Network Managed Services Vendor Questions

Similar documents
District IT Infrastructure Upgrade Plan

Addendum 03. This is the Final Extension in response and due to the above received request:

Addendum No. 1 to Packet No Enterprise Data Storage Solution and Strategy for the Ingham County MIS Department

Cisco Network Switches Juniper Firewall Clusters

Shipping Products Chart. Contents

NETWORK ADMINISTRATOR

Chabot Las Positas Community College District

Seward County Community College

Shipping Products Chart. Contents

Castle Hills First Baptist School Internal Connections Request for Proposal February 26, 2016

Phone System Replacement RFP Addendum 2 - Questions and Answers

Shipping Products Chart. Contents

Compatibility and Interoperability Matrix P/N REV A41

RFP-MM Enterprise Storage Addendum 1

GF Financial Markets I.T. Architecture Role

Shipping Products Chart. Contents

IT Security and OT Security. Understanding the Challenges

RFP 1337 Board approved Posted, 14 October, 2009

Pluralsight Training Pre-Approved for CompTIA CEUs

Appendix C to DIR Contract Number DIR-TSO-2736 SunGard Availability Services Discount Level: 25% Managed Data Center Services - Cloud Hosting

Request for Proposal

CAS18543 Migration from a Windows Environment to a SUSE Linux Enterprise based Infrastructure Liberty Christian School

Village of Oak Park Village-Wide Telecommunications System Selection Project Addendum #1 Vendor Questions and Answers February 18, 2014

Backup Exec 2014 Software Compatibility List (SCL)

DRO-210i LOAD BALANCING ROUTER. Review Package Contents

Penobscot County IT Department Technology Modernization: Server and Storage Virtualization

Security Information and Event Management (SIEM) Hardware & Software RFP #

The Mashpee satellite office is connected to the Mashpee main office by a wireless point to point connection.

Shipping Products Chart. Contents

Request for Proposals Voice over Internet Protocol Unified Communications System /2016

ADDENDUM 1 September 22, 2015 Request for Proposals: Data Center Implementation

JOHNSON COUNTY COMMUNITY COLLEGE College Blvd., Overland Park, KS Ph Fax

Copyright by Parallels Holdings, Ltd. All rights reserved.

Active Fabric Manager (AFM) Plug-in for VMware vcenter Virtual Distributed Switch (VDS) CLI Guide

Acronis Backup & Recovery 11.5

Network Status Review University of Moratuwa. Mr. Nadeesha Ranaweera (Systems Engineer, Center for IT Services)

Priority Pro v17: Hardware and Supporting Systems

Building a Highly Reliable, Multi-Vendor Network Through a Co-Location Facility, Multiple ISPs, and Data Center Upgrade


Contract title: Computer Equipment & Software Ref: EuropeAid/D/SUP/130204/JM - Computer Equipment & Software Clarification Request

QuickStart Guide vcenter Server Heartbeat 5.5 Update 2

IBM Software Group. Lotus Domino 6.5 Server Enablement

Service Description. Remote Consulting Service. Introduction to your service agreement. The scope of your service agreement

Ensure that the server where you install the Primary Server software meets the following requirements: Item Requirements Additional Details

1.0 Purpose of Solicitation

Service Description. Remote Consulting Service. Introduction to your service agreement. The scope of your service agreement

1.. Know the capabilities of the network system you are going to be adding cameras and/or DVR s to. Meaning, know if the present LAN has the

End to end application delivery & Citrix XenServer 5. John Glendenning Vice President Server Virtualization, EMEA

Backup Exec 15 Software Compatibility List (SCL)

High Availability Solution

vrealize Automation Support Matrix

Configuring High Availability for Embedded NGX Gateways in SmartCenter

Supported Devices (Event Log Sources)

Town of Wilton Telephone System Addendum 1 to RFP. NOTE: Deadline for submitting proposals has been postponed to March 13, 2015

ACME Enterprises IT Infrastructure Assessment

EMC AVAMAR. Deduplication backup software and system. Copyright 2012 EMC Corporation. All rights reserved.

Overview of Avaya Aura System Platform

Response to Bidder Questions and Amendment 2 to Request for Proposal Disaster Recovery Services

ACCELERATE YOUR VIRTUALIZATON JOURNEY WITH BACKUP BUILT FOR VMWARE

TELSTRA CLOUD SERVICES CLOUD INFRASTRUCTURE PRICING GUIDE AUSTRALIA

801.11n Wireless Broadband Router

This presentation provides an overview of the architecture of the IBM Workload Deployer product.

Addendum 1 RFP #154D-16F CityWorks System Cloud Hosting

Cisco Prime Data Center Network Manager Release 6.1

The Trouble with Backups

802.11n Wireless Broadband Router WNRT-625

Training Program: Network Admin. Program Structure: Hardware and Appliances. Networking

Private Cloud for WebSphere Virtual Enterprise Application Hosting

System Requirements and Server Configuration

Total Protection for Enterprise-Advanced

NET ACCESS VOICE PRIVATE CLOUD

APPENDIX 1 SUBSCRIPTION SERVICES

System Requirements. SuccessMaker 5

vcloud Automation Center Support Matrix vcloud Automation Center 5.2

IT Discovery / Assessment Report Conducted on: DATE (MM/DD/YYY) HERE On-site Discovery By: AOS ENGINEER NAME Assessment Document By: AOS ENGINEER NAME

JOB DESCRIPTION. *-- Assist with the administration of the Exchange Servers and Client Installations, including smart phones.

TELSTRA CLOUD SERVICES CLOUD INFRASTRUCTURE PRICING GUIDE SINGAPORE

How To Create A Virtual Desktop In Gibidr

Heroix Longitude Quick Start Guide V7.1

White Paper ClearSCADA Architecture

APPENDIX 1 SUBSCRIPTION SERVICES

This document describes the new features of this release and important changes since the previous one.

Solutions as a Service N.Konstantinidis Technical Director - MNG

1. Can you clearly state which piece of equipment we will be support and each site location?

City of Richmond Business and Financial Services Department. Contract 4595P. Security Information Event Management System

Request for Resume (RFR) CATS II Master Contract. Section 1 General Information R00B

CITY OF OAK CREEK VoIP Telephone System Addendum

System Requirements. Version 8.2 November 23, For the most recent version of this document, visit our documentation website.

MAYA ANGELOU PUBLIC CHARTER SCHOOL

Information Technology Division Technology Operations & Systems Management

Virtual Client Solution: Desktop Virtualization

The Remote Data Backup & Restore Service from

Play IT Safe. I love that everything just works with Unitrends. Unitrends Disaster Recovery as a Service. Backup, Archiving & Disaster Recovery

Support Services Department

Proof of Concept Guide

Case Study: Oconomowoc Area School District

Legal Services Corporation Technology Initiative Grant (TIG) Conference

Goliath Performance Monitor Prerequisites v11.6

Managed Backup Service Supported Platforms

Transcription:

ROCK RIVER WATER RECLAMATION DISTRICT ADDENDUM NO. 1 REQUEST for PROPOSALS #20-217 NETWORK MANAGED SERVICES November 20, 2020 AD1-1 Notice This Addendum No. 1, dated November 20, 2020, to the Request for Proposals: Network Managed Services, supersedes all contrary and conflicting information in the above-mentioned instructions, specifications, and contract documents which are hereby supplemented or revised in certain particulars as follows: AD1-2 General Information The District submits Addendum No. 1 to answer questions, and provide clarification. AD1-3 Instructions Please see the answers to questions from vendors below, and the following attachments: server list, networking equipment list, network diagram. A copy of this addendum initialed at the bottom shall be included in the proposal as acknowledgment of receipt. Network Managed Services Vendor Questions 1. In section 3.1 Scope & Specifications, item number 6 Network Administration. What network administration server monitoring is to be included in the proposal? In the Current Technology Environment section, I don t see any reference to the number of Servers, wireless access points or network switches listed in the RFP, are these devices to be included in the proposal? The scope of the Network Managed Services lists switches, routers, wireless and firewalls, 3.3.A. Servers are not part of the scope of Network Managed Services. Please refer to Switch Network Documentation 2020-11-11.docx (distributed on 11/20/2020 and also attached) for the quantity of switches, routers, and wireless. 2. I noticed the following note in the RFP. Will detailed information about the new equipment being implemented be referenced in the documents to be distributed on November 20th? Plans are in place to complete wireless infrastructure implementation in the main Administration Building in early 2021, before the start of these services. Wireless access points for the main Administration Building are included quantity of wireless access points listed in the Switch Network Documentation 2020-11-11.docx. 3. Please provide clarification on the required references. Addendum No. 1 - Page 1 of 3

Vendors must provide three northern Illinois government references. See Section III, 3.6 Minimum Qualifications, B. Vendor Experience 2. Provide a list of references from at least three northern Illinois government agencies for whom the firm has provided similar services. Please include company name, contact name, address, telephone number, and email address. 4. Can you provide more detail on what exactly the District is looking for regarding the project staff members and qualifications list? The list would be much like a resume. We want to know who are the staff members that will be working on this project, and their specific qualifications, certifications, experience. Refer to Section III, 3.6, C.: Adequacy & Availability of Professional Level Staffing. provide a list of proposed staff members who will be assigned to this project and their qualifications, and an explanation of staff related to certifications, knowledge, experience with the proposed data network, and alternates or optional services. 5. The RFP asks for a Project Manager, is this supposed to be a full-time resource? If not, does the District have a sense of the percentage of a resource they would like dedicated to RRWRD? The percentage of time the project manager is needed for the District depends on the scope of network monitoring issues on a monthly basis. The District does not anticipate anywhere near a full-time resource for project management. 6. Is a plan for a dedicated network engineer as well as shared backfill services an acceptable approach? The District does not anticipate that a full-time network engineer will be required for these services. A named primary network engineer and named backup contact is desirable but not required. 7. Is the District looking for some other type of pricing other than a fixed monthly price, fixed project prices and rates for projects? No, this is the pricing the District is requesting. Completing the tables in the Proposal Form meets the pricing requirement. If transition/implementation costs are a factor, please write them in on the signed Proposal Form. 8. Will you accept modifications/exceptions to your terms including, but not limited to, commercially reasonable limitation of liability and limited warranty? Submit proposed modifications with the proposal. State whether acceptance of the modifications is required for the vendor to propose its services. The District will review the proposed modifications as part of its evaluation process. 9. How many of the 15 locations on campus will need to be supported? 15 locations. Refer to Switch Network Documentation 2020-11-11.docx. Addendum No. 1 - Page 2 of 3

10. What is your timeline for implementation and transition process once the vendor is selected? The District anticipates a two-month transition period. 11. What is the plan of action for cycling out the devices running Windows 7 and older? District IT staff has the Windows upgrade on its task list for the first quarter of 2021. 12. Does RRWRD have a scale or grading tool to use to evaluate potential vendors? Refer to Evaluation Criteria in Section 3.7.B. No additional scale or grading tool is available. Proposer s Initials Addendum No. 1 - Page 3 of 3

Node IP Address Description/Node Node IP Address Description/Node NetWare 6.5 OES Red Hat Enterprise Linux 6 Volumes Netmail Indexer Service Service Netmail Master 0365 Windows 2003 Services Netmail Master Groupwise Services Windows 2003 Netmail Search Avaya BCMS Windows 2016 ESX Host 1 Horizon LIMS Reporting/Actuate ESX Host 2 Windows 2016 ESX Host 3 Horizon LIMS Application Server Windows 2016 VDI ESX 6 Host Horizon LIMS Web Server VDI ESX 6 Host Windows 2019 Standard VDI ESX 6 Host Print Server 1 Windows 2019 Standard Print Server 2 Suse Linux Enterprise 11 (64) vrealize Operations PCS ESX 6 Host PCS ESX 6 Host Windows 7 (VM) PCS ESX 6 Host Smart Mailer, Printing, Avaya Site Administrator IBM z13 VLAN First Level Hypervisor Windows 2016 HMC SQL Server 2016 / Milestone 2018 R3 TCPIP00/LINKO404 TN3270 VSEA NetWare 6.5 OES TCPIP01/LINKO414 FTPSERVR VSEA Volumes BSI Services TCPIP00/LINKO404 TN3270 VSEB TCPIP01/LINKO414 FTPSERVR VSEB Lieca Spider/CORS - DNAT Second Level Hypervisor Windows 2003 SP2 zvm HP ProCurve Manager Plus First Level Hypervisor RPS SQL Server Express 2005 Velocity NetWare 6.5 OES Volumes Linux Installation/ SLES 12 SP2 Central Log Server Apache - www.rrwrd.dst.il.us CentOS 5.9 Central Terminal Server Avaya - SAL_Gateway_2.0.0.6 SUSE Linux Enterprise 12 SP2 Rocket Software LegaSuite - PROD ArcGIS License Server Oracle/Infor Avaya - ECAS SUSE Linux Enterprise 12 SP3 Windows 2019 Standard (64) Oracle/GIS Sophos SafeGuard Management Linux (64) z/vse V6 Server VX9000 Wireless Controller Pri. C: OS Oracle Server Hanprod (V7000) D:Temp Data E: Temp Media Oracle Server Hantest (V7000) F: Misc Storage G: Sql Database VTAPE H: Media Storage Oracle/Cues GraniteNet IIS Server - ArcIMS Rocket Software LegaSuite - TEST Hansen/Infor/IIS TEST OES Netware 11 (64) Oracle Server - Granite Net New GroupWise 2012 POA - MAINPOST SUSE Linux Enterprise 12 SP3 SUSE Linux Enterprise 11 (64) Oracle Backup Server Service 10.104.0.17:25 10.104.0.17:9850 Oracle Server Windows 2016 SUSE Linux Enterprise 12 SP3 SQK Server 2016 / Maxxess Oracle Server Linux (64) SUSE Linux Enterprise 12 SP2 vcenter 6.5 Appliance Second Level Hypervisor/Level2VM Red Hat Linux 5 (32) AES/Avaya/TSG Milestone IP Camera Server Volume CentOS Linux (64 bit) Avaya WebLM Windows 2012R2 Standard (64) Autodesk - License Manager Sophos Enterprise Console Attendance Enterprise Test Identity Mgr Server Automatic Email Printing VDI POC Active Directory PDC Extrme VX9000 Wireless Controller Second Azure Active Directory Connection Server Novell OES 2015/SUSE 11 (64) Test OES Server Hansen/Infor/IIS Windows 2019 Standard (64) File Server Fundware/Blackbaud/RDS Cues GraniteNet VDI vcenter VDI View Connection Server VDI View Connection Server Redundant VDI AD Domain Controller Redundant VDI Security Server CentOS Linux (32 bit) VDI Unidesk Management Appliance CentOS Linux (32 bit) VDI Unidesk Master CachePoint Appliance CentOS Linux (32 bit) VDI Unidesk Secondary CachePoint Appliance Astaro REDS1 RED_PCS_VLAN PSC (Platform Services Controller) Astaro REDS2 RED_N_Facility Astaro REDS3 RED_WinnebagoGate vcenter Primary Astaro REDS4 RED_AirportGate Astaro REDS5 Fuller Creek vcenter Secondary (Future) Virtual SCADA1 Virtual SCADA2 Virtual Win911 Virtual Historian WebSpace Windows 7 PCS License Server Windows 7 SP1 Sytech XLReporter Unitrends 8060S - Backup Appliance ETH1 & ETH2 - Bonded Updated 09/15/2020 - DF

Rock River Water Reclamation District Switch & Network Documentation Note: Highlighted equipment is targeted for replacement. See the project item in the Proposal Form for Replace obsolete equipment with current models. Core switch 1 Core switch 2 J9995A J9995A Admin 1 Admin 2 2620 PWR Digester Control J8165A 2650 PWR Old Admin 2620 PWR

Guard Shack 1 Guard Shack 2 2 J8165A 2650 PWR HP 5500 48G PoE Training Room Sludge Transfer J8164A 2626 PWR Main Pump 2620 PWR J4903A 2824 Laboratory 2 HP 5500 48G PoE 2620 PWR Aqua Aerobics J9565A 2615 8 PWR Laboratory 1 J8165A 2650 PWR Network Documentation: Firewalls: Sophos UTM 9 SG230 (2) Sophos XG230 (2) Wireless: VX 9000 Wireless Controller (2) WiNG AP 8432 (20) WiNG AP 7632 (1) Internet Bandwidth: 500 Mbps ISP: Illinois Century Network / ifiber

Laboratory (HPE 5500 & 2650-PWR) LAB_IBM_FC2 J8165A hp procurve switch 2650 J4899A Act FDx Max Power Phase III Switch Refresh Proposed LAB_IBM_FC1 Fault Disinfection CL2 RAS Blower RRWRDV7K2 IBM Storewise V7000 (80TiB) AP8432 (5) Main Pump (2824) J4903A Well House #1 Grit Switch Gear PWR Meter Switch Gear Mains Switch Gear Grit S2 Excess Flow Aqua Aerobics (2616-8-POE) J9565A (HPE 5500 & 2650-PWR) Digester Control J8165A River Station hp procurve switch 2650 J4899A Act FDx Max Power Service Service Digester Control Digester Control AP8432 (8) Sludge Transfer (2650-PWR) hp procurve switch 2650 J4899A Power Act FDx Max Sludge Transfer Fault Sludge Transfer J8165A J8164A Fault Phase III Switch Refresh Proposed Training Room (2nd Floor) (2626-PWR) Well House #2 Freedom Field (*) Discharge Station IP Phone Discharge Station Discharge Station IP Camera 2 AP7632 (1) Old Admin Guard Shack Admin_IBM_FC1 16 Gb Admin_IBM_FC2 CS1 s Internet Comcast CS2 Cable Modem Aqua Aerobics RRWRDV7K1 IBM Storewise V7000 (80TiB) 16Gb Cable Modem - ITS Arris CM820 Total Access 900e Admin_1 Admin_2 Adtran 9083 Internet ifiber Proposed Internal Firewall IBM z13 3916 100-240VAC 3A 50/60Hz LN K/ACT SP D ST AT AL M CONS OLE 1 2 3 SP D 4 5 LN K/ACT 6 AT&T Cisco IP Flex Router AP8432 (1) Avaya G450's SYSTEM MD M ALM CPU PWR USB CONSOLESERVICES ETR CCA ETH WAN G450 ETH LAN RST ASB MD M ALM CPU PWR SYSTEM Optimux-106 USB V1 V5 V2 V6 V3 V7 V4 V8 V1 V5 V2 V6 V3 V7 V4 V8 Unitrends Recovery-8060S G450 CONSOLESERVICES ETR CCA ETH WAN ETH LAN RST ASB PCS ESX Cluster 2-Node Fiber Channel SM 8/16 Gb Fiber MM 10Mb Fiber MM Fiber MM Fiber Hybrid Fiber - SM Fiber - SM Fiber - SM - Aqua Aerobics VDI ESX Cluster 3-Node Server ESX Cluster 3-Node ifiber - Internet - 500Mb Heartbeat ifiber - WinGIS 500Mb ifiber - Internet - 500Mb ifiber WinGIS 500Mb HP 1410-16G CAT-5/6 10Mb CAT 5/6 CAT 5/6 - DMZ Proposed Redundant ISP CAT6 - RRWRD Network Diagram Last Update 09/17/2020 DF