NUMBER 107-011-100 EFFECTIVE DATE. July 23, 2003



Similar documents
Applies to: All Employees within the Facilities Management Department (FMD)

Measurement Standards for Structures

Office Space Standards and Guidelines

Part 2 Definitions for this Policy 2.1. ADA / TAS the Americans with Disabilities Act / Texas Accessibility Standards.

PUBLIC NOTICE State of Kansas. Request for Proposal Leased Office Space

State of New Mexico Space Standards

SPACE LOCATION, ALLOCATION, LAYOUT AND MEASUREMENT STANDARDS POLICIES

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

LEASE TOTAL AMOUNT LEASE NO

Special Use Commercial Properties

Real Property Performance Results

Discussion paper on clinic space standards, funding model and support services

The Pros and Cons of Space Management

Calculating Commercial Real Estate Rent. An E-book Prepared By:

Department of Defense INSTRUCTION

This notice sets forth interim guidance, pending the issuance of regulations,

June 7, 2010 Page 1 of 5

Part III. Administrative, Procedural, and Miscellaneous

Professional Property Management TREC 4507

The WCO Guide to: A Glossary of Workplace Terms. The Workplace Consulting Organisation. Occasional Paper OP2 January 2013, v1.0

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

Commercial Building Valuation Report

From Page 1 of form:

Table of Contents. Section I. Introduction Space Planning Section II. Definitions and Terms Section III. Guidelines and Process...

Maximum Floor Area and Maximum Development Area

Department of Defense INSTRUCTION

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

Flexible Office Space Up to 66,240 Ft 2

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Modified Pre-design Instructions

The Impact of Building Shape on Space Planning Efficiency By Randall Walker, AIA, Executive Vice President, Kirksey

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

Building Code Clarifications - 7. Fire Resistance

From Page 1 of form:

Measuring Single Family Dwellings Town homes Condominium Units. P) ~ F)

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

NEWARK RENT CONTROL BOARD TAX SURCHARGE APPLICATION

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Chief Facilities Officer-Associate Vice President of Facilities

Oakland County Executive Department of Facilities Management. Energy Management Procedures October 5, 2009

Residential Adjustments. Overview 4.1

ELECTRONIC HEALTH RECORDS AND WRITING SURFACES

UNIVERSITY OF CALIFORNIA, SAN DIEGO REAL ESTATE DEVELOPMENT OFFICE

Planning and Construction Management Services

Work Space and Office Furniture Standards December 2014

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Office Space Standards and Guidelines Government of the Northwest Territories

BUILDING PERMIT SPECIFICATIONS

2012 CEEI Floor Area Methodology - Residential, Commercial, and Industrial Buildings

EXAM GUIDE. Schematic Design. Overview 2. Interior Layout Vignette 3 Sample Passing Solution 5 Sample Failing Solution 6

Space Management Guidelines

Single Family Residential Basement Finish

AEDG Implementation Recommendations: Interior Lighting Sample Layouts for Office Buildings

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

G O S S. G o v e r n m e n t O f f i c e S p a c e S t a n d a r d s J AN U AR Y 8, Province of British Columbia

Commercial Building Valuation Report

HEALTH FACILITY CHECKLIST SECTION 1226 [OSHPD 3] CLINICS PRIMARY CARE CLINICS

Tate s Wire & Cable Solution

Civil Service Conciliation and Arbitration Scheme General Council Report 1332

BY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS

Benchmarking Questionnaire on Facility Management Costs and Business Practices

WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING DIVISIONS OF FACILITIES MANAGEMENT AND REAL ESTATE. Space Allocation and Furniture Standards

VILLAGE OF ARLINGTON HEIGHTS

Building Measurement Services

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

LEASE AGREEMENT. Stanislaus County Attn: Purchasing Agent th Street, Suite 5400 Modesto, California. $ per mo. ($ per sq. ft.

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

ENERGY STAR Data Verification Checklist

PAGE INTENTIONALLY LEFT BLANK

San Diego Convention Center Floor Plans

Indiana Building Rehabilitation Standard

REQUEST FOR PROPOSALS FOR LEASED OFFICE SPACE

Saint Cloud Business Center

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

OCFRD TENT STANDARD This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

17,280 square feet Overview:

City of Douglas Commercial Building Permit Site Application

The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services

FORM TC201 INSTRUCTIONS FOR 2015

STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan

Buying and Owning a Condominium

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

BUILDING COST UPDATE: Q COMMERCIAL FIT-OUT AND REFURBISHMENT

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER May 2015

DEPARTMENTAL DIRECTIVE

The Internal Revenue Service Faces Significant Challenges to Reduce Underused Office Space Costing $84 Million Annually.

Space and Door Numbering Standards (V1.0) Facilities Planning and Construction

STANDARD METHOD FOR MEASURING< FLOOR AREA IN OFFICE BUILDINGS

2010 ADA Standards for Accessible Design. Department of Justice

Schedule B to By-law Part A Fees Payable for Permits

Building Codes Update: The 2009 International Fire Code and the Apartment Industry

Code Requirements for Existing Buildings

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Message from the Assistant Deputy Minister

6 FAM 1700 SPACE ALLOCATION AND RELATED SERVICES

Revised: Previously Issued As: P/BC PLUMBING FIXTURES

EXHIBITION DISPLAY RULES

State of Florida Statewide Financial Statements Capital Asset Policy. Introduction

Schedule B to By-law

Transcription:

STATEWIDE POLICY NUMBER 107-011-100 EFFECTIVE DATE SUPERSEDES Policy 125-6-100 July 23, 2003 PAGE NUMBER Division Enterprise Asset Management July 23, 2003 Pages 1 of 9 REFERENCE ORS 276.004 and other related provisions of Chapter 276. Policy Owner Facilities SUBJECT Building Office Space and Planning Standards APPROVED SIGNATURE Laurie A. Warner, Administrator PURPOSE To establish size standards to be used in assigning space to state agencies in buildings owned or leased by the state, and to provide planning standards which promote employee productivity and the functional, efficient, and flexible use of space, as required under ORS 276.410. APPLICABILITY Any Tenant Agency occupying facilities owned, operated, or leased by the Department of Administrative Services (DAS). FORMS/EXHIBITS/INSTRUCTIONS Form 125601 - Office Space Request Website: DEFINITIONS Building Common Area: Building Rentable Area: Circulation Space: Construction Area: Conventional Furniture: Floor Common Areas: Common area in a building includes corridors, building lobbies, custodial rooms, mechanical and electrical rooms, restrooms, building conference rooms, break rooms, and food service areas shared by the entire building. Gross Interior Area minus Vertical Penetrations. (This calculation should be fixed for the life of the building unless a vertical penetration is added or removed from the building or area is added or removed from the building.) Space for passage from one work area to another. The Circulation Space Allowance is calculated by multiplying the Workstation Space and Support Space by the standard factors (see Office Space Standards Table). The gross area of a building measured from the exterior face of exterior walls on all floors including basement(s) and mechanical penthouse(s). Construction Area is not used for determining rent. Free standing furniture not supported by modular partitions. Corridors, lobbies, custodial rooms, mechanical and electrical rooms, restrooms, conference rooms, and food service areas used only by the tenants of that floor. DAS Statewide Policy No: 107-011-100 Page 1

Gross Interior Area: Growth Space: Special Program Space: Support Space: Systems Furniture: Tenant Rentable Area: Tenant Useable Area: Vertical Penetrations: Workstation: The total area measured to the inside face of the exterior walls at the floor plane. Space for workstations or support functions of full time equivalent positions (FTE), which are not included in the current budget. Growth space may be added only with authorization from Budget and Management. Functional areas used by tenant agencies to support their programs in addition to the standard office space allowances for workstations and support space. Areas for functions to support the agency's programs but not generally used for office personnel. Examples include computer rooms, centralized filing areas, waiting areas and conference rooms. Interconnected modular partitions that support work surfaces and storage components. Systems Furniture often incorporate internal raceways for power, data, and telephone service to the workstation. The Tenant Useable Area plus a prorated share of the Floor Common and Building Common Areas. This figure is used to calculate rent. The area of a building assigned to a tenant agency. Usable Area is the actual area of the floor occupied used for WorkStations, Support Space, Special Program Space, and the Circulation for those spaces. This area is computed by measuring to the finished surface of the tenant side of corridors and to the center of partitions that separate the office from adjoining tenants. This calculation is of importance only to the tenant agency. The area for stairs, elevators, mechanical and electrical chases or shafts measured from the outside of enclosing walls. The individual workspace containing furniture and equipment. A workstation may be open space, with or without modular partitions, or an enclosed office. POLICY: I. APPLICATION OF THE STATE SPACE AND PLANNING STANDARDS A. The Space and Planning Standards shall apply to all state agencies subject to the jurisdiction of the Department according to ORS 276.410 and other referenced Statutes, and shall apply to all owned or leased facilities. B. In cases where agencies exempted from ORS 276.410 request the Department's assistance for space assignment or leasing service, then that party shall be subject to the Space Standards. C. Any request for space, which does not follow the Space or Planning Standards, or those spaces or layouts specifically requiring justification under this policy, shall include a written justification. The justification must be approved by both the requesting agency heads, or designee, and meet at least one of the following tests: (1) The building shape, size, or configuration make it difficult to achieve efficient layouts and proper relationships between work units without varying from the standards; or (2) Existing walls, features, or other elements mean that cost savings are achieved by leaving some non-compliant spaces or layouts in place; or DAS Statewide Policy No: 107-011-100 Page 2

(3) Unique and special duties of certain staff or functions cannot fit into the standard amount of space. Before the space request or layout is authorized, the justification must also be approved by the DAS Facilities Division. D. Space Requests shall be reviewed by the DAS Leasing Section or the Space Allocation Committee. The Division will confirm compliance with the Office Space Standards. Allocation of space will be made in the best interest of the state. E. Application of these standards to any existing facility, where no major alterations are planned, will be limited to the extent feasible and economically practical. F. Space Requests for non-office space or a combination of office and non-office space shall be developed using the applicable portions of this policy. G. For reconfiguration of space in DAS owned buildings, a Project Authorization Request form shall also be completed and submitted to DAS Planning and Construction Management Section. II. OFFICE SPACE REQUESTS A. Space Currently Budgeted Staff: Space Request and approvals shall be made using the Office Space Request Form (DAS Form 125601). Office space calculations shall be made using the Office Space Worksheet (reverse side of the Office Space Request Form). B. Growth Space: With authorization from the Budget and Management Division of DAS, Growth Space for future FTE increases or program needs may be added to the space requested. Requests for Growth Space shall be made on a separate Office Space Request Form. Calculations shall be made using the Office Space Worksheet. Due to the cost of unused space, it is recommended that alternatives, such as an option for increased space, short-term cohousing, satellite offices, and conversion to systems furniture be considered before committing to Growth Space. III. OFFICE PLANNING STANDARDS A. These standards describe how owned or leased office space should be planned for new or reconfiguring existing facilities. "Open Landscape" office design is the standard approach for state owned and leased facilities. The Department's objective is to reduce initial costs, increase sustainability, reduce the expense for future remodeling, increase flexibility, and contribute to employee productivity. Minimizing floor to ceiling walls contributes to efficient and effective environmental control and promotes the use of natural lighting. (1) Generally, enclosed offices and other enclosed spaces shall be located in the interior areas (core) of office space rather than on windowed exterior walls. The Department's objective is to provide natural light for the greatest number of staff, and better dissipate heat and cold from exterior walls and windows. A limited number of enclosed spaces may be approved on the building perimeter where it is feasible, cost-effective, and still allows natural light to most of the floor area. Perimeter enclosed spaces should not exceed 10% of the total perimeter. (2) Enclosed offices for staff below the Manager level on the Office Space Standards Table require written justification based on the duties and responsibilities of the position occupying the office and approval by the agency head and the Division. DAS Statewide Policy No: 107-011-100 Page 3

(3) Freestanding or modular components, which are easily moved, should be used rather than built-in casework or cabinets. (4) Agencies are encouraged to use Systems Furniture to reduce the amount of space needed, increase flexibility, and provide greater adjustability. B. The following planning goals describe how Systems Furniture layouts should be designed and installed in owned or leased office space: (1) Reduce the usable area by approximately 20% compared to conventional furniture space layouts; (2) Minimize reconfiguration expense and disruption by moving people, not furniture to adapt to personnel turnover and changing technology; (3) Minimizing single runs of workstations and establish a flexible grid with a central spine that carries electrical power and voice/data cabling; (4) Place spines perpendicular to window walls to allow greater penetration of light into building core areas; (5) Locate workstation clusters away from exterior window walls to allow better dissipation of temperature extremes off the glass; (6) Increase flexibility by using 2' and 4' wide panels not exceeding 5'-9" in height (per Uniform Building Code requirements); (7) Design the layout to reduce sight and sound distractions; (8) Provide each workstation with task lighting; and (9) Adhere to applicable federal, state and city laws, regulations, codes and standards. IV. NON-OFFICE SPACE PLANNING STANDARDS A. Mixed Office and Non-office Facilities: Where space requests are for a mixture of office and nonoffice functions, the Office Space Standards and Space Request Form shall apply to the extent possible. Other non-office areas should be treated as special program space. B. Non-Office Facilities: Facilities developed for non-office purposes need to be handled on a case-bycase basis. Planning for the facility should create flexible, functional, and efficient space. Rationale and justification for the required spaces and sizes needs to be attached to the Space Request. C. The Non-Office Planning Standards describe how space owned or leased by the state should be planned when designing new buildings or reconfiguring existing facilities. (1) Unless programmatic needs do not allow its use, "Open Landscape" design should be used as the design approach. Minimizing floor to ceiling walls promotes flexibility, contributes to efficient and effective interior environmental control, and promotes greater use of natural lighting. (2) Generally, enclosed spaces shall be located in the interior areas (core) rather than on windowed exterior walls. The Department's objective is to provide natural light for the DAS Statewide Policy No: 107-011-100 Page 4

maximum number of employees, and to better dissipate heat and cold from exterior walls and windows. (3) Circulation space for non-office functions should not exceed 30% of the functional areas. V. OFFICE SPACE STANDARDS TABLE The Office Space Standards Table lists space allowances and the method to calculate space in accordance with the standards as described below. A. WORKSTATION SPACE (1) The Office Space Standards Table lists the area allowed for various staff categories (Workstation Space). The areas listed are not entitlements, but are the maximums allowed without written justification. (2) Workstation, Support, and Special Program Spaces shall be measured from the centerline of interior walls, and the inside face of exterior walls and corridors. (3) Space allowances may be adjusted for the inefficiency of particular spaces. Considerations may include window placement, existing plumbing locations, built-in obstructions (e.g. structural columns), and building, fire and safety code requirements. (4) With written justification, space for caseworkers may be increased to accommodate deskside interviews if the caseworker will be interviewing customers 50% or more of the time. (5) While facilities with fewer than eight FTE may require more space than allowed by the standards, the Office Space Standards shall be applied to the extent feasible. MAXIMUM MAXIMUM CONVENTIONAL SYSTEMS FURNITURE FURNITURE CATEGORY OF POSITION SQ. FT. PER EMPLOYEE SQ. FT. PER EMPLOYEE Director 160 * 280 Deputy Director 144 * 210 Administrator 120 *180 Manager 96 *150 Staff Attorney 96 *120 Supervisor/Professional/Technical 64 100 Caseworker 64 100 Support Staff 48 or 64 80 Field Worker/Data Entry 36 or 48 50 Add 45% to the system furniture total and 30% to the conventional furniture total for circulation space. *May be an enclosed office B. SUPPORT SPACE Examples of Support Space include, but are not limited to the areas listed below. Add 30% for Circulation Space. Conference Room 50 square feet plus 15 square feet per person Waiting Area 50 square feet plus 10 square feet per person Mail/Work Room Depends on equipment size & FTE Copier 50 sq. ft. DAS Statewide Policy No: 107-011-100 Page 5

Printer or Fax 25 sq. ft. Centralized Filing Systems 9 sq. ft. per file cabinet or as needed for other filing syst Storage Area As needed for immediate-need supplies Interview Room 50 sq. ft. plus 15 sq. ft. per occupant Coffee Station 10 sq. ft. Recycle Area 2 barrels per fl., minimum, 4 sq. ft. per barrel Library Depends on materials stored Computer Room Depends on equipment size Break room/lunch room Staff FTE divided by 6 times 15 square feet C. SPECIAL PROGRAM SPACE This is space in addition to Workstation and Support Space that is required by the agency to fulfill its mission/program. Add 30% to the total Special Program Space requested for Circulation Space. Examples of Special Program Space include, but are not limited to the following: Training Room Requires justification Hearing Room Requires justification Client Interview Room 50 sq. ft. plus 15 sq. ft. per occupant Computer Room Depends on equipment size Bulk Storage Area Depends on materials stored. Describe. Other Special Program Area Attach justification to the Office Space Worksheet VI. OFFICE SPACE WORKSHEET INSTRUCTIONS Agency Usable Area square footage needs must be documented on the Office Space Worksheet on the reverse side of the Space Request Form. Calculate the Workstation, Support and Special Program space (usable area) as follows: A. WORKSTATION AREA CALCULATION (Section A, Office Space Worksheet) Step 1. On the Office Space Worksheet, multiply the number of FTE in each position category, director, caseworker, etc., by the standard square footage for either Systems Furniture or Conventional Furniture. Enter the total for each category in the unshaded areas in the column headed Square Feet Requested. Step 2. Total square footage for all categories and enter in shaded area A8. Step 3. Multiply the total in A8 by 45% for Systems Furniture or 30% for Conventional Furniture. Enter the results in the shaded area A9. This is the Workstation Circulation Space Allowance. B. SUPPORT SPACE AREA CALCULATION (Section B, Office Space Worksheet) Step 1. Step 2. Determine the square footage allocations for each Support Space category per calculation methods listed on the Worksheet. Enter the total for each category from Step 1 in the unshaded areas on the Worksheet under the column headed Square Feet Requested. Step 3. Enter the total square footage for all Support Space categories in the shaded area B12. Step 4. Multiply the total square footage in B12 by 30%. This is the Circulation Space Allowance for Support Space. Enter the results in the shaded area B13. DAS Statewide Policy No: 107-011-100 Page 6

C. SPECIAL PROGRAM SPACE (Section C, Office Space Worksheet) Step 1. Step 2. Determine the square footage allocations for each Special Program Space category per calculation methods listed on the Worksheet. Enter the total for each category, determined in Step 1, in the unshaded areas on the Worksheet under the column headed Square Feet Requested. Step 3. Enter the total square footage for all Special Program Space categories in the shaded area C11. Step 4. Multiply the total square footage in C11 by 30%. This is the Circulation Space Allowance for Special Program Space. Enter the results in the shaded area C12. D. TOTAL USABLE AREA Add the totals in shaded areas. Enter the total in the shaded area D1. This is the total Usable area requested. No Space allocation shall exceed an average of 250 square feet per FTE, without written justification. E. TOTAL RENTABLE AREA It is important to remember that a pro rata share (up to 100% for single tenant facilities) of floor and building common areas will be added to the Usable Area total. The Usable plus Common Areas make up the Rentable Area that is used to arrive at the rent cost. VII. DAS BUILDING AREA CALCULATION METHOD Areas from the Space Request and Office Space Worksheet are estimates of what tenant agencies will occupy. Once planning for the space is completed, the actual building area is the basis for rent payments. The Facilities Division has developed the following method for calculating Rentable Area based on industry standards. A. MEASUREMENT STEPS: Step 1. Establish the Gross Interior Area of each floor by measuring from the interior face of exterior walls at the floor plane. Structural elements such as columns and pilasters are not deducted. Step 2. Deduct all Vertical Penetrations (measured to the exterior faces of the penetrations) from the Gross Interior Area. Step 3. Establish Building Rentable Area for the entire building. (This calculation should be fixed for the life of the building unless a vertical penetration is added or removed from the building or area is added or removed.) Step 4. Establish Building and Floor Common Areas for each floor. Step 5. Subtract the common areas from each floor to establish the Tenant Useable Areas. Step 6. Establish the Tenant Rentable Area by floor by adding the pro-rated common areas to the Tenant Usable Areas. Step 7. Establish the total Tenant Rentable Area in the building for each tenant agency. (The sum of these totals should equal the Building Rentable Area.) DAS Statewide Policy No: 107-011-100 Page 7

OFFICE SPACE REQUEST (DAS Form 125601) TO: Department of Administrative Services Real Property Services 1225 Ferry Street SE U100 Salem, Oregon 97301-4281 LOCATION REQUIRED: (Closest City) DATE: THIS REQUEST IS FOR: Current Budgeted Space Growth Space Office Space Sq. Ft. Other Space Sq. Ft. FROM: (Requesting Agency/Division and Address) TENANT: (Agency, Branch, etc.) CURRENT SPACE OCCUPIED BY TENANT: (Address) TYPE OF SPACE REQUESTED: State-owned COB Leased Build-to-suit Purchase TERM REQUESTED: (years/months) ESTIMATED COSTS: REQUESTING AGENCY CONTACT PERSON: Name: Phone: PARKING SPACE REQUIRED: State Vehicles Client Parking Staff Parking Monthly Base Rent $ Remodeling Cost (if not in Rent) $ Other Monthly Costs $ Moving Cost / Telephones, Other Costs $ TOTAL COST / MONTH $ TOTAL UNAMORTIZED COSTS $ REQUESTING AGENCY CERTIFICATION: Funds are available to cover the estimated costs of the proposed office facility, as listed above, for the current biennium. Future funding will be sought to continue the lease and rental agreement for the proposed term. Signature: (Agency Head) Date: Typed/Printed Name and Title of Agency Head: DATE REQUEST RECEIVED AT DAS: DAS CONTROL NUMBER: DAS ACTION RECOMMENDED: Assign State-Owned Space Assign DAS-Leased Space Commence leasing action Other as follows: DAS Property Manager Assigned: Property Manager Review of Agency Request--- Initials & Date: Authorized by DAS: (Signature) Date: DAS Form 125601 DAS Statewide Policy No: 107-011-100 Page 8

OFFICE SPACE WORKSHEET (See DAS Policy Manual 125-6-100) Office Location: SQUARE FOOTAGE ALLOWANCES ( * may be enclosed office) SECTION A: WORKSTATION SPACE SYSTEM CONVENTIONAL # (FTE) A1 Director 160 280 * A2 Deputy Director 144 210 * A3 Administrator 120 180* A4 Manager 96 150* A5 Staff Attorney 96 120* A6 Supervisor/Technical/Professional 64 100 A7 Caseworker 64 100 A8 Clerical Support Staff 64 or 48 80 A9 Field Worker 48 50 A10 Budgeted Future FTE workstations Describe and attach justification A11 TOTAL WORKSTATION AREA ( Add requested sq. ft. A1 through A9) A12 CIRCULATION SPACE A10 X 45% A10 X 30% SECTION B: SUPPORT SPACE B1 Conference Room(s) (50 sq. ft. +15 sq. ft. per person) B2 Waiting Room (50 sq. ft. +10 sq. ft. per person) B3 Client Interview Room As needed for equipment B4 Confidential Staff Meeting Room (10 sq. ft) B5 Mail/Work Room (50 sq. ft.), B6 Copy (9 sq. Ft. per file cabinet) B7 Centralized filing As Needed for Immed. Need B8 Storage Area (4 sq. Sft. per li barrel) B9 Recycling, 2 barrels per fl., (100 sq. ft.) B11 Coffee i i Station (25 sq. ft. total) B12 B13 Printer and FAX Area Other B14 TOTAL SUPPORT SPACE (Add requested sq. ft B1 through B13) B15 CIRCULATION SPACE B14 X 30% SECTION C: SPECIAL PROGRAM SPACE C2 Training Room Requires justification C3 Hearing Room (100 sq. ft. each) C5 Computer Room As needed for on site storage, C6 Bulk Storage Describe and d attach ib justification C8 Other: Describe and attach justification C9 Other: Describe and attach justification C10 Other: Describe and attach justification C11 TOTAL SPECIAL PROGRAM SPACE (Add requested sq. ft. C1 through C10) C12 CIRCULATION SPACE C11 X 30% SECTION D: SQUARE FOOT REQUESTED D1 TOTAL USABLE SQ. FT. A10+A11+B14+B15+C11+C12 D2 TOTAL USABLE SQ. FT. PER FTE ( Divide Total Useable Sq. Ft. by #FTE ) SQUARE FEET REQUESTED FOR DAS USE DAS Form 125601 DAS Statewide Policy No: 107-011-100 Page 9