Market Solutions to Loop Flow



Similar documents
Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement

Priority Project Description Status and Milestone Deliverables

Presentation for The National Commission for Energy State Regulation of Ukraine

New York Independent System Operator (NYISO)

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

Performance Metrics. For Independent System Operators And Regional Transmission Organizations

Energy in the Wholesale Market December 5, :30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

Preliminary Project Description

Generation and Transmission Interconnection Process

NYISO Demand Response Programs: Enrollment

PJM LMP Market Overview

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D.

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers

Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0

Appendix A. Glossary. For Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

Convergence Bidding Stakeholder Conference Call

Overview and Comparison of Demand Response Programs in North American Electricity Markets

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009

103 FERC 61, 044 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Texas transformed. Achieving significant savings through a new electricity market management system

Convergence Bidding Tutorial & Panel Discussion

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

NV Energy ISO Energy Imbalance Market Economic Assessment

Ancillary Services and Flexible Generation

Transmission Function Employees Job Titles and Descriptions 18 C.F.R 358.7(f)(1)

Governance. What s a Governance?

Introduction to the Integrated Marketplace

Revenue Metering Requirements Manual

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out

Aliso Canyon Gas-Electric Coordination. Straw Proposal

2013 Ventyx, an ABB company

Overview of Reliability Demand Response Resource

NEW YORK INDEPENDENT SYSTEM OPERATOR, INC. WORKING CAPITAL POLICY AND PROCEDURE

Ms. Rae McQuade President & COO, North American Energy Standards Board

California ISO Straw Proposal. Ancillary Services Procurement in HASP and Dispatch Logic

How PURPA is driving utility scale solar in North Carolina By QF Solutions April 7, 2015

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44.

Wind Power and Electricity Markets

Demand Response Programs: Lessons from the Northeast

Transmission Pricing. Donald Hertzmark July 2008

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, Electric Grid Operations

How To Manage The Ercot Grid

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Generator Interconnection and Deliverability Study Methodology Technical Paper

Virtual Transactions in the PJM Energy Markets

Consistency of Energy-Related Opportunity Cost Calculations

TRANSMISSION SERVICES MANUAL

MISO Schedule 41 Charge to Recover Costs of Entergy Storm Securitization SCHEDULES SCHEDULE 41

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, Electric Grid Operations

Status of Demand Response in Europe. Jessica Stromback, Smart Energy Demand Coalition EPFL Lausanne Switzerland Sept 10 th, 2015

BUSINESS RULES GOVERNING CONTINGENCY RESERVE PROVIDED BY BATCH-LOAD DEMAND RESPONSE

Transcription:

Market Solutions to Loop Flow Robert Pike Director, Market Design New York Independent System Operator Business Issues Committee September 9, 2009 1

Agenda Background Recommendation Next Steps Solution Concepts Schedule 2

Background At the September 25, 2008 Management Committee Meeting, as part of Motion #2 to approve tariff changes prohibiting the Scheduling of Circuitous Transactions around Lake Erie, Market Participants requested the development of a proposed schedule for developing market solutions. Specifically, motion #2 included: In order to carry out FERC s recommendation that the long term solutions to the loop-flow problem should be worked out through a collaborative process where all such issues may be fully considered, the Management Committee requests that the NYISO return to the October 22, 2008 Business Issues Committee meeting with a proposed schedule (including milestones) for identifying and developing long term market solutions. If long-term solutions are ultimately agreed upon, the Management Committee further requests that the NYISO develop and provide a schedule for expeditious implementation of those solutions. In response, staff presented a schedule for the development of Long Term Solutions to Loop Flow Concerns, which included a milestone to present recommendations to BIC by Q3-2009. 3

Loop-Flow Solution Development Description Assess proxy pricing protocols Market Participant developed alternative proposals Review alternative proposals Develop solution improvement options Stakeholder reviews Review options with control areas Present recommendations to BIC Schedule Q2-2009 Q1-2009 Q2-2009 Q3-2009 Q3-2009 Q3-2009 2008 2009 Assess current scheduling practices Status MIWG reviews on 12-16-2008 and 02-06-2009 of historical and PJM methodologies. No additional proxy pricing proposals suggested. Requested to consider representing additional scheduling nodes. Reviewed concepts with PJM. Congestion Management Technical Conference (02-12-2009), Stakeholder Sector meetings (April, 2009) Issue review and remediation suggestions developed at 03-23-09 meeting with PJM, OH, MISO. Joint ISO Review of Broader Regional Market concepts. Benefits presented Sept 2009 Assess proxy pricing protocols MP developed alternatives Review of alternative options Develop solution improvement options Stakeholder reviews Review with Control Areas Present to BIC Prioritize and implement possible solutions 4

FERC s s July 16, 2009 Lake Erie Report/Order Finds no evidence of market manipulation by market participants scheduling external transactions around Lake Erie Determines that there were no tariff violations by the NYISO or by market participants Determines that restitution isn t appropriate Orders the NYISO to expeditiously develop long-term comprehensive solutions to the loop flow problem with its neighboring RTOs, including addressing interface pricing and congestion management. NYISO must submit a report to FERC detailing its proposed solution, including necessary Tariff revisions, by mid-january 2010 5

Current Practice Day-Ahead Modeling: The Lake Erie circulation value used in the Day Ahead Market (DAM) evaluation is updated weekly, based on the average hourly loop flows experienced in real-time over the past 30 days. The circulation value used in the DAM evaluation for the week that begins with market day 9/2/09 will be set to 350 MW of clockwise circulation. Real-Time Operation: Incorporate real-time experienced loop flows into the market solutions. Transmission Loading Relief events initiated when: Lake Erie loop flow exceeds 400 MW NYISO is addressing transmission constraints on defined flow gates 6

Concept Development MIWG: December 2008 August 2009 Review of pre-existing conditions and sources of loop flows. Review of impacts of incorporating PJM proxy pricing protocols. Review of implication of reducing the 75 minute bid lockout. Review and concept development of Broader Regional Markets Physical and Market solutions to Loop Flow. Review of Benefits associated with Interregional Transaction Coordination. Sector Meetings: April 2009 Identified opportunities for financial recovery of congestion management costs. MISO, PJM, IESO: March 2009 August 2009 Review and concept development of scheduling improvement opportunities, buy-through of congestions and congestion management. 7

Recommendation Broader Regional Markets - Enhance the efficiency of external transaction scheduling outcomes to deliver improved regional price convergence and interface utilization. Market Solutions to Loop Flow Buy-Through of Congestion Congestion Management Interregional Transaction Coordination Physical Solutions to Loop Flow Installation and Operation of the Michigan/Ontario PARs to better conform actual power flows to scheduled power flows Objective: Replace the need for Transmission Loading Relief (TLR) events to address loop flow, improve the accuracy and consistency of transaction scheduling decisions and lower congestion costs to consumers. 8

Next Steps Provide recommendations to BIC on Sept 9, 2009 Budget Development Projects included in the 2010 Potential Project Candidates list Ongoing Solution and Schedule Development MIWG: September December, 2009 Joint ISOs: August December, 2009 Joint Stakeholder Meetings: October/November, 2009 BIC: Concept Approval December, 2009 FERC: Response January 12, 2010 9

Physical Solutions to Loop Flow Phase Angle Regulator Installation Installation of PARs on fourth Michigan/Ontario tie anticipated to be completed by November 2009. First transformer installation complete. Second transformer installation began July 2009. Additional installation of protective relay equipment expected to be finished in first quarter 2010. Expected operation to better confirm actual power flows to scheduled power flows, thereby reducing loop flow. 10

Buy-Through of Congestion Benefits Buy-Through of Congestion provides for the recovery of congestion management costs incurred in managing loop flow impacts. Provides an alternative to market and operational interruptions caused by Transmission Loading Relief (TLR) actions. More efficient utilization of the transmission network. More accurate transaction scheduling decisions. 11

Buy-Through of Congestion Concept Parties scheduling transactions with any of the other ISO/RTOs surrounding Lake Erie, but not with the NYISO, would be billed for the real-time congestion costs incurred by NY to support the loop flow created by the transaction. Congestion costs captured by NYISO s OH and PJM prices. Exposure to NY congestion costs can be managed with existing Day-Ahead transmission scheduling processes. Charges in proportion to the contract s NY impacts. NY continuing review of external bus pricing logic. 12

Buy-Through of Congestion A collective ISO/RTO solution: Will facilitate sharing of transaction schedule and scheduling entity billing data. Improve identification of sources of loop flow. A mandatory program is necessary to address firm transmission capacity and free-riders. 13

Congestion Management Benefits Congestion Management achieves a more cost effective utilization of the region s collective assets to address constraints across multiple systems, resulting in lower congestion costs to consumers. Provide a more consistent pricing profile across markets. 14

Congestion Management Concept Allow for the dispatch of generator assets within a neighboring control area to address transmission constraints within own control area when more cost effective than operation of in-area generation. Pre-determination of collective transmission constraints to jointly solve and real-time coordination of constraint solution costs. Provides financial settlement to neighboring control area for off-cost operation. Establish market flow calculation tools. 15

Congestion Management Status of NY-PJM Discussions Reconciliation of market flow calculation process Historical recalculation of data not feasible. Definition of historical data needed to resolve entitlements discussion PJM settlement process based upon actual flows at time of event relative to historical usage. NY desires dynamic baseline process. Reviewing option of a bandwidth solution which addresses concerns of both areas. 16

Interregional Transaction Coordination Benefits Dynamic scheduling lower total system operating costs through improved consistency of transaction schedules with market-to-market price patterns. Expand pool of flexible assets to balance intermittent power resources output. Improve price consistency and transmission utilization across markets. Address uncertainty in forward looking scheduling horizons. 17

Interregional Transaction Coordination Concept Allow Market Participants to provide flexible energy, reserve and regulation transaction bids, where the real-time dispatch tools will evaluate these flexible transactions on an intra-hour basis. Phase 1 Adjust HQ energy interchange on a 5-minute frequency based upon NY economic evaluation of flexible bids. Pre-coordination of flexible bids and automated coordination of energy schedules necessary to support frequency of interchange adjustments. 18

Interregional Transaction Coordination Future Steps Phase 2 Establish market and coordination processes to support purchase and sale of reserve and regulation between markets. Phase 3 Define process to apply dynamic scheduling between two market systems. 19

Market Solutions to Loop Flows Buy-through of Congestion 2011* Congestion Management Market Flow Calculator 2010* PJM NYISO Full Implementation 2011* Extend to Additional Regions 2013* Interregional Transaction Coordination Energy Scheduling with NY/HQ 2010* Buying Reserves and Regulation 2011* ITC with NY/NE 2011* ITC with other regions 2013* *Prospective timeline pending review with Market Participants, neighboring Control Areas and the Commission. 20

The New York Independent System Operator (NYISO) is a not-for for-profit corporation that began operations in 1999. The NYISO operates New w York s s bulk electricity grid, administers the state s s wholesale electricity markets, and provides comprehensive reliability planning for the state s s bulk electricity system. www.nyiso.com 21