1 Governance What s a Governance?
2 Governance FERC - Federal Energy Regulatory Commission NERC - North American Electric Reliability Council. NPCC - Northeast Power Coordinating Council NYSRC - New York State Reliability Council NYISO - New York Independent System Operator
3 Federal Energy Regulatory Commission (FERC) Regulates the Transmission and Wholesale Sales of Electricity in Interstate Commerce Licenses and Inspects Private, Municipal and State Hydroelectric Projects. Oversees Related Environmental Matters Administers Accounting and Financial Regulations.
4 FERC Website
5 NERC North American Electric Reliability Council Four Synchronous Interconnections Eastern Interconnection Atlantic to the Rockies Western Interconnection Rockies to the Pacific ERCOT Most of Texas Quebec
6 NERC Security Coordinators and Interregional Security Network Nodes Nov Québec Interconnection ECAR - East Central Area Reliability Coordination Agreement ERCOT - Electric Reliability Council of Texas FRCC - Florida Reliability Coordinating Council BPA PG&E WAPA- Loveland MAPP MAIN MECS TVA AEP ECAR OH APS Duke HQ NYPP VP PJM MARITIMES NEPOOL MAAC - Mid Atlantic Area Council MAIN - Mid-America Interconnected Network MAPP - Mid-Continent Area Power Pool NPCC - Northeast Power Coordinating Council SERC - Southeastern Electric Reliability Council SPP - Southwest Power Pool WSCC - Western Systems Coordinating Council APS SPP Southern Western Interconnection SEC.CTR. Eastern Interconnection FP&L ERCOT Interconnection Security Coordinator Interregional Security Network node
7 NERC 10 Regional Reliability Councils ECAR - East Central Area Reliability Coordination Agreement ERCOT - Electric Reliability Council of Texas FRCC - Florida Reliability Coordinating Council MAAC - Mid Atlantic Area Council (PJM) MAIN - Mid-America Interconnected Network MAPP - Mid-Continent Area Power Pool NPCC - Northeast Power Coordinating Council SERC - Southeastern Electric Reliability Council SPP - Southwest Power Pool WSCC - Western Systems Coordinating Council
8
9
10 NERC Operating Manual 9 Policy Standards Generation Control and Performance Transmission Interchange System Coordination Emergency Operations Operations Planning Telecommunications Training Security Coordinator Procedures
11 NERC Website
12 Northeast Power Coordinating Council (NPCC) Formed in 1966 NPCC is one of ten regional reliability councils established within the framework of the North American Electric Reliability Council (NERC) Geographic area includes: New York New England Maritimes (New Brunswick, Nova Scotia) Ontario Quebec
13 Ontario New York Maritime Area Maritimes New England Quebec NPCC
14 NPCC is one of the three regional councils which has non-us membership NPCC is one of the seven regional councils which (electrically) comprise the Eastern Interconnection The Eastern Interconnection is: everything east of the Rockies except Texas and Quebec ; roughly 400GW load
15 NPCC Website
16 NYSRC - New York State Reliability Council The Need for the NYSRC: Reliability Rules adopted following '65 Blackout and strengthened following '77 Blackout. What happened? NERC & NPCC reliability criteria apply. TOs have fiduciary, contractual and common law duties to maintain system reliability!
17 NYSRC - Continued Formed by agreement among the New York Transmission Owners & interested parties. Principal Mission: Develop reliability rules and criteria for the secure operation of the NY Bulk Power System. Rules are binding on the ISO. NYSRC's oversight is limited to basic reliability criteria, specific to facilities under the control of the ISO.
18 NYSRC Website
19 New York Independent System Operator (NYISO) The NYISO was formed as a not-for-profit NY Corporation under FERC & applicable NYPSC jurisdiction. Principal Mission: Maintain reliability and provide transmission service on a comparable and non-discriminatory basis.
20 NYISO - Charges Oversee Operation of the Bulk Power System Maintain Reliability as Reliability Coordinator Administer Tariffs Develop Procedures to Implement New York State Reliability Council Criteria Coordinate Outages Coordinate Schedules "Dispatch" the System Monitor Performance Render Statements
21 System Security The mission of all of the governing bodies is to maintain a fair market and Reliability Without reliability, there is no energy market. All of the components of the electric system must do their part to maintain system integrity. Generation Transmission The Market
22 Governance Committees Board of Directors NYISO Staff Management Committee Business Issues Committee Operations Committee Various Subcommittees and Working Groups Market Participants
23 Operating and Market Committees. All Market and Operating rules are set and monitored by Committees. Operating Committee SOAS - System Operating Advisory Subcommittee SPAS - System Protection Advisory Subcommittee TPAS - Transmission Planning Advisory Subcommittee CDAS - Communication and Data Advisory Subcommittee. Management Committee Business Issues Committee
24 NYISO Website -
25 Governance Review FERC NERC NPCC NYSRC NYISO
26 More information about Governance All of the organizations have websites:
On-Site vs. Off-Site Electric Power Supply in Refineries in the USA: The Use of Cogeneration in Texas and Louisiana
25 th Annual Conference of the USAEE/IAEE Fueling the Future: Prices, Productivity, Policies and Prophecies On-Site vs. Off-Site Electric Power Supply in Refineries in the USA: The Use of Cogeneration
TRANSMISSION OPERATIONS (August 5, 2010)
TRANSMISSION OPERATIONS (August 5, 2010) Managing Director Transmission Operations: Paul B. Johnson The Managing Director - Transmission Operations is responsible for the safe, reliable, costeffective,
Written Statement of Richard Dewey Executive Vice President New York Independent System Operator
Written Statement of Richard Dewey Executive Vice President New York Independent System Operator Senate Standing Committee on Veterans, Homeland Security and Military Affairs Senator Thomas D. Croci, Chairman
Energy Ventures Analysis 1901 N. Moore St. Arlington, VA 22209 (703) 276 8900
T H E I M P A C T O F E A R L Y C O A L R E T I R E M E N T S O N K E Y P O W E R M A R K E T S ISO = 46.6% Prepared for: National Mining Association Washington, DC Northwest = 41.3% MISO = 36.8% NYISO
Performance Metrics. For Independent System Operators And Regional Transmission Organizations
Performance Metrics For Independent System Operators And Regional Transmission Organizations A Report to Congress In Response to Recommendations of the United States Government Accountability Office April
JOHN H. STOUT PRESIDENT, MARINER CONSULTING SERVICES, INC. 1303 LAKEWAY DRIVE TAYLOR LAKE VILLAGE, TEXAS 77586 713-252-0535
JOHN H. STOUT PRESIDENT, MARINER CONSULTING SERVICES, INC. 1303 LAKEWAY DRIVE TAYLOR LAKE VILLAGE, TEXAS 77586 713-252-0535 [email protected] WWW.MARINERCONSULT.COM OVER 36 YEARS OF EXPERIENCE
Duke Energy Progress Standards of Conduct Transmission Function Employee Job Titles and Job Descriptions 9/1/13
Duke Energy Progress Standards of Conduct Transmission Function Employee Job Titles and Job Descriptions 9/1/13 Transmission Operations & Planning Carolinas Power System Operations Director Power System
Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS
Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Chief Operations Officer, has primary responsibility for the overall planning, operations and control of the transmission
INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)
INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional
Electric Field Operations Organization
NSTAR Electric Transmission Function Job Summaries Electric Field Operations Organization Vice President, Electric Field Operations (Transmission) This position has primary responsibility for the planning,
Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards
Updated July 11, 2013 Job Descriptions Job Title Reports To Job Description TRANSMISSION SERVICES VP Compliance & Standards Develops strategy and business plans for efficient, safe, reliable, regulatorycompliant
Investor-Owned Utility Ratio Comparisons
Investor-Owned Utility Ratio Comparisons 2002 Data Published March 2004 2301 M Street NW Washington, D.C. 20037-1484 202/467-2900 Investor-Owned Utility Ratio Comparisons, 2002 Data APPA provides several
ISO/RTO Council Comments on National Institute of Standards and Technology Proposed Smart Grid Interoperability Standards
ISO/RTO Council Comments on National Institute of Standards and Technology Proposed Smart Grid Interoperability Standards Pursuant to the Notice posted in the Federal Register on June 9, 2009, the ISO/RTO
Market Solutions to Loop Flow
Market Solutions to Loop Flow Robert Pike Director, Market Design New York Independent System Operator Business Issues Committee September 9, 2009 1 Agenda Background Recommendation Next Steps Solution
NYISO Demand Response Programs: Enrollment
NYISO Demand Response Programs: Enrollment Donna Pratt Demand Response Market Product Specialist New York Independent System Operator DR-Expo Chicago, Illinois October 16-17, 2007 New York Independent
HVDC Transmission Line Project for Moving ERCOT Wind Into SERC
HVDC Transmission Line Project for Moving ERCOT Wind Into SERC ERCOT RPG Meeting August 13, 2010 Agenda Pattern Energy Group SERC and ERCOT Market Drivers Southern Cross Project Overview Project Development
Demand Response Policy and Programs
Demand Response Policy and Programs Dr David Crossley Managing Director Energy Futures Australia Pty Ltd Metering, Billing and CRM/CIS Australia and New Zealand Conference 2005 Melbourne, 16 March 2005
Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market?
Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market? Regulation and Operating Reserves 33 rd Eastern Conference Center for Research in Regulated Industry Romkaew P.
Assessment of. Demand Response and Advanced Metering. Staff Report
2015 Assessment of Demand Response and Advanced Metering Staff Report Federal Energy Regulatory Commission December 2015 The opinions and views expressed in this staff report do not necessarily represent
PJM LMP Market Overview
PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people
NPCC Implementation of the NERC Compliance Monitoring And Enforcement Program (CMEP)
Northeast Power Coordinating Council, Inc. NPCC Implementation of the NERC Compliance Monitoring And CP-01 Rev.2 The NERC Rules of Procedure and the Regional Delegation Agreement are the overriding documents
Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting
Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented
Guide to Electric Power in Texas
Third Edition Guide to Electric Power in Texas January 2003 Houston Advanced Research Center and Institute for Energy, Law & Enterprise University of Houston Law Center Guide to Electric Power in Texas
MEMORANDUM OF UNDERSTANDING THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION
MEMORANDUM OF UNDERSTANDING BETWEEN THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR AND THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION AND THE NORTHEAST POWER COORDINATING COUNCIL, CROSS-BORDER REGIONAL
Dan T. Stathos, CPA* Associate Director
Dan T. Stathos, CPA* [email protected] Austin, Texas Direct: 512.493.5415 Professional Summary Dan Stathos, an in NCI s Austin, Texas office, has been involved with electric, gas, water and telephone
Assessment of. Demand Response and Advanced Metering. Staff Report
2014 Assessment of Demand Response and Advanced Metering Staff Report Federal Energy Regulatory Commission December 2014 The opinions and views expressed in this staff report do not necessarily represent
Sabal Trail Transmission, LLC
FGU 2014 ANNUAL MEETING JUNE 25, 2014 Sabal Trail Transmission, LLC Connecting diverse natural gas supplies to southeast markets Josh Browning Changing Natural Gas Flows Value of capacity increases with
Presentation for The National Commission for Energy State Regulation of Ukraine
Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection
Top Ten Compliance Issues for Implementing the NERC CIP Reliability Standard
Top Ten Compliance Issues for Implementing the NERC CIP Reliability Standard The North American Electric Reliability Corporation 1 s (NERC) CIP Reliability Standard is the most comprehensive and pervasive
124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Communication Protocols for Public Utilities ORDER NO.
124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff.
PJM Electric Market. PJM Electric Market: Overview and Focal Points. Federal Energy Regulatory Commission Market Oversight www.ferc.
PJM Electric Market: Overview and Focal Points Page 1 of 14 PJM Electric Market Source: Velocity Suite Intelligent Map Updated August 23, 21 145 PJM Electric Market: Overview and Focal Points Page 2 of
Evolution of the Electric Industry Structure in the U.S. and Resulting Issues
Evolution of the Electric Industry Structure in the U.S. and Resulting Issues Prepared for: Electric Markets Research Foundation Navigant Consulting, Inc. 1200 19 th Street NW Suite 700 Washington, DC
COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF
COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF I. INTRODUCTION The City of Colorado Springs, Colorado ( City ) is a Colorado home-rule municipal corporation with a population
The economic impact. of current Investment Trends in. Infrastructure
Failure to Act The economic impact of current Investment Trends in Electricit y Infrastructure This report was prepared for the American Society of Civil Engineers by Economic Development Research Group,
Experience in Electricity Market Restructuring. Texas: Mostly Good. Jay Zarnikau Frontier Associates And University of Texas at Austin.
Experience in Electricity Market Restructuring Texas: Mostly Good Jay Zarnikau Frontier Associates And University of Texas at Austin September 2005 1 Outline Texas is unique Overview of wholesale market
CMS Marketing, Services and Trading Company
I. BACKGROUND CMS Marketing, Services and Trading Company Order No. EA-223 Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e)
Program Guide for Risk-based Compliance Monitoring and Enforcement Program. ERA-01 Rev. 1. NPCC Manager, Entity Risk Assessment
NPCC Entity Risk Assessment Program Guide for Risk-based Compliance Monitoring and Enforcement Program ERA-01 Rev. 1 Process Owner: NPCC Manager, Entity Risk Assessment Effective Date: 03/02/2015 Table
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff. Brazos Electric
PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013
PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity
NPCC Regional Reliability Reference Directory # 8 System Restoration
NPCC Regional Reliability Reference Directory # 8 Task Force on Coordination of Operations Revision Review Record: October 21, 2008 Adopted by the Members of the Northeast Power Coordinating Council, Inc.
Smart energy, clean energy, today s energy. The. Mariah. wind power project
Smart energy, clean energy, today s energy The Mariah wind power project The Mariah project at a glance The Mariah Project is developed by Scandia Wind Southwest LLC, a joint venture company owned by Havgul
Electricity from the Power Plant To the Consumer
Electric Transmission Lines Electricity from the Power Plant To the Consumer The Nature of Electricity Electricity must be used as it is generated. Unlike other commodities, there is very little ability
Electric Utilities, Deregulation and Restructuring of U.S. Electricity Markets
1 Electric Utilities, Deregulation and Restructuring of U.S. Electricity Markets http://pnnl-utilityrestructuring.pnl.gov/publications/primer/primer.pdf 2 In The Early Days Initially utilities were not
Washington DC Power Sector Overview
Washington DC Power Sector Overview Kenneth (Ken) Glick Public Service Commission Of the District of Columbia December 8, 2014 DC Power Market Area - Summary Single electric utility that has divested itself
Part 7.6: Glossary of Standard Operating Terms
NPCCGLOSSARY PUBLIC IMP_GOT_0002 Market Manual 7: System Operations Part 7.6: Glossary of Standard Operating Terms Issue 9.0 This document provides a glossary of terms with definitions used in the System
Mitchell Rothman. Mitchell Rothman. Current Position Mitchell Rothman is a Managing Consultant in Navigant Consulting s Toronto office.
Mitchell Rothman Mitchell Rothman Managing Consultant Navigant Consulting 2 Bloor Street West, Suite 2005 Toronto, Ontario M4W 3E2 Tel 647-288-5205 Fax 416-927-0541 [email protected] Education
Electricity Regulation In the US: A Guide
Electricity Regulation In the US: A Guide Electronic copies of this guide and other RAP publications can be found on our website at www.raponline.org. To be added to our distribution list, please send
Nodal Exchange Contract Specifications
Nodal Exchange Contract Specifications Monthly Day Ahead On-Peak Power Contract Specification Cash Settled Financial On-Peak Power. Financial On-Peak, [PJM/NYISO/MISO/MISO-RTO/ISO- NE/CAISO/ERCOT] [Nodal
Administrative Services for the PJM Interconnection Operating Agreement
PJM Manual 33: Administrative Services for the PJM Interconnection Operating Agreement Revision: 12 Effective Date: March 31, 2016 Prepared by Member Relations PJM 2016 PAGE iii lviii PJM 2008 Revision
How To Manage The Ercot Grid
US MEXICO Cross-border trade Joel Mickey Director, Market Design & Development NARUC Summer Meeting Dallas, Texas North American ISOs and RTOs Independent System Operators and Regional Transmission Organizations
THE FUTURE OF NUCLEAR POWER IN THE UNITED STAES. Richard A. Meserve Carnegie Institution 1530 P St., NW Washington, DC 20004 202-387-6404
THE FUTURE OF NUCLEAR POWER IN THE UNITED STAES Richard A. Meserve Carnegie Institution 1530 P St., NW Washington, DC 20004 202-387-6404 Outline Factors affecting domestic interest in nuclear power Challenges
LECET MARKET SUMMARY NATURAL GAS PIPELINE DEPLOYMENT
LECET MARKET SUMMARY NATURAL GAS PIPELINE DEPLOYMENT MARKET FUNDAMENTALS The market for the construction of natural gas pipelines continues to be strong and promises significant growth in the United States
Dr. A. D. (Dee) Patton. President and Principal Electrical Engineer
Dr. A. D. (Dee) Patton President and Principal Electrical Engineer Associated Power Analysts, Inc. Principal Electrical Engineer, Forensic Electrical Engineering Education, Licenses and Professional Associations
Wind Power and Electricity Markets
PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: [email protected] Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy
Generation and Transmission Interconnection Process
PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents