Sample RMP/PSM Filing And Document Control/Circulation Policy



Similar documents
On-Site Risk Management Audit Checklist for Program Level 3 Process

Environmental Compliance Management Services

WHITE PAPERS. Process Safety Management

Process Safety Management

IMPLEMENTATION OF PROCESS SAFETY MANAGEMENT (PSM) IN CAPITAL PROJECTS

Process Safety Management of Highly Hazardous & Explosive Chemicals. Management of Change

How To Improve Process Safety In Singapore

Owner-User Pressure Equipment Integrity Management Requirements

Process Safety Management Program

Process Safety Management Guide. 4th Edition

Acknowledgements. Process Safety Code Task Force 06. Faisal Malallah TF Leader EQUATE Petrochemical Co. Vijay Kumar Member EQUATE Petrochemical Co.

Powerful information management services and software for the oil, gas, and chemical industries

MODEL RISK MANAGEMENT PROGRAM AND PLAN FOR AMMONIA REFRIGERATION

Rx Whitepaper. Using an Asset Management Framework to Drive Process Safety Management and Mechanical Integrity

GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS

Process Safety Management Program

A Guide to the Legal Framework of the PSM Standard for Engineers

Ir. NOORAZMAN BIN SOUD. Deputy Director Petroleum Safety Division

Comments on and improvements for the following proposed Chemical Management System Guide are welcome. Please them to

Process Safety Audits and Inspections

OSHA s PSM Covered Chemical Facility National Emphasis Program. Jim Lay, PE OSHA Office of Chemical Process Safety

ANNEX 2 Emergency / Pollution Incident Response Plan

SAFETY ENVIRONMENTAL MANAGEMENT SYSTEM (SEMS) STANDARDS MANUAL TABLE OF CONTENTS

CAL/VPP EVALUATION Check list Revised 02/18/15. EMPLOYER: Contact:

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

KMS TM Operational Risk Management Solution

Documents, Records and Change Control

Environment of Care Hazardous Materials and Waste Management Plan

ASSE On-Site Seminar Course Selections

Process Safety Management Standard. 1st Edition

Process Safety Management of Highly Hazardous & Explosive Chemicals. Operating Procedures

SHE Standards. Safety, Health and Environmental Protection Standards

Guidance on Process Safety Performance Indicators

Internal Audit Checklist

Hobart and William Smith Colleges. Environmental, Health and Safety Program

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

U. S. Department of Energy Consolidated Audit Program Checklist 5 Laboratory Information Management Systems Electronic Data Management

LASER SAFETY MANUAL UNIVERSITY OF KENTUCKY POLICIES AND PROCEDURES FOR LASER USERS REVISED EDITION 2012 ISSUED BY

Business Continuity Management For Small to Medium-Sized Businesses

Process Safety Key Performance Indicators

The Importance of Safe Isolation of Plant and Equipment

OSHA Compliance Checklist ASC

OSHA SAFETY TRAINING TABLE for more information see

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

Sample Hazard Communication Program

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG Introduction

EPA RISK MANAGEMENT PROGRAM RULE TO IMPACT DISTRIBUTORS AND MANUFACTURERS

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

EMPLOYEE SAFETY TRAINING PROCEDURE

Programs Implementing Management System Elements AT&T Environment, Health and Safety Management System ISO EMS Element 4.1General 4.

How To Monitor Safety Management System Performance

Designing an Effective Risk Matrix

PITTSBURG TANK AND TOWER CO., INC.

USING INSTRUMENTED SYSTEMS FOR OVERPRESSURE PROTECTION. Dr. Angela E. Summers, PE. SIS-TECH Solutions, LLC Houston, TX

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

Disaster Recovery Plan Documentation for Agencies Instructions

Technology Recovery Plan Instructions

Contractor Safety Management Program Guidebook

This policy is not designed to use systems backup for the following purposes:

LOGISTICS FREIGHT FORWARDERS SUPPLEMENTAL APPLICATION

SECURITY VULNERABILITY CHECKLIST FOR ACADEMIC AND SMALL CHEMICAL LABORATORY FACILITIES

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

Control of legionella bacteria in water systems

Emergency Preparedness Guidelines

Table of Contents Introduction How to Use This Manual How to Do a Facility Audit

Contingency Plan Template. Hazardous Materials and Waste Management Division (303)

Australia Pacific LNG Project. Narrows Crossing Pipeline Environmental Management Plan Attachment 3 Crisis and Emergency Management Directive

POSITION DESCRIPTION. TITLE: Clinical Assistant CATEGORY: Classified FLSA STATUS: Non-Exempt GRADE: D

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS

Contingency Plan. Facility Name

Control of Major Accident Hazards

An inventory of hazardous materials used in your workplace will prove useful.

FAQ SHEET - LAYERS OF PROTECTION ANALYSIS (LOPA)

DIT HEALTH AND SAFETY OFFICE

Safety Management in Oil and Gas Exploration and Production. Lori Siegelman

PACKAGED FIRE TUBE BOILER

GEMI Survey. EHS Metrics and Processes. April Mark Hause GEMI Benchmark Chair

Traffic Management Plan

Title: OHS Risk Management Procedure

An Employer s Guide to Developing A Workplace Accident and Injury Reduction (AWAIR) Program

CPA DUE DILIGENCE CHECKLIST FOR THE SALE AND ACQUISITION OF A BUSINESS

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

Roles and Responsibilities of Plant Commissioning, Hydrocarbon Introduction and Acceptance Test Run

APPENDIX C EHS CONTRACTOR QUALIFICATION QUESTIONNAIRE

Release 1. BSBWHS508A Manage WHS hazards associated with plant

ISO 27002:2013 Version Change Summary

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

IMS-ST-1.04 Document and Record Management. Prepared By: Jacqueline Raynes Print Date: 20/08/13 Version No: V01 Reviewed By: Jeff Innes

The University of Texas at Dallas Texas Hazardous Communication Act Handbook

Transcription:

Sample RMP/PSM Filing And Document Control/Circulation Policy The plant shall maintain a separate RMP/PSM filing system Separate files will be maintained for each RMP/PSM element, with sub-files for each heading as listed below. 1. Employee Participation 1.1 Correspondence 1.2 Employee Participation Plan Excerpted from the PSM Manual 1.3 Employee Circulation Sheet A Listing of all employees at the site and a signature block for each. This document will be used to document that employees have been provided the opportunity to review key PSM information; i.e. completed audit reports are to have a copy of this sheet attached to their cover page, followed by circulation to employees. Employees will initial the sheet upon review of the document, prior to filing the document appropriately. 2. Process Safety Information 2.1 Correspondence 2.2 MSDS Sheets may be kept outside of this file, as long as the file contains a reference indicating location of the MSDS sheets 2.3 Inadvertent Mixing A compilation of the possible hazardous effects of inadvertently mixing chemicals kept on site. This file may be empty if there are no hazardous effects of inadvertent mixing, or if MSDS sheets contain this information. A note to either effect must be placed in this file 2.4* Process Flow Diagrams/Block Flow Diagrams 2.5 Process Chemistry 2.6 Maximum Intended Inventory of plant tanks 2.7 Safe Operating Limits for process control parameters 2.8 Deviation Consequences of operating outside of acceptable limits; note that information in files 2.7/2.8 may be combined, as long as there is appropriate reference as to the location of the information not kept separately in its file 2.9 Materials Of Construction this file may be blank, due to inclusion of such information on P & ID s and in equipment files. The file will contain at least a statement indicating where such data/information may be found 2.10 P & ID s a full set of all plant P & ID s 2.11 Electrical Classification An electrical classification drawing of the facility 2.12 Relief Systems The design bases and details of all relief systems. This file may be blank, due to location of this information in individual equipment files. The file will contain at least a statement indicating where such data/information may be found 2.13 Ventilation System Design This file may be blank if there are no ventilation systems in place. The file will contain at least a statement indicating such is the case for the facility in question 2.14 Design Codes/Standards A summary of the design codes and standards used for facility design. Information may be in summary form; i.e. storage tanks 102 and 103 were designed to API 650, piping per ANSI B31.3; pressure vessels 401 and 402 to ASME section VIII, etc.

2.15* Material/Energy Balances for all processes constructed after 27 May 1992. Note that file may be blank, as M & E information is normally included on PFD s. The file will contain at least a statement indicating whether or not an M & E is required according to the age of the plant, or where such data/information may be found if not stored in the file 2.16 Safety Systems A description of site safety systems to include interlocks, detection/suppression systems, etc. 2.17 Plot Plan A plan view drawing of the site highlighting significant/pertinent safety features, including egress routes, safety systems, etc. 3. Process Hazard Analysis 3.1 Correspondence 3.2 PHA Reports 3.3 PHA Action Item Reports Listings of action items and status reports 4. Operating Procedures 4.1 Correspondence 4.2 Standard Operating Procedures The step-by-step operating procedures for the site. This file may be blank, due to location of procedures elsewhere. The file will contain at least a statement indicating where such procedures may be found 5. Training 5.1 Correspondence 5.2* Master Exams Sub-jackets: Exams by process/type written, sketch 5.3* Master Exam Answer Keys Sub-jackets: Answer Keys by process/type written, sketch 5.4* Training Records Individual training records on each employee, including exam results 5.5 Training Materials Sub-jackets Key process equipment by process Sub-jackets Raw materials, intermediates, final products by process Sub-jackets Chemical hazards by process Sub-jackets Key operating variables and limits by process Sub-jackets Safety equipment systems/descriptions by process Sub-jackets Emergency systems descriptions by process 5.6 Employee Authorization Forms Sub-jacket Completed Authorization forms Sub-jacket Blank Authorization forms 5.7 Refresher Training Frequency List 5.8 Blank Performance Test Record Forms 6. Contractors 6.1 Correspondence 6.2 List Of Approved Contractors 6.3 Contractors Safety Briefing/Checklist 6.4 Contractor Injury/Illness Log 6.5 Individual Contractor Files By Contractor; Include:

Sub-jacket: OSHA 200 Log Sub-jacket: Completed Safety Briefing/Checklist and safety exam results Sub-jacket: Contractor bid/safety evaluation form Sub-jacket: Contractor safety compliance audit 6.6 Contractor Bid/Safety Evaluation Form 6.7 Contractor Safety Compliance Audit 7. Pre-Start-up Safety Review (PSSR) 7.1 Correspondence 7.2 PSSR Checklists/Form Blank 7.3 PSSR Checklist/Form Completed - PSSR Checklist/Forms can be kept with the associated Management of Change paperwork. The file will contain at least a statement indicating where the completed checklists can be found 8. Mechanical Integrity (MI) 8.1 Correspondence 8.2 MI Covered Process Areas 8.3 MI Procedures - This file may be blank, due to location of this information elsewhere. The file will contain at least a statement indicating where such procedures may be found 8.4 Frequency Requirements This file will contain a summary of covered equipment, the type of inspection/test required, the frequency of inspection/test required, and the basis for the frequency 8.5 Inspection/Test Results Sub-jacket: Monthly tests/reports: Monthly tank/vessel inspection Monthly Rotating Equipment Inspection Alarms/Sensors record outside the PSM filing system in our general plant safety system in the Monthly Safety Reporting Form Quarterly Relief Device Inspection Quarterly Controls/As Possible Interlock Inspection Sub-jacket: Infrequent/Special Inspection/test records For infrequent inspections Sub-jacket: Action Log this file will be used to document any corrective action taken as the result of an inspection/test 8.6 Equipment List a compiled listing of all active pressure vessels, storage tanks, and rotating equipment in service at the site and subject to inspection 8.7 Controls List a list of main controls subject to quarterly test 9. Hot Work Permits All Issued 9.1 Correspondence 9.2 Blank Permits 9.3 Completed Permits 10. Management Of Change (MOC) 10.1 Correspondence 10.2 Blank MOC Forms Sub-jacket: MOC Form

Sub-jacket: Minor Mechanical/Information/Set-point Only Checklist Sub-jacket: Engineering/Mechanical Checklist Sub-jacket: What If Safety Review Checklist 10.3 Completed MOC Forms 11. Incident Investigation (II) 11.1 Correspondence 11.2 Blank II Forms 11.3 Completed II Forms 11.4 Action Item Reports This file will contain all RMP/PSM incident reports 12. Emergency Planning And Response (ERP) 12.1 Correspondence 12.2 ERP this file will contain a hardcopy of the ERP, or a reference as to its location 12.3 Small Release Procedures a compilation of the small release containment/control procedures required as part of the plan; this file may be blank as long as it references the location of these procedures, usually found in the ERP. 13. Compliance Audits 13.1 Correspondence 13.2 Audit Reports 13.3 Action Item Reports This file will contain all tracking/status reports on any audit action items 14. Trade Secrets 14.1 Correspondence 14.2 Confidentiality Agreement Blank if any 14.3 Confidentiality Agreement Completed, if any This file will be used to hold signed confidentiality agreements, or a reference as to their location 15. Risk Management Plan Specific Information (RMP Binder) 15.1 Copy of the most current plan which includes: Registration Information Worst-case release scenario analysis Alternative release scenario analysis Off-site impacts including o Population o Environment 5 year Accident History Prevention Program Emergency Response information Executive Summary 15.2 Copy of any plan updates 15.3 Appendices of backup information Scenario descriptions, estimated quantity released, rate, duration Methodology used to determine distance to endpoint

Data used to estimate population and environmental receptors Coordination with local emergency responders 15.4 Management System Document identifying person or position with overall responsibility of the risk management program Document other persons responsible for implementing individual requirements of the risk management program Plant management will make appropriate use of the employee circulation sheet (file 1.4). This sheet will be attached to key RMP/PSM documents for circulation to employees, to assure their review of important PSM information. Most critical use will be with any MOC form, any PHA report, any audit report and any tracking/follow-up reports. Employees are to affix their signature to the circulation sheet upon their receipt/review of the appropriate document. Following circulation, the document, with the circulation sheet attached, will be retained in the appropriate file.