London Luton Airport Document PPO5 Procedures for Requesting Prior Permission to Operate Version 1.4 - issued 25 th February 2009



Similar documents
1.2 Some of the figures included in this publication may be provisional only and may be revised in later issues.

AGENCY: Federal Aviation Administration (FAA), Department of Transportation.

CONTROLLING THE MISUSE OF SLOTS AT COORDINATED AIRPORTS IN THE UK MISUSE OF SLOTS ENFORCEMENT CODE

LAYMAN S GUIDE TO USING SSIM

Tariff Regulations. Published September 2010

Airport Charges and Handling Fees. AIRPORT DEBRECEN Kft.

the only system with Unified Management & Optimization of: crew SchedulAir decisal

Airport Charges. Airport Charges for Swedavia AB

Airport charges for Warsaw/Modlin Airport date of entry into force 17 December 2013

Dealing with flight disruption

CIVIL AVIATION REQUIREMENTS SECTION 3 AIR TRANSPORT SERIES M PART IV ISSUE I, DATED 6 TH AUGUST, 2010 EFFECTIVE: No.

January 2004 is issued for information, guidance and compliance. OPERATIONS OF INCLUSIVE TOUR PACKAGE (ITP) CHARTER FLIGHTS TO AND FROM INDIA

Incentive Schemes to air transport currently in force in Cyprus

Aircraft Noise Control at London Luton Airport. August 2015

UK SLOT ALLOCATION PROCESS AND CRITERIA

Airport Charges. Airport Charges for Swedavia AB.

Air Medical Ltd. Air Ambulance Charter Terms & Conditions

AIRPORT CHARGES TARIFF AT WARSAW CHOPIN AIRPORT 1. GENERAL PROVISIONS AND DEFINITIONS

Price list Swedavia s Conditions of Use and Airport Charges. Valid for aircraft with an authorised MTOW exceeding 5,700 kg.

Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers. Valid since Lennart Meri Tallinn Airport

The Mayor of London s Submission:

incentive programmes of vienna airport effective from June 01, 2016

A-CDM from an airport perspective Oslo Airport

REGULATION ON COMMON RULES FOR THE ALLOCATION OF SLOTS AND SCHEDULING COORDINATION AT AIRPORTS. Adoption of the European Union Regulations Article 2

AIRPORT CHARGES DEBRECEN INTERNATIONAL AIRPORT DEB / LHDC

Charges & fees at Brussels Airport Effective as from 1 April, 2016

Charges & fees at Brussels Airport Effective as from 1 April, 2015 (v2)

World Food Passenger Procedures - Myanmar

Slot request for GA/BA flight (GCR)

Customer Service Plan. (Issued in Compliance with 14 CFR Part 259)

CONNECTING PROGRAM FOR EUROPE QUESTIONS AND ANSWERS

Airport Charges. Airport Charges for Swedavia AB

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

TravelNet Guide - Buddy Pass and Yield Fare Travel. Table of Contents. 2 How to Ticket Buddy Pass or Yield Fare Travel

AIRPORT CHARGES TARIFF

Tariff Regulations at Torp Sandefjord Airport

Cape Verde Jetaway Booking Terms and Conditions

AIRCRAFT CHARTER CONTRACT

ACL is the coordinator of choice for 35 airports worldwide. We coordinate 2.8 million flights carrying over 300 million passengers each year.

AIR PASSENGER RIGHTS EU COMPLAINT FORM

STANDARD GROUND HANDLING AGREEMENT - SIMPLIFIED PROCEDURE

AIR MAURITIUS (MK) - AUSTRALIA OPERATIONAL CHANGES QUESTIONS & ANSWERS SHEET

FEES AND CHARGES. For the use of Heliports and Airports in Greenland. G. Season Cards and Flights Using Closed Landing Grounds

Air Dispatch and Finnair

The business of Gatwick Airport Limited

Group D: FAA Landing Slots. Elaine Ou Jeff Shneidman Allan Sumiyama

Jargon Buster. Amadeus APIS ASK ATA ATC ATD. BA2Buy BAA BABS. Agents Discount Tickets (AD75 - pay 25% of fare)

CHARGES REGULATIONS APPLYING TO COPENHAGEN AIRPORT IN FORCE DURING THE PERIOD 1 APRIL 2015 TO 31 MARCH 2019

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

AGREEMENT BETWEEN THE GOVERNMENT OF JAMAICA AND THE GOVERNMENT OF CONCERNING AIR SERVICES

*This information brochure has been issued pursuant to provisions of EC 261/2004 Regulation of the European Parliament and European Union Council.

UIB AVIATION AIRLINE RISK PROFILE. Dependable Corporate Insurance in any language

Asia/Pacific Airport Coordinators Association (APACA) Agenda Item 9. Reformatting of Worldwide Scheduling Guideline (WSG)

AIRLINE PASSENGER SERVICE COMMITMENT 28 March 2001

THE UNIVERSAL SECURITY AUDIT PROGRAMME (USAP)

The SESAR programme: Making air travel safer, cheaper and more efficient

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

AN AIRCRAFT TAXI SIMULATION MODEL FOR THE UNITED PARCEL SERVICE LOUISVILLE AIR PARK. W. Swain Ottman Angela C. Ford Gregory R.

Heathrow and Dubai the World s Hub Airports

Airport preparedness guidelines for outbreaks of communicable disease

AIR CARGO SECURITY: An Overview of Several Regulatory Initiatives around the World

OR Applications in the Airline Industry

Customer Service Plan

AFRAA AIRLINE PASSENGER SERVICE COMMITMENT

NSB AS Service Quality Performance Report for 2012 Passenger Rights regulation 1371/2007

FLUGHAFEN WIEN AG. Results Q1-3/2015

RULES OF TRANSPORTATION

Airport Operations. Web-based Airport Management.

COMMISSION STAFF WORKING DOCUMENT

Aegean Airlines Nine Month 2008 Results. Analysts Conference Call November 12, 2008

Contents. 1 General Take-Off Charge Weekly season card Miscellaneous... 9 CONTACT... 10

Qantas International Network Changes Frequently Asked Questions Trade

Apprenticeship in Aircraft Maintenance Engineering

FLIGHT PATH TO GROWTH THE CASE FOR INCREASING LONDON S AIR CAPACITY

Charter Services. Frequently Asked Questions

Catania Airport Commercial Aviation Policy 2016 on incremental international traffic. 31st January 2016

Risk In the Value Stream at United Airlines. Mike Quiello

FBO & Handling Charges. Düsseldorf

DECISION No 120/2014. on the implementing provisions for Regulations No 3/2014, No 4/2014 and No 5/2014 of the Committee of the Regions

Airport Slot Allocations In The EU: Current Regulation and Perspectives.

A380 Commercial Update for JP Morgan

The responsibility for this policy and adherence to the procedures rests with the Chief Operating Officer.

Transcription:

London Luton Airport Document PPO5 Procedures for Requesting Prior Permission to Operate Version 1.4 - issued 25 th February 2009 1. Introduction 1.1. All fixed wing aircraft flights at London Luton Airport (LLAO) are required to secure Prior Permission to Operate from Airport Coordination Limited (ACL) or, as a last resort, the London Luton Airport Operations Control Centre. This document sets out the procedures for requesting a PPO time at London Luton Airport. 1.2. Diverted arrivals and all emergency, rotary wing and ILS check flights are exempt from the requirement for a PPO time. 1.3. The objectives of the Prior Permission to Operate system are: 1.3.1. To make full use of available capacity for the mutual benefit of all types of traffic in accordance with prevailing rules and regulations. 1.3.2. To ensure that all requests for operations are administered in a neutral, nondiscriminatory and transparent way. 1.3.3. To prevent congestion due to over-scheduling from impacting upon the efficient operation of the airport runway, taxiways, parking stands and terminals. 1.4. ACL has been appointed by LLAO to process all PPO time requests for operations at the airport and the Online Coordination System (OCS) is available at all times. In the event of OCS being unavailable then PPO time responsibilities will be assumed by the London Luton Airport Operations Control Centre see Annex 1: Contact Details. 2. Definitions The following definitions apply to terms used in these procedures: 2.1. LLAO - London Luton Airport Operations Ltd. the airport operator 2.2. ACL - Airport Coordination Ltd. - the appointed schedules facilitator for LLAO. 2.3. PPO - Prior Permission to Operate. 2.4. OCS - Online Coordination System a web based system for the securing of PPO time. 2.5. PPO time - a request by ACL (on behalf of LLAO) to an operator to operate a flight at a specific time that will optimise traffic to the overall benefit of all airport users. Issued by ACL on behalf of LLAO. A PPO time will only differ from the operators preferred time in order to avoid overscheduling which would lead to congestion of the airport runway, taxiways, parking stands or terminals. The aircraft operator chooses to comply voluntarily with the PPO time but LLAO reserves the right to surcharge operators who choose not to abide by the PPO time, as a legitimate

reflection of the added costs of a non-optimised operation. Applicable surcharges will be published in the LLAO Charges and Conditions of use. 2.6. Regular Series Flight - a recurring flight which operates on the same day of week and time of day over a period of successive days or weeks in any season where PPO times for the entire series are requested at the same time. 2.7. Ad Hoc Flight - a one-off flight of any type which does not recur on the same day of week and time of day over a period of successive days or weeks in any season. 2.8. Public Passenger Flight a Commercial Air Transport flight, either regular series or ad hoc, carrying passengers and on general sale to the public either directly or through a third party. Private, non-commercial or chartered general aviation flights are not considered Public Passenger Flights. 2.9. SSIM - Schedule Standards Information Manual, an IATA document that defines the schedule coordination request message formats (SSIM Chapter 6). 2.10. OCS - Online Coordination System, a web based system for requesting and allocating slots at fully coordinated airports and PPO time at schedules facilitated airports. 3. Ad Hoc Flight Availability 3.1. The runway capacity available for ad hoc operations in any operating season will only be established after all requests for regular series flights in that operating season have been processed. 3.2. Approval of PPO time requests for ad hoc operations will therefore not be confirmed before February (for forthcoming summer season) and September (for forthcoming winter season). 3.3. Details of available airport capacity are published and continuously updated on the ACL website http://www.online-coordination.com. All operators are encouraged to review the details of available airport capacity prior to making a request for permission to operate and to target their requests to times where capacity is available. 4. PPO time Requests 4.1. General 4.2. A request for a PPO time should be made as far in advance of the intended day or time of operation as possible. 4.3. PPO time for arriving flights must be secured prior to the aircraft departing from its point of origin. 4.4. Rotary wing movements, emergency flights, ILS check flights and diverted arrivals do not require a PPO time. 4.5. Departing flights following a diversion require a PPO time for their subsequent departure. 4.6. Speculative PPO time requests should be avoided and where uncertainty exists about likely time of operation then a PPO time should not be applied for until the time of operation is known with reasonable certainty. For an indication of reasonable certainty see clause 5.6 below.

4.7. The issuing of a PPO time by ACL automatically creates an entry for that flight in the airports operational management system and in the case of public passenger flights also updates the airports flight information displays. 4.8. PPO time times are on/off block times not runway times. 4.9. Airlines 4.9.1. All airline requests for PPO time must be submitted to ACL electronically. Requests should be made via SITA in SSIM format or by EMAIL messages in SSIM format or by using OCS (http://www.online-coordination.com) which is available at all times. 4.9.2. Urgent requests outside ACL office hours should be made via OCS. 4.9.3. As a last resort these may be made by FAX to the Luton Airport Operations Control Centre using the form - Annex 4: Out of Hours Request for Permission to Operate which is attached to these procedures, or as an absolute last resort, by telephone. Note all such requests remain subject to clause 4.3 above. 4.9.4. LLAO reserves the right to levy an administrative charge for the booking of a PPO time through the LLAO Operations Centre as detailed in the London Luton Airport Charges and Conditions of use. 4.10. General and Business Aviation 4.10.1. General and Business Aviation operators who have their own Online Coordination accounts may submit their PPO time requests directly to ACL but must keep their Handling Agent at the airport fully informed of the status of these requests. 4.10.2. All other General and Business Aviation operation PPO time requests must be submitted by their authorised Handling Agents to ACL electronically using OCS (http://www.online-coordination.com) which is available at all times. 4.10.3. Each Handling Agent will use their own prefix and assign a flight number as follows; Signature SIG number range 100-799 Harrods MVI number range 100-799 Ocean Sky OCS number range 100-799 4.10.4. If the Handling Agent wishes to book a PPO time on behalf of customers/ operators who have their own prefix the Handling Agent they should send the details to ACL and an authorisation for the Handling Agent to use the prefix for PPO time booking will be activated in the OCS system. 4.10.5. All PPO time requests should be in turnaround format wherever possible. 4.10.6. For details of PPO time data requirements, please see Annex 2: Prior Permission Requests - Data Requirements and Annex 3: Use of Service Types Codes. 4.10.7. Handling agents must not re-assign PPO time permissions between different operators. 5. PPO time Management, PPO time Tolerance and Surcharges for non-compliance 5.1. All operators are expected to operate as closely as possible to their PPO time to minimise congestion and delays.

5.2. Public Passenger Flights (regular series or ad hoc) are not required to re-clear a PPO time in the event of an operational delay unless the delay extends beyond 0600 hours the following day because the allocation of a PPO time by ACL automatically updates the airports flight information displays. Rescheduling a delayed passenger service could, therefore, cause confusion as the flight entry may not match the ticket details 5.3. Regular Series flights are not required to re-file their PPO time in the event of schedule disruption or flight delay unless the delay extends beyond 0600 hours the following day. 5.4. Ad Hoc flights are required to cancel and re-book their PPO time if they are unable to operate to their allocated PPO time within the following windows of tolerance: For arriving flights: 5.4.1. with a flight time of up to 6.5 hours : PPO time -20 to +40 minutes 5.4.2. with a flight time of greater than 6.5 hours : PPO time -40 to +80 minutes For departing flights: 5.4.3. for all departing flights: PPO time -10 minutes to +30 minutes 5.5. Evidence of intent not to comply with a PPO time - e.g. planning and/or repeated operating to a time of 0615 when the PPO time is 0555, without the prior approval of ACL, will be subject to a per flight surcharge as a legitimate reflection of the added costs of a non-optimised operation. Applicable surcharges will be published in the LLAO Charges and Conditions of use. 5.6. LLAO reserves the right to surcharge operators who choose not to abide by the PPO time, subject to the above tolerance as a legitimate reflection of the added costs of a non-optimised operation. Applicable surcharges will be published in the LLAO Charges and Conditions of use. 5.7. Approval to not comply with a PPO time will normally only be granted where the operation is constrained by slot requirements at a down-line Level 3 co-ordinated airport and where ACL is satisfied that every effort has been made by the aircraft operator to secure an optimised compatible timing at the down-line airport. In such a circumstance ACL may block a nearby vacant PPO time, if available, to ensure that airport operations overall are not prejudiced. 5.8. As soon as it becomes apparent that a flight with an existing PPO time is not going to operate then the PPO time for this flight should be cancelled immediately to allow the capacity to be re-allocated.

ANNEX 1: CONTACT DETAILS Airport Coordination Limited Capital Place 120 Bath Road Hayes Middlesex UB3 5AN Office Hours: Monday-Friday (excluding UK Bank Holidays) 0900 1700 local time Telephone: +44(0)20 8564 0614 Fax: +44(0)20 8564 0691 Email: SITA: Website: LONACXH@acl-uk.org LONACXH http://www.online-coordination.com/(for Slot Availability and submitting requests) London Luton Airport Operations Control Centre Telephone: +44(0)1582-395087 / 395089 / 395092 Fax: +44(0)1582-395121 Airport Operations Duty Manager: Tel: +44(0)1582-395451 Email: Operations.Control@ltn.aero

. ANNEX 2: PRIOR PERMISSION ONLY - DATA REQUIREMENTS All requests for ad hoc operations must include the following data: Basic Information: Arrival/Departure Flight Number (General and Business Aviation must use the Handling Agent prefix and assigned number, unless the operator has an approved ICAO prefix) Date of operation (arrival if an overnight stay) Number of seats (use 0 if no passengers on board) Aircraft type Origin/Last station Arrival/Departure time requested Turnaround days (if the departure is 1 or more days after arrival) Next station/destination Arrival/Departure Service Type Supplementary Information: Aircraft Registration mandatory for non-airline requests Timing flexibility

ANNEX 3: USE OF SERVICE TYPE CODES Commercial Passenger Service J G Q C Scheduled passenger service Additional passenger Scheduled passenger/cargo combi service Charter passenger service Commercial All-Cargo Service F M H A Scheduled cargo service Mail only service Charter cargo service Additional freight/mail service Air Taxi and General/Business Aviation D N V General/Business Aviation service Air Taxi service empty Air Taxi service with passengers Other I E U W P T K X VIP/Official Flight Government charter service Air Ambulance service (use N for positioning leg unless Medical Crew aboard) Military Other positioning Air Test Training Technical stop

ANNEX 4 URGENT FAX LONDON LUTON OUT OF HOURS REQUEST FOR PERMISSION TO OPERATE FROM: TO/FROM: AIRPORT OPERATIONS FAX: +44 (0) FAX NO: TEL: +44 (0) TEL NO: ALL TIMES UTC AIRPORT OPERATIONS USE ARRIVAL DEPARTURE REMARKS ONLY Flight Number Actioned by AIRPORT OPERATIONS A/C Registration Name: Date Date: Time Requested Flexibility Range - - Replied to Originator: Yes/No Time Offered Aircraft Type Entered in : OCS Yes/No No of Seats Enter 0 if no pax Origin / Destination Service Type Previous Permitted Time