Revision Description By Approved Date Apr 06 Change to Rilta Env. Ltd. CH 26/04/06 Jan 08 Review CH EI 18/01/08



Similar documents
MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

Employee Health and Safety Induction Training Record

EMERGENCY PLANS FACT SHEET

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

For inspection purposes only.

ANNEX 2 Emergency / Pollution Incident Response Plan

CHEMICAL SPILL MANAGEMENT GUIDELINES

BUSINESS RESILIENCE AND DISASTER RECOVERY POLICY

Pollution Incident Response Management Plan

Safety and Environmental Information for External Companies Koehler Oberkirch

FIRE RISK ASSESSMENT WORKED EXAMPLE

The terms hazard and risk are often used, which we define as the following:

Emergency WARDEN HANDBOOK. Lets Keep Fire Safety Proactive not Reactive

EMERGENCY ACTION AND FIRE PREVENTION PLAN

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN SLUG CONTROL PLAN

Fire Evacuation Procedures Network Building, 97 Tottenham Court Road, London, W1

SAFETY GUIDANCE MATERIAL

SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl

Sample New Employee Safety Checklist

THE UNIVERSITY OF NEWCASTLE- SCHOOL of BIOMEDICAL SCIENCES

Safety and Health Office WORKPLACE SAFETY CHECKLIST

FIRE SAFETY RISK ASSESSMENT

Berkeley Castle. Occupant Fire Safety

GUIDE NOTES FOR SCHOOLS, ACADEMIES AND COLLEGES

Emergency procedures instructions to farm staff

Health and Safety Policy

NORTH BIRMINGHAM ACADEMY

CHEMICAL SPILLS. (revised April, 2013)

BRITISH SCHOOL OF GENEVA HEALTH AND SAFETY POLICY

Contents. Company Name: XTP Recruitment Ltd ( the Company ) Policy No. XTP002. Policy Name: Model Health and Safety Policy. Date: January 2014

Safety and Environmental Information for External Companies

Spill Kits and Incidental Spill Response

Pollution Incident Response Plan

HEALTH AND SAFETY POLICY Issue Date: November 2014

The Hub Dental Practice

Fire alarm bells (and associated fire detection equipment) are tested on Wednesday mornings between

Safety and Environmental Information for External Companies

UNIVERSITY OF WISCONSIN MADISON

1.0 APPOINTMENTS 2.0 FIRE RISK ASSESSMENTS

FLA S FIRE SAFETY INITIATIVE

TOOELE COUNTY EMPLOYEES EMERGENCY SAFETY HANDBOOK 2012 REVISION

1.1.4 The findings from Fire Risk Assessment must be incorporated into the FRAMS Action Plan to manage fire safety at each premise.

Fire Risk Assessment Safety Checklist

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

OCCUPATIONAL HEALTH AND SAFETY POLICY: INCIDENT AND INJURY REPORTING ERJ

CONTRACTOR INDUCTION HANDBOOK

SMITH COLLEGE EMERGENCY PLANNING SUMMER PROGRAMS EMERGENCY PLAN

This plan, its contents, and emergency notification procedures shall be made available to all appropriate University employees.

Health & Safety Policy For Locations Hosting Film Production Companies

HSE Requirements for Contractors

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

SPILL RESPONSE PROCEDURE

A. OCCUPANT FIRE PROCEDURES... 3 B. THE TENANT FIRE SAFETY TEAM... 6 C. SENIOR FIRE WARDEN... 7 D. DEPUTY FIRE WARDEN... 8

Fire Safety PROCEDURES January 2011

FLAMMABLE LIQUIDS COMPLIANCE NOTE

Safety at Kaiser Permanente Los Angeles Medical Center Environmental Health & Safety Department

Environmental Management System Procedures

Pollution Incident Response Management Plan (PIRMP)

Occupational Health and Safety in the Laboratory (Undergraduate Students)

CITY OF LONDON SCHOOL FOR GIRLS FIRE SAFETY, PROCEDURE AND RISK ASSESSMENT POLICY

EVACUATION & EMERGENCY PREPAREDNESS PLAN

ROAD TRANSPORT EMERGENCY PREPAREDNESS

Occupational Health & Safety Policy Injury & Incident Reporting

Part 1: Incidents taking place on department property

Fire Safety Policy/Procedures

1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG Introduction

FIRE EVACUATION PLAN. School of Mathematics & Statistics

File: Spill Response Plan for Hazard Chemicals and Mercury Spills. Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website

Health and Safety at Work Policy

MAJOR EMERGENCY RESPONSE PROCEDURE

Health and Safety Policy

Spill Clean-up. Flammable Liquids Liquids with flash points below 100 degrees Fahrenheit.

Standard Operating Procedure for a Chemical Spill

BWC Division of Safety and Hygiene

EPA PRIMP Pollution Incident Response Management Plan

EVENT SAFETY MANAGEMENT PLAN. A Small/ Medium Scale Event

Civil Engineering Sector Labour-Management Health and Safety Committee

Union College Campus Safety Emergency Action Guide

For Libraries and Archives

SCS1. UNIT TITLE: MAINTAIN HOTEL SECURITY

SCC CONTRACTOR ORIENTATION CHECKLIST

HYDE PARK SCHOOL, Marble Arch CRISIS MANAGEMENT PLAN

RESOURCE RECYCLING SOLUTIONS LTD

While at work your safety also depends upon your colleagues. If you observe an unsafe situation, point it out to your colleague.

Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).

An inventory of hazardous materials used in your workplace will prove useful.

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

HEALTH & SAFETY HANDBOOK. No Body GetsHurt. Our Safety Slogan is:

Chippewa County Courthouse Security Emergency Procedures. Dial FIRE POLICE AMBULANCE

EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use

Gatehouse School. Fire Risk Assessment

MAJOR PLANNING CONSIDERATIONS CHECKLIST

Working for business. Workplace Safety Discount Application With employees

Health and Safety Policy

Decree of the Ministry of the Environment. on fire safety of garages

Transcription:

DATE NOVEMBER 2004 PAGE 1 of 8 This document is issued and controlled by the Environmental Manager. This is a controlled document subject to change at any time, and therefore should not be copied. Only signed, authorised copies may be used as working documents. Revision Description By Approved Date Apr 06 Change to Rilta Env. Ltd. CH 26/04/06 Jan 08 Review CH EI 18/01/08 1.0 Purpose 2.0 Scope To ensure the safety of all staff, visitors and contractors working at the Integrated Waste Site premises at Greenogue Business Park. 2.1 The main emergency risks associated with RILTA Environmental operations are fire and spills. 2.2 This emergency plan outlines the emergency procedure that should be followed when dealing with any potential emergency situation such as fire, spillage, explosion, equipment failure etc. 2.3 The plan provides for the minimisation of the effects of any emergency. 3.0 Responsibility 3.1 The following section outlines the responsibilities and duties of all RILTA Environmental personnel charged with implementing and maintaining the emergency plan. 3.2 Facility/Operations Director or Designate (Mr. Eftim Ivanoff) 3.2.1 Providing overall direction and support to those responsible for the plan. 3.2.2 Having available adequate financial and manpower resources to prepare for and carry out emergency duties. 3.2.3 Responding to all external enquiries from interested parties in connection with an emergency. 3.2.4 Taking full control of operations in an emergency in the role of plant incident controller (if present). 3.3 Facility Manager (Mr. Colm Hussey) 3.3.1 Formulating, reviewing and updating the emergency plan in conjunction with relevant management personnel.

DATE NOVEMBER 2004 PAGE 2 of 8 3.3.2 Monitoring the effectiveness of the plan through periodic drills to be held at least twice a year. 3.3.3 Informing local emergency response teams of the details of the emergency plan. 3.3.4 Overseeing all emergency responses (if present). 3.3.5 Providing and updating necessary MSDS information for all chemicals handled on site. 3.3.6 Checking and maintaining all the necessary emergency supplies and equipment. 3.3.7 Providing/organising training for personnel with responsibilities as outlined in this emergency plan. 3.3.8 Provide and maintain up to date roll calls for an emergency. 3.3.9 Organise a minimum of 2 evacuation/emergency drills per annum. 3.3.10 In the absence of the Operations Director, taking full control of operations in an emergency in the role of plant incident controller (if present). 3.4 Supervisors/Foremen (Colin Moore/Adrian Kirby/Declan Geoghegan) 3.4.1 Check that subordinates are sufficiently trained/briefed to follow the emergency procedures as outlined in this emergency plan. 3.4.2 Indicate any required modifications/additions to the emergency plan to the Facility Manager, or Operations Director on an on going basis. 3.4.3 Provide up to date site information to help with the maintenance and development of this emergency plan. 3.4.4 In the absence of the Facility Manager or Operations Director, taking full control of operations in an emergency in the role of plant incident controller. 3.5 RILTA Environmental Personnel 3.5.1 Notifying their supervisor, Facility Manager or Operations Director as appropriate on leaving or returning to the plant inside normal working hours. They should also inform a responsible person assigned to their own assembly point if necessary so that they can be accounted for in the event of an emergency occurring.

DATE NOVEMBER 2004 PAGE 3 of 8 4.0 EMERGENCY RESPONSE S 4.1 The following section outlines the emergency response procedure and individual responsibilities. 4.1 Finder On discovering an emergency situation the finder should; 4.1.1 Raise the alarm by breaking a glass unit, inform reception and attempt to tackle the emergency with the available emergency equipment, e.g. fire extinguishers, if trained to do so. 4.1.2 If the finder considers the emergency to be beyond control, to leave immediately by the nearest fire exit and proceed to the designated assembly point at the front of the building. 4.1.3 Immediately inform reception of the location/nature of the emergency and services required. 4.2 Reception 4.2.1 Inform all site supervisors of the nature of the incident and direct them to emergency assembly point. 4.2.2 Return to reception if absent and remain there for the duration of the emergency, unless otherwise instructed by the plant incident controller. 4.2.3 Await instructions from the plant incident controller or his designate. If evidence of a serious emergency exists, dial 999 immediately and give whatever information that is available. 4.2.4 Keep telephone lines clear for emergency calls 4.2.5 Take roll call for visitors/representatives and inform the Chief warden of the headcount status. 4.2.6 On the instructions of the plant incident controller, inform personnel to leave the site. 4.2.7 Prevent incoming traffic except for outside emergency services/call in personnel. 4.2.8 Direct outside emergency services to site of emergency on arrival.

DATE NOVEMBER 2004 PAGE 4 of 8 4.3 Plant incident controller The role of the plant incident controller shall be assumed by the Facility Manager or Operations Director or in their absence, the site supervisor. On hearing the alarm he should; 4.3.1 Proceed directly to the emergency location 4.3.2 Liase with reception 4.3.3 Prepare hydrant connection in anticipation of the emergency services 4.3.4 Give instructions, to contact outside emergency services, as required, providing information on the nature of the emergency. 4.3.5 Give instructions to have all personnel removed off site depending on the nature of the emergency. 4.3.6 Give the all clear. 4.3.7 Liaise with the fire wardens. 4.3.8 Receive information on any missing personnel. 4.3.9 Instruct first aiders to proceed to the site of the emergency. 4.3.10 Instruct personnel to move off site depending on the nature of the emergency. 4.3.11 To initiate a search and rescue for missing personnel, if deemed safe to do so. 4.3.12 Hand over control of the emergency to outside emergency services on their arrival and provide any information/assistance as required. 4.4 Managers/Supervisors/Foremen On hearing the alarm they should: 4.4.1 Order an immediate evacuation, checking that all equipment is shut down safely. 4.4.2 Search designated area for stragglers/trapped persons and close all doors on leaving. 4.4.3 Take appropriate action to confirm the emergency pending the arrival of outside emergency services. 4.5 Fire wardens On hearing the alarm they should; 4.5.1 Leave immediately via the nearest available exit, proceed to the nearest assembly point and take a roll call. 4.5.2 Fire wardens should relay the headcount status to the plant incident controller. 4.5.3 Lead personnel off site if instructed to do so by the plant incident controller. 4.5.4 Instruct personnel to remain at the assembly point, until the all-clear is given by the plant incident controller.

DATE NOVEMBER 2004 PAGE 5 of 8 4.6 First Aiders (Helen O Brien/Eoin Kirby) On hearing the alarm they should; 4.6.1 Leave immediately via the nearest available exit and proceed to the nearest assembly point. 4.6.2 Proceed to the emergency site if requested to do so by the fire warden. 4.6.3 Remain at the assembly point until further notice by the fire warden. 4.7 Employees/Contractors/Temporary Staff 4.7.1 Leave immediately via the nearest available exit and proceed to the nearest assembly point. 4.8 Visitors/Representatives On hearing the alarm should: 4.8.1 Leave immediately via the nearest available exit and proceed to the nearest assembly point. 4.9 Fire Water 4.9.1 Waste treatment: all drainage in the waste treatment facility leads back into the main settlement tanks. 4.9.2 Drum Division and Hazardous Waste transfer Station: Both the drum division and transfer station have a floor drainage safety valve, which is kept in the closed position. Surface water drains into a sump, which can be extracted and transferred to the relevant holding tank for export. 4.9.3 The site incorporates actuated isolation valves on both the foul and surface water drainage systems that can be shut off completely in the event of an emergency, thereby providing for the containment of firewater.

DATE NOVEMBER 2004 PAGE 6 of 8 RILTA Environmental Ltd Emergency Telephone Numbers 24-Hour Emergency Number - (01) 4018000 Managing Director - Nick Beale (086) 2501900 Director - Eftim Ivanoff (086) 2347400 Facility Manager - Colm Hussey (087) 9176264 RILTA Environmental Main Office Number - (01) 4018000 Fire Brigade - 999 Ambulance - 999 Company Doctor Gardai - 999 - Dr. Patrick Feeney, 96 Lwr. Kilmacud Road Stillorgan, Co. Dublin, Tel.: (01) 2885851 Gardai (Local) - Garda Station, Rathcoole (01) 6667900 South Dublin C.C. - (01) 4149000 EPA Headquarters Wexford - 053-60600, Fax: 053-60699 EPA Office Dublin - (01) 2680100 ESB - 1850 372999 / (01) 6778855 Eastern Regional Fisheries Board - (01) 8379209

DATE NOVEMBER 2004 PAGE 7 of 8 Personal Protection and Emergency Equipment The following is a list of personal protection and emergency equipment kept on site at Sheriff Street and available to all staff. Personal Protection Equipment 1 Hard Hats. 2 Visors. 3 Goggles. 4 Safety glasses. 5 Gloves. 6 Gas masks. 7 Ear muffs Fire fighting equipment 1 Portable fire extinguishers. 2 Fire Hoses. 3 Hydrant connection Emergency Infrastructure 1 Remote controlled sewer shut-off valve or Actuator Spillage Kits 1 Absorbent material. 2 Containment booms/sand bags. 3 Wiping cloths. 4 Vacuum Pumps/Tanks First Aid Equipment 1 Eye wash units. 2 First aid boxes. 2 Emergency shower. Safety/Emergency Information 1 Material safety data sheets are kept on file in the control building. 2 Emergency contact/phone numbers posted around the site. 3 Site maps showing assembly points and safety/fire fighting equipment are posted around the site. 4 An emergency assembly point is clearly marked in the facility yard. 5 All incoming wastes/chemicals are stored in clearly labelled, bunded areas. 6 Operating Work Instructions and procedures have been established for all site activities. 8 RILTA Environmental operate a strict no smoking policy on site.

DATE NOVEMBER 2004 PAGE 8 of 8 Safety Hazards As with most workplaces, there are potential safety hazards related to working at the Integrated Waste Facility. RILTA management will do everything possible to create and maintain a healthy and safe working environment. However, it is the duty of each employee to take steps to minimise any potential risks to themselves and colleagues and to bring to the attention of the management any hazard, which they feel may not be sufficiently addressed. RILTA Environmental provides emergency training for all site staff. The following table highlights the emergency training given to RILTA staff. Training Issue Staff Involved Trainer Frequency Spillages All site staff In-house Annually Fire Evacuation All site staff In-house Bi Annually First Aid All site staff External Course Every three years Use of Fire All site staff External Course As required Extinguishers Basic First Aid First Aid Staff External Course As required Chemical Handling All site staff External Course As required Basic Site Health & Safety All site staff In-house Induction/As required Forklift Operation Relevant Site Staff External Course Induction/As required Hazardous Goods Drivers External Course Induction/As Transport required Schedule of Incident Personnel Supervisors/Foremen Colin Moore Adrian Kirby Paddy Smith Declan Geoghegan First Aid Personnel Helen O Brien Eoin Kirby Fire Wardens Colin Moore (TBC)