PDmB, Inc. Definitions



Similar documents
Mark Cramer Inspection Services, Inc.

Pre-Drywall Inspection Report

Georgia Association of Home Inspectors

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Applications for building permits will not be reviewed until all of the required information has been submitted.

HomeSpec REPORT SUMMARY

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/20/2009)

Total Home Inspection Checklist

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

COMPREHENSIVE PROPERTY INSPECTIONS

Inspection Tech. (330) Inspected By: Aaron Westerburg

Building Information Packet

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Home Inspection Report

Inspection Item COMMENTS

Holz Choices & Specifications

How To Build A Basement House

2014 FLORIDA BUILDING CODE

Residential Inspection Guidelines

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

Residential Building Inspection Policies

Additions and Alterations

Residential Deck Safety, Construction, and Repair

Typical Finished Basement Details

Structure Survey Findings:

Typical Finished Basement Details

8/18/14. Introduction to. Framing. Terminology and Concepts

BUILDING PERMIT SPECIFICATIONS

Engineered Wood Foundations

Vision Home Inspection

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Uniform Construction Code (UCC) Building Permit Application Package

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Building Condition Assessment Report

Footing and Temporary Power Inspection

Custom 30 x 20-8 Garage Plan Plan #g233 By SDS-CAD Specialized Design Systems

RRIO Checklist. Use of checklist: Definitions: Limitations

Self-Home Inspection Checklist

Residential Building Permits

Basic Requirements for Residential Plan Review _

Single Family Residential Basement Finish

Quality Home Inspections, LLC 4433 Tennyson Street Denver, Colorado

Does Wall Township require an inspection by the building department on resale of a home?

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

Botetourt County, Virginia. Residential Information Handout

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: Inspection Date: Saturday, February XX, XXXX

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

FINISHED BASEMENT REQUIREMENT GUIDE

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

March 14, Installation of Bay, Bow and Garden Windows

POST AND FRAME STRUCTURES (Pole Barns)

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

New Home Walk-Through Package

Crawford Inspection Services C.C.B. #

you haven t seen sawgrass until you ve seen old landing & coronado drive, rehoboth beach, de

Sample Drawing Package for One and Two Family Dwelling Applications

PROPERTY INSPECTION REPORT Property Address:

City of St. Charles Basement Finish or Remodel

How To Make A House Safe

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

GENERAL WIRING RULES FOR HOUSES

Inspecton Report. Property Address:

Home Inspection Report

Residential Decks. Planning and Development Services Department

Superform Products Ltd.

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

I NI NP R Inspected Items

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

2014 British Columbia Building Code Changes

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Certification: Building Plans Examiner. Exam ID: B3

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Uncovered Decks & Porches

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Home Inspection Report

Home Inspection Report

PROPERTY INSPECTION REPORT

Residential Plan Routing Information

Home Inspection Report

BUILDING SAFETY UNIT

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

Latigos Trail 911 Latigos Trail ~ Des Peres, Missouri $428,500

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Mike and Jen Sample 111 Main St. Tabb, VA SPECIFICATION LIST

Chapter 6 ROOF-CEILING SYSTEMS

Home Inspection Report

Estimating Database Checklist

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Inspection Report. Prepared For: Sampath Sample. Property Address: Waterside Drive. Alpharetta, GA Atlanta Home Inspections

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

SINGLE-FAMILY EARTHQUAKE (SEISMIC) RETROFITS

GeorgiaHomePros.com Yellow Creek Road Ball Ground, GA Inspected By: Scott Webb

The Verona 4 BEDROOMS I 3 ½ BATHS I 3,220 SF I PLAN 4628

Transcription:

Page 1 of 11 Definitions S Satisfactory Meets industry standards for proper material and installation NP Not Present Condition or item was not present at time of inspection NI Not Inspected Condition or item was not inspected M Marginal Meets industry standards for proper material and installation, but improvements are recommended U Unsatisfactory Does NOT meet industry standards for proper material or installation. Corrections will be required. Builder Buildum Quick Builder Address 1234 Rocky Road City Somewhere State US Zip 12345 Phone 555-222-1111 Fax 555-222-1212 Rough Framing/Mechanical Inspection Builder Information Address Information Builder Subdivision Quail Run Lot # 321 Inspection Address 5432 Quail Lake Dr Permit # 45-345-07 City Somewhere State US Zip 12345 Contact Name Bob D. Builder Phone 555-222-1111 Fax 555-876-7899 E-Mail bobdbuilder@buildumquick.com Client Name Janet and Jim Newhomowner Client Address 456 Smith Rd City Somewhere State US Zip 12345 Phone 555-222-3434 Fax 555-222-6543 E-Mail newhomowner@cc.com Inspector Name Joe H. Inspector Company Name Company Address 9600 Colerain Ave Suite 110 City Cincinnati State OH Zip 45215 Phone 555-333-4656 Fax 555-324-3266 E-Mail joeinspector@cc.com Amount Received $275 File Number 888-07 Client Information Inspection Company General Conditions Inspection Date 6/21/07 Start Time 9:00 End Time 10:30 Temperature 75 degrees Weather Partly sunny Soil Conditions Dry Others Present Buyer Space Below Grade Basement Building Type Multi-family Garage Attached Planned Sewage Disposal City Planned Water Source City Permits Obtained Building Permit PDspect, Copyright 1998-2008,

Page 2 of 11 Roof System Evaluation of inspection conditions and requirements are limited due to the unavailability of approved construction plans and specifications at the time of inspection. Main roof Roof Framing 1. Approved plans on-site? Yes No 2. Type: Gable 3. Method of Inspection: On roof 4. Unable to Inspect: 0% 5. Trusses: 2x4 Split truss, Recommend review and correction per structural engineer 6. Gang Nail Plates: 7. Proper Truss Nailing: 8. Joists: 9. Proper Joist Nailing: 10. Hangers: 11. Proper Hanger Nailing: All required nail locations were not filled, replace missing nails 12. Beams: Micro-Laminated 13. Truss Blocking: 2x4 14. Truss Bracing: 1x4 Missing crows feet diagonal blocking at North gable end 15. Fire-Stop Blocking: Plywood, 1x6 16. Roof Sheathing: 7/16" Oriented Strand Board 17. Proper Sheathing Nailing: 18. "H" Clips: 19. Attic Scuttle/Access: opening framing dimension too small-reframe as per plans 20. Roof Mounted Vents: Box 21. Roof Penetrations: PDspect, Copyright 1998-2008,

Page 3 of 11 Wall Framing 1. Wall Sill Sealer: Closed cell foam 2. Wall Anchor Bolts: Embedded anchor bolts 3. Wall Hurricane Straps: 4. Sill Flashing/Gasket: Flash & Seal Improperly installed, loose at seams 5. Exterior Bearing Walls: 2"x4" studs 16" on center 6. Bearing Wall Sheathing: 4"x8"x7/16" Oriented strand board (OSB) 7. Wall Vapor Barrier: Tyvek Improper installation, seams must run horizontal 8. Bearing Wall Blocking: 2x4 wood 9. Non-Load Bearing Wall Framing: 2"x4" wood Stud 24" on center 10. Non-Load Bearing Wall Blocking: 1x4 wood 11. Knee Wall: 2"x4" wood stud 16"on center Wall framed out of plumb/level at bath knee wall 12. Wall Furring: 13. Fire-Stop Blocking: Plywood Cavity not fully sealed 14. Beam(s): Glue Laminated 15. Beam Shims: Steel 16. Beam Anchors: Hex bolts 17. Column(s): Steel 18. Column Anchors: Ramshot anchors 19. Bulkhead/Soffit Framing: 2x2 wood Framed out of square 20. Framed Opening(s): 2x4 Opening framed incorrectly at head PDspect, Copyright 1998-2008,

Page 4 of 11 Floor and Ceiling Framing 1. Floor Joists: 2x10 structural grade 2. Floor Sheathing: 4'x8'x 3/4" T&G Plywood 3. Ceiling Joists: 4. Joist Hangers: Simpson hangers Not properly installed, Improper nailing 5. Cross Bridging: Steel bridging Replace bridging where missing 6. Attic Scuttle Framing: Present 7. Drop Ceiling Framing: 8. Ceiling Blocking: 2x2 Doors and Windows 1. Window Framing: Proper rough frame dimensions 2. Window Installation: Improper installation 3. Door Framing: Proper rough frame dimensions 4. Exterior Door Installation: Improper installation Opening is out of square 5. Garage Door Opening(s): Proper rough frame dimensions PDspect, Copyright 1998-2008,

Page 5 of 11 Stair Framing Foyer Stair Framing 1. Approved plans on-site? Yes No 2. Type: Prefabricated Units 3. Stringers: 2x12 Wood 4. Risers: Solid framed 5. Treads: Wood 6. Bullnose Tread: Prefabricated 7. Platforms/Landings: Site-built 8. Stair Blocking: 1x4 Wood Railing blocking missing 9. Head Clearance: Fireplace Framing Living Room Fireplace Framing 1. Approved plans on-site? Yes No 2. Type: Pre-fabricated 3. Flue/Chimney Framing: Metal Flue 4. Hearth Framing: Framing lumber and plywood sheathing 5. Flue Connections: 3 wall metal piping 6. Flue Supports: Metal straps 7. Combustion Air Ventilation: Flexible Foil Fixture and Cabinetry Layout Main Level Fixture/Cabinet Layout 1. Approved plans on-site? Yes No 2. Kitchen 3. Sink Drain Layout: Mislocated, requires correction 4. Kitchen Cabinetry Layout: 5. Island Layout: Slightly out of square, Relocate as required 6. Ventilation Fans: PDspect, Copyright 1998-2008,

Page 6 of 11 Fixture and Cabinetry Layout (Continued) 7. Bathroom(s) 8. Sink Drain Layout: 9. Vanity Layout: 10. Ventilation Fans: 11. Toilet Drain Layout: 12. Shower Drain Layout: 13. Sink Drain Layout: 14. Tub Drain Layout: 15. Tub Installation: Tub not installed to date 16. Whirlpool Tub Layout: 17. Whirlpool Tub Installation: 18. Laundry 19. Deep Sink Drain Layout: 20. Cabinetry Layout: 21. Washer Drain Layout: 22. Floor Drain Layout: Floor drain is positioned too far towards door- see plans for proper dimensions Plumbing Rough- in 1. Verify permit inspections are completed and approved 2. Main service sealed at wall penetration Fill gap at wall penetration 3. Supply piping complete and securely installed 4. Supply piping protection plates installed where required Install plates where missing 5. Sanitary drain piping complete, properly sized and securely installed 6. Sanitary vent piping complete, properly sized and secure Install missing support hangers 7. Sanitary vent piping vented to exterior 8. Required sanitary clean outs provided 9. Sink, tub, shower and floor drain traps installed 10. Shower and tubs installed level 11. Footing draintile complete along perimeter 12. Sump well installed and connected to draintile 13. Verify gas lines installed/secured at all gas equipment locations Gas supply piping installation is not installed to date 14. Change order items installed Added bar sink in Family room completed PDspect, Copyright 1998-2008,

Page 7 of 11 Electrical Rough- in 1. Verify permit inspections are completed and approved Electrical rough-in inspection not completed 2. Main panel securely mounted and accessible 3. Proper grounding and bonding provided 4. Branch wiring installed to all locations and secured properly Branch wiring installation is not completely installed to date 5. Interior fixture junction boxes installed and at proper locations 6. Exterior fixture junction boxes installed and at proper locations Box mounted at incorrect height 7. Switch and outlet locations verified 8. Branch conductor gauges sized properly as per local code requirements 9. Conductor splices protected within junction boxes 10. Minimum clearances provided for light fixtures 11. Proper support at ceiling fans 12. Change order items provided for No changes made to contract 13. Phone pre-wire locations verified/installed 14. Cable TV pre-wire locations verified/installed Mechanical Rough- in 1. Verify permit inspections are completed and approved 2. Supply ductwork properly installed/secure Install missing support braces 3. Return ductwork properly installed/secure 4. Return air cavities panned properly 5. Combustion air ventilation installed properly 6. Metal flue connections are tight, secure with exterior termination Connections disconnected, Connections not properly secured with fasteners 7. Clearances between flues and combustibles 8. Ventilation fans properly installed Not vented to exterior 9. Floor register temporary covers installed Install covers where missing 10. Change order items installed PDspect, Copyright 1998-2008,

Page 8 of 11 Housekeeping and Safety 1. Local construction authority inspections completed at time if this inspection: Mechanical rough-in, Electrical rough-in 2. Legal/ Company postings All required postings present 3. Fall protection: Open window opening Fall protection not installed at window opening. Add fall protection as illustrated 4. Daily site clean-up: Structure perimeter 5. Daily interior clean-up: Unclean conditions Construction debris throughout interior creating unsafe conditions 6. Excess construction materials: No materials present 7. Special features: 8. Change order items: PDspect, Copyright 1998-2008,

Page 9 of 11 Summary Roof System 1. Main roof Roof Framing Trusses: 2x4 Split truss, Recommend review and correction per structural engineer 2. Main roof Roof Framing Proper Hanger Nailing: Proper Hanger Nailing: All required nail locations were not filled, replace missing nails 3. Main roof Roof Framing Truss Bracing: 1x4 Missing crows feet diagonal blocking at North gable end 4. Main roof Roof Framing Attic Scuttle/Access: Attic Scuttle/Access: opening framing dimension too small-reframe as per plans Wall Framing 5. Sill Flashing/Gasket: Flash & Seal Improperly installed, loose at seams 6. Wall Vapor Barrier: Tyvek Improper installation, seams must run horizontal 7. Knee Wall: 2"x4" wood stud 16"on center Wall framed out of plumb/level at bath knee wall 8. Fire-Stop Blocking: Plywood Cavity not fully sealed 9. Bulkhead/Soffit Framing: 2x2 wood Framed out of square 10. Framed Opening(s): 2x4 Opening framed incorrectly at head PDspect, Copyright 1998-2008,

Page 10 of 11 Summary (Continued) Floor and Ceiling Framing 11. Joist Hangers: Simpson hangers Not properly installed, Improper nailing 12. Cross Bridging: Steel bridging Replace bridging where missing Doors and Windows 13. Exterior Door Installation: Improper installation Opening is out of square Stair Framing 14. Foyer Stair Framing Stair Blocking: 1x4 Wood Railing blocking missing Fixture and Cabinetry Layout 15. Main Level Fixture/Cabinet Layout Sink Drain Layout: Sink Drain Layout: Mislocated, requires correction 16. Main Level Fixture/Cabinet Layout Island Layout: Island Layout: Slightly out of square, Relocate as required 17. Main Level Fixture/Cabinet Layout Floor Drain Layout: Floor Drain Layout: Floor drain is positioned too far towards doorsee plans for proper dimensions PDspect, Copyright 1998-2008,

Page 11 of 11 Summary (Continued) Plumbing Rough- in 18. General Plumbing Main service sealed at wall penetration Main service sealed at wall penetration Fill gap at wall penetration 19. General Plumbing Supply piping protection plates installed where required Supply piping protection plates installed where required Install plates where missing 20. General Plumbing Sanitary vent piping complete, properly sized and secure Sanitary vent piping complete, properly sized and secure Install missing support hangers Electrical Rough- in 21. General Electrical Branch wiring installed to all locations and secured properly Branch wiring installed to all locations and secured properly Branch wiring installation is not completely installed to date 22. General Electrical Exterior fixture junction boxes installed and at proper locations Exterior fixture junction boxes installed and at proper locations Box mounted at incorrect height Mechanical Rough- in 23. General Mechanical Supply ductwork properly installed/secure Supply ductwork properly installed/secure Install missing support braces 24. General Mechanical Metal flue connections are tight, secure with exterior termination Metal flue connections are tight, secure with exterior termination Connections disconnected, Connections not properly secured with fasteners 25. General Mechanical Ventilation fans properly installed Ventilation fans properly installed Not vented to exterior 26. General Mechanical Floor register temporary covers installed Floor register temporary covers installed Install covers where missing Housekeeping and Safety 27. Fall protection: Open window opening Fall protection not installed at window opening. Add fall protection as illustrated 28. Daily interior clean-up: Unclean conditions Construction debris throughout interior creating unsafe conditions PDspect, Copyright 1998-2008,