Project Scheduling by PERT/CPM



Similar documents
Operational Research. Project Menagement Method by CPM/ PERT

Project Scheduling. Introduction

Project Management Chapter 3

PROJECT EVALUATION REVIEW TECHNIQUE (PERT) AND CRITICAL PATH METHOD (CPM)

March 30, 2007 CHAPTER 4

Lecture 26 CPM / PERT Network Diagram

12 CRITICAL PATH ANALYSIS

Project Planning and Scheduling

MECH 896 Professional Development for MEng Students. Homework Discussion. Scheduling Overview. Winter 2015: Lecture #5 Project Time Management

Unit 1: Project Planning and Scheduling

EdExcel Decision Mathematics 1

Large Scale Systems Design G52LSS

Project Scheduling: PERT/CPM

CISC 322 Software Architecture. Project Scheduling (PERT/CPM) Ahmed E. Hassan

Resources Management

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration

Cambridge International AS and A Level Computer Science

ME 407 Mechanical Engineering Design Spring 2016

The work breakdown structure can be illustrated in a block diagram:

Topic: The easiest way to calculate Critical Path, Total Float, Free Float, Early Start, Early Finish, Late Start, and Late Finish.

Network analysis: P.E.R.T,C.P.M & Resource Allocation Some important definition:

Project Scheduling: PERT/CPM

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

Network Calculations

Application Survey Paper

8. Project Time Management

Project Management Glossary

Project Planning. Lecture Objectives. Basic Reasons for Planning. Planning. Project Planning and Control System. Planning Steps

Project Management SCM Pearson Education, Inc. publishing as Prentice Hall

Project Time Management

Time Management. Part 5 Schedule Development. Richard Boser

Leaving Certificate Technology. Project Management. Teacher Notes

Figure out the early start and early finish. Early start. Early finish

Chapter 1.7 Project Management. 1. Project financing is one of the step of project management- State True or False

CRITICAL PATH METHOD (CEE 320 VDC SEMINAR)

Chapter 2: Project Time Management

Project Management 1. PROJECT MANAGEMENT PROJECT ANALYSIS...3

Scheduling Glossary Activity. A component of work performed during the course of a project.

Goals of the Unit. spm adolfo villafiorita - introduction to software project management

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

Priori ty

Chapter 11: PERT for Project Planning and Scheduling

Chapter 4: Project Time Management

Construction Project Scheduling

Critical Path Analysis & PERT Charts (taken from

CPM-200: Principles of Schedule Management

A GUIDE TO NETWORK ANALYSIS by MICHAEL C GLEN

10 Project Management with PERT/CPM

PROJECT COMPLETION PROBABILITY AFTER CRASHING PERT/CPM NETWORK

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

CPM Analysis of Rolai-Rinjlai Road Construction

PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

22 Project Management with PERT/CPM

Chapter 6: Project Time Management

Notes on the Critical Path Method for project planning and management.

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza

Critical Path Analysis

7. PROJECT MANAGEMENT

Scheduling. Anne Banks Pidduck Adapted from John Musser

CRITICAL PATH ANALYSIS AND GANTT CHARTS

ANALYSIS OF PROJECT PLANNING USING CPM AND PERT

Use project management tools

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort

SECTION CONSTRUCTION SCHEDULE B. Part 1 - General Work Included Related Requirements Reference Standards...

Leaving Certificate Technology. Project Management. Student Workbook

B D E F

Egypt Scholars Presented by Mohamed Khalifa Hassan Jan 2014

Project Planning Tools. GANTT Chart. Chapter 7 Project Planning. GANTT Chart (Figure 7.3) CPM Chart (Figure 7.12) PERT Chart (Figure 7.

Project Management DISCUSSION QUESTIONS

PERT/CPM. Network Representation:

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

technical tips and tricks

ICT Project Management. Software Project Planning By J. Ogutu

Precedence Diagram Method. CSTM 462 Planning & Scheduling

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

Section Four Learning Module C: Planning for Project Success

Chapter-6. Developing a Project Plan

PROJECT MANAGEMENT: PERT AND CPM

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur

CRITICAL-PATH ANALYSIS FOR NETWORK SCHEDULING

CS 5150 So(ware Engineering Project Management

Devising new Software Project Risk Management Model: MARUNA

Project management using Excel spreadsheets: The case of Jules Event Planning Company

CRITICAL PATH METHOD (CPM) SCHEDULES

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University

Systems Analysis and Design

A. O. Odior Department of Production Engineering University of Benin, Edo State.

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY

SE351a: Software Project & Process Management

Review on Using Packages to Enhance the Teaching of Critical Path Networks

SESSION 4 PLANNING THE PROJECT PROJECT PLANNING DEFINITIONS

12 Network Scheduling Techniques

PROJECT MANAGEMENT. BIPARD, Patna 25 th January Rajiv Misra

SWEN 256 Software Process & Project Management

Transcription:

Project Scheduling by PERT/PM Reference ooks: nderson, Sweeney, and Williams, N INTROUTION TO MNGEMENT SIENE, QUNTITTIVE PPROHES TO EISION MKING, th edition, West Publishing ompany,99 Hamdy. Taha, OPERTIONS RESERH, N INTROUTION, th edition, Maxwell Macmillan International, 99 aellenbach, George, McNickle, INTROUTION TO OPERTIONS RESERH TENIQUES, nd edition, llyn and acon. Inc, 9 Lawrence Lapin, QUNTITTIVE METHOS for usiness ecisions with ases, th edition Harcourt race Jovanovich, Inc., 9 T.. urley and G O sullivan, OPERTIONL RESERH, MacMillan Education Ltd., 990. Introduction Lecture project defines a combination of interrelated activities that must be executed in a certain order before the entire task can be completed. n activity in a project is usually viewed as a job requiring time and resources for its completion. Project management has evolved as a field with the development of two analytical techniques for planning, scheduling, and controlling of projects. These are the project evaluation and review technique (PERT) and the critical path method(pm). These techniques were developed by two groups almost simultaneously. PM was developed by E. I. u Pont de Nemours & ompany as an application to construction projects and was later extended to a more advanced status by Mauchly ssociates. PERT was developed by the U.S. Navy by a consulting firm for scheduling the research and development activities for the Polaris missile program. lthough PERT and PM were developed independently, they are similar in principle. Today, PERT and PM actually comprise one technique and the differences, if any, are only historical. onsequently, both technique are referred to as project scheduling techniques. Project scheduling by PERT-PM consists of three basic phases: Planning breaking down the project into distinct activities; determining the time estimates for these activities;

constructing a network diagram with each arc representing the activity; Scheduling constructing a time chart showing the start and the finish times for each activity as well as its relationship to other activities in the project; pinpointing the critical (in view of time) activities that require special attention if the project is to be completed on time. Showing the amount of slack (or float) times for the non-critical activities; ontrolling Using the network diagram and the time chart for making periodic progress reports; updating the network.. Network iagram Representations and Network onstruction The network diagram represents the interdependencies and precedence relationships among the activities of the project. n arrow is commonly used to represent an activity, with its head indicating the direction of progress in the project. n event represents a point in time that signifies the completion of some activities and the beginning of new ones. The following diagram shows an example, where activities (, ) and (, ) must be completed before activity (, ) can start. Head event Tail Rules for constructing a network diagram:. Each activity is represented by one and only one arrow in the network;. No two activities can be identified by the same head and tail events (a dummy activity is introduced in such situations); In this case, is the dummy activity.

. To ensure the correct precedence relationship in the network diagram, the following questions must be answered as every activity is added to the network: What activities must be completed immediately before this activity can start? What activities must follow this activity? What activities must occur concurrently with this activity? Example : The Galaxy plc is to buy a small business, Tiny Ltd. The whole procedure involves four activities:. evelop a list of sources for financing;. nalyse the financial records of Tiny Ltd;. evelop a business plan (sales projections, cash flow projections, etc.);. Submit a proposal to a lending institution. The precedence relationship of these four activities is described as in the Table below. onstruct the network diagram. ctivity Immediate Predecessor - -,

Example : onstruct the network based on the Table of information. Immediate ctivity Predecessor - -, E G, E, or activities,,, and, the network portion is as follows: When activity E, which has as its immediate predecessor, is to be added, we come cross a problem because activities and both end at node. If activity E is to happen after, it has to be after as well in this arrangement, which is not true according to the specification. The solution is to add a dummy activity between and node in order to add E correctly. This is shown below. E The first completed -activity network is shown as follows:

E G It is seen that activities E and share the same head and tail events, which is in conflict with Rule. In such situations, dummy activities should be introduced. E G The above network describes correctly the relationships among the activities. Lecture. etermination of the ritical Path n activity is said to be critical if a delay in its start will cause a delay in the completion date of the entire project. non-critical activity is an activity that has time to spare (known as slack or float time) within the entire project. critical path is a sequence of connected critical activities that leads from the source node to the sink node. We will discuss the determination of the critical path through the following example. Example The owner of a shopping centre is considering modernising and expanding the current -business shopping complex. He hopes to add to 0 new business or tenants to the shopping complex. The specific activities that make up the

expansion project, together with information on immediate predecessor and completion time, are listed in the following table. ctivity ctivity escription Immediate Predecessor ompletion Time (weeks) Prepare architectural drawings - Identify potential new tenants - evelop prospectus for tenants Select contractor E Prepare building permits Obtain approval for building permits E G Perform construction, H inalise contracts with tenants, I Tenants move in G, H Total We are now asked to answer the following questions: ) What is the total completion time of the project? ) What are the scheduled start and completion time for each activity? ) Which activities are critical and must be completed exactly as scheduled in order to keep the project on schedule? ) How long can the non-critical activities to be delayed before they cause a delay in the completion time for the project? To solve the problem, we need first construct the network according to the problem specification. E H G I ompletion time for activity H

Starting at the network s source node (node ) we will have to compute the earliest start time and the earliest finish time for each activity in the network. Let s assume that ES = earliest start time for a particular activity E = earliest finish time for a particular activity t = expected completion time for the activity The earliest finish time can be calculated by the following expression for a given activity: E = ES + t or example, for activity ES = 0 and t = ; thus the earliest finish time for activity is E = 0+ =. We will write ES and E directly on the network in brackets. Using activity as an example, we have ctivity ES [0, ] E Expected completion time Since activities leaving a node cannot be started until all immediate preceding activities have been completed, the following rule determines the earliest start time for activities. Earliest Start Time Rule The earliest start time for an activity leaving a particular node is equal to the largest of the earliest finish time for all activities entering the node. Using this rule, the earliest start and finish times for each activity are written onto the network, which now looks as follows:

[0,] [0,] E [,] [,9] [,] [,0] [9,] H G [0,] I [,] s has demonstrated, proceeding in a forward pass through the network, we can establish the earliest start time and then the earliest finish time for each activity. This process gives the earliest completion time of the entire project, which is the earliest finish time for the last activity. In the case of the shopping centre, the total time required for project completion is weeks. We now continue the algorithm for finding the critical path by making a backward pass calculation. Starting at the sink node (node )and using a latest finish time of weeks for activity I, we trace back through the network, computing a latest start time and latest finish time for each activity. Let LS = latest start time for a particular activity L = latest finish time for a particular activity The latest start time is given by the following expression: LS = L - t The latest start and finish times are also to be displayed on the network, but we will put them within a pair of round brackets. The following rule determines the latest finish time for any activity in the network. Latest inish Time Rule The latest finish time for an activity entering a particular node is equal to the smallest of the latest start times for all activities leaving the node. The PERT/PM network with both [ES, E] and (LS, L) for the example is shown below.

E [0,] [,] (0,) (,) (,) [,9] [0,] (,) [,] (,0) [,0] (,0) [9,] H (,) G [0,] (0,) I [,] (,) rom the above diagram, we find the amount of slack or free time associated with each of the activities. Slack is defined as the length of time an activity can be delayed without affecting the total time required to complete the project. The amount of slack is computed as follows: Slack = LS - ES = L - E ctivities with zero slack are the critical path activities. ccording to the finished PERT/PM network, we arrive at the following table of information (the project schedule) for the shopping centre project. ctivity ES LS E L Slack ritical Path? 0 0 0 Yes 0 9 0 E 0 Yes 0 0 0 Yes G 0 0 0 Yes H 9 I 0 Yes We can now answer the questions we were asked before: ) What is the total completion time of the project? The project can be completed in weeks if the individual activities are completed on schedule. ) What are the scheduled start and completion time for each activity? See the above Table. 9

) Which activities are critical and must be completed exactly as scheduled in order to keep the project on schedule?, E,, G, and I are the critical path activities. ) How long can the non-critical activities to be delayed before they cause a delay in the completion time for the project? Table above shows the slack time associated with each activity. It is evident that it is the critical paths that determine the project completion time; changing time of the non-critical activities within the permissible range will not affect the project completion time; but changing time of the critical activities may cause the project completion time to change. Now, let us summarise the PERT/PM critical path procedure. Step evelop a list of activities that make up the project; Step etermine the immediate predecessor activities for each activity listed in the project; Step Estimate the completion time for each activity; Step raw a network depicting the activities and immediate predecessors listed in Steps &; Step Using the network and the activity time estimates, determine the earliest start and finish times for each activity by making a forward pass through the network. The earliest finish time for the last activity in the project identifies the total time required to complete the project; Step Using the project completion time identified in Step as the latest finish time for the last activity, make a backward pass through the network to identify the latest start and finish times for each activity; Step Use the difference between the latest start time and the earliest start time for each activity to identify the slack time available for the activity; Step ind the activities with zero slack; these are the critical path activities; Step 9 Use the information from Steps & to develop the activity schedule for the project.. onsideration of Time-cost Trade-offs Lecture rom the shopping centre example, it is seen that the PERT/PM can answer questions such as the total project completion time, the critical activities, and the slack times of the non-critical activities. This, obviously, will give the project manager a clear picture for his control over the project. The project schedule is based on the given cost and finish time of the individual activities. 0

In practice, we sometimes demand more than this. We may be interested in completing a project at minimum cost, or completing a project in minimum time. These are the considerations of time-cost trade-offs. To obtain the minimum cost or the minimum time, we need to know the possible reduction in time and extra cost for reduction per unit time for each activity.. ompletion of projects at minimum cost y adding more resources, a project may be sped up. Usually, the purpose of speeding up is to save money on project overheads, to avoid penalty clauses in contracts or, sometimes, to earn bonuses for early completion. The complication which arises is that as the critical activities are sped up more and more, other activities also become critical. We will discuss the algorithm through the following example. Example: project consisting of activities are described in the following table. The cost for completion of these activities is 00 excluding the site overhead. The overhead cost of general site activities is 0/day. We are asked to: ) calculate the normal completion of the project, its cost, and the critical path; ) calculate and plot on a graph paper the cost/time function for the project and state: the minimum cost and the associated time; the shortest time and the associated cost. ctivity Normal completion time (days) Shortest completion time (days) ost of reduction per day ( ) (-) 0 (-) 90 (-) 0 (-) - E (-) 0 (-) 00 G (-) 0 H (-) - We first set-up the network according to the description of the project. Then using the PERT/PM scheduling technique discussed earlier, we establish the ES, E, LS, L times and the critical activities. These are shown in the following network and table. [,0] [0,] (,0 ) (0,) [0,] G [9,] (,) (,0) [,9] [0,] (9,) (,9) E [,] (9,) [,] H (,0)

ctivity ES E LS L Slack ritical? 0 9 0 0 0 Yes 0 9 9 E 9 0 0 0 Yes G 9 0 H 0 The above shows that the normal completion time is 0 days and the critical activities are (-) and (-). The cost of completing the project at normal speed is 00 + 0 0 = 9000 Now, we wish to speed up the project so that the project will cost the least. The rule is to speed up firstly the critical activity that cost the least to do so. Obviously, the activity to speed up is, which costs 90 for speeding up one day. ccording to the project description, the activity can be shortened by -= days. The amount of time to speed up is determined based on () the reduction should reduce the project completion time the most; and () the reduction should cause as many activities to become critical as possible. Let us speed up days for. This reduces the completion time to days. s indicated in the following diagram, all activities except become critical because of this. [0,] (, ) (0,) [0,] G[9,] (,9) (9,) [,9] [0,] (,9) (0,) E [,] (,) The new cost accordingly is now: 9000-0 + 90 = 90 [,] [,] H (,) In order to achieve any further saving, it is necessary to reduce time along all the critical paths simultaneously. The cheapest way this can be done in this example is to save one day on activities and the same time. This action further reduces the project completion time into days. The critical paths remain the same. [,] [0,] (, ) (0,) [0,] G[,] (,) (,) [,] [0,] (,) (0,) E [,0] (,0) [0,] H (0,)

The total cost under this circumstance is 90-0 + 90 + 0 = 00 Now, to reduce time further on all the critical paths, we need to consider activities and which have days and day, respectively, to spare. We can only reduce one day on both of these and the total completion time is now reduced to days. ctivity still has days slack time while all the others are critical. [,] [0,] (, ) (0,) [0,] G [,] (,) (,) [,] [0,] (,) (0,) E [,9] (,9) [9,] H (9,) The total cost is now 00-0 + 0 + 00 = 90 The project can still be sped up by reducing time on activities E,, and G ( days, days, and days available respectively). Reduction of two days on these activities makes the total projection time to days. [,] [0,] 9 (, ) (0,) [0,] G [,] (,) (,) [,] [0,] (,) (0,) E [,] (,) [,] H (,)

The total cost in this case is 90-0 + ( 00 + 0 + 0) = 90 days is the minimum completion time for the project because no further time reduction is available on the critical path ---. or the purpose of plotting the required cost/time graph, we summarise in the following table the completion times and costs of the project. ompletion time (days) ost ( ) 0 9000 90 00 90 90 ompletion time VS ost 900 900 9000 ( ) 900 00 ost ( ) 00 00 00 0 ays It is evident that the minimum cost for completing the project is 00 in days, and that the minimum possible completion time is days costing 90. This concludes the example. Lecture. ompletion of projects in minimum time In some circumstances the primary interest when completing a project is to use the least possible time even if this does not mean the least possible cost. One example for

this is the situation when the equipment being used for the project is urgently needed for more profitable work else where. One way of finding the minimum time for completion of a project is to start with the normal completion network and gradually make reductions in critical activities until minimum time is reached, like the method used in the last example. However, if it is the minimum time that is of interest, then there is another and more efficient way of proceeding, i.e., ) rash every activity and look at the resulting network this will certainly give us minimum completion time but it may be a highly wasteful way of achieving the minimum time ) onsider the activities which are not critical and allow the most expensive of these to slow down as much as possible without the duration of the project being increased above the desired minimum. Note: To crash an activity is to use the shortest possible time available for the activity. Example: The data shown in the following table relates to a contract being undertaken. There are also site costs of 00 per day. You are required to: () calculate and state the time for completion on a normal basis; () calculate and state the critical path on this basis, and the cost; () calculate and state the cost of completion in the shortest possible time. Possible reduction time (days) Extra cost for reduction ( /day) ctivity ompletion time (days) ost of activity (,000) (-) 00 (-) 0 00 (-) 00 (-) 00 E(-) 00 (-) 00 G(-) 9 00 H(-) 00 I(-) 0 00 J(-) 00 K(-) 9 00 L(-) 0 00 nswer:

() ccording to the above table, the PERT/PM network can be generated as follows. E [,] (0,) [,9] J [,0] K [0,9] [0,] (0,) (,9) (,0) 9 (0,9) [0,] [,] [,] [,] (,9) [9,] (9,) G H (9,0) L (9,9) [0,] (,) 0 [,] (0,) I (9,9) 0 s it is indicated, the project will require 9 days to complete under the normal situation. () The above network shows that there are two critical paths, i.e., ---G-J-K, and -G-J-K. The cost on the normal basis is Σ (ll costs) + 9 00 =,000 + 9,00 =,00 () To find the minimum completion time, we first reconstruct the PERT/PM network by crashing all the activities, i.e., using the shortest completion time for each activity. E [,] 9 (,) [,] J [,] K [,9] [0,] (0,) (,) (,) (,9) [0,] [,] [,9] [9,] (,) [,] (,) G H (,) L (,9) [0,] (,) [,9] (0,) I (,) y crashing all the activities, the minimum completion time of the project is found to be 9 days. Money can be saved by allowing the slowing down of those non-critical

activities which are most expensive to speed up. It should be mentioned that the slowing down of the non-critical activities should not increase the minimum completion time of the project. The follow table lists all the non-critical activities and their costs to speed up. Non-critical activities ost to speed up ( /day) 00 E 00 H 00 I 00 L 00 Obviously, the most expensive non-critical activity to speed up is I. So, we first let activity I to slow down to its normal completion time of 0 days. This will result in the following network diagram. E [,] 9 (,) [,] J [,] K [,9] [0,] (0,) (,) (,) (,9) [0,] [,] [,9] [,9] (,) [,] (,) G H (,) L (,9) [0,] (,) [,] (0,) I (,) 0 The change of the completion time of activity I from days to 0 days makes activities I and L critical without increasing the minimum project completion time. Secondly, we let activity H take its full days, which leads to the following diagram. E [,] 9 (,) [,] J [,] K [,9] [0,] (0,) (,) (,) (,9) [0,] [,] [,] [,9] (,) [,] (,) G H (,) L (,9) [0,] (,) [,] (0,) I (,) 0

Thirdly, we allow activity E to take its full days, leading to the diagram below. E [,] (,) [,] J [,] K [,9] [0,] (0,) (,) (,) (,9) [0,] [,] [,] [,9] (,) [,] (,) G H (,) L (,9) [0,] (,) [,] (0,) I (,) 0 ourthly, we allow activity to take days, which makes critical as indicated in the following diagram. E [,] (,) [,] J [,] K [,9] [0,] (0,) (,) (,) (,9) [0,] [,] [,] [,9] (0,) [,] (,) G H (,) L (,9) [0,] (,) [,] (0,) I (,) 0 No further savings are possible as the three non-critical activities are all now at normal duration. Hence, the least possible cost of completing in 9 days is: Σ (ll costs) + 9 00 + 00 + 00 + 00 + 00 + 00 + 00 + 00 + 00

+ 00 =,000 +,00 +,00 =,900 9

Exercise Scheduling with PERT/PM. onsider the PERT/PM network shown below. E G J H I a. dd the dummy activities that will eliminate the problem that the activities have the same starting and ending nodes. b. dd dummy activities that will satisfy the following immediate predecessor requirements: ctivity H I G Immediate predecessor,,, E. onstruct a PERT/PM network for a project having the following activities: ctivities Immediate predecessor - - E,, G, E The project is completed when activities and G are both complete.. ssume that the project in problem has the following activity times: 0

ctivities Time (months) E G a. ind the critical path. b. The project must be completed in ½ years. o you anticipate difficulty in meeting the deadline? Explain.. onsider the following project network (the times shown are in weeks): H G 0 E a. Identify the critical path. b. How long it will take to complete the project? c. an activity be delayed without delaying the entire project? If so, how many weeks? d. an activity be delayed without delaying the entire project? If so, how many weeks? e. What is the schedule for activity E?. project involving the installation of a computer system consists of eight activities. The immediate predecessor and activity times are shown below. ctivity Immediate predecessor Time (weeks) - -, E E G, 9 H, G a. raw the PERT/PM network for this project.

b. What are the critical path activities? c. What is the expected project completion time?. Piccadily ollege is considering building a new multipurpose athletic complex on campus. The complex would provide a new gymnasium for intercollegiate basketball games, expanded office space, classrooms, and intramural facilities. The activities that would have to be undertaken before beginning constructing are shown below. ctivity escription Immediate predecessor Time (weeks) Survey building site - evelop initial design - Obtain board approval, Select architect E Establish budget inalise design, E G Obtain financing E H Hire contractor, G a. evelop a PERT/PM network for this project. b. Identify the critical path. c. evelop the activity schedule for the project. d. oes it appear reasonable that construction of the athletic complex could begin year after the decision to begin the project with the site survey and initial design plans? What is the expected completion time for the project?. Hamilton ountry Parks is planning to develop a new park and recreational area on a recently purchased 00-acre tract. Project development activities include cleaning playground and picnic areas, constructing road, constructing a shelter house, purchasing picnic equipment, and so on. The PERT/PM network shown below is being used in the planning, scheduling, and controlling of this project. 9 E 0 H G I ctivity time in weeks a. What is the critical path for this network? b. Show the activity schedule for this project.

c. The park commissioner would like to open the park to the public within months from the time the work on the project is started. oes this opening date appear feasible? Explain.. onsider the project network with activity times shown in days: E G The crash data for this project are as follows: Time (days) Total ost ($) ctivity Normal rash Normal rash 00 00 00 900 000 00 00 00 E 00 00 00 000 G 00 000 a. ind the critical path and the expected project completion time on the normal basis. b. What is the total project cost using the normal times? c. ind out the minimum project completion time using the crashing method. d. What is the minimum cost associated with the crashed project completion time?

9. Office utomation, Inc., has developed a proposal for introducing a new computerised office system that will improve word processing and interoffice communications for a particular company. ontained in the proposal is a list of activities that must be accomplished to complete the new office system project. Information about the activities is shown below. ctivity escription Immediate predecessor Time Normal (weeks) rash ost Normal ($000 s) rash Plan needs - 0 0 0 Order equipment 0 0 Install equipment 0 00 0 Setup training lab 0 0 E onduct training 0 0 Test system, E 0 0 a. Show the network for the project. b. evelop an activity schedule for the project. c. What are the critical path activities, and what is the expected project completion time? d. ssume that the company wishes to complete the project in months or weeks. What crashing decisions would be recommended to meet the desired completion time at the least possible cost? Work through the network, and attempt to make the crashing decisions by inspection. e. evelop an activity schedule for the crashed project. f. What is the added project cost to meet the -month completion time?