QUALITY SYSTEM DOCUMENTATION CONTROL



Similar documents
Departmental Policy Departmental Procedure Instructions/Forms. UCVM DIAGNOSTIC SERVICES UNIT Document Control Procedure

DOCUMENT CONTROL PROCEDURE

Title: COFL-FF-EP Control of Documents Procedure

Quality Procedure ISO 9001: 2008 Control of Documents

Quality Enhancement Unit Environmental Management System Module 6. Document Control

Document Control in an ISO Environment

This procedure applies to the following categories of documents:

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Standard Operating Procedure: EMS Document Control and Record Keeping

Document Control. White Paper By Galaxy Consulting. At Your Service Today Tomorrow We Appreciate The Privilege Of Serving You! Abstract.

Wan Bao Construction Limited. Environmental Procedure

HSE DOCUMENT CONTROL PROCEDURE

BEST PRACTICES FOR MANAGEMENT OF LOTUS NOTES RECORDS September 4, 2003

Quality Procedures and Work Instructions Manual

Document Control. DOWNLOADED AND/OR HARD COPY UNCONTROLLED Verify that this is the correct version before use.

Standard Operating Procedure

QUALITY OPERATING PROCEDURE QOP QUALITY ASSURANCE SYSTEM MANUAL

I. PURPOSE This SOP describes policies, procedures, and record keeping requirements for all documents subject to change control.

Table Of Contents. DOCUMENT CONTROL EHS-XX Page 1 of 7. Environment, Health & Safety

Procedure for Document Control and Management

Core Fittings C-Core and CD-Core Fittings

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

UNCONTROLLED COPY FOR REFERENCE ONLY

4.0 - QUALITY MANAGEMENT SYSTEMS

Using and Maintaining Documents and Records. Finding the information when you need it

IMS-ST-1.04 Document and Record Management. Prepared By: Jacqueline Raynes Print Date: 20/08/13 Version No: V01 Reviewed By: Jeff Innes

T: Records Management Made Simple.

REVISIONS LTR DESCRIPTION DATE APPROVED

OFFICE OF STATE HUMAN RESOURCES ADMINISTRATIVE SERVICES DIVISION PERSONNEL MANAGEMENT INFORMATION SYSTEM SECTION

State of Michigan Records Management Services. Frequently Asked Questions About E mail Retention

DRAFT Standard Operating Procedure for Long-Term Archiving of PM 2.5 Filters and Extracts

DATA Protection Act - A Review of Version 7

Document Management System Request for Proposals April 22, 2013

Archiving Study Documents

CONTROLLED DOCUMENT. Uncontrolled Copy. RDS014 Research Related Archiving. University Hospitals Birmingham NHS Foundation Trust

WHS DOCUMENT MANAGEMENT PROCEDURE

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

Information Security Policies. Version 6.1

TITLE: Quality System Manual DOCUMENT NUMBER: QMS

To establish a process to control all UON Health and Safety Management System Framework

ENVIRONMENTAL MANAGEMENT SYSTEM ISO-14001:2004 POLICY MANUAL

Centerwide System Level Procedure

Document Management Operations Audit Checklist

Example of a food company quality

Review of Document Imaging Railroad Unemployment Insurance Act Programs Report No , November 17, 2000

This policy is not designed to use systems backup for the following purposes:

Superconducting Magnet Division

City of Raleigh Public Utilities Department. Wastewater EMS Manual

Overview. Disasters are happening more frequently and Recovery is taking on a different perspective.

Presented by: Catherine Katsikis, LDCFL, Inc , NEMC August San Antonio, Texas

LTO4 Hardware Encryption Best Practices. By Vic Ludlam Distributed by Dynamic Solutions International

RECORD RETENTION & DESTRUCTION POLICY

RUTGERS POLICY. Section Title: Legacy UMDNJ policies associated with Information Technology

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

DOCUMENTED PROCEDURE MANUAL

LEHMAN COLLEGE: DEPARTMENTAL RETENTION SCHEDULE 8/7/2014 INFORMATION TECHNOLOGY (IT)

MUSC Information Security Policy Compliance Checklist for System Owners Instructions

GNB RSA Token Standards and Procedures

Purchasing Card (P-Card) JP Morgan Chase VISA. Procedure and Reference Manual

Design-Build Demonstration Program Volume IV Document Management Plan

Eclipsys Sunrise Clinical Manager Enterprise Electronic Medical Record (SCM) and Title 21 Code of Federal Regulations Part 11 (21CFR11)

Standard Operating Procedure for Archiving Essential Documentation relating to Clinical Trials of Investigational Medicinal Products (CTIMPs)

An Introduction to Document Control

COUNTY OF RIVERSIDE, CALIFORNIA BOARD OF SUPERVISORS POLICY. ELECTRONIC MEDIA AND USE POLICY A-50 1 of 9

How To Move From Iseries To Iseries Content Manager On A Microsoft Computer (For A Non-Profit)

Quality Assurance Manual. QAM-2013-Rev2

APX VCS Registry Operating Procedures. September 2012

Walton Centre. Document Control. Document History Date Version Author Changes 01/10/ A Cobain

Section 4, 5 Table of Contents Page 1 of 1 TABLE OF CONTENTS

Surgi Manufacturing Quality Manual

Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications Between the ISO and Local Control Centers

Authentication of Documents/Use of Professional Stamps

Information Security Policy September 2009 Newman University IT Services. Information Security Policy

How to prepare and transfer records for off-site storage (Guidance for departments)

MONROE COUNTY WATER AUTHORITY IDENTITY THEFT PREVENTION POLICY REVISED MARCH 2014

Life Cycle of Records

UNCONTROLLED DOCUMENT ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL UNCONTROLLED DOCUMENT

Human Resources Officer Job Description

Compliance Procedure

Document Control Program

Full Compliance Contents

DRAFT AUSTRALIAN PRIVACY PRINCIPLES GUIDELINES 6-11

Approved By: Agency Name Management

Information retention and disposal guide. Date: 31 October 2014 Version: 2.0

OPERATIONAL STANDARD

NABL NATIONAL ACCREDITATION

Credit and Debit Card Handling Policy Updated October 1, 2014

CUNY SCHOOL OF PROFESSIONAL STUDIES: DEPARTMENTAL RETENTION SCHEDULE 4/7/2014 OFFICE OF INFORMATION TECHNOLOGY

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc.

A Maturity Model for Enterprise Key Management. Lessons Learned

FORT KNOX. Environmental Management System Manual EMS-01 FORT KNOX. Environmental Management System Manual. Reference Number: Revision Date: 19MAY15

Practical and Effective Standard Operating Procedure Development

1. The records have been created, sent or received in connection with the compilation.

INTERNATIONAL SOS. Data Retention, Archiving and Destruction Policy. Version 1.07

LIVINGSTON COUNTY CREDIT CARD PROCEDURES

SharePoint User guide

Empower TM 2 Software

NYE COUNTY NUCLEAR WASTE REPOSITORY PROJECT OFFICE QUALITY ADMINISTRATIVE PROCEDURE SUPERSEDES: CONCURRENCE

Contingency Planning and Disaster Recovery Internal Control Questionnaire

Prospectus. Dominion Direct 11,000,000 Shares of Common Stock (Without Par Value) (NYSE: D)

Transcription:

PAGE : 1 of 1 TITLE: QUALITY SYSTEM DOCUMENTATION CONTROL 1.0 PURPOSE 1.1 This document is to ensure that quality system procedure; work instructions, SOPs, reference documents, forms, etc. have an easy to use and consistent format. 1.2 This document will outline the issuance control, define responsibilities for their maintenance and use, and correctly represent the quality system for all internal and external concerns. 2.0 REFERENCES 2.1 CWI-05-QAD-0001 Quality System Documentation Format 2.2 CWI-05-QAD-0002 Document Change Request (DCR) 2.3 CWI-05-QAD-0003 Document Distribution Form (DDF) 2.4 CWI-05-QAD-0004 Use of SOP s and Posted Materials 2.5 CWI-05-QAD-0005 Master Document Control List (MDCL) 2.6 CWI-16-QAD-0001 Quality Record Retention 3.0 RESPONSIBILITIES 3.1 The Plant Manager has responsibility for the overall site Quality System, to be overseen by the Quality Assurance Manager. 3.2 The ISO Coordinator has responsibility for the administration and maintenance of the site document control system. 3.3 Others as defined throughout this work procedure. 4.0 DOCUMENT CREATION, APPROVAL, AND CONTROL 4.1 All new or revised documents must pass through the document approval process known as the Document Change Request (DCR), CWI-05-QAD-0002. 4.2 The ISO Coordinator shall review all submitted documents for compliance to ISO standards, this procedure, CWI-05-QAD-0002, and CWI-05-QAD-0001, the Quality System Documentation Format.

PAGE : 2 of 2 4.3 Final approved documents shall be formatted and assigned a number or revision per CWI-05-QAD-0001. 4.4 Original copies are to be retained in a master file by the ISO Coordinator. 4.5 Originals from the master file shall be used to make controlled copies for use by all GNB Columbus personnel. 5.0 WORK INSTRUCTION MANUALS 5.1 Reference manuals (relevant to specific department) will contain: 5.1.1 Corporate Specification 5.1.2 Plant Work Instructions 5.2 The Department Manager/Engineer will be considered the Manual Holder and be responsible for the maintenance of manuals in their area. 5.3 The ISO Coordinator shall maintain a current manual distribution list. 5.4 Each manual will be numbered for reference and include an index of all documents contained in it. 5.5 Manuals that require multiple binders to hold the contents of the manual are to be labeled Book # of #. For example, if Manual 8.01 requires two binders; the binders are labeled 8.01 Book 1 of 2 and 8.02 Book 2 of 2. 6.0 DOCUMENT ISSUE 6.1 Controlled copies of Quality System documents are issued to Department Engineers, by referencing the Master Document Control List (MSDL), ensuring that each user has the latest of the document. 6.2 Distribution lists for official controlled copies of Quality System documents shall be determined by the Quality Assurance Manager and/or the ISO Coordinator. 6.3 These distribution lists shall be maintained using a document control database system so all relevant personnel can be properly notified of new or revised documents. 6.4 Distribution of controlled copies shall be by the ISO Coordinator and shall follow the Quality System Documentation Distribution, CWI-05-QAD-0003.

PAGE : 3 of 3 7.0 CONTROLLED COPIES 7.1 Manual holders shall be responsible for incorporating new or revised documents, and keeping their manuals updated and accessible. 7.2 Manual holders shall ensure that all obsolete and uncontrolled documents are removed from points of use. 7.3 The ISO Coordinator may update any department manual in lieu of the department Engineer. 8.0 UNCONTROLLED COPIES 8.1 Company personnel may make uncontrolled copies of documents for training, short-term use (less than 30 days), audits, or proposed revisions. 8.2 These copies are to be discarded after use. 8.3 Uncontrolled copies of Quality System documents, including the Work Instruction Manuals, may be issued to organizations, customers, consultants, and suppliers at the discretion of the Plant Manager or Quality Assurance Manager. 8.3.1 These copies are to be stamped "UNCONTROLLED COPY, CURRENT WHEN ISSUED". The recipient shall not receive subsequent revisions. 9.0 REVISIONS TO DOCUMENTS 9.1 All personnel are responsible for notifying the Supervisor, Engineer or Manager for their area if there is a need to update procedures whenever actual practices are permanently changed from documented procedures. 9.1.1 The primary responsible Supervisor/Engineer or Manager for the department affected is responsible for initiating a document change request (DCR), in accordance with CWI-05-QAD-0002, to ensure document changes are made. 9.2 The ISO Coordinator shall be responsible for issuing a CF-Q-27, Document Distribution Form (DDF), in accordance with CWI-05-QAD-0003. 9.3 The nature of changes within revised documents shall be clearly indicated in the last section REVISION CONTROL of each Work Instruction.

PAGE : 4 of 4 9.3.1 Details of the three latest revisions will be maintained in the current document. 9.4 Actual documents shall be maintained by retaining electronic copies of all old revisions. 10.0 WITHDRAWAL OF DOCUMENTS 10.1 It is the responsibility of all employees to destroy obsolete documents found in their work areas. 10.2 Current and approved documents shall appear by number on the index found in the front of each Manual and on the Master Document Control List (MDCL). 10.3 Removal of a document from the MDCL shall constitute permanent withdrawal of that document. 10.4 These documents shall be considered obsolete and removed from all work areas. Any obsolete document not destroyed shall be clearly stamped in red, "OBSOLETE DOCUMENT". 11.0 MASTER DOCUMENT CONTROL LIST 11.1 Follow procedure outlined in CWI-05-QAD-0005 to assist in the control and identification of current Columbus Quality System documents. 12.0 RECORD RETENTION 12.1 The Plant shall retain quality records for an appropriate time as determined by the QA Manager. 12.2 Record retention schedules and procedures are documented in the Record Retention Procedure, CWI-16-QAD-0001. 13.0 BACK UP OF ELECTRONICALLY STORED DOCUMENTATION 13.1 Documentation electronically stored by the Network Management Group shall be backed up using a tape backup process. 13.2 The monthly tape drive back-up shall be retained for 3 years.

PAGE : 5 of 5 14.0 USE OF SOP s and REFERENCE MATERIALS 14.1 SOP s are controlled summaries or highlights of work instructions, procedures, drawings, product specifications, or best process parameters. 14.2 The use of SOP s as posted material is authorized in accordance with CWI-05- QAD-0004. 14.3 A SOP log shall be maintained to assist in the control of all posted materials. 14.4 This log shall contain a document number, revision level, reference to parent document, and department location of document. 15.0 USE OF FORMS 15.1 Forms referencing or recording product data or process specifications, work practices, SOP s, etc are to be controlled as part of the document control system. 15.2 The ISO Coordinator will maintain a form log assist in the control of forms requiring document control. 15.3 The form log shall consist of a form number, form title/description, revision level and revision date. 15.4 Supervisor/Engineer is responsible for reviewing forms when adding, removing or modifying process equipment. 15.4.1 As part of the PM system, a semi-annual review is required. 15.5 Initiating or revision forms shall be done by: 15.5.1 Drafting or marking up current revision and turning it in to the ISO Coordinator 15.5.2 ISO Coordinator will create/edit the file and issues the form. 16.0 REVISION CONTROL 16.1 Revision C Format changes. Redefine responsibilities and all sections of this work instruction. 16.2 Revision D Remove sections 5.1.3 Plant SOPs, 5.1.4 Plant Forms and 5.1.5 Labels. Remove and revision from section 10.2. Clarify section 15.4

PAGE : 6 of 6 16.3 Revision E remove and initialed by the authorizing manager, the Plant Manager, or the QA Manager from 4.3. Delete 4.4 The authorizing manager is the manager of the department responsible for the procedure, see CWI-05-QAD- 0001. And 4.7 The QA Manager and the ISO Coordinator are the only personnel authorized to store the controlled copy paper. 16.4 Revision F Changed 1.1 from This document is to ensure that quality system procedure documents, forms, etc. have an easy to use and consistent format. Removed section 4.7. Changed 6.1 was Controlled copies of Quality System documents are issued to Department Engineers, by referencing the Master Document Control List (MSDL), as required to maintain the standards of quality, ensuring that each user has the latest issue and has received adequate training for use of the document.. Added 7.3 The ISO Coordinator may update any department manual in lieu of the department Engineer. Added (less than 30 days), to 8.1. Added 9.1.1. Add new sections 15.4 and 15.4.1.