SSP Offshore. Well Containment. April 2011

Similar documents
April 20, Two years later: the tragedy of the Deepwater Horizon oil spill

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions

A View from the (Deepwater) Horizon: Regulatory and Statutory Developments Affecting Offshore Drilling and. Spill Liability.

Deepwater Horizon Disaster

National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling. Report to the President.

Real-Time Monitoring & Offshore Safety. Background & BSEE Study John Cushing

OFFSHORE FIELD DEVELOPMENT

Subsea Standard & Rules What is Subsea?

Macondo: the disaster that changed the rules

Total Subsea Solutions

A DEEPER LOOK AT MODULARIZATION IN FACILITIES CONSTRUCTION. Stephen Whitfield Oil and Gas Facilities Staff Writer

The Dalian Developer A new approach to oil spill response

Department of the Interior

Single Point Mooring System (SPM) for an Offshore LNG Terminal

Oil Spill Response. Global Industry Response Group recommendations

137 Northpark Blvd. Telephone: (985) Covington, LA Fax: (985) Prepared Statement by. Thomas L. Shaw, President LOOP LLC

Florida Institute of Oceanography

Deepwater Horizon BP Well Blowout

Safe Offloading from Floating LNG Platforms (SAFE OFFLOAD) R. V. Ahilan Noble Denton Europe


This document, and more, is available for download from Martin's Marine Engineering Page -

C. WILTON TOWNSEND 8111 Teakwood Forest Dr., Spring Texas

PETROLEUM PRODUCTION MASTERCLASSES

36 th Annual Marine / Offshore Industry Outlook Conference - Houston, Texas March 28 th, Bollinger Shipyards, Inc

Deepwater Horizon Accident Investigation Report

Opportunities and challenges for global deepwater players

Offshore Structures. Offshore Drilling Equipment

Market Outlook on the Deepwater Subsea Sector. Marine Richard, Associate Analyst 6th February 2014

Kodiak Deepwater Project Challenges and Solutions

REDACTED VERSION DEEPWATER CHAMPION EMERGENCY RESPONSE MANUAL VOLUME 1 OF 2. Non Controlled

Dispersion of Oil released from the Deepwater Horizon MC 252 Oil Spill following Subsurface Injection of Corexit Kenneth Lee

Hurricanes and the Offshore oil and Natural Gas Industry

SWIMMER. An innovative Subsea Intervention System for Deep Offshore Fields. Jean-Jacques QUESNEL CYBERNETIX S.A. Oil&Gas Division

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico

Pandora FLNG Wison Offshore & Marine

New Generation of Deepwater BOP Stacks. Dominique Allegre CAMERON Paris, October 23rd 2013

North Carolina s Response to the Deep Water Horizon: What Obama s OCS Strategy Could Mean for Us. Carrie McMillan

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

OPERATIONAL LIMITATIONS DUE TO COMPLIANCE WITH THE JONES ACT

Extract from. Études et Dossiers No th Meeting of The Geneva Association s Amsterdam Circle of Chief Economists

MANAGING MAINTENANCE OPERATIONS IN THE OFFSHORE INDUSTRY

A ROAD MAP FOR GEOSPATIAL INFORMATION SYSTEM APPLICATIONS ON VBLOCK INFRASTRUCTURE PLATFORMS

13. FPSO Operational Problems Don Smith, OGP

DEEPWATER HORIZON. Summary report

Offshore Oil and Gas. Experience and Capabilities

The Offshore Oil and Gas Industry in the Gulf of Mexico Key Economic Characteristics of the Supply Chain

Depth-independent solution for Offshore Wind the WindFloat

Strategy. Øivind Tangen. Group Strategy Director September 19, SBM Offshore All rights reserved.

[Docket ID BSEE ; OMB Control Number ; 15XE1700DX. Information Collection Activities: Global Positioning Systems (GPS) for

Subsea Drilling Systems

ANALYSIS OF OIL SPILL TRENDS IN THE UNITED STATES AND WORLDWIDE

Marine integrity monitoring Offshore oil and gas

Baron Energy, Inc. Corporate Overview. October 1,

Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments

The role of technology and knowhow in the sector

Natural Resource Damage Assessment and Restoration

Subsea Market Review. Subsea 2011 February 9 10, Quest Offshore Resources, Inc. 1

In Situ Burning. The Oil Industry s Response. Copyright Oil Spill Response Limited.

Oil and Gas Steve Oliver

Cybersecurity in the Maritime Domain

Final Report on the Investigation of the Macondo Well Blowout Deepwater Horizon Study Group March 1, 2011

Deepwater Horizon Settlement Update

Part 4. The IXTOC-I Well Blowout: The Gulf of Mexico. Mexico, Contents Part 4. Geography of the Gulf of Mexico... 27

Offshore development benefits.

ne year after the catastrophic oil spill that resulted from the explosion of the Deepwater Horizon mobile offshore drilling unit, personnel from

Send your directly to

Help Shape the Future of Energy as an Engineer at Chevron

DELTA HOUSE PROJECT APPROVED; ARCLIGHT TO PROVIDE FINANCING. Covington, LA: December 13, LLOG Exploration Company,

STRATEGIC CONSULTING AND INDUSTRY ADVISORY SERVICES Due Diligence and Advisor to Lenders and Investors

Oil spill approaches Louisiana coast

SAFETY ENVIRONMENTAL MANAGEMENT SYSTEM (SEMS) STANDARDS MANUAL TABLE OF CONTENTS

Simulate an Oil Spill Cleanup

Texas Universities Recover from Hurricane Ike University of Texas Medical Branch Galveston and Texas A&M University Galveston

The Shifting & Allocation of Risks

Safety, Efficiency, and Productivity: Conflict or Cooperative? The BP Deepwater Horizon Accident Personal Observations

Oil spill risk assessment and response planning for offshore installations

LNG SAFETY MYTHS and LEGENDS

Platform Technologies for Offshore Renewable Energy Conversion Diego Vannucci, RINA

Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters

Deepwater Horizon Oil Spill Phase I Early Restoration Plan and Environmental Assessment

Transcription:

SSP Offshore Well Containment April 2011

Well Containment - Points to Discuss 2 Lessons Learned in the Aftermath of the Deepwater Horizon Incident The Containment Solutions : Interim MWCS and the MCV solution Limitations of Current Initiatives SSP - a Long Term Solution that s US designed and built Q&A

Worst Oil Spill in the GoM to date.. 3 Source: Public Domain

Deepwater Horizon the Aftermath 4 Reorganization of the former Minerals Management Service (MMS), into the Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE). Establishment of a Restoration Plan to address long term recovery and restoration efforts in the GoM. Creation of the Marine Well Containment Company by Chevron, ConocoPhillips, ExxonMobil and Shell to address future well containment needs. Report by the National Commission on the BP Deepwater Horizon Oil Spill The American Petroleum Institute (API) formally endorsed the industry s steps to create a Center for Offshore Safety. 2011:SSP Solution 4/ 2010 Deepwater Horizon Incident 7/ 2010 Creation of Marine Well Containment Company 2/ 2011 Completion of Spill Containment System BoD 2/ 2011 Helix presents Containment System 3/ 2011 API Approves Industry Center for Offshore Safety MMS BOEMRE GoM Restoration Plan

Interim Solutions 5 Interim Response, prior to MWCS readinesss, capabilities are handled by the Interim Containment Response System.such as Mobile Offshore Drilling Units, Early Well Test Vessels and Oil Spill Response vessels. The MWCS will provide the equipment required to connect these vessels Source: MWCS Project Design Basis Interim Solutions include existing marine and SURF equipment used (or designed to be used) on the Macondo Well which are therefore available for use at this time.

The Marine Well Containment System and Helix 6 MWCS Available 2012 Fully operational in weeks 2 x MCV s with capacity of 50,000 stbpd throughout each Deepwater functionality (up to 10,000ft) 10 year storm maximum on station capabilities MARINE WELL CONTAINMENT SYSTEM HELIX SYSTEM HELIX Available NOW Fully operational in weeks Capacity of 45,000 stlpd throughput WD up to 8,000ft Includes a 15kpsi single ram capping stack & dispersant injection capability Requires 2 vessels: one producer + one multiservice vessel. MCV s built in Japan Delivery 2011 2 x MCV s with 700,000 stb storage capacity each Quick Containment Solutions Built overseas Storage of 55,000 stb liquids Source: Public Domain

Limitations of the Current Spill Initiatives 7 According to the December 2010 National Commission of the BP Deepwater Horizon Oil Spill Report : The systems are not designed to contain all possible catastrophic failures. The current systems would not be able to contain a spill of the type that occurred in the GoM in 1979 during the Ixtoc oil spill. No planned capabilities to go past 10,000ft. These systems are not structured to ensure the longterm ability to innovate and adapt over time to the next frontiers and technologies. Source: National Commission of the BP Deepwater Horizon Spill Report, Dec 2010, Section 8, p. 244.

The SSP Solution Well Test and Early Production 8 The Stabilized Service Platform (SSP) is a hybrid floating production unit with capabilities that go above and beyond any other type of unit available today. An SSP320 Plus can accommodate drilling equipment, dry-tree s, SCR s, 150,000 bopd process and up to 2.0 mmstb oil storage. It has motions comparable to a SPAR and tank test results demonstrate an ability to survive a 1000 yr (Hurricane) storm. As a shared Early Production Unit in the GoM it can enhance reservoir perfomance and be available for IMMEDIATE use as a Well Containment Vessel. No turret needed and direct offloading to shuttle tankers. MWCC and its participating members have access to an adaptable, multifunctional unit that can handle deep water oil spill emergencies Immediately.

MWCS complemented with an SSP Solution 9 Fully operational in weeks 2 x MCV s with capacity of 50,000 stbpd throughout each Deepwater functionality (up to 10,000ft) MWCS - 10 year storm (maximum on station capabilities) MARINE WELL CONTAINMENT SYSTEM SSP Fully operational in DAYS 150,000 stbpd in ONE vessel Feasible for deep and ultra deep waters (> 15,000ft) Capable of handing wide range of well designs and equipment Can accommodate risers, drilling, offloading and production Built Overseas Can be built in the USA Made in America 1.5 mmstb storage (combined 3 vessels) SSP - 1000 year storm (hurricane) on station capabilities Can store 2 mmstb

The SSP Solution a Shared Facility 10 Drilling or Workover Designed, Built and Operated in the US waters - American Technology Process Storage SSP floater deployed in the GoM as a shared facility servicing E&P companies (as required) means: NO idle time sitting in port waiting to be used NO re-shuffling of emergency vessels from other countries for clean-up US Designed, Built and Manned Copyright SSP Offshore Inc. All Rights Reserved December 2010

The SSP Solution - MADE IN THE USA 11 SSP build does not require a dry dock. Can be fabricated on the Texas / Louisiana coast = employment and money back into the communities most affected by the Deepwater Horizon incident. Political WIN-WIN scenario: MADE IN AMERICA - jobs and revenue for the Gulf. Copyright SSP Offshore Inc. All Rights Reserved December 2010

The SSP Solution = NO Idle Time 14 The incident rate is low, the financial burden, enormous Therefore Asset costs can be effectively amortized among industry participants in times of nonemergency 100% Early Production Capability Proving reservoir performance and well deliverability as extended welltest unit in various locations outside pipelines infrastructure. Cost-Sharing SSP utilization costs may be shared among participant E&P stakeholders based on long-term, FRAME AGREEMENT day rates. Capture and Sale of Early Production SSP can offload oil produced during testing to US shuttle tankers 99% 99% 99% Established Frame Agreement Containment System and deepwater emergency response unit 1%

How does the SSP Compare? NPV 3 OPEX 2 15 CAPEX 1 2MMbbls Storage = Size of VLCC Utilization cost may be balanced by drilling and early production activity Station keeping capabilities: -Full DP Class #3 -DP Assist -Conventional Mooring System = Competitive CAPEX Will be able to contain a surface spill Well Intervention capabilities SPAR Like Motions Able to stay on location in post-katrina hurricane conditions = Significant Savings SSP technology can improve well / reservoir knowledge Can be built in the GoM = JOBS in Louisiana and Texas The Unit can be shared among Operators = WIN-WIN Scenario for GoM

Ability to contain all kinds of oil spills 16 Current Containment Systems Surface oil spill containment Current Capacity of Helix and MWCC Capture Vessel: 45,000 ~ 60,000bpd All functions of drilling unit and storage of VLCC Limited intervention landing systems = Difficult positioning Weather Sensitive Spills due to BOP failures Courtesy of the Marine Well Containment Company LLC Deep and Ultra Deep Waters

17 17 17 10370 Richmond Avenue, Suite 1200 Houston, TX 77042 Ph: 713-461-0044 www.sspoffshore.com Copyright SSP Offshore Inc. All Rights Reserved December 2010