PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE



Similar documents
STATE BANK OF INDIA.

BOQ for Plumbing, Sanitary Works

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

SUMMARY (PLUMBING WORKS)

Toilet Plumbing. Here is a selection of different types of W.Cs and urinals. Can you match the pictures to the names below?

Tender schedule. Rate in

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines)

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions

CHAPTER NO. 27 QUANTITIES OF MATERIALS

ESTIMATE (CIVIL) BASED ON DSR 2013 NAME OF THE WORK :- A.R.M. CIVIL WORK OF E.S.I.C. SRO BUILDING AND RESIDENTIAL QUARTERS FOR THE YEAR

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT

By K M Chanda, HUDCO

Chapter. Restoration of Damaged Structures

- From the Makers of India s Finest Designer Homes

LAYING BLOCK AND BRICK

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Borges Construction Company A limited liability Corporation Page1 of 1

SECTION STORM DRAIN SYSTEM

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

Retail Price List 2015

CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA.

Saferand easierinstallation

HOUSE BUILDING DIGEST

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

SECTION STORM DRAINAGE SYSTEM

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

CUBICLE SYSTEMS LTD. CI/SfB 74 X IPS. Pre-plumbed Wall Duct Access Panel System

SECTION STORM DRAINAGE TABLE OF CONTENTS

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

CHAPTER 11 STORM DRAINAGE

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

plumbing products guide

Guide to working on Public Sewers

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

Division 2 Section Section 02795

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

LS 2540 SEWER LATERALS AND INSPECTION TEES

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc

NATIONAL INSTITUTE OF BIOLOGICALS

8.7 Schluter -KERDI-LINE

12.1 Schlüter -KERDI-BOARD

Section 402. STORM SEWERS

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

Schedule of Quantities

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

What Causes Foundation Leaking?

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

USER GUIDE Easier, Safer, Betta! WATERPROOFING

BUDGETARY COST ESTIMATE OF INTERIOR WORK OF LOWER PAREL BRANCH FOR CENTRAL BANK OF INDIA

What you need to know about concrete block basement construction.

CHAPTER 11 STORM DRAINAGE

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Plumbing for retail food businesses

Sports Buildings: budget costs for the Flood Relief Fund

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

BILL OF QUANTITIES Part No.: Part Description

Connex. Mortarless Masonry Block System

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

Mineral waterproof coating PCI Dichtschlämme

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Prepare a drainage system layout and specification notes for a low- rise building.

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

:2009 HELLENIC CHNICAL SPECIFICATION. Sanitary ware for disabled persons. ежглеяис тгс йубеямгсеыс (теувос еутеяо) 32199

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

I N D I A N S T A T I S T I C A L I N S T I T U T E. 8 th MILE POST, MYSORE ROAD, BANGALORE Tel : , 2 OF 2

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

AGREGADOS RECICLADOS MITOS Y REALIDADES

Passive Fire Protection

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Carriers, Fixtures & Piping

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Designing and Waterproofing of Internal Wet Areas

Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References

Transcription:

Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other necessary materials and refix without causing any damage, etc manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (i) Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) 16.00 Cum 804.00 12864.00 2 Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required, etc complete all as per the (i) W.C. pan with ISI marked black solid plastic seat and lid 3 Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering etc complete all as per the direction of (i) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) 4 Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry etc complete all as per the direction of 6.00 Each 4809.00 28854.00 16.00 Cum 7981.00 127696.00 55.00 Sqm 413.00 22715.00

5 Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc complete all as per the 6 Engaging labours(mason) for masonry work for plastering and other patch works along toilets to do the maintenance works wherever required including jungle clearance, site cleaning, etc complete all as per the direction of civil engineering wing supplyco. 7 Supplying materials for repairing and plumbing maintenance in toilets including taps, floor trap, waste line pipes, all necessary fittings, fixtures, material charges, etc complete all as per the direction of civil engineering wing supplyco. 8 Plastering 12mm thick with cement mortar using sand specified below, finished rough including scaffolding, curing, etc; complete for SURFACES. Mix specified is for cement : coarse sand. NOTE : i) CM 1:3 OR CM 1:4 is generally applicable for ceilings and RCC surfaces unless otherwise specified etc complete all as per the direction of 55.00 Sqm 1147.00 63085.00 10.00 Nos 635.00 6350.00 L.S 3000.00 (i) 12 mm cement plaster of mix 1:4 (1cement : 4 coarse sand) 20.00 Sqm 252.00 5040.00 9 Applying one or more coats of cement primer of approved brand and manufacture on wall/beam surface along duct portion and where ever required etc complete all as per the 10 Providing and fixing Polyvinyl Chloride (PVC) pipes, having thermal stability for water supply including all PVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement,trenching,refilling & testing of joints complete as per direction of civil engineering wing supplyco. 130.0 0 Sqm 52.00 6760.00 (i) 25 mm nominal outer dia Pipes (10kg/cm 2 ) 30.00 Mtr 49.00 1470.00 (ii) 32 mm nominal outer dia Pipes (10kg/cm 2 ) 30.00 Mtr 83.00 2490.00 iii)63 mm nominal outer dia Pipe (6kg/cm 2 ) 100.0 0 Mtr 142.00 14200.00 iv)110 mm nominal outer dia Pipe (6kg/cm 2 ) 150.0 0 Mtr 398.00 59700.00 Unforseen items 776.00 Total : 355000.00

I... (contractor) hereby agree to undertake to execute the work at estimate rate. % below estimate rate. % above eestimate rate as per standared specification and sanctioned drawings as directed by the Supplyco Engineering wing. Manager (E&CP) Contractor Address Phone No:

Name of work : Construction of R.C.C Drainage along back side of the Head office Building at Gandhinagar Estimate Sl.No. Description of item Quantity Unit Rate Amount 1 Demolishing brick work manually/ by mechanical means and removing the existing waste materials around the site including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (i) In cement mortar 9.00 Cum 1100.00 9900.00 2 Earth work in excavation by mechanical means / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth,lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed including all cost and conveyance of tools and plants, labour charges etc complete as per the direction of engineering wing KSCSC (i) All kinds of soil 40.00 Cum 227.00 9080.00 3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering etc complete all as per the direction of i)1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) 7.00 Cum 6280.00 43960.00 4 Centering and shuttering including strutting, propping, etc. and removal of form for Drain side walls, etc whereever required, all cost and conveyance of materials & labour charges etc., complete all as per the direction of engineering wing KSCSC 160.00 Sqm 287.00 45920.00 5 Providing and laying in position specified grade of reinforced cement concrete, including smooth finish over the surface, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : etc complete all as per the i) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 25.00 Cum 8360.00 209000.00

6 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, including all cost and conveyance of materials, labour charges etc complete all as per the (i) Thermo-Mechanically Treated bars 1825.00 Kg 99.00 180675.00 Unforseen if any 465.00 Total 499000.00 I... (contractor) hereby agree to undertake to execute the work at estimate rate. % below estimate rate. % above eestimate rate as per standared specification and sanctioned drawings as directed by the Supplyco Engineering wing. Manager (E&CP) Contractor Address Phone No:

PROVIDING RAIN WATER HARVESTING IN PANAMPALLY NAGAR QUARTERS, KOCHI ESTIMATE Sl.No. Description of item Qty Unit Rate Amount 1 Providing and fixing Polyvinyl Chloride (PVC) pipes, having thermal stability for water supply (for rain water harvesting and additional plumbing works) including all PVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement,trenching,refilling & testing of joints complete as per direction of civil engineering wing supplyco. i)75 mm nominal outer dia Pipe (10kg/cm 2 ) 3 Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering etc complete all as per the 200.00 Mtr 248.00 49600.00 (i) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) 4 Steel reinforcement using TMT bars for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level etc complete all as per the 5 Providing and placing on terrace (at all floor levels) polyethylene water storage tank, ISI : 12701 marked ( syntex or other approved brand) with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes and the base support for tank ( for rain water collecting tank). 10000.00 10.00 Cum 7981.00 79810.00 300.00 Kg 95.00 28500.00 per litre 10.00 100000.00 Unforseen items 2090.00 Total : 260000.00 I... (contractor) hereby agree to undertake to execute the work at estimate rate. % below estimate rate. % above eestimate rate as per standared specification and sanctioned drawings as directed by the Supplyco Engineering wing.

Manager (E&CP) Contractor Address Phone No: