DNVGL-CP-0209 Edition March 2016



Similar documents
DNVGL-CP-0393 Edition December 2015

DNVGL-RU-0050 Edition October 2014

Electrical Shore Connections / Cold Ironing

General Description of The CMC- Services

Cable Trays and Ducts (Metallic)

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment

Procedure Manual. Shipboard Oil Pollution Emergency Plan (SOPEP)

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

STANDARD. Maritime training providers DNVGL-ST-0029: DNV GL AS

ANNEX 4 RESOLUTION MEPC.174(58) Adopted on 10 October 2008 GUIDELINES FOR APPROVAL OF BALLAST WATER MANAGEMENT SYSTEMS (G8)

Ballast Water Management WÄRTSILÄ AQUARIUS BALLAST WATER MANAGEMENT SYSTEMS

CLASSIFICATION SOCIETIES - their key role

Cybersecurity in the maritime and offshore industry

QUALITY & TECHNICAL CERTIFICATIONS

Import Health Standard

IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE

Fuel Treatment and Conditioning Systems

TYPE CERTIFICATION OF WIND TURBINES

Managing risks for lay-up of OSVs and Rigs

Ballast Water Management Regulations and Challenges

Analysing Big Data in ArcGIS

Vessel Operations Cooperative Solutions

PANAMA MARITIME AUTHORITY General Directorate of Merchant Marine. Merchant Marine Circular No. 193

1 The purpose of this Code is to provide an international standard for the safe management and operation of ships and for pollution prevention.

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Management of Safety and Environmental Protection (SEP)

Hvor er vi med ballastvandsrensning? Frank Stuer-Lauridsen. 29 oktober 2012 Skibsteknisk Selskab 1

Crew manning offices, private recruitment and placement services

EAMS for Future Grids

Certification of Materials and Components

New Requirements for Security Training for Shipboard Personnel

ROLLED STAINLESS STEEL PLATES, SECTIONS AND BARS

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

Technical Interpretation by the Administration

Merchant Marine Circular No. 152

Energy efficient operation what matters

New Requirements for Security Training for Shipboard Personnel

Maritime and Coastguard Agency LogMARINE INFORMATION NOTE. New Requirements for Security Training for Shipboard Personnel

Maritime cybersecurity using ISPS and ISM codes

Maritime accidents and safety investigations. Executive Director Dr. Veli-Pekka Nurmi

To: Seafarers, Ship Security Officers and Company Security Offices, Deputy Registrars and Other Interested Parties

HELCOM perspective on clean Baltic Sea shipping. Helsinki Commission

QUALITY MANAGEMENT IN VTS

FUEL TRANSFERS OIL SPILL PREVENTION WORKSHOP. WAINWRIGHT 9 th July. Shell Exploration & Production Restricted

Ballast Water Management: Frequently Asked Questions, Volume I April 5, 2013

ST. VINCENT AND THE GRENADINES

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES

Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators

JIP Offshore Leak Detection

IACS QUALITY MANAGEMENT SYSTEM CERTIFICATION SCHEME (QSCS)

Integrated management systems Ship operating companies

III International Maritime Congress

Security Matrix. STCW Regulation (applicable from 1 st of January 2014):

REVISED CONSOLIDATED FORMAT FOR REPORTING ALLEGED INADEQUACIES OF PORT RECEPTION FACILITIES

SAFER, SMARTER, GREENER

Bunkers Regulatory and Practical Considerations. Piraeus, 8 November 2012 Capt. Simon Rapley

Frequently Asked Questions

Module Content:

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS

NORWAY. Website. Contact points Flag State. EEA Country. Port State. Coastal State

Performance Condition When asked by a qualified assessor, On board ship or in an approved training program,

Environmental Compliance

Safety Management System Manual Guidebook

Marine pollution prevention pocket checklist Revision 3

Rules for Classification and Construction Additional Rules and Guidelines

Marine Engineer Class 3 (MEC 3)

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Personnel Management and Ship Masters Business (Fishing)

Total water management. Water and wastewater treatment systems for ships and offshore

INTERPRETATIONS OF, AND AMENDMENTS TO, MARPOL AND RELATED INSTRUMENTS. Management of boiler/economizer washdown water

Draft Maritime Labour Certificate and Declaration of Compliance Regulations, 2015

Thickness measurement and close-up survey guidance

Survey Guidelines for MARPOL Annex I under the Harmonized System of Survey and Certification (HSSC), 2011

BALLAST WATER EXCHANGE

APPROVAL OF COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM USED ON BOARD SHIPS

accommodation services on board of foreign vessels have the following obligations, depending on the vessel's flag:

Introducing Vessel Environmental Compliance Reporting and Energy Management: From ESRG

Domestic Shipping. Safety Management System. Company:

Uniform Application of MARPOL Annex I, Revised Regulation 12

Marin Ising (sjøsprøyt) på fartøyer, MARICE prosjektet

The rigging of ladders

Frequently Asked Questions: North American Emission Control Area (ECA) U.S. Coast Guard Office of Commercial Vessel Compliance

Gas pricing and network access

Noble Denton marine services - marine warranty survey

MEPC 56/23 ANNEX 2 Page 1 ANNEX 2 RESOLUTION MEPC.162(56) Adopted on 13 July 2007

TITLE 5.1 AND TITLE 5.2 FLAG STATE INSPECTION AND CERTIFICATION AND PORT STATE INSPECTION

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

Fleet Performance Management and Benchmarking Against Peers

SOx - FUEL CHANGE MANUAL. Manual No. 01

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

What does mandatory shore power in EU mean?

Hydrostatically Balanced Loading

ARMATEURS DE FRANCE S BLUE CHARTER. For responsible transport and maritime services

Identifying and managing environmental risks in the maritime sector

Transcription:

CLASS PROGRAMME Type approval DNVGL-CP-0209 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version.

FOREWORD DNV GL class programmes contain procedural and technical requirements including acceptance criteria for obtaining and retaining certificates for objects and organisations related to classification. March 2016 Any comments may be sent by e-mail to rules@dnvgl.com This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document.

CHANGES CURRENT This is a new document. Changes - current Class programme DNVGL-CP-0209. Edition March 2016 Page 3

CONTENTS Changes current... 3 Contents Section 1 General...5 1 Introduction...5 2 Documentation...5 Section 2 Assessment of manufactured products...7 1 General... 7 Changes historic...9 Class programme DNVGL-CP-0209. Edition March 2016 Page 4

SECTION 1 GENERAL 1 Introduction 1.1 Objective The objective of this class programme (CP) is to give a description for the type approval (TA) of Ballast water management systems. For a description of the DNV GL type approval scheme in general and further information on conditions and procedures for obtaining DNV GL TA certificate, see class programme CP 0338 - DNV GL type approval scheme. The procedures and requirements described in this CP are applicable for obtaining DNV GL TA certificate based on requirements in: DNV GL rules RU SHIP Pt.6 Ch.7 Sec.1 IMO: International convention for the control and management of ships ballast water and sediments Guidelines for approval of ballast water management systems (G8), Res. MEPC.174(58) Appendix Procedure for approval of ballast water management systems that make use of active substances (G9), Res. MEPC.169(57) Appendix Section 1 Guidance note: DNV GL also provides USCG TA according to 46 CFR 162.060.60. For manufacturers who apply for USCG TA, the DNV GL TA will also be covered. For these cases, please contact DNV GL for further information. This class programme is not applicable for obtaining EU Marine Equipment Directive (MED) certificates. Visit www.dnvgl.com for information on MED certification. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 1.2 Scope This CP gives a description of the procedures and requirements related to documentation, design and type testing applicable for TA of (BWMS). This CP does not set the design requirements to the. TA is based on compliance with design requirements given in the DNV GL rules and/or other regulations and standards. The CP describes the applicable design requirements and how to document compliance with the requirements in order to obtain a TA certificate for the equipment. This includes, where relevant, technical requirements for how the type tests shall be performed. 1.3 Application TA of equipment in accordance with this CP is not mandatory, but may be used as an alternative to case by case design approvals for equipment to be installed on DNV GL classed vessels. A TA certificate in accordance with this CP will confirm compliance with the requirements in the DNV GL rules as specified in [1.1]. The TA certificate will not confirm compliance with requirements in other parts of the rules. In case additional requirements in other parts of the rules shall be covered by the TA certificate, this shall be specified in the application for TA and will be stated in the TA certificate. 2 Documentation For TA of, the following documentation shall be submitted. This list can vary case by case and additional documentation may be requested. application for TA main drawings of the system Class programme DNVGL-CP-0209. Edition March 2016 Page 5

general arrangements P&ID electrical/electronic wiring diagrams sampling points bill of materials technical manuals including: system process description system process limitations operational instructions specification of main components maintenance instructions safety requirements installation specifications troubleshooting procedures commissioning procedure scaling documentation functional description corrosion tests land-based and shipboard test plans as required in IMO guideline G8 Appendix Part 2, Section 2.3 and Section 2.2: quality management plan (QMP) addressing the quality control management structure and policies of the testing body (including subcontractors and outside laboratories). IMO guideline G8 Appendix Part 2, Section 2.1. The QMP may be included in the QAPP. quality assurance project plan (QAPP) specifically produced for the BWMS to be approved. IMO guideline G8 Appendix Part 2, Section 2.1. discharge permit for the land based test facility and the treated ballast water if required by national authorities. Section 1 Class programme DNVGL-CP-0209. Edition March 2016 Page 6

SECTION 2 ASSESSMENT OF MANUFACTURED PRODUCTS 1 General The manufacturer of the equipment shall submit information regarding the design, construction, operation and functioning of the Ballast water management system in accordance with Sec.1 [2] and G8 Part 1 of the Appendix. This information shall be the basis for a first evaluation of suitability. Further assessment shall be performed to conclude if the system is making use of an active substance or not. Following the first evaluation, a function test shall be performed to verify operation according to technical manuals and compliance with the DNV GL rules. The Ballast water management system shall be tested for type approval in accordance with the procedures described in G8 Parts 2 and 3 of the Appendix. A type approval certificate will be issued based on compliance with the DNV GL rules and procedures for type approval in accordance with G8 Parts 2 and 3 of the appendix. that make use of active substances or preparations containing one or more active substance shall be approved by IMO. The objective of the approval is to determine the acceptability of the active substances or preparation concerning ship safety, human health and aquatic environment, as described in G9. Section 2 1.1 Design requirements The shall comply with the relevant requirements of the following publications: DNVGL rules RU SHIP Pt.6 Ch.7 Sec.1 DNVGL rules RU SHIP Pt.4 Ch.6 Piping systems DNVGL rules RU SHIP Pt.4 Ch.8 Electrical installations DNVGL rules RU SHIP Pt.4 Ch.9 Control and monitoring systems DNVGL class guideline CG 0339 International convention for the control and management of ships ballast water and sediments Guidelines for approval of ballast water management systems (G8), Res. MEPC.174(58) Appendix Procedure for approval of ballast water management systems that make use of active substances (G9), Res. MEPC.169(57) Appendix. 1.2 Pre-test evaluation The manufacturer of the equipment should submit information regarding the design, construction, operation and functioning of the Ballast Water Management System in accordance with G8 Part 1 of the Appendix and according to Sec.1 [2]. This information should be the basis for a first evaluation of suitability. The documentation evaluation is carried out to assess that the BWMS is in compliance with requirements as stated in [1.1]. 1.3 Type testing Each type of Ballast Water Management System shall be subject to the following prototype tests witnessed by a DNV GL surveyor: visual inspection verifying compliance with approved documentation functional test performance testing in shipboard and land based tests as described in G8 Parts 2 of the Appendix Environmental tests according to G8 Parts 3 of the Appendix and DNVGL class guideline CG 0339. DNV GL will perform an assessment of documentation of test results from shipboard and land based tests. Class programme DNVGL-CP-0209. Edition March 2016 Page 7

The Ballast water management system will be type approved with a specific rated capacity. However, the type approved system may be installed in parallel to increase the total capacity. Such increased capacity does not require re-approval provided that each module consists of the same components and has the same capacity as the system, which was initially granted a type approval. Different sizes of BWMS shall be assessed based on scaling documentation. Type testing may be required on a case by case basis. Section 2 1.4 Type approval certificate When the design assessment and type testing are successfully completed, and an initial assessment of the manufacturing process has been performed, a type approval certificate will be issued to the manufacturer for the conformity of the design and performance of the product type. The type approval certificate will on a format as set forth in the Appendix of G8. The type approval certificate is valid for 5 years. 1.5 Makers certificate The manufacturer shall furnish each BWMS with a certificate. The certificate shall contain: declaration that the design of the BWMS conforms to the basis for the type approval details of the shop where testing was carried out reference to DNVGL type approval certificate. Class programme DNVGL-CP-0209. Edition March 2016 Page 8

CHANGES HISTORIC There are currently no historical changes for this document. Changes historic Class programme DNVGL-CP-0209. Edition March 2016 Page 9

DNV GL Driven by our purpose of safeguarding life, property and the environment, DNV GL enables organizations to advance the safety and sustainability of their business. We provide classification and technical assurance along with software and independent expert advisory services to the maritime, oil and gas, and energy industries. We also provide certification services to customers across a wide range of industries. Operating in more than 100 countries, our 16 000 professionals are dedicated to helping our customers make the world safer, smarter and greener. SAFER, SMARTER, GREENER