ITSR Road/Rail Vehicle Workshop. V/Line Hi-Rail Project Allen Fleckner



Similar documents
Rail Industry. Course Guide. Version 3. Enhancing your people capability through tailored learning and development solutions

The risk of derailment and collision, and safety systems to prevent the risk

Rail safety statistics August 2014

JCB Fastrac in Heavy Goods Vehicle Applications

Rail Accident Report. Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005

SAFETY OF RAIL MAINTENANCE AND INSPECTION VEHICLES

Health and safety policy

Traffic Management Issue 1.0 Revision: v2 October 2014

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015

State of Minnesota Model Fleet Safety Management Standards

Guidelines for Traffic Controllers

POSITION DESCRIPTION

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013

Please direct requests for further information or authorisation to: Principal Information Governance Advisor

FATIGUE MANAGEMENT MODULE STANDARDS

Automation of Taximeters Frequently Asked Questions

Group TRAFFIC MANAGEMENT SPECIALIST ACCESS WAY SOLUTIONS CREATIVE SOLUTIONS TO COMMON CHALLENGES. Products

STAFF AND TICKET SYSTEM

Accident / Incident Reporting Guidelines for Provincial Railways

Occupational Health & Safety Policy Injury & Incident Reporting

[ C o m p a n y A d d r e s s ]

Vehicle Fleet Safety Program Procedures for Employees & Students

BY-LAW NUMBER

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/ Galloper Wind Farm Limited

ENACTED BY LEGISLATURE: MAY 20, 2002 CITE AS: 6 HCC Authority. See basic document (Occupational Safety and Health Program Act).

AUGUST 2013 INFORMATION BULLETIN. Livestock transport

REPORT OF THE ROAD SAFETY CAMERA COMMISSIONER TO THE MINISTER FOR POLICE AND EMERGENCY SERVICES

Commentary Drive Assessment

EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING NAVFAC MIDLANT

The complete provider for. Gauging Products and Measurement Systems

CERTIFICATION, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE GUIDELINES for BRITISH COLUMBIA COMMUTER RAILWAYS

THIS PAGE INTENTIONALLY LEFT BLANK

INSTRUCTOR S GUIDE. Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers

Volvo Trucks view on Truck Rollover Accidents

Contents Technical Information Drivers Cabin Controls Exterior Lighting and Destination Screen Keyboard Controls...

Legal Requirements for. Motor Vehicles and Trailers. according to ECE Regulation 48. Our Ideas, Your Success. Customized Solutions

1.ISSUE OF LEARNER'S LICENSES

Motor Vehicle and Fleet Management Policy and Procedures. Facilities Management

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.

HEAVY DUTY EQUIPMENT TECHNICIAN (MECHANIC)

ACCIDENT/INCIDENT REPORTING REGULATIONS for BC RAILWAYS

SYDNEY TRAMWAY MUSEUM HEALTH RISK ASSESSMENT

Unit ID: 482 Domain AUTOMOTIVE ELECTRICAL AND ELECTRONICS Title: Install and repair electrical lighting system of vehicles Level: 2 Credits: 6

Contractor Environment, Health and Safety Management Plan

M&EE Networking Group

STATISTICS OF FATAL AND INJURY ROAD ACCIDENTS IN LITHUANIA,

Water Well Drilling Rig or any associated motor vehicle or trailer used directly for that purpose.

Model Fleet Safety Program Short

Occupational Health and Safety Amendment (Long Distance Truck Driver Fatigue) Regulation 2005

Traffic Management Plan - Depot Procedure

Non-responsiveness of conventional measures of road traffic noise to an urban truck restriction strategy

Job Code Job Title Function Sub Function EEO 4. TRM011 Sr Mgr, Air Transport Admin Front Line Mgr Senior Manager Professionals N

MOTOR VEHICLE ACCIDENT CLAIM REPORT

Rail Accident Report. Fire on prototype tram 611 at Blackpool 24 January 2007

COMPANY VEHICLE OPERATING POLICY Effective May 2013

Rail Network Configuration Management

Light-Duty Vehicle Purchase Approval Form

Points Jay Walking N 0

August 23, Dr. Eugene Trinh Director, NASA Management Office, Jet Propulsion Laboratory

Claim form Motor accident

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

Safety Rules. Car Washes CORPORATE HEADQUARTERS 518 EAST BROAD STREET COLUMBUS, OHIO STATEAUTO.COM

1 / 6. Appendix-K. Traffic Management Plan. ESIA Report for Etlik IHCP Appendix-K Traffic Management Plan Project No.: 12/019.

Risk Assessment for visits by schools and other groups including children.

Life Saving Rules SAFETY BY CHOICE, NOT BY CHANCE

Information Booklet. Independent Contractor

Jargon is easy. to learn, buster

Northern Territory ROAD TRANSPORT FATIGUE MANAGEMENT

WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions

TABLE OF CONTENTS. Contact Information Regarding Fleet Operations...2. Driver Qualifications...3. Fleet Operations...4. Use of Personal Vehicles...

ODOT Emergency Preparedness Committee. Guidelines for Using the Public Works Emergency Response Cooperative Assistance Agreement

FLEET FUEL EFFICIENCY: A WIN-WIN OPPORTUNITY ABSTRACT INTRODUCTION. Peter Baas TERNZ

VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL

Daily Equipment Inspection Programs

2010 SECURITY AWARENESS TRAINING

Penalty points and fixed charge offences

Managing A Vehicle Fleet In Australia

Thames Water Utilities Limited. Settlement deed

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

OCCURRENCE REPORTING IN RAILWAYS. DG workshop Valenciennes, 29 October 2014 EKSLER Vojtech

Operations. Transport Officer OP199. Operations Manager. Administration Officer

Risk Control Industry Guide Series. Utility Contractors Industry

34% of all incidents reported to MinEx for surface mines are related to vehicles and traffic.

Vehicle Lift Safety The Fleet Manager s Responsibility Presented by: Steve Perlstein

Fatigue Management Accreditation Guide

Transcription:

ITSR Road/Rail Vehicle Workshop V/Line Hi-Rail Project Allen Fleckner October 2012

Introduction Overview of RRV usage in V/Line Experiences Recent RRV incident - Kyneton August 2012 Explore weakness Look at strengths to improve RRV prognosis - V/Line Hi- Rail Project

Overview of V/Line RRVs A range owned / contractor RRVs operate on the V/Line regional network - Within occupation / On the running line under a track warrant or road / rail permission. By expectation some contractor vehicles operate under V/Line accreditation (e.g. weed spray). Generally contractors require accreditation for access to the V/Line network. The Regional Rail Link project will dramatically increase hi-rail usage over next 2 years this will be a quantum shift from rural usage to a metropolitan working environment

Rail Guidance fitted to light vehicles ( Track Inspector vehicles ) The Fleet includes 29 light road rail vehicles used for track inspection. 4 Plant Maintenance March 2009 The rail gear requires regular inspection and adjustment (4 month cycle)

Rail Guidance fitted to Heavy Vehicles ( Gang Trucks ) Hi rail Mobile Gang Truck The RM Track maintenance group operates 18 Mobile Gangs through out the state each equipped with a set of engine powered tools Night shift is becoming more common requiring better lighting and accessories. 5 Plant Maintenance March 2009

Rail Guidance fitted to wheeled excavator 6 Motor Vehicle Fleet Management August 2008

Rail Guidance fitted to tracked excavator A Komatsu 4 tonne excavator fitted with driven rail wheels and a Harsco Scarifier Head. Concept and design by V/Line Plant in cooperation with Harrybilt 7 Plant Maintenance March 2009

Rail Guidance fitted to tracked excavator A Komatsu 4 tonne excavator fitted with driven rail wheels and a Harsco Tie Grip. Concept and design by V/Line Plant in co-operation with Harrybilt 8 Plant Maintenance March 2009

Rail Guidance fitted to loader back hoe 9 Plant Maintenance March 2009

Recent experiences - Kyneton Occurrence August 2012 20 th August 2012, after 11 pm Hi rail holding a Road / Rail permission circular to spray on the east track Initial findings suggest that the hi-rail driver did all the right things e.g. got out of cab and checked signals etc. and after a goods train had went past he contacted Bendigo control panel to verify and asked to follow behind the goods train behind signal KYN10 He then accessed the Bendigo corridor at Mollison St Kyneton level crossing with his Isuzu hirail weed spraying truck with a 5000 litre capacity (Contractor vehicle under V/Line accreditation) The hi-rail was signalled to travel towards Melbourne on the West track (bi-directional) At the same time V/Line passenger train 8055 was travelling towards Kyneton approaching on west track section 886 and signal M887 at nearly 160 km/h

Incident event sequence continued An axle counter in track section 887 detected the hi-rail causing the signal in front of the passenger train to revert to red this is the only corridor of 5 fitted with axle counters. Axle counter set signal to stop train stopped 80 m ahead of signal The passenger train stopped before the signal. The hi-rail vehicle reversed back to Mollison St to get off track allowing the passenger train to continue. When hi-rail reversed back over axle counter signal changed to yellow. Train started to proceed and got a verbal stop from the signaller.

Mollison St level crossing Kyneton Occurrence Sequence Axle Counter West Track Passenger Goods Signal KYN10 East Track Signal KYN12 Circular states Hi-rail to follow goods train on the East Track

Preliminary incident findings Communications between the signaller and the hi-rail operator failed to identify or mitigate the error made in getting on the wrong track Hi-rail did not question erroneous signaller movement Weed spraying is a night activity the current Rule Book does not cover night-time hi-rail operations No standards for hi-rail vehicles (in Victoria) No list of approved vehicles The S circular procedure failed as communications tool

Response Track inspections using hi-rails on double lines in a number of locations have been replaced with train cab inspections Contractors must be accredited or be accompanied by a V/Line Supervisor The Hi-rail Project

General incidents experienced in Victoria include: Near misses particularly at HXP level crossings Separation of parts / plant and equipment being left on track after hand back SPADS particularly with track machines / tampers / regulators etc. Derailment Safeworking breaches e.g. exceeding authority / failure to comply with Rule Book Elphinstone tunnel 2004 incident Unattended hi-rail equipment within occupations

Weaknesses There are not many system safety strengths within Victoria at present Track worker competency especially with a major rail project underway - Bread maker yesterday track worker tomorrow Procurement / contractor management technical requirements Vehicle design integrity Contractor / in house staff hi rail safe use verification Record keeping Risk mitigation SFAIRP

Strengths - V/Line Hi-Rail Project V/Line and others have been reviewing various aspects of hi-rail operations for some time and funds have been made available to improve RRV specification and procedural operation: Project commenced in October 2012 A risk-based and holistic review of hi-rail operations to develop, adopt or review: - An engineering standard and maintenance requirements - Certification or approval process for plant - Book of rules related to hi-rails - Operating instructions and required competencies Consultative and collaborative approach with MTM and others.

Project Overview

Any Questions?