amounts of water transferred T.P. ペントハウス +5.057m 天 端 さ(T.P.+5.057m) top end of Penthouse 移 送 量 (m3) Transferred Amount (m3) Expected water levels 16.0 翌 日 after 以 降 の tomorrow 予 想 水 位 4.50 T.P. +5.057m top end of Penthouse 14.0 4.00 12.0 3.50 3.00 10.0 2.50 T.P. +2.509m above 坑 坑 the さ(T.P.+2.509m) sea level (ground level) 8.0 2.00 1.50 1.00 *Water transfer has been suspended from June 12 due to the completion of water-proof coating inside the Penthouse. 6.0 4.0 0.50 2.0 0.00 6/1 6/2 6/3 6/4 6/5 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 6/14 6/15 6/16 6/17 6/18 6/19 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6/28 6/29 6/30 7/1 7/2 7/3 7/4 Amount of water Amount of water 予 移 測 transferred 送 水 量 位 ( 1( 実 績 至 ) 近 (m3) 流 入 量 最 高 値 18.89m3で 想 定 ) 予 移 測 that 送 水 量 位 will ( 2( 予 想 be 至 ) 近 流 入 量 最 低 値 15.22m3で 想 定 ) 予 立 測 vertical 坑 水 位 1( ( 予 shaft 至 想 近 ) 流 入 量 最 高 値 18.89m3で 想 定 ) 予 立 測 坑 vertical 水 位 2( ( 実 shaft 至 績 近 ) 流 入 量 最 低 値 15.22m3で 想 定 ) transferred (m3) Water level at (expected) Water level at (results) 0.0 6/28 作 成 データ *Data generated at 3 p.m. on May 28. 13