D5.3 Energy audit report



Similar documents
PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS

Energy Efficiency HOSPITALITY.

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Exemplary Retrofitting of an Old School in Stuttgart - EROS -

Report Date: 04/03/2014. Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: MPRN:

SAVE ENERGY AT HOME INSULATE AND AIR SEAL

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Klosterenga, Oslo, Norway, page - 1

Norwegian Tax Authority - Oslo Norway

RENOVATION OF SCHOOL #171 SPORT COMPLEX

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

IES <Virtual Environment> training. Trainee notes. ASHRAE 90.1 Appendix G - PRM Navigator. Version

FAS Training Course on Energy Efficiency / Renewable Energy

Before You Start an Energy Efficiency Retrofit The Building Envelope

The first apartment house renovation with Passive House components in Norway

Introduction to the London Energy Efficiency Fund (LEEF)

PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS

Best Practice Guide BPGCS007

ENERGY AUDIT IN THE KACST BUILDING

Corporate Energy Conservation and Demand Management Plan Engineering Department. Public Works Division

1..GENERAL DATA 2. CLIMATIC DATA. Location

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

PROTOCOL FOR BUILDING ENERGY ANALYSIS SOFTWARE For Class 3, 5, 6, 7, 8 and 9 buildings

Module 2.2. Heat transfer mechanisms

Council s energy efficiency upgrades benefit community

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

DISTRIBUTED GENERATION AND ENERGY EFFICIENCY FOR ACHIEVING ENERGY SELF-SUSTAINING INDUSTRIAL AREAS

FLORIDA SOLAR ENERGY CENTER

Introduction to Energy Codes & Green Building Programs

Data Collection Summary Report

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

MARKET ENGAGEMENT EVENT

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

BUILDING SAFETY UNIT

HEATING, VENTILATION & AIR CONDITIONING

energy-saving checklist a guide for rental property owners

Energy Efficiency. Bars & RestauRants.

Climate and Energy Responsive Housing in Continental Climates. The Suitability of Passive Houses for Iran's Dry and Cold Climate. Farshad Nasrollahi

Energy Management in Wuppertal

Passive house rehabilitation of post war residential building in Zug, Switzerland

Engineering Department. Public Works Division. August 14th, 2014

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Sample Customer 123 Conservation Way TAMPA FL Tracking Number:

Building Energy Systems. - HVAC: Heating, Distribution -

Roadmap for Enhancing Energy Efficiency in New Buildings

IEA SHC Task 47 Renovation of Non-Residential Buildings towards Sustainable Standards

This report presents the findings and recommendations of the assessment of energy use and

Energy'Saving,'Thermal'Comfort'and'Solar'Power'Information'Sheet'

This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+.

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

Creating Efficient HVAC Systems

ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY

EUROPEAN COMMISSION. Energy Audits - Cyprus

A guide to using variable-speed drives and motors in swimming pool halls

Deep Energy Savings in Existing Buildings

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Mechanical, Plumbing, and Fire Protection Conditions

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP

HEATING-COOLING WALL PANELS SYSTEM IN SLOVENE ETHNOGRAPHIC MUSEUM

SAP 2012 IN A NUTSHELL

Economics of Passive Solar and Zero Energy Homes

Residential HVAC System Sizing

GAS HEATING IN COMMERCIAL PREMISES

The Potential for Energy Retrofits within the City of Sacramento s Rental Housing Inspection Program

By Tom Brooke PE, CEM

Rules of Thumb Energy Efficiency in Buildings

The District Energy Manager and Classroom Heating

Achieving Net Zero. Bradley Berneche, President Alouette Homes. National Marketing Committee Canadian Home Builders Association Ottawa, June 6, 2008

City of Cornwall Social Housing Division Top 10 Energy & Water Saving Tips. in Multi-Unit Residential Buildings

Innovent LASER Packaged Fresh Air Conditioning Units

Energy Efficiency in Buildings

The sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications.

Refurbishment Mas Thibert / Arles

HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget

Condensing Boiler Efficiency

Corporate Energy Conservation & Demand Management Plan (CECDMP)

2015 RACE TO ZERO STUDENT DESIGN COMPETITION

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT

BUNKER HILL ELEMENTARY SCHOOL

ENERGY SAVING BY COOPERATIVE OPERATION BETWEEN DISTRICT HEATING AND COOLING PLANT AND BUILDING HVAC SYSTEM

ASHRAE Level I Energy Audit June 2011

How To Fund A School

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

Methodology for the production of Display Energy Certificates (DEC)

Home Energy Efficiency and Conservation: Call to Action. July 23, 2015 Dave Blake and David Wood REEP Green Solutions

Residential HVAC Load Sizing Training October 14, David Kaiser Green Code Plan Reviewer

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)

MURCH ELEMENTARY SCHOOL

AN AUDITAC PROPOSED PRELIMINARY AUDIT METHODOLOGY FOR AIR- CONDITIONING FACILITIES

06150 PORVOO, FINLAND Pelican eco ED(D), Pelican eco EDE(D), Pelican eco EDW(D), Pelican eco EDX(D)

Energy Audits. Good energy management begins with an energy audit

Further Education (FE) Colleges Energy Efficiency Loans Application Notes

9 Energy management. 9:1 General. BFS 2011:26 BBR Oct. 9:11 Scope of application

Case Studies in Existing Building Audits

Sustainable Design and Energy-Efficient Building Techniques for Existing Housing

Assessment Methods. 15 th November 2010 Huw Jenkins Simon Lannon

HEAT PUMPING AND REVERSIBLE AIR CONDITIONING: HOW TO MAKE THE BEST USE OF HVAC EQUIPMENT?

Setting the Scene. Fuelling the Future, Heat Pumps and more. What are the Drivers? Have we reached Peak Oil? Heating Technologies.

Impact of energy management software on the improvement of energy performance in public buildings

Transcription:

Project Acronym: EPLACE Project Title: Eco public PLAtform for smart green CityzEn s living labs Call identifier: CIP-ICT-PSP Call 6 Theme 1: ICT for SMART CITIES Objective1.1: Smart Urban digital services for energy efficiency Grant agreement no.: 325182 Starting date: 1 st February 2013 Ending date: 31 st July 2015 Fergal Purcel, Iliya Doychinov, Álvaro Rojas 1

Version Autor Date Description 1.0 Fergal Purcel 20/05/2014 Irish energy audits (annex 1-2) 2.0 Iliya Doychinov Georgi Simeonov 26/05/2014 Bulgarian energy audits (annex 3-4) 3.0 Álvaro Rojas Leiva 30/05/2014 Spanish energy audits 4.0 Nikolay Vangelov 30/05/2014 Revision of energy audits and summary information 4.1 Alicia Jimenez Gonzalez 03/06/2014 Format and content revision 2

Index 1. Abstract... 4 2. Finglas Leisure Center... 4 3. Tallaght Library... 6 4. Administrative Building Septemvri... 7 5. Medical Center septemvri... 8 6. City council of Cartaya... 10 7. Cultural center Cartaya... 11 8. Guadalinfo room Cartaya... 12 3

1. Abstract Deliverable 5.3 focuses on the prepared energy audits reports for the pilot buildings in Bulgaria, Irelands and Spain. Each energy audit report is carried out in each pilot building during the project execution and description of a common audit methodology preparation. In the presented deliverable are included detailed and professional analyses of different type of buildings such as administrative building, medical centre, leisure centre, The Deliverable contained results in office pilot buildings after measuring energy use according to D2.3 and D2.4 and highlighting the energy efficiency improvements. The energy audit reports give detailed information as follows: - Description of audited pilot building; - Detailed information of each facility and used energy carriers; - Energy consumption information for each pilot building; - Data analysis and building s base line; - Energy Management Action Plan and Energy Management Matrix included. Detailed energy audit report information for pilot buildings is given Annex A. 2. Finglas Leisure Center Finglas Leisure Centre was built in 2003 as a state of the art leisure centre with a total floor area of 2,600 m2. It incorporates many energy efficient features including a CHP plant, heat recovery ventilation a BMS and insulated building fabric. Notwithstanding these features, the centre was built over 10 years ago and there is considerable scope for energy efficiency improvement. The energy uses at the leisure centre are natural gas and electricity with monthly bills based on the billing gas and electricity meters on site. Over 80% of the electricity us used by plant (pumps and fans) with the majority of the remaining 20% used for lighting. The air handling units are the largest single use at 21% for AHU-1 and AHU-2 and an estimated 10% for AHU-3. The pool circulating pumps account for almost 20% of use and miscellaneous pumps and fans for 30%. The main energy saving opportunities centre around improved efficiency and control of this plant with significant savings also attainable through a lighting retrofit. Projects with total savings of 290 MWh or 43,000 per annum. This represents readily attainable and easily implemented saving of 40% in use with a payback of under 2 years. 4

There is no gas or heat submetering and therefore no breakdown in thermal energy demands. There are three distinct demands pool and pool area heating via AHU-1 (supplied by CHP and HE boilers), changing village heating via AHU-2 (supplied by CHP and HE boilers and radiator and underfloor heating circuits supplied by condensing boiler plant. With a gas use of 2.5 GWh per annum and thermal demands of 1.7 GWh per annum there are significant opportunities for improved efficiency. The analysis of the energy carrier s consumption and costs is carried out on the basis of the data, received by the Account Department and verified by continuous on-site measurements and data-logging. The natural gas, electricity and delivered heat energy consumption and cost by teh Finglas Leisure Center for the 2012 and 2013 years are shown in table 1. 2012 kwh/yr 2012 /yr 2013 kwh/yr 2013 /yr Gas 2,322,464 101,066 2,546,472 116,355 Electricity Imported 318,053 64,200 297,175 62,985 Delivered Heat 1,604,108 1,705,572 Total Electricity 675,899 726,953 Table 1: Energy carriers consumption and cost at the Finglas Leisure Center The BMS controls the 4 boilers on site according to opening hours with temperature control and load management based on return temperatures. There is little control based on climatic conditions (temperature and humidity) within the building. An upgrade of the BMS to include enhanced environmental controls should yield savings in excess of 10%. A significant proportion (over 70%) of the energy delivered to the swimming pool leaves in the wet exhaust air. Some of this is recovered by the heat exchanger in the pool area ventilation system (AHU-1). However the majority of heat leaves as the latent heat of vapourisation of the moisture in the exhaust air. A heat pump on the ventilation system would recover this energy efficiently and cost effectively yielding and indicative 800 MWh in total final energy use and savings of 15,000 per annum. A heat pump (ground source or air source) would be ideally suited for replacing the condensing boiler plant and could save in the region of 350 MWh in final energy. These are other measures to improve efficiency of the heat supply require more detailed design and consideration and ideally data on the profile and breakdown of gas use. The implementation of these measures may be intrusive requiring significant works in the plantroom and possibly closure of the facility for short periods. 5

Finglas Leisure Centre is an exemplar site in the National Energy Services Framework and energy savings are planned to be delivered through an EPC. This report will assist in informing the EPC procurement and negotiation process. Easily attainable electricity savings of 40% (290 MWh/ 34,000 per annum) are identified in this audit report. The report indicates potential thermal demand savings of up to 1.2 GWh subject to a detailed energy efficient design process. NOTE: More detailed information in Annex 1 of the deliverable 3. Tallaght Library The County Library, Tallaght, which reopened in April 2008 following a major refurbishment program, is in the heart of the cultural quarter of the Tallaght Town Centre, which includes the Civic Theatre, the Big Picture and Rua Red Art Centre. The library extends to over 2,500 m2 over three floors with public areas on the ground and upper floors and an open plan office area for staff in the basement. As electric energy and heat is delivered, unmetered, to the library via the services for the entire South Dublin County Council (SDCC) campus, historic data on thermal and electrical energy use is not available at the moment. The electricity metering from February to May 2014 indicates a consistent use of 4,400 kwh per week or 230,000 kwh per annum. Lighting is the largest use accounting for 48% with general services accounting for 42% as shown in the usage breakdown below. General services mainly consist of fan coil units and air handling units associated with HVAC for the building (Figure 1). 10% 42% General Services Lighting 48% Small Power Figure 1: Percentage Allocation of Energy Use at Tallaght Library The main energy saving opportunities are centred around the general services and lighting loads. There are zero investment cost opportunities to reduce the out of hour s base load for 6

both lighting and general services, particularly over weekends when the out of hours load is higher. The usage trend for both lighting and general services is very constant, rising from about four hours before opening time to a constant load and falling again after closing time to the base load. Improved control of both loads could reduce the usage in the four hours leading up to opening time and could also modulate the daytime demand depending on occupancy and conditions. The lighting fixtures are reasonably new and efficient and predominantly comprise linear T8 fluorescent fittings with electronic ballasts. However, savings of over 40,000 kwh per annum could be made through replacing with more efficient T5 or LED fittings. NOTE: More detailed information in annex 2of the deliverable 4. Administrative Building Septemvri The administrative building of Septemvri Municipality was constructed in 1978 and there was a full reconstruction in 2001. The total built area is 3,687 m2. The building is a reinforced construction with brick walls, flat roof, and reinforced concrete floors. The windows are double glazed, with PVC frames and have low infiltration of cold outer air. There are 105 employees working in it, engaged primarily in servicing the local citizens. The building consumes only electric energy for its necessity. The electricity is supplied by the local electricity supplier EVN-Bulgaria. The analysis of the energy carrier s consumption and costs is carried out on the basis of the data, received by the Account Department and verified by continuous on-site measurements and data-logging. The electric energy consumption and costs by the administrative building for the 2012 and 2013 Years are shown in Figure 2. Figure 2: Electricity Consumption and Cost at the Administrative Building The allocation of the electricity consumption shows mostly considerable part for heating (61%), the office equipment (20%), indoor lighting (13%) and other (6%). 7

The estimated energy saving measures can include: heat insulation of outer surrounding elements of the building; installation of central heating system; replacement of conventional bulbs by modern energy efficient ones; installation of BMS, which must control the feeding of heat energy depending on outer temperature. The central heating system will consist of internal heating installation, powered by a highly efficient hot water pellet boiler. The implementation of these energy conservation opportunities will lead to energy costs reduction by 40% at least, while the payback period will be below of 4 years. The potential thermal energy saving opportunities in the administrative building are: - Heat insulation of outer surrounding elements. - Heat insulation of building s roof. - Substitution of existing outer windows and doors by energy efficient ones. - Installation of hot water pellet boiler for production of hot water with nominal capacity of 75 kw and temperature of outlet hot water of 70 ос. - BMS implementation which will have an option to control the feeding of wood pellets to the boiler burner depending on outside temperature. The expected annual electricity savings having implemented the above mentioned measures might reach 155,471 kwh and that is equal in the amount of 15,547. The payback period is estimated to 2.5 years. NOTE: More detailed information in annex 3of the deliverable 5. Medical Center septemvri The Medical centre building in Municipality of Septemvri was built in 1958, and there was a full renovation in 1992. It is a two-floor building with unheated ground floor. There are 114 employees working in it, primarily medics, who provide only diagnosticmedical services to local citizens of the municipality. The Medical centre is visited by about 72,757 citizens per year. The only energy source used in the Medical centre is electricity supplied by the local electricity supplier EVN-Bulgaria. There is no central heating/cooling system as well as a building management system (BMS). The heating is ensured by electric heating appliances. The analysis of the energy carrier s consumption and costs is carried out on the basis of the data, received by the Account Department of the Medical centre and verified by continuous on-site measurements and data-logging. The electricity consumption and costs by the Medical centre for the 2012 and 2013 Years are shown in Figure 3. 8

Figure 3: Electricity Consumption and Cost at the Medical Centre A considerable part of the electricity consumption belongs to heating (46%), but there is a significant consumption by a X-ray device, which is of an older generation. The estimated energy saving measures can include: heat insulation of outer surrounding elements of the building; installation of central heating system in the building; replacement of conventional bulbs by modern energy efficient ones; installation of BMS, which must control the feeding of heat energy depending on outer temperature. The implementation of these energy conservation options will lead to energy costs reduction by 40% at least, while the payback period will be below 4 years. The potential thermal energy saving opportunities in Medical centre are as follows: - Heat insulation of outer surrounding elements. - Heat insulation of building s roof. - Substitution of existing outer windows and doors by energy efficient ones. - Installation of hot water pellet boiler for production of hot water with nominal capacity of 50 kw and temperature of outlet hot water of 70 ос. - BMS which will have an option to control the feeding of wood pellets to the hot water boiler burner depending on outside temperature. The expected annual electric energy savings having implemented the above mentioned measures might reach 27,617 kwh and that is equal in the amount of 2,762. The payback period is estimated to 9.3 years. NOTE: More detailed information in annex 4 of the deliverable 9

6. City council of Cartaya The City Council of Cartaya was built in the sixteenth century although carried out a comprehensive reform in 2000, leaving the interior with modern architecture and exterior with the facade without changing. It is located in the center of Cartaya, in Plaza de la Redondela 1. The gross floor area is 1606,3 m2 and the occupancy is about 22 days per month and 264 days per year. The analysis of the energy carrier s consumption and costs is carried out on the basis of the data, received by the Account Department and verified by continuous on-site measurements and data-logging. The imported electricity and delivered electric consumption and costs by the Cultural center of Cartaya for the 2012 and 2013 Years are shown in the next table. 2012 kwh/yr 2012 /yr 2013 kwh/yr 2013 /yr Electricity Imported 79.373 9.525,48 67.467 8096,04 Delivered HVAC (Electric consumption) 44.096 5.291,52 37.481 4.497,72 Total Electricity 123.469 14.816,28 104.948 12.893,76 Table 2: Energy Carriers Consumption and cost at the city council of Cartaya The following figure is used to show different electricity use. 28% of the power delivered corresponds to the attic. The SAI and the Police Department are the 19%, and the other significant electricity use are the mayor offices. The main consumption is the light and electrical appliances. 0% Lift [kwh] 1% 15% 28% Attic [kwh] Air Conditioning [kwh] 19% 4% 9% 19% 1% 4% Mayor Office [kwh] Police Department [kwh] Ground Floor [kwh] Figure 4: percentage allocation of electricity use at city council of Cartaya 10

The municipality of Cartaya no gas installation or boiler to heat water. For this reason potential savings opportunities are not covered in this sector. In the City Council of Cartaya already are implementing austerity energy savings measures to reduce economic costs. Work on the project aims eplace further optimize saving measures that have not been raised yet. Furthermore, and associated to the city council installation, there is a monitoring equipment installed for teh street lighting consumption in a near street. This is a very good opportunity because the City will look at increases in the energy savings in one of their streets and they have the opportunity to change the consumption. The consumption obtained is shown in the following table. 2014 kwh/yr 2014 /yr Total Electricity 39.600 4.752 Table 3: Electricity and heat use. NOTE: More detailed information in annex 5 and 8 of the deliverable 7. Cultural center Cartaya One of the most important building in Cartaya is the Cultural Center. Is the place where people can be to study, watch a theatre performance, look for some books, learn music, etc. The Cultural Center of Cartaya was built in 2000 year. The gross floor area is 5103 m2 and the occupancy is about 26 days per month and 12 months The analysis of the energy carrier s consumption and costs is carried out on the basis of the data, received by the Account Department and verified by continuous on-site measurements and data-logging. The electricity imported and delivered electricity consumption for heating and costs by the Cultural center of Cartaya for the 2012 and 2013 Years are shown in the next table. 2012 kwh/yr 2012 /yr 2013 kwh/yr 2013 /yr Electricity Imported 88.499 10.619,88 86729,02 10407,482 Delivered HVAC (Electric consumption) 58.998 7.079,76 53098,2 6371,784 Total Electricity 147.497 17.699,64 139827,22 16779,266 Table 4: Electricity consumption and cost at the cultural center of Cartaya 11

Figure 6 shows different electricity use in the building. 44% of the power delivered corresponds to the Attic. The basement is the 23%, and the other significant electricity use are shared between the others zones. It can understand that the main focus of the consumption goes to conditioning the temperature of the areas. 4% 0% 9% 8% 5% Air Conditioner Attic Reception 44% Basement Ground floor 23% First floor Second floor 7% Theatre Figure 6: Percentage allocation of electricity use at Cultural Center of Cartaya The Cultural Center of Cartaya not have gas installation or boiler to heat water. For this reason potential savings opportunities are not covered in this sector. In a leisure/cultural center you can do many things, and every day has a different visitor, for this reason it is a complicated project to educate people to do certain actions to save energy. It is much easier to make people aware that you always work on the same site that visitors NOTE: More detailed information in annex 6 of the deliverable 8. Guadalinfo room Cartaya To understand the usefulness of Guadalinfo Cartaya center must know that this is a promote by Community of Andalusia and is used to disseminate new information, workshops, computer resource center, disseminating content etc. It is really a room that there are many networked computers with printers and some devices. It is over a market building. It is over a market building and was built in 2012. The gross floor area is 25-30 m2 and the occupancy is about 26 days per month and 12 months. The analysis of the energy carrier s consumption and costs is carried out on the basis of the data, received by the Account Department and verified by continuous on-site measurements 12

and data-logging. The electricity imported and delivered electricity consumption for heating and costs by the Guadalinfo center of Cartaya for the 2012 and 2013 Years are shown in the table 5. 2012 kwh/yr (estimated) 2012 /yr 2013 kwh/yr 2013 /yr Electricity Imported 5 616 673,92 3508 420,96 Delivered HVAC (Electric consumption) 0 0 0 0 Total Electricity 5 616 673,92 3508 420,96 Table 5: Electricity consumption and cost at the Guadalinfo Center The following Figure 7 is used to show different electricity use. 84% + 9% of the power delivered corresponds to the ofimatic. The lighting is the 7%, and it is necessary know that there not exist any HVAC system. 9% 7% Plugin 1 Plugin 2 Lighting 84% Figure7: Percentage allocation of electricity use at Guadalinfo center The Guadalinfo Centre not have gas installation or boiler to heat water. For this reason potential savings opportunities are not covered in this sector. Guadalinfo Center every day has a different visitors, for this reason it is a complicated project to educate people to do certain actions to save energy. However because Guadalinfo is a small place, is very easy aware people by the Guadalinfo Manager, only need to give and show information for each person that enter in the room. NOTE: More detailed information in annex 7 of the deliverable 13