<Your> Yacht Club. Oil Spill Response Plan



Similar documents
Spill Prevention, Control and Countermeasure (SPCC) Training

OIL POLLUTION REPONSE POLICY

FUELING AND FUEL STORAGE

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

MARINA ENVIRONMENTAL MANAGEMENT POLICY

OIL. Booming. Objective: 1. To prevent oil from contacting resources at risk 2. To facilitate oil removal.

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans

CONTAINMENT BOOM OBJECTIVE & STRATEGY TACTIC DESCRIPTION. Mechanical Recovery Containment and Recovery

Civil Engineering Sector Labour-Management Health and Safety Committee

SEAPRO has both foam filled flotation boom and inflatable boom systems.

How To Prevent Over Water Activities

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

skirt Appendix A Mechanical Containment and Cleanup Technologies Containment Booms

History of the SPCC Rule

Spill Prevention, Control and Countermeasure (SPCC) Rule

12. Hall of Fame Marina

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

Waste Oil Collection / Storage

Preventing and Responding to a Fuel or Oil Spill. Recommended Practices

APPENDIX 7-B. Hazardous Materials Management Plan

Spill Clean-up. Flammable Liquids Liquids with flash points below 100 degrees Fahrenheit.

Section Operations Section Organizational Guidance

Company Name Chemical Spill Prevention & Clean-up Procedures Program. Last Revised On 00/00/0000

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

VEHICLE SERVICE FACILITIES. Best Management Practices

Flammable and Combustible Liquids. Slide 1 (of 23)

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003

SPILL PREVENTION PLAN

Oil Spill Response Methods

PORT OF CASCADE LOCKS MARINA MOORAGE RULES AND REGULATIONS

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Sample Written Program. For. Flammable Liquids

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

How To Safely Handle A Spill

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN

OIL CONTAINMENT AND SPILL MITIGATION M-04 ISSUE: F SEPTEMBER 2001

Notes. Material 1. Appropriate Flammable Liquids

UNIVERSITY OF WISCONSIN MADISON

Stormwater BMPs: Secondary Containment and Spill Control. September 2012

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

Pollution Incident Response Management Plan

Oil Spill Cleanup. Activity at a glance. Objectives. Materials. Background Information. GRADES 6-8 Time: 10 mins for prep; 1-2 hrs.

THE EFFECTS OF CLEANING OIL SPILLS

BP WIND ENERGY POLICIES AND PROCEDURES

Spill Prevention, Control, and Countermeasures (SPCC) Course Material

Container Management for Hazardous Waste Generators Technical Guidance Document HW-2005-G1

TRAINING SPCC/SWPP Training UGA. Automotive Center. Campus Transit

OREGON FIRE CODE Interpretations and Technical Advisories

National Transportation Safety Board

OSHA Office of Training and Education 1

POLLUTION PREVENTION FACT SHEET: AUTOMOBILE MAINTENANCE

Above Ground Liquid Storage Solutions

Archived. Gloves should be changed frequently during the analysis.

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

Title: Aircraft Parking

Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).

APPENDIX G Materials Storage and Handling Guidelines

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

Spill Prevention, Control & Cleanup SC-11

Managing Floor Drains and Flammable Traps

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Fuel Storage Who to ask: tank farm owners/operators

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN SLUG CONTROL PLAN

BODILY FLUID CLEAN UP PROCEDURES

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

The potential to adversely affect human

ADMINISTRATIVE SERVICES MANUAL

ALL YOU NEED TO KNOW...

Spill Control Prevention Plan (SCPP)

FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN

HAZARDOUS WASTE SATELLITE ACCUMULATION MANAGER RESPONSIBILITIES

Oil Spill Cleanup Lab

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

SPILLS & SPILL KITS. Spills -General Guidelines:

MARINE SUPPLY SOLUTIONS

Shark River Municipal Marina 149 South Riverside Drive Neptune, NJ (732)

BEST MANAGEMENT PRACTICES FOR LEAK AND SPILL CONTROL

Waste Handling & Disposal

Spill Response Procedures & Sorbent Materials

WHY A FATS, OILS AND GREASE PROGRAM. Employee Food Service Establishment Information Sheet INTRODUCTION

U.S. EPA Office of Solid Waste and Emergency Response

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Appendix J IBC Biohazard Spill Management Plan

Seaborn Marina, Inc. 87 Ocean Ave Bay Shore, NY (P) (F)

Environmental Standard Operating Procedure Originating Office: MCAS Miramar Environmental Management Department

Chemical Storage and Spill Response Guidelines

Minnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

FOG PRETREATMENT INFORMATION. New London Public Utilities F.O.G. Program 120 Broad Street New London, CT 06320

Chemotherapy Spill Response:

Chapter 5: Spills Response

Pollution Response RESPONDING TO AN OIL SPILL

Transcription:

Oil Spill Response Plan EMERGENCY RESPONSE ACTION Reaction * Identify the source of the spill if possible. * Attempt to secure the source of the spill. * Make a preliminary assessment as to what the spill material is and approximately how much has entered the waterway. This information will dictate what equipment needs to be deployed. * Advise the facility manager or spill response manager if necessary. Reporting * U.S. Coast Guard: 1-800-424-8802 * Wisconsin EPA: 1-800-943-0003 (24 hrs) All spills that result in a slick or a sheen on the water require that the Coast Guard and state department of environmental protection be contacted and provided with pertinent information. Note: All fuel spills, no matter how small must be reported to the U.S. Coast Guard. Response Gasoline spill: If the spill is small (5 gallons or less): *Allow natural weathering to reduce and eliminate the spill. * Do not allow smoking during any spill. * Do not contain or collect gasoline - confined gasoline may create a risk of explosion or fire. For larger spills (more than 5 gallons): * Implement the reporting requirements. * Secure all electricity. * Make sure everyone is away from the affected area. * Do not allow anyone to enter the affected area. * Use water hoses to wash the spill away to protect docks and boats. * Contact the <Your> Fire Department: 1210 Main St, <Your-City> and the harbormaster.

Response Oil Spill Response Plan - page 2 Other oil spills (crude and refined residual oils, diesel fuel, and kerosene): PERSONNEL Spill Manager * Contain the oil spill using a curtain boom to prevent spreading. When possible, completely surround the source. * If the oil was spilled in an upland area, use an absorbent boom and pads to contain the material and prevent it from entering the waterbody. * If more oil than can be contained by the boom was spilled, contact: <Your Rep>. for additional spill equipment. * Once the spill is contained, use absorbent material to collect the oil. Absorbent pads can be placed within the boomed area, retrieved, wrung out, and placed back in the boomed area. <Your Manager> Qualified Spill Containment Staff Staff: <Your qualified staff members> Marina Spokesperson: <Your Spokesperson> Contact for Additional Assistance List professional oil spill service here, contact name, this needs prior arrangements with service to be made. This service should be requested only by the facility manager, or spill response manager. THREATS Maximum Threat(s) Overfilling of gasoline during fueling, creating an explosion hazard: them most common spill occurrence will result from overfilling of gasoline fuel tanks at the fueling dock. Gasoline, because of it s flammability, is the greatest threat. * Vessel Spill Under a worst-case scenario, the largest on-board fuel tank is aboard a 33-foot powerboat that carries approximately 200 gallons of gasoline fuel and 3 gallons of crankcase oil. This would pose a maximum threat if this vessel was to sink within the marina perimeter. * Spill from fuel storage tank or connections to pumping station On-site there is a 3000 gallon above ground storage tank that is connected to the fuel pumping station by a series of flexible and rigid hoses. A fuel spill could result from the failure of one of the connections. A spill could also result when the fuel tank is being filled. This tank is located within a containment tank. What spill response does the Co-op provide for the tank? In Writing?

Oil Spill Response Plan - page 3 THREATS Minimum Threats Spill from waste oil receptacles: There are no waste oil receptacles at <Your> Yacht Club. Engine and drive oil is collected in closed containers by the individual boat owners and immediately removed from the site. SPILL RESPONSE EQUIPMENT Available On-site Resources * 150-foot harbor curtain boom (3 times the length of the longest vessel that would visit OYC. Operational characteristics: Deflects and contains oil in the water. Curtain boom is susceptible to wind, waves, and current. These factors could cause oil to escape over the top and under the bottom of the boom. OYC is in a sheltered location with minimum current. Deployment: Can be attached to a fixed structure or anchors. Place downstream of the oil spill. If surface current is moving greater than 0.7 knot, the boom will not contain oil acting at a right angle to it. The boom angle will need to be adjusted to decreasing angles as the speed of the current increases. Disposal: The boom, if maintained properly, can be used multiple times. The average life span of the boom is approximately 5 to 10 years, depending on the use it receives. Maintenance: Rinse thoroughly with fresh water. Be sure to collect with absorbents any remaining oil on the boom. Store out of sunlight in a manner that allows quick deployment. * 80 feet of 5-inch absorbent boom. Operational characteristics: Boom has little inherent strength and might require extra flotation to keep it from sinking when laden with oil. * 100 individual absorbent pads (3/8 in. x 18 in. x 18 in.) Operational characteristics: Use absorbents in low current velocity situations. Deployment: Place absorbents on spilled oil. Recovery efficiency decreases rapidly once outer layer is oil soaked. Disposal: May be wrung out and reused. (See manufacturer s specifications.) At the end of it s useful life, wring out and store in a sealed container. The container will be disposed of by a contracted waste hauler. Maintenance: When possible, wring out and dry after use. (See manufacturer s specifications.) Otherwise, material is to be disposed of properly. * Misc. equipment: (Used for handling Spill Response Equipment) * Empty drum with lid for storage of collected oil. Empty container with lid for used absorbents. * Gloves. * Pitchfork and rake. * Two anchors. * Mooring lines. * Standard mop of laundry wringer.

SPILL RESPONSE EQUIPMENT Location <Your> Yacht Club Oil Spill Response Plan - page 4 The spill response equipment is located in the spill response shed. This shed is located between the Clubhouse and the fuel pump. During normal operations the shed will be unlocked. The fueling attendant will have a key for the shed lock on the master fueling ring along with the key to the fuel pump. Additional Resources NOTES If the rapid deployment of additional resources is necessary, we have secured permission to use all equipment available from the boating members. Many have spill supplies onboard their vessels. (any other local sources?) The Co-op should have a written response plan if their equipment fails. Do not use dispersants on oil/fuel spills. Dispersants include products manufactured specifically for that purpose and more common products such as detergent. Using them simply forces the oil into the water column, where it might be even more harmful. Dispersants may be used only with the approval of the Coast Guard federal on-scene coordinator. On the downstream side of the marina are private homes that should be protected from a large oil spill. A floating oil boom should be used to deflect spilled oil away from this area. This response plan will be tested twice per year, with at least one test occurring at the beginning of the boating season. All of the spill response equipment will be inspected at the time of the tests. EMERGENCY PHONE LIST: United States Coast Guard 1-800-424-8802 State Department of Environmental Management 1-800-943-003 Local Harbormaster (Contact s number) 1-715-xxx-xxxx Local Fire Department 1-715-xxx-xxxx (911) Local Police Department 1-715-xxx-xxxx (911)

Staff Readiness Drills Oil Spill Response Plan - Records Date Drill Simulation Participating Members Supervisor Spill Containment Equipment Inspection Form Date Inspector Equipment Condition