1 Appendix 2 Ageing Plant: Site Operator Self-Assessment Question Set 1. This appendix contains a question set to help operators assess compliance against Managing Ageing Plant: A Summary Guide. 2. In the question set, each high-level question is provided with benchmarks to indicate what would typically be expected to manage the issue. It should be noted that the way these arrangements or systems are developed, provided and implemented will vary greatly depending on the nature and ways of working of the operator, and the hazards, size and complexity of the plant being managed. 3. Some supplementary questions are also provided which address the key underlying issues relevant to each high-level question. 16 of 57 pages
2 Question 1. Plant and Equipment on Site What plant and equipment is involved at the site? Rationale: It is important to know what plant and equipment is present on site, how important it is to safety, and whether it may be subject to ageing mechanisms, so it can be managed effectively. There should be an asset register that lists important plant and equipment and its location. There should also be information on relevant hazardous fluids present within plant and equipment, together with their hazardous properties i.e. Material Safety Data Sheets (MSDSs). Most sites will have both computer and hard copy records containing this information but often it will be kept in different formats, and records may be fragmented. The format is not critical providing that information on hazardous fluids and the hazardous fluids operating envelope is easy to access and use. It is also important that the Asset Register is kept up-to-date and mirrored by accurate up-to-date process and instrumentation diagrams, P&IDs, and other plant or process documentation. The Asset Register should clearly identify all primary containment safety-critical mechanical equipment (tanks, vessels, pumps, piping etc) which if they failed could give rise to a major accident. There should also be a register of safety-related electrical, control and instrumentation and prevention/control/mitigation safeguards equipment for major hazard plant. There should be some form of prioritisation or risk ranking system within the asset register or maintenance management system to highlight safety-critical plant and equipment associated with major hazard plant. There should be arrangements for identifying and highlighting equipment found to be subject to significant ageing, either through inspection reports, written schemes of examination or integrity reviews, so these can be monitored and managed effectively. Do you have an Asset Register? How is the Asset Register kept up-to-date? Does it include electrical, control and instrumentation, EC&I, prevention, control and mitigation safeguards, and structures (this can be particularly important where the safety of the plant relies on instrumented protective systems e.g. Safety Integrity Level (SIL) 1 or higher rated systems)? Are safety-critical items highlighted together with all the relevant assets that comprise this, support it, or are necessary for it to function? Are items found to be suffering from ageing identified, highlighted and given specific attention e.g. in risk-based inspection, RBI, reports, inspection reports or written schemes of examination? 17 of 57 pages
3 Question 2. Plant and Equipment Exhibiting Signs of Ageing Are arrangements in place to identify and assess the condition of plant and equipment that may be showing signs of ageing, or which may be approaching or beyond its original design life or calculated remnant life, and to justify continued operation or down-rate/decommission this? Rationale: Plant and equipment exhibiting signs of ageing, such as corrosion, erosion, fatigue, creep, obsolescence, etc should be identified so it can be monitored/assessed to check it is still fit for purpose. If the deterioration is significant, then plant and equipment may have to be down-rated, removed from service, or other measures introduced so it can continue operation. Reviews of documented information about the plant, including reassessments of design in relation to operating history, is a useful way to identify the potential for ageing after a period of service. An appraisal of operations, maintenance, inspection, and test and repair records could reveal trends in ageing. There should be processes to identify plant that is either showing degradation or malfunctioning (e.g. inspection regimes or maintenance and test routines). Where plant is showing significant degradation or approaching its design life, there should be clear justification for continued operation. In the first instance, this may be based on a calculation of the remaining life. This process is described in published guidance on inspection and should be carried out by a competent person and recorded. Where calculated remnant life extends beyond design life, then there should be a formal mechanism for approving this life extension (most likely by a senior manager within the organisation). This applies wherever it is intended to use equipment beyond its originally specified design life. Where the remnant life calculation does not justify continued operation (for example where there is no remaining corrosion allowance), then a fitness for service assessment may be used, providing that it too is carried out to a recognised standard, by a competent person, recorded and approved. In all cases the methods for continued condition assessment and monitoring of such plant should be identified. Leading and lagging performance indicators should be set for monitoring the effectiveness of ageing plant controls. Leading indicators could include a cyclic environment, information that staff responsible for equipment on a day-to-day basis are competent and aware of the tell tale signs of ageing from plant performance. 18 of 57 pages
4 Lagging indicators could include repeated service problems and unplanned shutdowns, leakage, surface damage such as blistering or corrosion, or reductions in plant efficiency or lack of process stability. The latter could indicate pipe fouling or valve pump/seizure, or excessive vibration and movement. While fatigue (cycling), creep, cracking and corrosion are typical features of ageing they manifest themselves in different ways. Visible deterioration e.g. leakage, surface damage, blistering and corrosion are obvious enough but there are others that are equally revealing. Internal inspections/nondestructive testing, NDT techniques will show what is happening in places that cannot be seen and can measure rates of corrosion and other changes. The stability of the process is another indicator. Repeated service problems and unplanned shutdowns all provide useful information. It is unlikely that the plant was designed to do this and there must be a reason that could be age-related for these unplanned events and excursions. Where plant items are removed from service, there should be arrangements to ensure that they are managed and maintained so that they remain safe and do not present a hazard to people, the environment and or other equipment. Are there arrangements to identify plant and equipment that may be showing signs of ageing? Are there arrangements to identify plant and equipment approaching or beyond its original design life or calculated remnant life? How is their condition assessed and monitored? What leading and/or lagging indicators are used to indicate assets that may not be performing as required or showing signs of deterioration in their integrity or performance? Is the remnant life calculated for items showing significant degradation? Where remnant life calculation suggests an extension of service beyond design life, or the design life is approaching, are formal life extension studies conducted? Who is responsible for conducting plant life extension studies/justifications, etc? Who is responsible for approving the use of such equipment or plant and determining conditions for its continued use, e.g. setting the inspection/review periods, allowable service limits, etc? Are there arrangements in place to manage items removed from service? These still need to be managed and maintained to ensure they remain safe and do not present a hazard to people, the environment or other equipment. 19 of 57 pages
5 Question 3. Plant and Equipment Change Management How are changes to plant and equipment assessed and are ageing issues addressed as part of this? Rationale: new plant and equipment, changes to existing plant and equipment, or changes to the conditions under which they operate need to be identified and assessed. If these could detrimentally affect the integrity or performance, breach safe operating and design limits, introduce new ageing mechanisms or exacerbate deterioration due to existing ageing mechanisms, then suitable safeguards would need to be identified and provided to manage the situation. Some form of hazard studies (e.g. HAZOP) would be expected for new plant designs and modifications to assess the hazards and risks. There should be a formal change management system and procedures for plant changes to ensure these are identified, assessed and approved at the relevant level. A change approvals procedure should require specialist safety and mechanical engineering input/checks. A good change management system should also capture changes to safety-related control and instrument systems including software changes. There should be some mechanism for the changes approved by the change management system to result in an update of the asset register and to ensure drawings (P&IDs or process flow diagrams, PFDs) or plans are updated to show the changes. Are plant design reviews and hazard studies carried out for new plant and major modifications? Does the change management system address alterations, temporary changes, modifications and repairs to plant and equipment including EC&I (including software/control systems), safeguards, and structures? How do you check that changes proposed do not impact the original design basis/specification or the intended operating envelope of the process and plant or equipment? Are these changes recorded/logged, safety-assessed, and approved before the changes are implemented? Are specialists such as mechanical integrity, engineers, corrosion specialists, EC&I specialists and health/safety/environmental specialists consulted as part of the assessment and approvals process? Who can approve the changes and are they competent to do this? How are changes fed in to the asset register(s) to keep it up-to-date? How are plant drawings, data sheets, operating manuals, maintenance manuals and other key documents and procedures kept up-to-date with changes or new additions? 20 of 57 pages
6 Question 4. Managing the Integrity of Plant and Equipment Is there an Integrity Management System in place and who is responsible for managing the integrity of the plant at the site? Rationale: Asset integrity management is a significant task that needs to be properly managed. Over the years sites may have changed, organisation and management reorganised and duties reallocated. There has also been an increase in the use of independent bodies for the management of integrity. It is important to establish who has the responsibility onsite for managing the assets and what demarcation there may be between them and independent bodies or other bodies who have a role in asset integrity assurance. There should be a clearly defined Integrity Management System in place at the site covering policy, strategy, responsibilities and arrangements for the management of integrity of all major hazard assets. The maintenance, inspection and testing requirements set out in the Integrity Management System should be based on appropriate information, e.g. equipment supplier advised requirements, historically developed requirements, reliability or risk-based assessments, etc. Ownership of the process and clarity in the responsibilities should be clearly set out in the procedures or organisational arrangements. It should be clear who is responsible for the integrity of the plant, does this include the safeguards and EC&I equipment, if not are responsibilities clearly assigned for these? Uncertainty in responsibilities, or gap and overlaps may indicate a defective system. It should be clear who has the responsibility onsite and what the demarcation is between them and independent bodies or other parties who have a role in plant integrity assurance. Who is responsible for the maintenance management system (MMS), and keeping this up-to-date? Are there clear interfaces and no significant gaps/omissions between responsibilities for integrity e.g. if use third parties or contractors or if other companies/sections share assets on the site what do they cover, is this clear? Are there clear interfaces and allocation or responsibility for pipelines, vehicles, transportable containers or other transport features coming on to or leaving the site? Are all the assets/asset types covered, including EC&I (including software/control systems), safeguards, and structures? Are there good lines of communication between operators, maintenance technicians and managers covering inspection, testing, maintenance, and repair activities and requirements so that everyone is clear about their role and responsibilities and so issues can be quickly identified and resolved? How are the requirements for maintenance, testing and inspection set? Some testings, e.g. functional testing, may be conducted by operators. If so, is this logged in the MMS or some other system to plan and log the tests and record the findings? 21 of 57 pages
7 Question 5. Changes to the Integrity Management System How are changes to the asset management system assessed, controlled and communicated? Rationale: Over the years there are likely to be many changes to the asset integrity management systems, arrangements, and procedures as requirements, ideas and practices change. There may be changes to the inspection periods, the type and scope of testing, use of different inspection bodies, or a move to a risk based inspection method or changes to Written Schemes of Examination. These changes need to be controlled, assessed and recorded to ensure the systems continue to be fit for purpose and effective. Changes to the Integrity Management System could involve changes in methods and scope e.g. as a result of inspection findings (day-to-day changes) or more comprehensive changes to the system e.g. organisational changes or a move to a RBI based inspection strategy (strategic changes). The standard of assessment and authorisation would be different for more strategic changes. For day-to-day changes: Fitness-for-service assessment, repair and revalidation need to be supported by on-going schemes of examination that address the age and condition of the plant and equipment and the risk of failure. This process should be managed transparently. It should be clear who has the authority to revise and change written schemes of examination. It may be useful to check when the written schemes of examination were last revised to see both what was done and who on site was responsible for it, and who approved the change or revision. If the scheme(s) was (were) not changed in line with changes to the plant and equipment, then the extent, nature or frequencies of the inspection need to be reviewed and revised or the operator needs to justify why no change is needed. For more strategic changes: There should be evidence of assessments being carried out of the impact of recent organisational changes; did these check for implications for the integrity management systems, including the loss of key skills or knowledge needed to maintain integrity? There should be evidence of changes being communicated to the workforce and relevant contractors or other external bodies, or of training, so they are aware of new arrangements, responsibilities or standards/procedures/requirements. Changes to the integrity management systems should be identified, assessed, managed and approved through the change management systems. 22 of 57 pages
8 Do the change management systems address changes to: The organisation, responsibilities, persons and competence? Inspection, testing and maintenance procedures? Asset integrity or operational priorities? Change in examination, inspection or testing arrangements scope and frequencies? A move to a risk-based inspection regime(s)? A change in the competent body(s) or their scope of work? Changes in international, national, company and local codes, standards, practices or guidance? How do you ensure that key skills, knowledge and experience relevant to asset integrity management and ageing is not lost when people leave, retire, move to a new position in the company etc? Are the changes recorded/logged, assessed, and approved before the changes are implemented? 23 of 57 pages
9 Question 6. Resources Are integrity management resources monitored to ensure the required level of attention, focus, skills and knowledge are maintained? Rationale: Asset integrity management is a significant task that needs to be properly managed and resourced. Over the years sites may have changed, organisation and management reorganised, personnel changed and duties reallocated. There has also been an increase in the use of independent bodies for the management of integrity. It is important to establish that those with responsibility for managing the assets and undertaking the maintenance, testing, inspection, are suitably competent and that the overall allocation of resources is adequate to maintain the integrity, functionality and safety of the plant and equipment. Those responsible for managing and undertaking maintenance, testing and inspection should be competent for this. Someone with an engineering qualification would be expected to manage the maintenance, inspection and testing systems and arrangements. Technicians should also have suitable NVQ. SVQ or similar qualifications or experience or specific training to meet the company requirements. Supervision should be in place for those not yet assessed as fully competent, newcomers, or those in training. Some companies will have recruitment, training and development competence assessment systems in place. Important attention should be paid if a new inspection body or contractor for maintenance has been appointed, or where experienced staff are due to retire, or other organisational changes may be underway. Where key people are about to leave, arrangements to retain or plug gaps in skills and knowledge should be in place. Checks should be in place to confirm the competency of third parties involved in asset integrity management. These should include competence checks as part of the selection and monitoring processes for contractors. Inspection bodies should be registered and certificated as such, e.g. to BS EN ISO/IEC 17020:2004 and UKAS accreditation. The level of backlogs in the maintenance management systems may give an indication as to whether the overall levels of resources are suitable. This can be a particular issue if there has been recent downsizing of maintenance staff and managers in the company. Changes to resources or responsibilities should be identified, assessed, managed and approved through the change management systems 24 of 57 pages
10 Who is responsible for monitoring and maintaining the maintenance, inspection and testing programme and ensuring this is delivering the required performance? Are those responsible suitably qualified in terms of professional qualifications, experience and skills? How are contractors or other bodies involved in asset integrity management or inspection and testing activities selected, and how are they assessed for competency and managed/monitored to check they are working to the required scope and standards? How do you ensure you retain the skills and experience to maintain, test, (re-program?) and repair unusual, novel, old or obsolete plant and equipment (include EC&I systems and equipment) still in use on site? How are Maintenance Management System (MMS) backlogs monitored, priorities assigned and addressed? Are job/skills continually addressed when changing personnel or plant and equipment? How is the adequacy of overall resource levels assessed? Is the completion and close out of tasks and actions and MMS backlogs used as KPIs? 25 of 57 pages
11 Question 7. Awareness of Ageing Are those responsible for ensuring asset integrity aware of ageing mechanisms, and what plant and equipment may be particularly prone to this type of deterioration? Rationale: It is important that those responsible for managing the integrity of the assets and conducting maintenance, inspection and testing, are aware of the potential ageing mechanisms relevant to the assets on site, the conditions under which these can occur and the types of deterioration they can cause. This is a key issue if ageing issues are to be identified early and managed effectively. This is vital to making decisions about ageing plant. The decisions made here are only as good as the information available and the soundness of the process used to apply it. Those who are responsible for assessing the fitness for purpose of plant should be aware of its age, likely damage mechanisms, current condition, and rate of ageing and remaining life. Are key issues, signs or symptoms being communicated to operations or maintenance personnel so they are aware of what to be alert to as indicators of ageing plant? It is likely that only the largest and international multi-site operators will have fully developed formal systems. Smaller less complex sites should take a proportionate approach based on: asset management planning; periodic reporting on condition indicators; identification of key equipment performance indicators along with availability/reliability targets; comparative equipment performance reviews; reporting analysis of lost production, incidents, and failures; holding plant integrity review meetings; knowledge about industry codes and guidance through trade associations and standards bodies; and access to specialist skills and knowledge on ageing mechanisms and their management. Do those responsible for maintaining, testing and inspecting plant and equipment, and managing these activities, have an understanding of ageing issues? Are they aware of the key indicators to show that a plant is ageing? Are those responsible aware of current standards and guidance and are they applying these? Do they have access to mechanical engineers and corrosion/asset integrity specialists, electrical, control and instrumentation specialists, for specialist advice? Do they carry out reviews of the operational history to identify equipment that may have been subject to ageing-related deterioration, or prolonged service, or operated at or above its design limits? 26 of 57 pages
12 Question 8. Out-of-date or Obsolescent Plant and Equipment How is out-of-date or obsolescent plant and equipment, particularly EC&I equipment, identified and managed to ensure their integrity and performance (including equipment that may no longer be supported by the supplier or manufacturer)? Rationale: Some of the assets on site, including electrical, instrument and control systems may be very old, or essentially obsolete, or no longer supported by the manufacturer or supplier. This may not necessarily mean that they are no longer fit for purpose, but it could affect the ability to maintain, test and repair these items. There should be a list of equipment that is obsolete or no longer supported by the manufacturer/supplier. This may be indicated in the Asset Register and maintenance procedures. There may be special arrangements for repairing, maintaining or replacing such equipment, for example to have access to other suppliers of parts or to access software programmes with the right experience. A programme of replacement may be needed where equipment is approaching the end of its useful life and/or is obsolete or no longer supported by the manufacturer/supplier. Where EC&I equipment is to be replaced with modern digital equipment, this will need to be carried out in accordance with the requirements of IEC 61508/IEC (including change management). If the in-house specialist resources and competency in these key areas is not available, then consideration should be given to bring in specialist contractors to advise and assist. How is the condition of out-of-date or obsolescent plant and equipment identified? (This can be a particularly important issue for EC&I equipment and systems, which may also have a shorter design life than mechanical equipment.) How is equipment maintained, repaired and tested where there is difficulty in accessing detailed information on its design and maintenance requirements, difficulty in obtaining spares, or a lack of expertise/skills or knowledge, for example, to maintain, change/debug software etc? How do you access specialist skills or knowledge needed about these items? What is the replacement strategy for such plant and equipment? Where EC&I equipment is to be replaced with modern digital equipment, is the company aware of the requirements of IEC 61508/IEC 61511, and the implications of these, particularly regarding specialist resources and competency to deal with these? 27 of 57 pages
13 Question 9. Monitoring the Condition of Plant and Equipment How is the condition of plant and equipment monitored? Rationale: The asset integrity management system needs to include arrangements to check/assess the condition and performance of the assets on an ongoing basis to make sure they remain fit for purpose and to identify items needing non-routine maintenance, repair or replacement etc. Various methods can be used to monitor the condition of the assets depending on the circumstances. The information gathered is also important to allow the overall effectiveness of the asset integrity management system to be assessed and to identify areas for improvement. There should be an inspection and testing plan in place which shows what needs testing, and at what interval. This should also record the test/inspection dates and a summary of links to the conclusions (pass/fail). This plan should include all safety-critical equipment including prevention, control and mitigation safeguards and structural elements as well as the primary containment and motive equipment such as pumps, compressors, etc. Some form of documented scheme of examination should be in place for safety-critical equipment, especially where this is for major hazard plant. As a minimum, there should be formal records of all inspections of pressurised equipment and the testing of safety related devices such as SIL-rated instrumented safety systems, pressure relief valves etc. Pressure systems should have up-to-date written schemes of examination in place. The maintenance management system should also contain logs of remedial work or repairs undertaken. There should be a clear process to ensure that reviews of inspection reports and maintenance activity are carried out. As a minimum this should be undertaken by a competent engineer; more complex sites may employ a formal team-based site-wide review. There should also be a process for senior management review for key issues arising. There should be a process in place for identifying changes in codes, standards and practices relevant to integrity management and assessing the impact of these, including adapting plant, equipment or procedures as appropriate. There should be evidence of changes to the inspection and testing arrangements for equipment that has been found to be suffering unacceptable levels of deterioration. 28 of 57 pages
14 Are records kept of all maintenance, inspections, testing/proof testing, calibrations and repairs? [see Research Report 509 Plant ageing: Management of equipment containing hazardous fluids or pressure (4), Section 2.4 page 32]. Are all the assets/asset types covered, including EC&I (including software/control systems), safeguards, and structures? What methods are used to indicate trends or issues in the condition of the assets, e.g. regular reviews of data, use of key performance indicators (KPIs) benchmarking of performance etc? Are reviews conducted to assess the implications of revised/new codes and standards etc, and adapt plant, equipment or procedures where appropriate? Are regular integrity reviews conducted by suitably qualified persons to look for trends and issues, and are significant issues referred to and given attention by senior management? For more complex high hazard sites, might expect formal integrity reviews attended by senior management. Has plant or equipment been identified as ageing, and if so, how was this identified/discovered and what is being done to manage this? 29 of 57 pages
15 Question 10. Feedback, Review and Continuous Improvement How are the findings of inspections, tests, maintenance and repairs used to manage and improve the integrity of the assets? Rationale: It is important that information is gathered and used to allow the overall effectiveness of the asset integrity management system to be assessed and to identify areas for improvement. Useful data could be collected from a variety of sources, not just the inspections and test records. Integrity reviews should be carried out for equipment to assess the overall adequacy of the integrity assurance arrangements. The findings of the tests and inspections should be used to review performance and improve the arrangements and inspection/testing periods etc. Use leading and lagging key performance indicators (KPIs) to assess the integrity of the assets with objectives/targets set and reviewed annually for these KPIs. Plant and equipment approaching or past its design life or calculated remnant life should be identified and given specific attention in integrity/asset reviews. Lessons and trends from incident, accident and near miss reporting systems should also be being used to improve the asset management systems. Senior managers and plant/asset managers should be aware of the status of the assets and being involved in reviews or audits of the integrity management systems. Are integrity reviews conducted on a regular basis using information from the maintenance, testing and inspection systems and reports? Are key performance indicators (KPIs) set for reviewing the condition of the assets and the effectiveness of the maintenance, testing and inspection regimes? Are known problems, changes in inspection, testing or maintenance regimes or changes in priorities communicated to plant/asset managers and to staff and contract personnel involved in operations, maintenance and testing/inspection? How are lessons learned from incidents/accidents and near miss reports used to improve integrity management? Are there safety suggestion schemes, plant defect reporting schemes, to encourage personnel to report problems or observations or suggest ways to improve the systems and arrangements? Is this information from integrity reviews, KPIs, incidents, fed back to senior management? 30 of 57 pages
OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)
OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained
Examples of pressure systems and equipment are:
Pressure systems A brief guide to safety Introduction Pressure systems A brief guide to safety If pressure equipment fails in use, it can seriously injure or kill people nearby and cause serious damage
The anglo american Safety way. Safety Management System Standards
The anglo american Safety way Safety Management System Standards 2 The Anglo American Safety Way CONTENTS Introduction 04 Anglo American Safety Framework 05 Safety in anglo american 06 Monitoring and review
Integrity Management for the 21st century with 20th century equipment
Integrity Management for the 21st century with 20th century equipment Laza Krstin ABB Global Consulting Many of our assets in the process industries were built over 20 years ago and are still operating
Health and Safety Policy and Procedures
Health and Safety Policy and Procedures Health & Safety Policy & Procedures Contents s REVISION AND AMENDMENT RECORD : Summary of Change Whole Policy 4.0 05 Nov 08 Complete re-issue Whole Policy 4.1 10
Health and Safety Management Standards
Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...
Electrical Safety Policy
Electrical Safety Policy Version Number: V2 Name of originator/author: Director of Estates and Facilities Name of responsible committee: Estates and Facilities Committee Name of executive lead: Chief Operating
GUIDE. Evaluation of asset integrity management system (AIMS)
GUIDE Evaluation of asset integrity management system (AIMS) GUIDE Evaluation of asset integrity management system (AIMS) Reference The recommended reference for this publication is: Department of Mines
COMMISSION REGULATION (EU)
L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and
Key Programme 4 (KP4) Ageing and life extension
An interim report by the Offshore Division of HSE s Hazardous Installations Directorate November 2012 1 of 15 pages Contents Glossary 3 Summary 4 Introduction 5 KP4 inspection programme interim findings
HID Instruction: Assessment of Key Performance Indicators During Inspection/Investigation
HID Instruction: Assessment of Key Performance Indicators During Inspection/Investigation Open Government status Fully Open Target audience HID Inspectors Summary This instruction complements the HID Regulatory
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014)
AS/NZS 4801:2001 Safety Management Systems (SMS) Self-Assessment Checklist This document restates the requirements of AS/NZS 4801:2001 for Safety Management Systems (SMS) and has been developed to assist
Assured Joint Integrity
Assured Joint Integrity All leaks cost Loss of containment can have catastrophic results and negatively impact brand image, facilities, employees, and the environment. Unplanned shutdowns at hydrocarbon
ASTRAZENECA GLOBAL POLICY SAFETY, HEALTH AND ENVIRONMENT (SHE)
ASTRAZENECA GLOBAL POLICY SAFETY, HEALTH AND ENVIRONMENT (SHE) THIS POLICY SETS OUT HOW WE WILL MEET OUR COMMITMENT TO OPERATING OUR BUSINESS IN A WAY THAT PROTECTS PERSONAL HEALTH, WELLBEING AND SAFETY
Loss of Containment Manual
Loss of Containment Manual Introduction...3 Part 1 - Management of process integrity... 5 Part 2 - Small bore tubing and piping systems... 13 Part 3 - Information, instructions and training... 21 Part
Operations and Maintenance Procedures for Natural Gas Systems
Operations and Maintenance Procedures for Natural Gas Systems Contact Information John West Transportation Specialist U.S. Department of Transportation PHMSA Office of Training and Qualifications Office
Quality & Safety Manual
Purpose: This Quality & Safety Manual is intended to clarify and document the Quality and Health & Safety policies of GGS Oil and Gas Systems and to describe how the organization organizes its activities
Bawden Contracting Services Ltd Job Profile. Contracts Manager. Purpose of the Job
Contracts Manager Purpose of the Job As Contracts Manager you will manage all aspects of the Grounds Maintenance contracting business safely and efficiently, maximising profitability through the completion
Asset Integrity - Process Safety Management
Asset Integrity - Process Safety Management Commit to Process Safety Understand Hazards & Risks Manage Risk Learn from experience Process safety culture Compliance with standards Process safety competency
What is Functional Safety Management?
What is Functional Safety Management? This document gives a brief overview of what Functional Safety Management includes DISCLAIMER: Whilst every effort has been made to ensure the accuracy of the information
DNV GL Assessment Checklist ISO 9001:2015
DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction
CONTRACT RESEARCH REPORT. Best practice for risk based inspection as a part of plant integrity management HSE
HSE Health & Safety Executive Best practice for risk based inspection as a part of plant integrity management Prepared by TWI and Royal & SunAlliance Engineering for the Health and Safety Executive CONTRACT
KP3 Offshore maintenance management template. Communication between onshore support staff and offshore maintenance technicians
INSTALLATION DATE(S) INSPECTOR(S) Persons interviewed Position Offshore B Communication between onshore support staff and offshore maintenance technicians 1. Who are the technical authorities, discipline
BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL
130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical
Safety Integrity Level (SIL) Assessment as key element within the plant design
Safety Integrity Level (SIL) Assessment as key element within the plant design Tobias WALK ILF Consulting Engineers GmbH Germany Abstract Special attention has to be provide to safety instrumented functions
Health, Security, Safety and Environment (HSE)
Health, Security, Safety and Environment (HSE) Content: 1 Objective 2 Application and Scope 21 Application of HSE Directive with underlying documents 22 Scope of HSE Management system 3 Framework for our
On-Site Risk Management Audit Checklist for Program Level 3 Process
On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:
HSE information sheet Industrial radiography - managing radiation risks Ionising Radiation Protection Series No. 1(rev 1)
HSE information sheet Industrial radiography - managing radiation risks Ionising Radiation Protection Series No. 1(rev 1) Introduction This information sheet is for clients and main or principal contractors
Safety Management System. Compliance Checklist/Statement
Safety Management System Compliance Checklist/Statement. Version 1 Page 1 of 22 Organisation: Approval Signature: Position: Print Name: Date of signing: SMS Manual Revision: To be completed and signed
GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS
GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS Developed by: Ron Jarvis Andy Goddard Swiss Re, London Talbot Syndicate, London Contributions made by the London market engineers
Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization
Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context
NOS. Supply Chain Management Occupational Standards
NOS National Supply Chain Management Occupational Standards Contents Unit Supply Chain Management National Occupational Standards - Technical T1 Maintain operational relationships within the supply chain
CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems
Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: [email protected] CP14 ISSUE 5 DATED 1 st OCTOBER
A Risk Management Standard
A Risk Management Standard Introduction This Risk Management Standard is the result of work by a team drawn from the major risk management organisations in the UK, including the Institute of Risk management
Lifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.
LIFTING EQUIPMENT POLICY Background and Legislation The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) apply in all premises and work situations subject to the Health and Safety at Work,
EA-6/02 M: 2013. EA Guidelines on the Use of EN 45 011 and ISO/IEC 17021 for Certification to EN ISO 3834. Publication Reference PURPOSE
Publication Reference EA-6/02 M: 2013 EA Guidelines on the Use of EN 45 011 and ISO/IEC 17021 for Certification to PURPOSE EN ISO 3834 The purpose of this document is to provide the basis for the harmonisation
Safety Management Systems (SMS) guidance for organisations
Safety and Airspace Regulation Group Safety Management Systems (SMS) guidance for organisations CAP 795 Published by the Civil Aviation Authority, 2014 Civil Aviation Authority, CAA House, 45-59 Kingsway,
OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017
STRATEGIC CONTEXT OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017 1 This strategy sets out how HSE s Energy Division will regulate health and safety of the offshore oil and gas industry operating on the
Building façade maintenance
Building façade maintenance Legal liability and damage limitation A guide for building owners and occupiers What is a façade? The façade forms the external weatherproof envelope of a building. In modern
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM September 2011 OUR HEALTH, SAFETY AND ENVIRONMENT POLICY OUR PRINCIPLE OF DUE CARE We care about the wellbeing of our people and our impact on the environment.
Care service inspection report
Care service inspection report Full inspection 1st Homecare Ltd Housing Support Service Banchory Business Centre Burn O Bennie Road Banchory Inspection completed on 10 June 2016 Service provided by: 1st
Owner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
Record Keeping. Guide to the Standard for Professional Practice. 2013 College of Physiotherapists of Ontario
Record Keeping Guide to the Standard for Professional Practice 2013 College of Physiotherapists of Ontario March 7, 2013 Record Keeping Records tell a patient s story. The record should document for the
CER Audit and Inspection System. part of the Petroleum Safety Framework
CER Audit and Inspection System part of the Petroleum Safety Framework DOCUMENT TYPE: Consultation REFERENCE: CER/15/221 DATE PUBLISHED: 04 th September 2015 VERSION 1.0 The Commission for Energy Regulation,
INFORMATION SECURITY: UNDERSTANDING BS 7799. BS 7799 is the most influential, globally recognised standard for information security management.
FACTSHEET The essence of BS 7799 is that a sound Information Security Management System (ISMS) should be established within organisations. The purpose of this is to ensure that an organisation s information
How To Manage Health, Safety, Security And Environment
Health, Safety, Security and Environmental Management System Management Standards and take c&re of yourself, others and the environment Health, Safety, Security and Environment Policy E.ON Climate & Renewables
Preparation of a Rail Safety Management System Guideline
Preparation of a Rail Safety Management System Guideline Page 1 of 99 Version History Version No. Approved by Date approved Review date 1 By 20 January 2014 Guideline for Preparation of a Safety Management
Arrangements for the Maintenance and Testing of Laboratory Autoclaves
Arrangements for the Maintenance and Testing of Laboratory Autoclaves Royal Free NHS Trust & Royal Free and UC Medical School (Hampstead Campus) This document has been produced by the Safety Office, Royal
DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS
WELDING FABRICATOR CERTIFICATION SCHEME DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS 6 th Edition July 2012 Issued under the authority of the Governing Board for Certification All correspondence should
QUALITY MANAGEMENT POLICY & PROCEDURES
QUALITY MANAGEMENT POLICY & PROCEDURES Policy Statement Cotleigh Engineering Co. Limited specialises in the recruitment of engineering & technical personnel in the oil & energy, rail, civil engineering,
Delivering Excellence in Insurance Claims Handling
Delivering Excellence in Insurance Claims Handling Guide to Best Practice Delivering Excellence in Insurance Claims Handling Contents Page 1. Introduction 1 2. Executive Summary 2 3. Components of Best
AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?
1 Overview of Audit Process The flow chart below shows the overall process for auditors carrying out audits for IMS International. Stages within this process are detailed further in this document. Scheme
ESTATES MAINTENANCE POLICY (INCLUDING PLANNED PREVENTIVE MAINTENANCE)
ESTATES MAINTENANCE POLICY (INCLUDING PLANNED PREVENTIVE MAINTENANCE) Version Number 2 Version Date October 2013 Policy Owner Maintenance Manger Author Director of Estates and Facilities First approval
Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07
Performance Detailed Report Date Last saved: 12/10/2007 13:18:00 Property asset management Audit 2006/07 - Audit Commission descriptor to be inserted by Publishing- Document Control Author Filename Bob
Power presses: A summary of guidance on maintenance and thorough examination
Power presses: A summary of guidance on maintenance and thorough examination INTRODUCTION Power presses are dangerous machines which have caused many accidents over the years. The causes include poor maintenance
Health and Safety Policy Part 1 Policy and organisation
Health and Safety Policy Part 1 Policy and organisation ICO H&S Policy Policy and organisation, June 2014 Page 1 of 6 1. Scope 1.1 The Health and Safety policy applies to all employees of the Information
ISO 9001:2000 Gap Analysis Checklist
ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system
Jonathan Wilson. Sector Manager (Health & Safety)
Jonathan Wilson Sector Manager (Health & Safety) OHSAS 18001:2007 Making Life Easier For Health & Safety Managers Workshop Agenda 1. Introduction 2. Why Manage Health & Safety 3. OHSAS 18001 and OHSMS
Care service inspection report
Care service inspection report Full inspection SSCN Social Care Housing Support Service Suite 3, Floor 2 ELS House 555 Gorgie Road Edinburgh Inspection completed on 03 May 2016 Service provided by: Support
ISO 9001:2015 Internal Audit Checklist
Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence
Hertsmere Borough Council. Data Quality Strategy. December 2009 1
Hertsmere Borough Council Data Quality Strategy December 2009 1 INTRODUCTION Public services need reliable, accurate and timely information with which to manage services, inform users and account for performance.
JOINT INTEGRITY MANAGEMENT SOLUTIONS
JOINT INTEGRITY MANAGEMENT SOLUTIONS Joint Integrity Management Solutions Some 30 years after developing the technology behind hydraulic bolt tensioning, Hydratight continues to push the boundaries with
Achieve. Performance objectives
Achieve Performance objectives Performance objectives are benchmarks of effective performance that describe the types of work activities students and affiliates will be involved in as trainee accountants.
ISO 9001:2000 AUDIT CHECKLIST
ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality
Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process
CIPS takes the view that the outsourcing of services to specialist providers can often lead to better quality of services and increased value for money. Purchasing and supply management professionals should
Fire Protection Industry Scheme Reference SP205 Part 1
BAFE Scheme: SP205 Version 4(a): July 2015 Fire Protection Industry Scheme Reference SP205 Part 1 Life Safety Fire Risk Assessment BAFE (British Approvals for Fire Equipment) The Fire Service College,
ISO 20000-1:2005 Requirements Summary
Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service
Internal Audit Checklist
Internal Audit Checklist 4.2 Policy Verify required elements Verify management commitment Verify available to the public Verify implementation by tracing links back to policy statement Check review/revisions
Directory. Maintenance Engineering
2 / 17 INDEX 1.0 INTRODUCTION... 3 2.0 MAINTENANCE POLICY... 4 2.1 MAINTENANCE MISSION... 5 2.2 CRITICAL SUCCESS FACTORS AND KEY RESULT AREAS... 6 2.3 OBJECTIVES... 7 3.0 MAINTENANCE ENGINEERING SERVICES...
Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant
Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Safe management of industrial steam and
SMALL BUSINESS OH&S SELF APPRAISAL
SMALL BUSINESS OH&S SELF APPRAISAL This questionnaire is designed to help you judge whether your Occupational Health & Safety Management System (OHSMS) is ready for assessment. Completing this questionnaire
How To Monitor Safety Management System Performance
Guidance Note Performance standards and indicators Advice for operators of major hazard facilities on developing meaningful and useful performance standards and indicators for the Safety Management System
MANAGING THE RISKS OF CHANGE
MANAGING THE RISKS OF CHANGE Dr Andrew Brazier, Consultant www.andybrazier.co.uk [email protected] þ 44 7984 284642 The process industry has always had to deal with changes to plant and equipment,
ASSet InteGrIty MAnAGeMent PArtnerInG to AChIeve your InSPeCtIOn, engineering, data MAnAGeMent And SAfety GOAlS WWW.SGS.COM/AIM
asset integrity management Partnering to achieve your inspection, engineering, data management and safety goals WWW.SGS.COM/AIM ASSET INTEGRITY MANAGEMENT AIM An asset has integrity when it is operated
LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee
LIFT MANAGEMENT Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee This is a controlled document. It should not be altered in any way without the express permission of the author
WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES
WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties
Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system
Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Published in the Official State Gazette (BOE) number 270 of November
Enhanced calibration High quality services from your global instrumentation partner
Products Solutions Services Enhanced calibration High quality services from your global instrumentation partner Services 2 Calibration One trusted advisor Get the best to meet all your critical application
ANNEX 2 Emergency / Pollution Incident Response Plan
ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...
Safety Excellence Matrix
Safety Excellence Matrix 1 = Performance just meets minimum standards 2 = Performance is satisfactory got the basics 3 = Performance is good going beyond the norm 4 = Performance is very good best practice
Client information note Assessment process Management systems service outline
Client information note Assessment process Management systems service outline Overview The accreditation requirements define that there are four elements to the assessment process: assessment of the system
A competency framework for all prescribers updated draft for consultation
A competency framework for all prescribers updated draft for consultation Consultation closes 15 April 2016 Contents 1 Introduction... 3 2 Uses of the framework... 4 3 Scope of the competency framework...
HSE Management System Standard
Wood Group January 2012 HSE Management System Standard Energy Supporting Energy Contents Introduction 1 Our core Values 2 Scope 3 The system structure 4 Wood Group Health, Safety and Environmental policy
JOB DESCRIPTION. Manager Mechanical (Fleet, Workshop & Recycling)
JOB DESCRIPTION JOB TITLE: REPORTS TO: Manager Mechanical (Fleet, Workshop & Recycling) Director of Municipal Services PURPOSE OF THE JOB Organise, control, manage and develop staff and services of the
MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS
Health & Safety Services Unit name goes here Safety Code of Practice 46, Part 2 1st Edition, November 2009 MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS University of Reading 2015 Page 1 Contents
SEC. Specialist Engineering Contractors Group HEALTH AND SAFETY STRATEGY GROUP. www.secgroup.org.uk
Specialist Engineering Contractors Group HEALTH AND SAFETY www.secgroup.org.uk Message from the Group Chairman The Specialist Engineering Contractors Group ( Group) is the focal point for the sector s
The policy also aims to make clear the actions required when faced with evidence of work related stress.
STRESS MANAGEMENT POLICY 1.0 Introduction Stress related illness accounts for a significant proportion of sickness absence in workplaces in the UK. Stress can also be a contributing factor to a variety
Techniques for the evaluation of management systems. User manual
Techniques for the evaluation of management systems User manual Output Measures Process Measures Safety Management System Safety Culture Performance / Asset Management Customer Service System outputs Finance
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act
Information Governance Management Framework
Information Governance Management Framework Responsible Officer Author Business Planning & Resources Director Governance Manager Date effective from October 2015 Date last amended October 2015 Review date
Risk management systems of responsible entities
Attachment to CP 263: Draft regulatory guide REGULATORY GUIDE 000 Risk management systems of responsible entities July 2016 About this guide This guide is for Australian financial services (AFS) licensees
Guidance to Prevent Slips, Trips & Falls
Guidance to Prevent Slips, Trips & Falls Published June 2005 CONTENTS 1. Scope of this guidance 2. New plant/ installations 3. Maintenance 4. Housekeeping 1. Scope of this guidance Slips, trips and falls
HID Inspection Guide Offshore
HID Inspection Guide Offshore Inspection of Maintenance Management Contents Summary Introduction Action Background Organisation Targeting Resources Recording & Reporting Appendix 1: Asset Register Appendix
An Introduction to PRINCE2
Project Management Methodologies An Introduction to PRINCE2 Why use a Project Methodology and What Does PRINCE2 Enable? PRINCE - PRojects IN Controlled Environments - is a project management method covering
Relationship Manager (Banking) Assessment Plan
Relationship Manager (Banking) Assessment Plan ST0184/AP03 1. Introduction and Overview The Relationship Manager (Banking) is an apprenticeship that takes 3-4 years to complete and is at a Level 6. It
ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR
Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:
ISO 9001:2008 Quality Management System Requirements (Third Revision)
ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management