STATEMENT of WORK Roof Repair Dauphin County, Harrisburg, 0850101 Building # 0850111 Project #11452460



Similar documents
GUIDELINES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS

C. La Plata County is exempt from all state taxation including state sales and use tax.

D3 Bus Wash Rehabilitation AC Transit Contract # SECTION INSTRUCTIONS TO BIDDERS

Bureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

Policy Number: Policy Name: Professional Services and Construction Services Procurement

Summary. Essential Information in this Chapter

TABLE OF CONTENTS I. PURPOSE... 3 II. GOALS...3 III. DEFINITIONS

NOTICE TO CONTRACTORS INVITATION FOR BIDS

This Request for Proposal (RFP) consists of providing the Phone System and Phones for

INSTRUCTIONS TO BIDDERS

Non-English Translation and Translation Authentication of Documents I. ONLY CERTIFIED SMALL BUSINESSES ARE ELIGIBLE FOR AWARD.

Work Breakdown Structure Element Dictionary Construction

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1. June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: GM

QSP INFORMATION AT A GLANCE

Procurement practices of school districts and charter schools; definitions

CHAPTER PUBLIC IMPROVEMENT BIDS AND CONTRACTS

REQUEST FOR PROPOSAL (RFP) FORM. Enter title here. Invitation to Bid. Utica College invites you to submit a proposal to brief description.

ATTACHMENT A STATEMENT OF WORK Request for Quotes (RFQ) Project Management Training Solicitation Number:

INVITATION TO BID ENVELOPES AND CHECK STOCK PRINTING SEPTEMBER 30, 2014 SEPTEMBER 30, 2017

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

May 29, 2012 Solicitation of quotations

This project is not to exceed $250,000.

CONTENTS OF BID. Each bid must include all of the following: A completed and signed Bid Form (the form is attached).

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

City of Bellevue Request for Proposal RFP #15091 Locate Ticket Management Software

Purchases from $750 $1,500 requires 3 Verbal Quotes. Purchases from $1,501 $24,999 requires 3 Written Quotes

GREENFIELD MIDDLE SCHOOL ROOF PROJECT

This Request for Proposal consists of providing the Phone System and Phones for Philadelphia Works.

ADDENDUM 5 TO IFB 5212-BC UNLV UCC DORMITORY COMPLEX HUGHES AND FAIMAN HALLS HVAC AND ROOFING REPLACEMENT. University of Nevada, Las Vegas

How To Help The Town Of Bloomsburg With A Flood Resilience Program

Unity Community Center Metal Roof Installation. Request for Bids

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

Project Name: Project No.: CONTRACTOR BID FORM. BID FROM: Name: Address:

TRANSPORTATION SERVICES CONTRACTS

INVITATION TO BID. Contractor Services Associated with:

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL

RHODE ISLAND CONSTRUCTION LAW PRIMER

How To Bid On A Building Project In San Jose

Checklist 26: How Owners Can Avoid Litigation on Construction Projects

POST AWARD CONTRACT MANAGEMENT

MASSWORKS INFRASTRUCTURE PROGRAM 2011 GRANT RECIPIENT HANDBOOK

STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR

INFORMATION FOR VENDORS CITY OF ALLENTOWN PENNSYLVANIA

AGREEMENT BETWEEN THE CITY OF BEVERLY HILLS AND VENDOR TBD FOR PURCHASE AND INSTALLATION OF AUTOMATED LICENSE PLATE RECOGNITION SYSTEMS

CONSTRUCTION AGREEMENT FOR

TENDER FOR ROOF REPAIR FOR THE NSLC S METEGHAN RETAIL STORE NOVA SCOTIA LIQUOR CORPORATION 93 CHAIN LAKE DRIVE HALIFAX, NOVA SCOTIA B3S 1A3

REQUEST FOR PROPOSAL windows,sliding glass door repair and replacement contractors

Lawrence University Procurement Policy for Federally Sponsored Projects

BID NOTICE. Bids may be delivered or mailed to the Administration Office at the above address. TRAFFIC LINES AND MARKINGS

CHAPTER 7 PUBLIC PURCHASES, PURCHASE OF LAND OR STRUCTURES AND INVENTORY OF FIXED ASSETS

ORDINANCE NO THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

Introduction/Background. Competitive Bidding- Statutory Requirements. Competitive Bidding- Charter/Code Requirements

RFP VOICE OVER IP PHONE SYSTEM BID: # BOE

Request for Proposal For: PCD-DSS Level 1 Service Provider St. Andrew's Parish Parks & Playground Commission Bid Deadline: August 17, 2015 at 12 Noon

The Charter School Law establishes the following for charter schools with respect to school construction:

Submission Deadline: 28 Dec 11:30 AM (Eastern Time)

SUBMISSION REQUIREMENTS

How To Do Business With Omaha Public Schools

September 21, 2010 (Special Meeting)

Request for Proposal

REQUEST FOR PROPOSAL Procurement of Landscaping Services

MINNESOTA STATE COLLEGES AND UNIVERSITIES

Malta Resources Authority. Call for Quotations

Region 7 Education Service Center Request for Proposal (RFP) For Generator Installation

Contractor s Guide. April 2016

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager. David L. Brown, Director of Utilities

PAYMENT BOND. KNOW ALL MEN BY THESE PRESENTS that we,, as Principal (the Principal ), and, a corporation organized

BID BOND 9/7/12 BS - 1. KNOW ALL MEN BY THESE PRESENTS, that I/We. as Principal, hereinafter called Contractor, and

SUBCHAPTER E GENERAL CONTRACTING REQUIREMENTS PART 828 BONDS AND INSURANCE

NEW JERSEY ADMINISTRATIVE CODE Copyright 2015 by the New Jersey Office of Administrative Law

CITY OF SIKESTON INVITATION FOR BID GENERAL REQUIREMENTS

City of Plano Municipal Center 1520 Avenue K # 370 Plano, TX 75074

Sidewalk Rehabilitation Program

PRE BID MEETING AGENDA

RESIDENTIAL REAL ESTATE AGENT SERVICES FOR NEIGHBORHOOD STABILIZATION PROGRAM

PART 252 SERVICE-DISABLED VETERAN-OWNED-BUSINESS ENTERPRISE PROGRAM. (Statutory authority: Executive Law, 200, 369-i[5])

BID PROPOSAL for DISTRICT OFFICE AIR CONDITIONING REPLACEMENT/ UPGRADE at the Santa Maria Public Airport

How To Get A Job Done

COMMERCIAL CONSTRUCTION AGREEMENT. This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between <> ( Owner ) and <> ( Contractor ).

Florida Division of Emergency Management ITB-DEM Disaster Recovery Services Questions and Answers (ANSWERS IN BOLD)

PUBLIC WORKS CONTRACTORS' BOND LAW OF 1967 Act of Dec. 20, 1967, P.L. 869, No. 385 AN ACT Establishing a uniform and mandatory system governing the

Suppliers Brochure. The Commonwealth of Pennsylvania Department of General Services Bureau of Procurement COSTARS Program.

Summary Statement of Work

Responses to this RFP will be due on or before November 14, 2013, as described below in Sections III. and V.

SECTION NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA

A mandatory pre bid walk through will be held on May 14, 2015 at 1:30 p.m. See Invitation to Bid for pre qualifications required to bid.

NOTICE TO POTENTIAL BIDDERS

Joyce Plummer, Procurement Agent

INVITATION TO BID EOE

File: Page 1 of 6 CONSTRUCTION MANAGEMENT AT RISK SCHOOL CONSTRUCTION ALTERNATIVE

City of Hesperia. Request for Quotes Answering Services. Release Date: 02/04/10

State of Ohio Model Bid/Quote Template for General Goods & Services (Non-IT)

Chapter 2 - The Process Of Construction Contract Procurement. For Facilities Projects

Merchant Account Services

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS

ADVERTISEMENT FOR BIDS

Public Works Contract Completion

Transcription:

I. SUMMARY A. The Department of Transportation (PennDOT) is issuing a solicitation to provide for (Roof Repairs to Sign Storage Building). The following list of documents made part of this procurement will provide the bidder with the information needed to bid: Attachment A, Project Specification Attachment B, Design Build Projects Attachment C, GSPUR89, Reciprocal Limitations Act Requirements Attachment D, GSPUR95, Bidding Preference for Recycled Postconsumer Material Attachment E, Green Plan Attachment F, Prevailing Wage (If Applicable) Attachment G, Location Map Attachment H, Public Works Employee Verification Form (If Applicable) B. All work completed under this solicitation must be in accordance with all documents referenced above and the terms and conditions in the Invitation to Bid. II. GENERAL REQUIREMENTS A. All prospective bidders, before submitting a bid, must thoroughly familiarize themselves with the existing conditions at the project site. This opportunity will be provided at the Walk-Through. Should any discrepancies arise between the existing conditions and the plans and specifications, they shall be reported to the Bid Contact prior to the Bid Submission Due Date and Time. B. The Mandatory Walk-Through will begin at the designated time and location identified in the bid project delivery schedule below. C. Within five (5) days of the Contractor receiving the notice to proceed (purchase order), an Initial Job Conference will be scheduled by the District Facilities Administrator. D. PennDOT will provide clear access to the work area and relocate materials and equipment stored at the designated work area of the facilities site. III. BID AND PROJECT DELIVERY SCHEDULE Page 1 of 5

Time is of the essence. It is critical that prospective bidders understand and adhere to the following timeline for bidding and project completion. 1. Bid Timeline Mandatory Walk Through Bid Submissions Due 2. Project Timeline Project Completion: Project Photos as Described In the Project Specifications: March 22, 2013 @ 8:00 AM March 29, 2013 @ 10:00 AM (Electronic via the Portal) Must be completed and approved by the District Facilities Administrator by June 7, 2013. Must be completed and approved by the District Facilities Administrator prior to the start of demolition and upon completion of construction. IV. BIDS, AWARDS & INVOICING Awards will be made to the lowest responsive and responsible bidder. A bid amount must be entered for each Base Bid. PennDOT reserves the right to remove individual Base Bid rows prior to award. Progress payments do not apply to this project. 100% payment will be made when the awarded Contractor has completed the entire project inclusive of all final deliverables being accepted and approved by the FA. V. BONDS & Public Works Employment Verification Act The successful bidder for this project is required to furnish bonds from a surety company authorized to do business in the Commonwealth of Pennsylvania, if the total bid amount exceeds $25,000. The successful bidder for this project is also required to furnish verification that all employees performing public work are authorized to work in the United States. Additional information about these requirements is shown below: Page 2 of 5

A. Performance Bond in a sum equal to one hundred percent (100%) of the contract amount conditioned on the performance of the contract in accordance with the plans, specification, and conditions of the contract. B. Payment Bond in a sum equal to one hundred percent (100%) of the contract amount, conditioned on the prompt payment of all material furnished and labor supplied or performed in connection with the work contracted for the project. C. The Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act, effective January 1, 2013, which requires all public works contractors and subcontractors to use the Federal Government s E-Verify system to ensure that all employees performing work on public works projects are authorized to work in the United States. Additional information can be found in the Press Release or at the following hyperlink: Guidelines for Administering and Enforcing the Public Works Employment Verification Act, issued by the Department of General Services, the Commonwealth agency responsible for administering and enforcing this Act. This information is important because if you are the apparent low bidder for this Solicitation, before we can proceed with the award, you must comply with this new law by completing the Public Works Employee Verification Form and then returning it to the attention of the Bid Contact. Any subcontractors performing work on this project must also complete the form and return it to the attention of the Bid Contact specified before commencing work on the project. The award may be conditional if the contractors are required to furnish the above mentioned three (3) requirements. Notice to proceed for a project will not be given until all three (3) requirements are received. The bonds will be retained until the project is completed to the satisfaction of PennDOT and will not be returned unless requested. VI. DEPARTMENT CONTACTS Page 3 of 5

A. All administrative and technical questions prior to the Walk-through must be submitted to the Bid Contact identified below. Questions at the Walk-through will be directed to the Facilities Administrator. Any questions after Walk-through must be submitted by 12:00 Noon on March 26, 2013 to the Bid Contact. The official questions and answers will be posted to www.emarketplace.state.pa.us no later March 27, 2013 B. Bid Contact Susan Zellers Purchasing Agent 1 Bureau of Office Services Materials and Services Management Division 400 North Street Harrisburg, PA 17120 Phone: 717.346.9554 Fax: 717.783.7971 Email: szellers@pa.gov C. Project Contacts Do not contact prior to award. After award, all project questions, concerns and correspondence, except for change orders, as well as documents for review and approval should be directed to the Facilities Administrator. Emanuel Walker- District Facilities Administrator Bureau of Office Services Facilities Management Division 1920 Susquehanna Trail North, York Pa 17405-0907 Phone: 717-848-6230 Email: emwalker@pa.gov D. Project Change Order If, due to unforeseen circumstances, additional work or time not contemplated in the current Purchase Order s terms, conditions or specifications is uncovered which is necessary for completion of the project, the Contractor shall submit to PennDOT, in writing, a letter detailing the additional work, any requested cost (including a detailed breakdown of the time and materials required), any time requirements, and whether work can continue or have to stop. The work defined in the letter must be within the original scope of work stated in the project specifications. Upon acceptance, PennDOT will issue a Change Order to the Purchase Order for the additional work in accordance with the Terms and Conditions attached to this solicitation. The Contractor shall not proceed with the additional work until the Change Order is executed. All change order requests must be sent to: Susan Zellers Purchasing Agent 1 Bureau of Office Services Materials and Services Management Division Page 4 of 5

400 North Street Harrisburg, PA 17120 Phone: 717.346.9554 Fax: 717.783.7971 Email: szellers@pa.gov E. Facility Design Unit After award, the contractor will submit all Engineered Drawings by email in PDF format, submissions related to L&I permit application(s), and questions to: Emanuel Walker- District Facilities Administrator Bureau of Office Services Facilities Management Division 1920 Susquehanna Trail North, York Pa 17405-0907 Phone: 717-848-6230 Email: emwalker@pa.gov Upon the Department s review and approval, final L&I submission will be made by the contractor. VII. TERMS AND CONDITIONS The awarded contractor shall comply with the Terms and Conditions set forth in the Invitation to Bid. It is critical that bidders review and understand Terms and Conditions prior to submitting a bid. Page 5 of 5