Rural North, Oundle and Thrapston Plan. Submitted January 2008. Monitoring Framework



Similar documents
Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Sustainability Appraisal of the Lichfield Local Plan: Strategy

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Licensed Premises Warmington Oundle

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation

3.0 Planning Policies

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November Prepared by Capita Lovejoy on behalf of William Davis Limited

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

City Plan Part 1 Sustainability Appraisal Summary February 2012

Working towards a Core Strategy for Wiltshire Topic paper 11: Green infrastructure

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

BEMBRIDGE NEIGHBOURHOOD DEVELOPMENT PLAN

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

Site Specific Policies Local Plan

What do we already know about Bradford-on-Avon community area?

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Proposal for a Demonstration Exemplar at British Sugar, York

Chapter 2 Spatial Portrait

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries.

BIDFORD PARISH NEIGHBOURHOOD PLAN NEIGHBOURHOOD DEVELOPMENT PLAN. Consultation Document on Draft Policies 25th May th July 2015

Site Specific Policies

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

Planning Policy Statement 8 (PPS 8) Open Space, Sport and Outdoor Recreation

Core Strategy Leeds Local Development Framework

OVERARCHING SPATIAL POLICIES

London Borough of Havering. Draft Planning Guidance Note on Affordable Housing. Commuted Sum Payments

LONDON BOROUGH OF HAVERING

Decision Due Date: 18 April 2015

Report. Prepared for. Report for CIL Charging. GVA St Catherine s Court Berkeley Place Bristol BS8 1BQ (0) gva.co.uk

Application for Outline Planning Permission with All Matters Reserved Town and Country Planning Act 1990

Camden Development Policies

Residential Development Travel Plan

Community and Housing - Empty Property Strategy

Planning Obligations. Supplementary Planning Document to the Hounslow Local Development Framework

Relaxation of planning rules for change of use from commercial to residential

Leicester and Leicestershire Local Investment Plan

Reasons why it is expedient to issue an enforcement notice:

Relating to Supplementary Guidance Rural Development (RD) 1 and Special Types of Rural Land (STRL) type 2.

Social and Community Development

KEYPORT COMMUNITY PLAN

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Community Infrastructure Levy

Appendix A. DM Document SA Report Appendix A

Diamond Place Supplementary Planning Document. Options Consultation Document

Longford Local Authorities

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

Rochdale Unitary Development Plan Review: : Inspector s Report

Planning Policy and Guidance on Flooding and Coastal Erosion

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Renewable and Low Carbon Energy Study for Central Lincolnshire

Stowmarket Area Action Plan (AAP) Examination

Newham, London. Local Economic Assessment to Newham - Economic Development

Draft Winchester District Local Plan Part 2. Recommended Responses to Issues Raised WALTHAM CHASE

Item No: 4 Reference: B/13/00928/FUL. Parish: WHATFIELD Ward Member: Cllr D Kendall

Digital Communications

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION

Speed Limit Policy Isle of Wight Council

Guildford borough Local Plan Local Development Scheme 2015

Property & Asset Maintenance Business Unit Service Plan 2015/16

Briefing Note in relation to the Proposed Submission Local Plan: Strategy and Sites (appended to this report)

Soesterberg, the Netherlands An Advisory Services Panel. September

Merton Sites and Policies and Policies Plan (the plan) Public Examination

Major and Minor Schemes

CHANGE OF USE FROM AGRICULTURE TO A USE FOR CARAVAN STORAGE COMPOUND AND OPERATIONAL DEVELOPMENT.

Promote sustainable development and energy conservation. Facilitate the operation and use of public transport.

Kirklees Draft Local Plan Development Plan Document

PLANNING APPLICATION: 12/00056/APP

DRAFT. Amberley Road Adult Education Centre Amberley Road London, W9. Definitions

III. Focused Issues. 1. Economic Development C I T Y OF P E T E R S B U R G, V I R G I N I A - C O M P R E H E N S I V E P L A N 2 011

Development Management Report

New housing, settlement expansion and the natural heritage


Development Brief for the Gedling Colliery and Chase Farm site

Transcription:

Rural North, Oundle and Thrapston Plan Submitted January 2008 Monitoring Framework January 2008

1.0 Introduction 1.1 Monitoring and review are key components of the new planning system. Development Plan Documents need to be continually reviewed and revised, partly to evaluate assess the success of the plan, and partly to ensure the components of the framework are updated to reflect changing circumstances nationally, regionally and locally. As such this document reiterates the indicators and targets for each policy, as well as identifying where the required information will be sourced, who will be responsible for compiling the information, and also the implementing. 1.2 Monitoring of the plan should focus on implementation, setting out agreed delivery mechanisms to ensure that policies achieve desired results in the required timeframe. Monitoring will assess progress in delivering the spatial vision and objectives through the implementation of policies and may identify policies that need reviewing or replacing because they are not having the intended effect. 1.3 An Annual Monitoring Report (AMR), published in December each year, will measure progress against the indicators and targets, and will indicate whether the Plan policies are being implemented as envisaged. Evidence that policies are not working as intended, changes in national and regional policy, or new information and evidence that comes to light, may all trigger a review of the Plan. 1.4 Delivery of the Plan will be through a number of means, including the development control process (the consideration of planning applications), the preparation of other documents such as development briefs, public and private investment in infrastructure and new development, and partnership working with other agencies and. Investment in the area will be coordinated and managed by the North Northants Development Company, which has been established in order to drive the delivery of sustainable growth and the regeneration of communities and places within North Northamptonshire. 1.5 In conjunction with the monitoring of the Rural North, Oundle and Thrapston Plan policies, monitoring will also take place on the Sustainability objectives. The monitoring programme for the sustainability objectives has been incorporated into the Sustainability Appraisal (SA)(Section 12) (January, 2008). 1.6 The information contained within the monitoring framework and the SA monitoring programme will be reviewed during the preparation of the AMR. New sources of information may become available over time and other implementation agencies may also be identified.

Glossary ABI ACRE BC DEFRA EA emda GIS ICLA JPU LNR LPA LTP NBRC NCC NEL NHBC NNDC PP s PPO R&L R&MO RLA RNOTP RNRP RSL VDS Annual Business Inquiry Action with Communities in Rural England Building Control Data Capture Assistant Development Control Officer Department of Environment, Food and Rural Affairs Environment Agency East Midlands Development Agency Geographic Information System Industrial and Commercial Land Availability Joint Planning Unit Local Nature Reserves Local Planning Authority (East Northamptonshire Council) Local Transport Plan Northamptonshire Biological Records Centre Northamptonshire County Council Northamptonshire Enterprise Limited National House Building Council North Northants Development Corporation Parish Plans Planning Policy Officer Retail and Leisure Research and Monitoring Officer Residential Land Availability Rural North, Oundle and Thrapston Plan River Nene Regional Park Registered Social Landowners Village Design Statements

Monitoring Framework Description RNOTP Policy 1 Rural Service Centres - Oundle and Thrapston % of development on PDL, both within and adjacent to settlement boundaries % of development in Thrapston and Oundle; King's Cliffe, Nassington and Warmington RLA survey R&MO LPA 1,5,8 RLA, ICLA and R&L Surveys R&MO LPA 1,6,8 Number of applications approved with a local needs justification adjacent to Network village boundaries. RLA, ICLA and R&L Surveys and application details LPA 1,6,8 Employment diversification Retail Surveys and ABI, ICLA R&MO LPA, 8 Improvement in Public Transport Services NCC LTP, bus operators NCC highways authority, public transport providers, highways agency, LPA and Town and Parish Councils. 2 No net loss of services and facilities Town and Parish Councils, services and facilities survey LPA, ACRE 1,8 At least 60% of new development in Plan area within Rural Service Centres; at least 10% in King's Cliffe; at least 5% in Nassington and Warmington RLA survey R&MO Developers 1,6,8 No new development (excludes re-use and conversion) granted adjacent to village boundaries without a local needs justification RLA, ICLA, R&L surveys and application details LPA 5 Net jobs measured against CSS jobs target ABI data R&MO LPA/JPU 1,8 Policy 2 Windfall Developments in Settlements %/total amount of all development that is defined as windfall RLA survey R&MO LPA 1 Number of applications approved that do not adhere to criteria in Policy 2 RLA survey LPA 1,5,7 0% of applications approved without compliance to criteria in Policy 2 RLA LPA 5

RNOTP Policy 3 Phasing in Oundle Provision of infrastructure, services and facilities Uniform, R&L monitoring Liaising with providers LPA,, NCC, NNDC, utilities providers 1,7,8 Master plan proposals for phasing of developments at Ashton Road/Herne Road and Creed Road Developer PPO Developers, LPA 1,3,5,6,7 Delivery of new high quality business uses at East Road ICLA monitoring LPA, 1,5,7,8 0% applications approved on allocated sites without an agreed phasing schedule Uniform LPA 1,5,6,7,8 Policy 4 Phasing in Thrapston Provision of infrastructure, services and facilities in accordance with a timetable set out in a master plan Application form (Uniform), service providers /R&MO/PPO LPA,, NCC, NNDC, utilities providers 1,7,8 0% applications approved on Huntingdon Road site without an agreed phasing schedule Application form (Uniform) /R&MO/PPO LPA, Policy 5 Comprehensive Development Provision of infrastructure alongside new development supporting information for applications, service providers LPA,, NCC, NNDC, utilities providers 1,2,3,4,7,8,9 All residential sites of 100 units and over, or 3 hectares and over for non residential, provide for infrastructure via a master plan Developer, master plan PPO LPA,, NCC, NNDC, utilities providers 1,2,3,4,7,8,9 No permissions granted that potentially prohibit the comprehensive development of a site, or create a piecemeal form of development RLA, ICLA LPA, 1,5 Policy 6 Green Infrastructure An increase in the amount of green infrastructure accessible supporting information to applications RNRP, Wildlife Trust, Town and Parish Councils, LPA, NCC, 3

RNOTP Provision of specified routes Leisure monitoring RNRP, Wildlife Trust, Town and Parish Councils, LPA, Sustrans, NCC 3,2 Length of foot and cycle routes and links provided Wildlife Trust, RNRP, Supporting information to applications, Sustrans RNRP, Wildlife Trust, Town and Parish Councils, LPA, Sustrans, NCC 3 Amount of new nature conservation areas provided Wildlife Trust, RNRP, Supporting information to applications Wildlife Trust, RNRP, local interest groups, Town and Parish Councils 4 Number of developments that involve green economic uses or green education ICLA, supporting information to applications Developers, LPA 3,8 Type of recreation space provided supporting information to applications Developers, Town and Parish Councils, LPA 4,5,3 New accessible Green Infrastructure Wildlife Trust, RNRP, LPA, Town and Parish Councils, NCC RNRP, Wildlife Trust, Town and Parish Councils, LPA, Sustrans, NCC 2,3,4,7 Completion of the specified routes by 2021 Wildlife trust, RNRP, LPA, Town and Parish Councils, NCC RNRP, Wildlife Trust, Town and Parish Councils, LPA, Sustrans, NCC 2,3,4 100% of development providing or linking into foot and cycle links supporting information for applications and masterplans RNRP, Wildlife Trust, Town and Parish Councils, LPA, Sustrans, NCC 11 100% of development creating space or contributing towards nature conservation supporting information for applications and masterplans, Town and Parish Councils RNRP, Wildlife Trust, Town and Parish Councils, LPA, Sustrans, NCC 3,4 Increase in green economic uses and green education supporting information for applications, ICLA, economic development LPA, ACRE 4,7 100% of large sites providing for green infrastructure through a master plan supporting information for applications and masterplans, PPO RNRP, Wildlife Trust, Town and Parish Councils, LPA, Sustrans, NCC 3,4,5 Policy 7 Transport Network Level of bus usage and community transport County Council, Local Transport Plan, bus operators NCC, public transport providers, voluntary 1,2

RNOTP Delivery of additional bus services, in particular to King s Cliffe and Nassington County Council, Local Transport Plan, bus operators NCC, public transport providers, 1,2 Increase in bus service provision County Council, Local Transport Plan, bus operators NCC, public transport providers 1,2 Increase in community transport provision and use County Council, Local Transport Plan, bus operators NCC, public transport providers 1,2 Policy 8 Residential Parking Standards Provision of car parking in association with new residential developments Uniform LPA, NCC, 1,5 No more than 2 off road parking spaces per residential unit (1 space/unit in town centre locations) Uniform LPA, NCC, 1,2,5 Policy 9 Flood Risk Number of permissions granted for schemes that fail PPS25 sequential and exceptions test % of development that adheres to the 200 year standard of flood protection in relation to development and run off from new development EA - COI7 from, EA LPA, EA 1 Developer LPA, EA LPA, 1 Creation of additional flood storage within the Nene floodplain Local Authority LPA, EA, RNRP LPA, EA, RNRP 1,4 Number of SUDS schemes that include future maintenance and inspection schemes funded by the developer for the lifetime of the development Legal agreements LPA Developers 1 No permissions granted that fail the sequential or exceptions tests in PPS25 100% of permissions to meet the 200 year level of flood protection EA - COI7 form, EA LPA, EA 1,7 Uniform, supporting info to application, EA LPA, EA 1,7 Creation of additional flood storage by the end of the plan period Uniform LPA, EA, 1,4,5,7 100% of schemes that incorporate SUDS to include maintenance and inspection schemes funded by the developer Uniform, supporting info to application LPA, EA, 1,4,5,7

RNOTP Policy 10 Housing Density 100% of approved applications to adhere to criteria in Policy 10 RLA Survey R&MO LPA, 1,5,6 Policy 11 Housing Design Principles %/total number of dwellings by number of bedrooms Uniform, NHBC LPA, 1,5,6 % of wheelchair accessible units on developments of 10 or more BC LPA, 1,6 Thrapston 100% of housing developments of 3-50 units providing at least 50% of units with 3 or more bedrooms RLA R&MO LPA,, RSLs 1,5,6 Elsewhere in plan area 100% of housing developments of 3-50 units providing at least 60% of units with 1 or 2 bedrooms RLA R&MO LPA,, RSLs 1,5,6 5% (or at least 1 unit, whichever is greater) of all housing on sites of over 10 dwellings to be designed as wheelchair accessible BC LPA,, RSLs 1,5,6 Policy 12 Important Open Land within Towns and Villages Number of permissions granted that result in a loss of important open land as designated RLA, ICLA, R&L - GIS Policy Technician LPA, 1,3,5 No permissions granted for development that adversely affects important open land as designated RLA, ICLA, R&L - GIS Policy Technician LPA 1,5 Policy 13 Buildings of Local Architectural or Historic Interest Number of permissions granted that will lead to a loss of Buildings of Local Architectural or Historic Interest RLA, ICLA, R&L - GIS Policy Technician LPA, 1,5,9 No permissions granted for development that adversely impacts Buildings of Local Architectural or Historic Interest RLA, ICLA, R&L - GIS Policy Technician LPA 1,5,9

RNOTP Policy 14 Protection of Local Sites of Conservation Interest and Designation of Local Nature Reserves Number and condition of LNRs, sites of local conservation interest or other sites of biodiversity or geological interest Natural England, Wildlife Trust Natural England, Wildlife Trust, LPA 3,4 No permissions granted that adversely impact LNRs, sites of local conservation interest, or other sites of biodiversity or geological interest RLA, ICLA, R&L - GIS Policy Technician Natural England, Wildlife Trust, LPA 4 Declaration of three new LNRs by 2011 LPA, Wildlife Trust LPA, Natural England, Wildlife Trust 3,4 Policy 15 Enhancing Biodiversity Core Output 8 (i) Change in priority habitats and species (by type) Natural England, Wildlife Trust, NBRC R&MO LPA, Natural England,, Wildlife Trust 4 Policy 16 Wind Farms Number of Applications approved that adhere to the criteria set out in Policy 16 Developers, supporting information to applications, LPA LPA, energy/utilities 1,5 No applications approved which do not meet all criteria in Policy 16 Developers, supporting information to applications, LPA LPA, energy/utilities 1,5 Policy 17 Parish Plans and Village Design Statements Number of planning decisions that are informed by PPs/VDS Decision notes Town and Parish Councils, LPA, ACRE 1,5 All relevant applications to refer to PPs/VDSs Decision notes Town and Parish Councils, LPA, ACRE 1,5 Policy 18 Considerate Construction Number of actively promoting Industry Code of Considerate Practice Developer Developers 1

RNOTP Increase in the number of actively promoting the Industry Code of Considerate Practice over plan period Developers, LPA /BC LPA, 5 Decrease in the number of construction site related complaints received through Environmental Health and Enforcement Developers, LPA /BC LPA, 5 Policy 19 Affordable Housing s Cumulative affordable housing completions excluding rural exception sites RLA Monitoring R&MO LPA, Housing Associations 1,6,7 Minimum of 36 affordable units to be completed per annum up to the end of the plan period excluding rural exception sites (see policy 21) RLA Monitoring R&MO LPA, Housing Associations Policy 20 Affordable Housing Requirement Breakdown of completions by tenure RLA Monitoring R&MO LPA, Housing Associations 1,6,7 % of applications meeting the threshold that provide the required level of affordable housing and the stated tenure breakdown Uniform, RLA R&MO,, Housing Strategy LPA, Housing Associations, 6 100% of development sites over 50 dwellings providing 40% affordable housing, with a mix of 25% social rented and 15% intermediate housing RLA Monitoring, Uniform R&MO, LPA, Housing Associations, 1,6,7 100% of development sites of 15-50 dwellings providing 40% affordable housing, with a mix of 30% social rented and 10% intermediate housing RLA Monitoring, Uniform R&MO, LPA, Housing Associations, 1,6,7 100% of housing developments of 5 or more dwellings in rural areas providing 40% affordable housing, with a mix of 30% social rented, and 10% intermediate housing RLA Monitoring, Uniform R&MO, LPA, Housing Associations, 1,6,7 100% of applications meeting the threshold to be subject to the criteria set out in policy 20 RLA Monitoring, Uniform, supporting application information R&MO, LPA, Housing Associations, 1,6,7 Policy 21 Rural Exceptions Housing Number of exception site applications approved which meet the stated criteria Uniform, RLA Housing Associations, LPA, 1,6,7

RNOTP 100% of approved applications to adhere to the criteria as set out in Policy 21. Uniform, RLA Housing Associations, LPA, 6 Policy 22 Open Space, Sport and Recreational Total number and area of existing open space, sport and recreation facilities Additional open space, sport and recreational facilities created through Developer Contributions SPD PMP Open Space Study, Town and Parish Councils Town and Parish Councils, LPA LPA, Town and Parish Councils,, leisure providers LPA, Town and Parish Councils,, leisure providers 1,7,3 1,7,3 100% of applications approved to provide for open space in accordance with the required standard Uniform, supporting information Zero net losses of existing open space, sport and recreation facilities GIS - overlay shape files LPA, Town and Parish Councils,, leisure providers LPA, Town and Parish Councils,, leisure providers 1,3,7 1,3,7 Policy 23 Protected Employment Areas Total area of employment uses RNOTP Appendix 4, ICLA, R&MO, LPA, 1,8 Zero net loss of key employment areas GIS - overlay shape files R&MO, LPA, 1,8 Policy 24 Employment Sites Occupied by Single Businesses Use status of sites ICLA/Officer knowledge R&MO LPA, 1,8 100% of redevelopment applications approved to meet the criteria set out in Policy 24 ICLA Monitoring, Uniform LPA, 1,8 Policy 25 Town Centres Number of A1 units Retail Surveys R&MO LPA, 9 Number of other A use class units Retail Surveys R&MO LPA, 9 Number of vacant units Retail Surveys R&MO LPA, 9 Number of vacant units does not exceed 3 in Thrapston, and 2 in Oundle Retail Surveys R&MO LPA, retailers 8,9 100% of proposals for the use of spaces above shops adhere to Policy 25 requirements Retail Surveys R&MO LPA, retailers, 6,8,9

RNOTP Policy 26 Water Related Facilities along the River Nene Increase in the number of water based leisure and tourism facilities Retail & Leisure Monitoring R&MO LPA,, EA, RNRP 7,8 Provision of boat hire facilities in association with Oundle, Thrapston, Nassington or Warmington Retail & Leisure Monitoring R&MO LPA,, EA, RNRP 7,8 At least one boat hire facility within the plan area by 2021 Retail & Leisure Monitoring R&MO LPA,, EA, RNRP 7,8 Policy 27 Riverside Hotel (near Oundle) Use status of Riverside Hotel site Retail & Leisure Monitoring R&MO LPA, 1,3 To have the site in use as stipulated in the policy by 2015 Retail & Leisure Monitoring R&MO LPA, 1,3,8 Policy 28 Oundle Marina Use status of site Retail & Leisure Monitoring R&MO LPA,,EA 1,7,8 100% of redevelopment applications approved to meet the criteria set out in Policy 28 Retail & Leisure Monitoring/ICLA R&MO LPA,, EA 1,5,7,8 Policy 29 Lilford Park Improved public access to, and around Lilford Park NCC, LPA,, RNRP NCC, LPA,, RNRP 3,5 Creation of new footpath link between Lilford, Lilford Hall and public footpath NG1 NCC NCC, LPA,, RNRP 2,3,7 Policy 30 Rural Buildings - General Approach Number of approvals for the re-use of rural buildings in the countryside Uniform, RLA, ICLA, R&L, services and facilities monitoring R&MO LPA, 1,5,7,8

RNOTP 100% of approved applications to adhere to the criteria set out in Policy 30 Uniform LPA, 1,5,7,8 Policy 31 Replacement Dwellings in the Open Countryside Number of approvals for replacement dwellings in the open countryside RLA Monitoring R&MO LPA, 5 100% of approved applications for replacement dwellings to adhere to the criteria set out in Policy 31 Uniform LPA, 5 Policy 32 Farm Diversification Mix of uses associated with farm diversification proposals ICLA, Uniform R&MO,, PPO LPA,, DEFRA 1,7,8 Increase in farm diversification projects in the Plan area ICLA, Uniform R&MO, LPA,, DEFRA 1,7,8 100% of approved applications for farm diversification schemes to adhere to the criteria set out in Policy 32 ICLA, Uniform R&MO, LPA,, DEFRA 1,7,8 Policy 33 Lorry Parking Location of new lorry parking facilities across the plan area NCC, uniform R&MO,, PPO LPA, NCC,, Highways Agency 1,2,5 100% of approved lorry park applications to adhere to criteria set out in Policy 33 NCC, uniform LPA, NCC,, Highways Agency 1,2,5 OUN1 Infrastructure Improvements in infrastructure associated with the development of sites identified in policies OUN2 and OUN3 NCC,, NNDC, Utility Providers R&MO,, PPO, LPA,, NNDC, Utilities providers, public bodies, NCC 1,2,3,9 Transport Strategy completed by the end of 2009 NCC PPO LPA,, NNDC, Utilities providers, public bodies, NCC 1,2,3,9

RNOTP Improvements in infrastructure implemented prior to or alongside new development, as appropriate NCC,, NNDC, Utility Providers, public bodies R&MO,, PPO, LPA,, NNDC, Utilities providers, public bodies, NCC 1,2,3,9 OUN2 East Road, Oundle Redevelopment of East Road site for business use by 2016 ICLA Monitoring R&MO LPA,, emda, NEL, NNDC 1,8 At least 60% of the East Road site to be developed for B1 uses, with the remainder to be developed for B2 uses ICLA Monitoring/Application form LPA,, emda, NEL, NNDC 1,8 OUN3 Housing Allocations in Oundle Production of master plans for sites setting out details of infrastructure delivery and phasing of housing development Masterplans, supporting application information, Uniform R&MO,, PPO, Developers, LPA 1,3,5,6,7,8,9 Commencement of housing development at Ashton/Herne Road by 2011 and at Creed Road by 2013 RLA Monitoring R&MO Developers, LPA 1,3,5,6,7,8,9 OUN4 Prince William School Identification/safeguarding of land for expansion of Prince William School NCC, Uniform R&MO,, PPO, NCC, LPA, 1,7 Improvements to school buildings, extended playing fields and associated infrastructure to be underway or programmed prior to the commencement of development on sites identified in OUN3 and THR5 NCC, supporting application information, masterplans R&MO,, PPO, NCC, LPA, 1,7 OUN5 Milton Road School Site Re-use of school site for alternative community facilities NCC, Retail and leisure monitoring, uniform NCC, LPA, community 1,2,5,7 Identification of alternative primary school site, with timescales, by 2009 NCC, Retail and leisure monitoring, uniform NCC, LPA, community orgs 1,2,5,7

RNOTP 100% of approved applications for redevelopment of the Milton Road site to adhere to the criteria set out in Policy OUN5 Uniform, supporting application information NCC, LPA, community orgs 1,2,5,7 OUN6 Fletton House, Glapthorn Road Change of use of first floor to B1 uses NCC, ICLA R&MO, NCC, LPA, developer 1,8,7 Retention of existing uses at Fletton House NCC, ICLA, services and facilities survey R&MO, NCC, LPA, developer 1,8,7 THR1 Infrastructure Improvements in infrastructure associated with the development of land identified in policy THR5 Masterplans, supporting application information, Uniform R&MO,, PPO, Developers, LPA, utilities providers, NNDC, emda, NEL 1,2,3,5,6,7,8 Improvements in infrastructure implemented prior to or alongside new development, as appropriate Uniform, supporting application information R&MO,, PPO, Developers, LPA, utilities providers, NNDC, emda, NEL 1,2,3,5,6,7,8 THR2 Regeneration of Thrapston Town Centre Increased vitality and vibrancy within Thrapston town centre Retail monitoring R&MO, Developers, LPA, NNDC, emda 1,2,5,8,9 100% of approved town centre applications to adhere to the criteria set out in Policy THR2 Uniform, supporting application information R&MO, Developers, LPA, NNDC, emda 1,2,5,8,9 THR3 Thrapston Regeneration Sites The redevelopment of 17-31 High Street, Land at Cosy Nook and rear of High Street properties, the Bull Ring and Church Walk, and the Cattle Market. Applications, masterplan R&MO,, PPO, NNDC, LPA, emda, 1,2,5,7,8,9 Improved town centre retail offer by end of 2011 retail survey R&MO Increased amount of town centre parking by end of 2011 masterplan R&MO NNDC, LPA, emda, NNDC, LPA, emda, 1,2,5,7,8,9 1,2,5,7,8,9

RNOTP THR4 Relocating Existing Businesses around Thrapston Relocation of existing businesses to alternative sites ICLA, uniform R&MO,, PPO, LPA,, emda, NEL, NNDC 1,5,8 100% of approved schemes for business relocation meeting the locational requirements set out in Policy THR4 ICLA, uniform LPA,, emda, NEL, NNDC 1,5,8 THR5 Thrapston South Production of a master plan for the site setting out details of infrastructure delivery and phasing of housing development Uniform, supporting information to application R&MO,, PPO, Developers, LPA, utilities providers, NNDC, other public bodies 1,2,3,5,6,7,8 Commencement of housing development on the site by 2011 RLA Monitoring R&MO Developers, LPA, utilities providers, NNDC, other public bodies 1,2,3,5,6,7,8 KCF1 Kingsmead Small and Medium Enterprises Site, King's Cliffe Development of affordable SME units on the remaining 2.14ha of the Kingsmead site ICLA R&MO LPA, emda, NEL, 1,8 Construction of affordable SME units on the remaining 2.14ha by 2015 ICLA Monitoring R&MO LPA, emda, NEL, 1,8 KCF2 Willow Lane/Wood Road Completion of a legal agreement and provisions agreed in respect of affordable housing, education contributions, open space and phasing Uniform, supporting information to application LPA,, Parish Councils, Housing Associations, NCC 1,3,4,5,6,7 Commencement of housing development on the site by 2009 RLA Monitoring R&MO LPA,, Parish Councils, Housing Associations, NCC 1,3,4,5,6,7 NAS1 Church Street Nassington Development of the site with a minimum of 11 units RLA Monitoring R&MO Developers, LPA 1,5,6

RNOTP Commencement of development on the site by 2016 RLA Monitoring R&MO Developers, LPA 1,5,6 WAR1 Eaglethorpe Barn, Warmington Development of land to the south east of Eaglethorpe Barns for mixed uses ICLA/RLA Monitoring R&MO Developers, LPA, emda, NEL 1,5,6,8 Provision of a minimum of 12 dwellings by 2016 RLA Monitoring R&MO Developers, LPA, emda, NEL 1,5,6,8 Provision of a minimum of 0.38ha for Class B1 office uses by 2016 ICLA Monitoring R&MO Developers, LPA, emda, NEL 1,5,6,8 BC1 Brigstock Camp Production of a development brief setting out proposals for re-use of the Brigstock Camp site Developers, Uniform, supporting information for applications, PPO Developers, LPA 1,3,4,5,7,8 Re-use of the site for countryside uses or office development by 2021 ICLA and R&L surveys R&MO, Developers, LPA 1,3,4,5,7,8 DA1 Deenethorpe Airfield Level of aviation activity Applications, uniform, contact at airfield LPA 1,7 100% of applications to adhere to the criteria outlined in Policy DA1 Uniform LPA 1,7 AP1 Addington park Industrial Estate, Little Addington Number of vacant premises on the site ICLA monitoring R&MO, LPA,, emda, NEL 1,5,8 100% of approved applications for new development to adhere to the criteria set out in Policy AP1 Application form/uniform LPA,, emda, NEL 1,5,8