Rochdale Building Control Guide. Approved Document F Means of ventilation



Similar documents
Technical Bulletin 005(A) Developed with Communities and Local Government

Te c h n i c a l G u i d a n c e D o c u m e n t

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

City of Peterborough

Information paper 20. Prepared by: David Clark. book:

LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION

2010 edition. Ventilation ONLINE VERSION APPROVED DOCUMENT ONLINE VERSION. The Building Regulations F1 Means of ventilation

Condensation. Some Causes, Some Advice

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER May 2015

New York, Dean. Price 182,500

EAST LONDON GUIDANCE ON HMO STANDARDS (3)

ONLINE VERSION ONLINE VERSION ONLINE VERSION edition. Ventilation APPROVED DOCUMENT. The Building Regulations Means of ventilation

Compliance Document for New Zealand Building Code Clause G4 Ventilation Third Edition

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation The Building Regulations 2010

RHODE ISLAND DIVISION OF STATE FIRE MARSHAL

The Government s Standard Assessment Procedure for Energy Rating of Dwellings

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Building Control Guidance Note

The replacement or modification of existing windows shall comply with the following requirements:

Technical housing standards nationally described space standard

BUILDING PERMIT SPECIFICATIONS

Advice to consumer Reference 50.1 May Condensation. Some causes, some advice.

EAST LONDON HMO GUIDANCE (4)

Minimum Housing and Health Standards

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

RRIO Checklist. Use of checklist: Definitions: Limitations

HA5 4JX T: NEW Instruction. One Bedroom Retirement Flat for the over 60's. Greater London HA5 4JX. 523 Uxbridge Road Road

Housing Quality Standards Inspection Checklist

Northern Ireland Housing Executive: HMO Fire Safety Guide

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

BY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS

Dealing with damp and mould growth

How To Build A Basement House

HOUSING QUALITY STANDARDS (HQS)

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery

Single Family Residential Basement Finish

Dwelling Energy Assessment Procedure (DEAP)

London Borough of Redbridge

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Guide to Houses in Multiple Occupation Hostels & Staff Accommodation. Kitchens

Nationally Described Space Standard technical requirements. Consultation draft. September 2014

Guidance on loft conversions in two-storey houses

Guide to Houses in Multiple Occupation Self Contained Flats

Technical housing standards nationally described space standard

ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III. HOUSES IN MULTIPLE OCCUPATION Space Standards

MP 5.7 RESIDENTIAL SERVICES BUILDING STANDARD

GENERAL WIRING RULES FOR HOUSES

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

PYMOOR 105,000. cheffins.co.uk

New York City Department of Buildings

Approved Document M: Part M Access to and use of buildings Volume 1 dwellings. Consultation draft. August 2014

31 Linden Lane Kirby Muxloe Leicestershire LE9 2EG

Mechanical and Natural Ventilation

HVAC Code Requirements

HOUSES IN MULTIPLE OCCUPATION STANDARDS. Housing Executive

MUNICIPALITY OF KAZABAZUA. SMOKE DETECTORS By-Law number

APPEAL AGAINST REFUSAL TO RELAX OR DISPENSE WITH REQUIREMENTS ON A MATERIAL CHANGE OF USE


Ministry of the Environment Decree on accessible building

SUMMARY OF WORK FOR GENERAL CONTRACTOR

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Market Place, Leyburn North Yorkshire DL8 5BD. For Sales In The Dales Bridge Cottage, Hunton

Challacombe Close Hutton Mount, Brentwood.

Property Accreditation Standards 2014/2015

REFUSE AND RECYCLING STORAGE REQUIREMENTS

THE VOID LETTABLE STANDARD

Holiday Cottage / Live Work Home

Ministry of the Environment Decree. on housing design

It is against this refusal that the appellant appealed to the Secretary of State.

BUILDING CONTROL GUIDANCE SHEET SMOKE ALARMS IN STANDARD DWELLINGS Last updated 16/12/2010

Building Standards Conservatory Roofs Meeting 28 Nov 2012

SPECIFIC GUIDANCE FOR A HOUSE IN MULTIPLE OCCUPATION (HMO) CONVERTED ENTIRELY INTO SELF CONTAINED FLATS

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, , ]

Building Warrant Issues

ONTARIO PLUMBING INSPECTORS ASSOCIATION INC. In the public service since Wet Venting. Incorporating Stack Venting and NPC Harmonization

Report Date: 04/03/2014. Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: MPRN:

Dealing with damp, condensation and mould growth in your home.

550,000. Westfield Close, BATH

159,950 For Quick Sale

Wales for Replacement Doors and Windows Contents

Gas Water Heaters Regulation 35A of Building (Planning) Regulations

Ecojoist. Practical benefits of Ecojoist.

Applications for building permits will not be reviewed until all of the required information has been submitted.

4 LIFF TERRACE, DUNDEE, DD2 4LA OFFERS OVER: 85,000

25 PARSON STREET WILNECOTE TAMWORTH B77 5BD

Saffron Square (Keats) Unit 6.05 apt 36

Responsibilities regarding the upkeep of tenant owner apartments

London Borough of Barnet. Fire Safety in Houses in Multiple Occupation. A Guide to Landlords

Introduction. CE marked construction products

Basement Development Construction requirements for the development of basements in residential dwellings.


Blackhorse Lane Croydon Surrey CR0 375,000

EAST STROUDSBURG BOROUGH RESIDENTIAL RENTAL INSPECTION CHECK LIST

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

RESIDENTIAL WINDOW REPLACEMENT

Rental Property Safety Inspection Checklist

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

Planned maintenance works. What you need to know

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS.

Transcription:

Rochdale Building Control Guide Approved Document F Means of ventilation Coming into effect 1 st October 2010 As we build homes that are more airtight it is increasingly becoming important to ensure that sufficient ventilation is provided to remove harmful pollutants and provide good quality air. Rooms require ventilation, the main types are background, purge and mechanical. This guide seeks to provide details of how to comply with the revised requirements of Approved Document F. General requirements Owners are to be provided with sufficient information to operate the ventilation system to provide adequate air flow not later than 5 days after completion. New dwellings air flow rates should be measured on site and a notice given to Building Control (includes extract fans and cooker hoods). A commissioning notice for fixed mechanical ventilation systems is required to be supplied to building control (in accordance with the domestic ventilation compliance guide). Approved Document www.rochdale.gov.uk

Work to existing buildings including extensions Background ventilation Background ventilation is typically by the provision of trickle ventilators located 1.7m above floor level with simple flap control. The ventilation required is measured in equivalent area dependent upon the room use. The amount of background ventilation for work to existing buildings is as follows: Position Intermittent extract Dwellings Habitable rooms Kitchen, Utility and bathroom 5000mm 2 equivalent area 2500mm 2 equivalent area Buildings other than dwellings Occupiable rooms up to 10m 2 Occupiable rooms over 10m 2 Kitchens Bathrooms and shower rooms Sanitary Accommodation and washing facilities 2500mm 2 equivalent area 250mm 2 equivalent area per m 2 of floor area 2500mm 2 equivalent area 2500mm 2 equivalent area per bath or shower 2500mm 2 equivalent area per wc Windows with night latch are not recommended due to difficulty in measuring equivalent area, likelihood of draughts and security risk. Ventilation of one room through another. A habitable room without openable windows can be vented through another provided that purge ventilation is provided based upon total floor area of both rooms, shown in table below. A permanent opening must be provided between the rooms. www.rochdale.gov.uk 1

8000mm 2 equivalent area trickle ventilators are required, or alternatively single room heat recovery ventilator could be used for background ventilation. Ventilation of one room through a conservatory. Purge ventilation is provided based upon total floor area of conservatory and habitable room based upon table below. Purge (rapid) ventilation Opening Height x width of opening 30 degrees or more 1/20 th floor area 15 30 degrees 1/10 th floor area less than 15 degrees unsuitable for purge ventilation. Background ventilation should be provided by 8000m 2 trickle vents in external quality door & frame of conservatory and frame of door into conservatory. It is recommended that ventilation systems in new and existing dwellings are in accordance with the domestic ventilation compliance guide. Addition of wet room to a dwelling Background ventilation should be provided of 2500mm 2 equivalent area or single room heat recovery ventilator or passive stack ventilator or continuous extract fan. Purge ventilation should be provided in accordance with table above. An undercut of 10mm above floor finish should be provided in internal door to provide 7600mm 2 minimum area for ventilation. Refurbishing a kitchen or bathroom in an existing dwelling If you carry out building work to an existing dwelling and there is an existing extract fan or passive stack ventilator you should retain or replace it, however if one does not exist you need not provide one. www.rochdale.gov.uk 2

New buildings other than dwellings Ventilation in specialist non domestic buildings is generally required to be designed by a CIBSE engineer, however the following is information for general office buildings. Extract ventilation rates Room Rooms containing printers and photocopiers (over 30 minutes use per hour) Office sanitary accommodation and washrooms. Extract rate Air extract 20l/s during machine use. (if in use constantly use the greater of extract and whole building ventilation rate.) Intermittent extract rate of: 15 l/s per shower/bath 6l/s per wc/urinal Intermittent extract rate of: Food and beverage preparation areas (not commercial kitchens) Specialist buildings/spaces 15 l/s with microwave and beverages only 30 l/s adjacent to the hob with cookers 60 l/s elsewhere with cooker All to operate whilst food and beverage preparation is in progress. Refer to table 6.3 in approved Document F Whole building ventilation air supply to offices 10l/s per person Location of ventilators for offices with natural air supply: Extract vents located as high as practicable in the room and preferably less than 400mm below the ceiling. PSV extract terminals to be located in the ceiling For Whole building ventilation refer to CIBSE guide AM10: natural ventilation in non-domestic buildings. www.rochdale.gov.uk 3

Car park ventilation This is via a calculation of mean predicted pollutant levels to limit carbon monoxide to an average concentration to 30 parts per million over an 8 hour period, and 90 parts per million in peak concentrations (ramps and exits). Alternative approaches 1. Car parks can be naturally ventilated by well distributed permanent ventilation on each level with an aggregate equivalent area of a minimum 1/20 th of the floor area of that level (25% of which on two opposing walls). 2. Mechanically ventilated car parks having permanent natural ventilation openings of equivalent area of a minimum 1/40 th of the floor area and a mechanical ventilation system providing 3 air changes per hour minimum, or a mechanical ventilation system providing 6 air changes per hour minimum to basement car parks. Non domestic ventilation systems should be commissioned in accordance with CIBSE Code M. www.rochdale.gov.uk 4

New dwellings Guidance is based upon dwellings with air permeability less than 5m 3 /(h.m 2 ) at 50 Pa. Purge ventilation Purge ventilation is required to each habitable room giving 4 air changes per hour minimum this is achieved by following guidance below. Opening Height x width of opening 30 degrees or more 1/20 th floor area 15 30 degrees 1/10 th floor area less than 15 degrees unsuitable for purge ventilation. Extract ventilation rates Extract ventilation is required to the following areas Room Intermittent extract Continuous extract Kitchen 30 l/s adjacent to hob or 60 l/s elsewhere 13 l/s Utility 30 l/s 8 l/s Bathroom 15 l/s 8 l/s Sanitary Accommodation 6 l/s 6 l/s Whole ventilation rate for supply of air to the habitable rooms should be no less than below. Whole dwelling ventilation rates Number of rooms in a dwelling Whole dwelling ventilation rate l/s 1 2 3 4 6 13 17 21 25 29 www.rochdale.gov.uk 5

Air transfer An undercut of 10mm above floor finish should be provided in internal doors to provide 7600mm 2 minimum area, this dimension should be 20mm above any unfinished floor surface. Ventilation systems Ventilation can be achieved by either: System 1. Background ventilators and intermittent extract fans. System 2. Passive stack ventilators. System 3. Continuous mechanical extract. System 4. Continuous mechanical supply and extract with heat recovery. Total equivalent background ventilator area for system 1 is based upon the table below. Total equivalent ventilator area ( mm 2 ) for a dwelling of air permeability 5m 3 /(h.m 2 ) at 50Pa Total floor Number of bedrooms area (m 2 ) 1 2 3 4 5 < 50 35000 40000 50000 60000 65000 51-60 35000 40000 50000 60000 65000 61-70 45000 45000 50000 60000 65000 71-80 50000 50000 50000 60000 65000 81-90 55000 60000 60000 60000 65000 91-100 65000 65000 65000 65000 65000 >100 Add 7000 mm 2 for every additional 10 m 2 floor area www.rochdale.gov.uk 6

Background ventilators should be located for system 1 as below Position Intermittent extract Dwellings Habitable rooms Kitchen, Utility and bathroom 5000mm 2 equivalent area 2500mm 2 equivalent area For system 2, 3 and 4 please refer to Approved Document F. Ventilation systems for basements Basements with a large permanent opening i.e. open stairway should have background ventilation system 1 or 2. Ventilation of one room through another. A habitable room without openable windows can be vented through another provided that purge ventilation is provided based upon total floor area of both rooms, shown in table below. Opening Height x width of opening 30 degrees or more 1/20 th floor area 15 30 degrees 1/10 th floor area less than 15 degrees unsuitable for purge ventilation. A permanent opening must be provided between the rooms. 8000mm 2 equivalent area trickle ventilators are required, or alternatively single room heat recovery ventilator could be used for background ventilation. Ventilation of one room through a conservatory. Purge ventilation is provided based upon total floor area of conservatory and habitable room based upon table above. Background ventilation should be provided by 8000m 2 trickle vents in external quality door & window frame of conservatory and frame of door into conservatory. www.rochdale.gov.uk 7

Bibliography/Further Guidance DCLG, 2010, The Building Regulations 2000 Approved Document F means of ventilation, Department for Communities and Local Government, London, <www.planningportal.gov.uk> DCLG, 2010, Domestic ventilation compliance guide, Department for Communities and Local Government, London, <www.planningportal.gov.uk> GGF, 2010, A guide to trickle ventilators, Glass and Glazing Federation, London, <www.ggf.co.uk> CIBSE Application Manual AM10: Natural ventilation in non-domestic buildings. <www.cibse.org.> Building Bulletin 101 Ventilation of school buildings. www.rochdale.gov.uk 8