SECTION 2 HAZARDOUS WORK. CLASSIC STANDARD 2.04 Working at Heights

Working at a height of two metres or more while carrying out general work activities or construction works

GHD EPCM Standard operating procedure Working at height May 2013 v1

ELEVATED WORK POLICY

Safe Working at Height Major Hazard Standard

Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

Procedure. Working at Heights. 1. Purpose. 2. Scope. 3. Definitions. 4. Planning QUT risk check Work at Height permit

SITE SPECIFIC FALL PROTECTION PLAN

FALL PROTECTION WORK PLAN

Managing the risk of falls while working on roofs in housing construction

Fall Protection Guidelines

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

Guidance Note GN049. Using portable ladders safely. WorkSafe Tasmania Department of Justice. Introduction and purpose

Working at Height. Procedure

WORK AT HEIGHT UNIT 4

Working at Height. A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use.

FALL PROTECTION PROGRAM

Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, , , , and1926.

Fall Protection Program

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

CHAPTER 10. FALL PROTECTION PROGRAM

WORKING AT HEIGHT GUIDELINES. Version II

Work at Height. John Frontczak Construction Manager Facilities Engineering Chevron Corporation. All rights reserved.

Hazard Identification, Risk Assessment and Control (HIRAC) for Work at Height Risk, Health and Safety

Introduction to Fall Protection

Revision: Author: M Simons Department: HSEC. Category: Work Areas CONTENTS

Golden Safety Rules booklet. No one gets hurt, no incidents

Fall Protection and Fall Prevention. San José State University Environmental Health and Safety Facilities Development & Operations

Working at height A brief guide

COURSE INFORMATION SHEET

Working at Heights and Fall Protection

ISSC 34 Guide for Height Safety within the NSW Electricity Supply Industry

PREVENTION OF FALLS WORKING ON ROOFS

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

This material was produced under grant number SH F-48 Occupational Safety and Health Administration, U.S. Department of Labor.

Procedural Guidance for Roof Access/Roof Work

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

Question and answer brief for the construction industry on the Work at Height Regulations 2005

Programme-Based Engagement (ProBE) for Fall From Heights. Statistics

ELECTRICAL SAFETY & ARC FLASH Handbook

EMPLOYEE FALL PROTECTION

Managing the risk of falls at workplaces code of practice

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

UTILITIES. June 2006 WORKING AT HEIGHTS RESOURCE. WorkCover. Watching out for you.

4. How often should vehicles being used at worksites be inspected?

68 Metal Industry Guidelines for Safe Work

June 22, Steve Johnson Operation Manager Best Roofing, Inc N. 288th St. Sioux City, IA Booker Elementary Safety Survey Omaha, NE

QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION

Preventing Falls in Housing Construction

WORKING AT HEIGHTS. Introduction. Risk Assessment

Fall Protection. Solutions for Safety at Heights. Risk Assessment. Hierarchy of fall protection options. Supplementary Administration Controls

WORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015

MANAGING THE RISK OF FALLS AT WORKPLACES

Ladder Program and Training Materials

Walking Working Surfaces and Fall Protection Program

SAFE WORK ON ROOFS PART 1: COMMERCIAL AND INDUSTRIAL BUILDINGS. making a difference CODE OF PRACTICE New South Wales Government

Level 1 Award in Health and Safety in a Construction Environment

Managing the Risks of Falls at Workplaces

Contractor s Safe Working Agreement

Work at Height / Falling Objects

FALL PROTECTION PROGRAM RESCUE PLAN

NZQA registered unit standard version 4 Page 1 of 6

FALL PREVENTION PLAN FPP. Sharing of Safe Work at Height

Walking and Working Surface Checklist:

Excavation & Trenching Procedure

Fall Protection Basics for Construction Activities

The following symbol denotes a generally compliant condition: The following symbol denotes a generally noncompliant condition:

Working at Height Safety Methods For Live Entertainment and Events

SITE CONTRACTOR PROCEDURES

Health and Safety Resources Caution to Users

Fall Protection Safe Work Plan Fall Distance of 7.5M or More

Aerial/Scissor Lift Program. Environmental Health & Safety Office

The Work At Height Safety Association

RESIDENTIAL ROOF TRUSS INSTALLATION PROCEDURES

WALKING-WORKING SURFACES (SLIPS, TRIPS, AND FALLS)

Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules

Pre-Qualification Questionnaire Checklist

Environment, Health and Safety Technical Guidance

Safety. Vopak Fundamentals on Safety

A Workplace Accident and Injury Reduction (AWAIR) Program for Small Construction Employers

G. D-Ring A connector incorporated into a full body harness as an attachment point for lanyard and energy absorber lifelines.

NATIONAL CODE OF PRACTICE FOR THE PREVENTION OF FALLS IN HOUSING CONSTRUCTION

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

Job safety analysis Installing wall frames and roof trusses on-site

Drew University Ladder Safety Program Policy and Inspection Procedure Draft 0412

A Workplace Accident and Injury Reduction (AWAIR) Program for Small Construction Employers

RESCUE PLAN FALL PROTECTION PROGRAM

AUSTRALIAN AIRCONDITIONING SERVICES SAFETY MANAGEMENT PLAN

PRE-COURSE ASSIGNMENT

WEEKLY SAFETY MEETING

SG19:10 NASC. A Guide to Formulating a Rescue Plan. NOTE: Scaffolders who need to use a harness should never work alone. 1 of 8 1.

Fall Protection Training Guidebook

The University of Texas at Austin. Lift Safety Plan

What is Fall protection?

Fall Protection Solutions

WORKPLACE SAFETY. Table 1: Industries with highest fatalities rates and types of highest fatal* / non fatal^ injuries

HEALTH & SAFETY HANDBOOK. No Body GetsHurt. Our Safety Slogan is:

WORKING AT HEIGHT & ITS WOES

Tremline Pty Ltd trading as The Hills Bark Blower

Transcription:

PORT HEDLAND PORT AUTHORITY Working at Heights Procedure PR-OHS021 Document Users : All Contractors All Port Users Port Hedland Port Authority Position Responsible For Keeping Document Current : Safety and Security Advisor Revision Trigger : Significant change

Table of Contents 1. Scope...3 1.1 Application... 3 2. Definitions...3 3. Job Hazard Analysis...3 4. Ladders...4 5. Ladders...4 6. Safely Working at Heights...4 6.1 Training... 4 6.2 Hierarchy of Protection... 5 7. Scaffolding...5 8. Elevated Work Platforms...5 9. Barricading...5 10. Anchor Points...6 11. Rescue Plans...6 12. Equipment Register...6 13. Exempted Activities...6 Page 2 of 7

1. Scope The Port Hedland Port Authority recognises that work performed at heights presents a significant risk if not correctly managed. This document provides guidance on protecting people from the risk of falling from heights in the workplace. 1.1 Application This document is applicable to all work on PHPA land and roadways, including work undertaken on behalf of the PHPA at other locations. 2. Definitions Work at Heights Is any work undertaken where the potential for harm to a person or damage to equipment or the environment is created when a risk of falling is present Working at Heights Permits Required when conducting works within two metres of an open edge, from an elevated work platform or personnel cage or on surfaces which are not stable or where risk has been identified in a Take 5 JHA Job Hazard Analysis, a method of assessing the hazards associated with a task and implementing control measures to enhance the safety of all personnel Working at Height Permit Issuer A PHPA Supervisor that has been approved by the Registered Mine Manager to issue working at Heights Permits Trained Persons Persons that have completed an accredited working at heights training package and have been deemed competent Scissor Lifts Scissor Lifts are type of platform which lowers and raises vertically, they generally employ folding supports in an X pattern. Work undertaken from a scissor lift maybe done so without a harness; as such they are exempt from PHPA working at height requirements Elevated Work Platform (EWP) Are slewing boom lifts which are specifically designed to elevate personnel off the ground and manoeuvre them into a working area. EWP s generally have a full range of manoeuvrability while elevated Personnel Cage is specifically designed for use with either a crane or a forklift to lift people or equipment. Restraint Technique A fall is not possible, a person s movements are controlled by a belt or harness, or a combination, a safety line and a safety line anchor point which physically prevent the person from being in a position where there is a risk of a fall. Restrained Fall The person is partially restrained by a restraining device and the fall is arrested Limited Free Fall A fall where the arrest of the fall by the fall arrest system begins to take loading within 600mm of movement, either vertically or on a slope which it is not possible to walk on unassisted. Free Fall A fall where the fall arrest system experiences movement in excess of 600mm either vertically or on a slope which it is not possible to walk on unassisted before the system begins to take loading and arrest the fall, the distance of the fall must not exceed 2 metres. 3. Job Hazard Analysis The Port Hedland Port Authority requires that all work to be conducted at heights be subject to a Job Hazard Analysis (JHA), this includes work which requires the use of a ladder to access/egress the work site. Some examples of things the JHA should take into account are; Page 3 of 7

Whether fall protection is needed The type of fall protection that will be required The equipment being used Impacts of falling equipment or tools Other work currently occurring in the area The JHA should also consider whether it is possible to undertake the work in manner which would not require personnel to work at heights, or whether any other control measures that relate to the hierarchy of control could effectively be utilised. 4. Ladders Ladders may be used in work activities without the need for fall protection or a working at heights permit provided the following requirements are met; 1. When ascending or descending a ladder both hands and feet must be used, the person must be facing the ladder and maintain three points of contact at all times, moving one rung/step at a time. 2. Ladders must comply with the relevant Australian Standards, AS1657 and AS1892. 3. For work to occur from a ladder, three points of contact must be maintained at all times, leaning or stretching away from the ladder must not be required. An example of an acceptable activity would be changing a light globe directly over head. 4. A JHA must be undertaken if a significant risk is identified for all works involving ladders. 5. Ladders Where work requires the use of both hands a platform should be considered, platforms provide a stable surface to work from, they generally have railings on three sides to prevent a person losing balance and falling. If using a platform a working at heights permit is not required providing the following requirements are met; 1. The platform has enclosed railings on all four sides. 2. The platform complies with the relevant Australian Standard, AS1657 and AS1892. 3. The platform must not be able to move while a person is on it. 4. A JHA must be undertaken for all works involving a platform. 6. Safely Working at Heights The Port Hedland Port Authority requires that measures are implemented which reduces the risk of a fall to as low as reasonably practicable, in cases where controls cannot be engineered which will eliminate the risk of a fall from heights, working at heights PPE will be utilised. Appropriate PPE will be selected based on the type of work to be undertaken and the level of protection required. 6.1 Training Before any person is able to conduct work at heights which requires a permit on a Port Hedland Port Authority site they must have completed a nationally accredited course for working at heights. Page 4 of 7

6.2 Hierarchy of Protection The following methods of providing protection from falls are available, the most effective method should be utilised based on the hazards identified in the JHA. 1. Restraint Technique this method is the preferred in all situations where working at heights is required, it provides the most effective protection to the worker and minimises the risk as low as practicably possible. 2. Restrained Fall this method can be used in situations where the restraint technique will not provide effective protection due to movement required or location being worked, as the fall is arrested it is an effective method to protect the worker. 3. Limited Free Fall this method should only be used in situations where it is not possible to utilise either the restraint technique or a restrained fall system, work which requires this method to be implemented must have sign-off and approval from the Operations Officer and the Maintenance Superintendant. 4. Free Fall this method is considered a last resort, should no other way of completing the work be practicable or safe this method must be accompanied by a comprehensive safe work plan, which incorporates a rescue plan and have sign-off and approval from the Registered Mine Manager, who has physically inspected the work site prior to work commencing, utilisation of this method without these controls may result in expulsion from site. 7. Scaffolding Scaffolding is a sound method to reduce the risk of working at heights however care must be taken to ensure that setting up the scaffolding does not present a greater hazard than completing the work by another means, a JHA should be conducted in consultation with a person trained in working at heights. Scaffolding is only to be constructed by licensed scaffolders and must have complete floors, handrails and toe-boards. The scaffold must be inspected and tagged before initial use, and at regular intervals. If an inspection tag is missing or removed the scaffold should not be used and a PHPA supervisor must be advised immediately. Safe access and egress must be available at all times wherever scaffolding is installed and used. 8. Elevated Work Platforms All persons operating an Elevated Work Platform must be trained and assessed as competent which includes holding a national High Risk Work Licence for the operating of EWP s. The following requirements also apply to the operation; 1. Fall arrest PPE must be worn whenever the machine is running, by all persons in the basket 2. Users must attach their safety lanyard to the lowest manufacturers approved anchor point available 3. The EWP must only be operated within the manufacturers specifications and recommendations 4. Personnel will not leave the basket of an EWP while it is elevated 9. Barricading Control measures must be implemented to control the risk of objects falling whenever work is conducted at heights, where injury or damage possible by the risk of an object falling barricading must be utilised in addition to any other controls measures identified in the JHA. Page 5 of 7

10. Anchor Points Fixed or permanent anchor points shall be design rated and inspected as fit for purpose. Fix anchor points must sign posted, displaying the date of last inspection, name of the installer, standard that it complies with and the maximum safe working load. All anchor points must be inspected prior to use and be suitable to withstand a load of 1500kg, for a single person and 2100kg if used to anchor two people. Where possible anchor points should be attached to a structural point above the head, hand rails and guard rails are NOT working at heights anchor points. Periodic inspection of anchor points must occur every 12 months. Persons operating EWP s are required to use the lowest manufacturers approved anchor point available. 11. Rescue Plans Prior to a working at heights permit being issued a detailed rescue plan should have been identified, including the equipment required to effect a rescue, the equipment outlined in the rescue plan must be available onsite and trained personnel must be available to effect the rescue. This requirement may be modified at the discretion of the permit issuing officer if the JHA which has been completed adequately identifies additional controls or demonstrates the risk is sufficiently managed to allow alternative arrangements. 12. Equipment Register All Working at heights equipment, rescue gear and anchor points must be recorded in a register, this following information should be included: Description of the Equipment / Anchor point Identification Location equipment is stored / Location of anchor point Name of manufacturer Serial Number, date of manufacture and withdraw from service date Last Inspection date Next Inspection due date Comments 13. Exempted Activities 1. Access to open wharf edges do not require a working at heights permit however the following requirements apply: A buddy system must be implemented A recovery plan must be available Means of communication to raise an alarm must be identified Requirements of PHPA working over water procedure must be adhered to 2. Other activities may be added to the list of exempted activities as safe work procedures and method statements are developed and available for the activity. Prior to any activity being exempted from the requirements of a working at heights permit the Register Mine Manager and section Superintendent must sign off on the safe work procedure or method statement. Page 6 of 7

Revision Prepared by: Reviewed by: 1 S&SA Operations Managers Group DETAILS OF REVISION CHANGES OLD SECTION REF. NEW SECTION REF. DESCRIPTION OF CHANGE Page 7 of 7