Estimating Activity Durations CSTM 462



Similar documents
Subcontractor Involvement Project Tracking Progress Curves. CSTM 462 Fall 2012

Spec. Standard: 11/27/ Revision: 11/27/06

Resource Planning and Scheduling. CSTM 462 Resource Loading Fall 2012

How to Estimate the Cost of HIGHRISE CAST IN PLACE FLAT SLAB CONSTRUCTION. Peter M Hamilton July 2015

Project Delivery Methods & Contract Types CSTM 102 Spring 2013

LECTURE 10. Resource Allocation and Resource Leveling

Planning & Scheduling CSTM 462. Managing a project through time and resources. The need for proper planning and scheduling.

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No May 15, 2013

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

Developing Critical Path Method Scheduling (CPM)

CHAPTER 8 PROJECT TIME-COST TRADE-OFF

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

RFP ALTERNATE #1 SECURITY SYSTEMS Page 1 of 13

Introduction PURPOSE OF THIS BOOK

SOMETIMES the cost of installing a landscape plan

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

BCN 4612 Estimating II - Semester Course Outline Course Syllabus

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Introduction to Construction Project/Jobsite Management

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

EXHIBIT 2-2-C PROGRESS SCHEDULES

Scheduling. Anne Banks Pidduck Adapted from John Musser

Linear Schedules for Tunnel Projects

CHAPTER 2 QUANTITY TAKE-OFF

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

Review of Schedule Specification Requirements District SAP/WBS breakdown Asset template Cost & Resource Loading Stored Material Costs

CHAPTER 6 PROJECT CASH FLOW

The Task. for. PERI Construction-Exercise 2003

School Based Salary Scales

ITEM DOCUMENT CONTROL MANAGEMENT DESCRIPTION:

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

Your Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Address. Project Information

Anderson Ground Storage Tank No. 1 Painting and Rehabilitation Project SAWS Job No Solicitation No. B DD. ADDENDUM No.

Detailed Estimation and Pumpstation Overview. Nathaniel Osgood 3/3/2004

While RS Means is a useful estimating tool, it must be used as intended, coupled with regional knowledge.

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No December 2014

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

J.R. Huston Enterprises, Inc.

Establishing Commissioning Costs

Factors Affecting Construction Labor Productivity

Request for Qualifications for Disaster Debris Monitoring

FY08 SEWER POINT REPAIRS BID TABULATION

Precedence Diagram Method. CSTM 462 Planning & Scheduling

CRITICAL PATH METHOD (CPM) SCHEDULES

NextGEN Project Managers

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4

ECONOMICS OF PACKAGED LUMBER

How to Estimate the Cost of ACM (Aluminum Composite Material) Exterior Wall Cladding Systems. CPE Candidate No June 2013

Pu6lic Works works for the Public. COUNTY OF IMPERIAL Sunbeam Lake RV Park, Water Tank Re-Coating, located at 1750 Drew Road, Seeley, CA

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June d Page 1 of 7

IMPROVING THE DESIGN-CONSTRUCTION INTERFACE

Panama Canal - Third Set of Locks Expansion Project Project Controls in a multi-cultural environment

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

1. Concrete: T W L / 27 = Concrete C.Y. Multiply Feet Thickness x Feet Width x Feet Length / 27 = Cubic Yards.

Technical Assignment 2

Construction Planning, Equipment, and Methods

PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS

Estimated Cost of Repair

Estimating with Microsoft Excel

Analyzing Material Management Techniques on Construction Project Ashwini R. Patil, Smita V. Pataskar

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

Riverside County Transportation Department Summary of Bids

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Pricing of Construction Contract Change Order Documentation

CONSTRUCTION CONTRACT TERMINOLOGY

February 3, (1) CHAPTER 12

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

Taking the Stress Out of Controlled Insurance Programs: Guidance for Subcontractors

PELLISSIPPI STATE COMMUNITY COLLEGE MASTER SYLLABUS COST ESTIMATING W/LAB CET Class Hours: 3:0 Credit Hours: 4:0

Debris Contracting Guidance

UNIFIED FACILITIES GUIDE SPECIFICATIONS

How to Estimate the Cost of a. Laboratory Renovation. Candidate Number:

High Strain Dynamic Load Testing of Drilled Shafts

RICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER **********

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

1.040 Project Management

DIABLO VALLEY COLLEGE CATALOG

CITY OF EL PASO BID TABULATION FORM

CITY OF COMMERCE CITY BID BOND

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Transcription:

Estimating Activity Durations CSTM 462

Estimate activity durations Activity durations should be estimated based on available resources which include labor, material and equipment. These durations should reflect the planned resource productivity on anticipated site conditions. Key to production monitoring and controlling day-to-day construction.

Not Organized

Organized

Summarized

Time Unit Selection Activity durations can be expressed in any convenient time unit, depending on the objective of the scheduling effort. These units include the following: Years Months Weeks Days (most common) Hours (rarely used)

Resource Availability The key to estimating activity durations is the availability of resources. These resources include the following: Labor Equipment Material Subcontractors

Quantity and Productivity Data Sources Quantity Takeoff Bid Estimate Past Experience Outside Information Estimating Guides Industry and trade organizations Manufacturers, Fabricators and suppliers Specialty Contractors

Calculating Activity Durations Two elements go into calculating durations... Work Quantity Production Rate Activity Duration = Work Quantity Production Rate therefore 500 cy 50 cy / day = 10 days

Necessary Information Quantity of Work Production Rate Total Hours Based on a Crew Productivity Crew Mix Work Schedule Project Calendar

Estimating Durations Work Quantity x Production Rate = Total Hours from Material Take-Off (aka Quantity Survey) manhours per unit or MH/Qty Common units include LS, EA, LF, CY, SF, BF and SY ( ) Productivity Factor (Actual to Estimate) TOTAL HOURS x / Burn Rate = DURATION (usually days) Factors that Impact Productivity: - Weather - Proper Equipment - Supervision - Work Conditions - Learning Curve - Ability/Experience/Skill Level - Rework Factors that Determine Burn Rate: -Crew Mix Number of Workers -Work Schedule 5-8 s, 6-9 s, etc. Burn rate = (crew mix) x (work schedule) 1 carpenter and 3 laborers working 5-8 s therefore, the burn rate is 4 workers x 8 hrs./day = 32 hours/day hours/day

Sample Problem - Givens How long will it take to complete this activity? Activity: CIP Concrete Grade Beam Quantity: 3,000 sf Production Rate:.08 mh/sf Crew Mix: 3 Carpenters & 2 Laborers Work Schedule: 40 hour work week w/ 5-8 s Note: No productivity factor is provided assume 1.0

Sample Problem - Solution Step #1: Work Quantity x Production Rate = Total Hours 3,000 sf x.08 mh/sf = 240 hours Step #2: ( ) Productivity Factor (Actual to Estimate) TOTAL HOURS x / Burn Rate = DURATION ( 240 mh x 1.0 ) / 40 mh/day* = 6 days (usually days) * Burn rate = (crew mix) x (work schedule) 5 x 8 = 40 man-hours/day

Activity Duration Calculation Based on Material Quantity Quantity to Install Production Rate Production Rate Typical Crew Size Work Hours 9900 Pounds 220 Quantity/Day 0.1455 MH/Quanittiy 4 Men 8 Hours/Day Therefore: Total Manhours Burn manhours per day 32 Activity Duration Assign Resources: 1440 MH (Quantity x Production Rate) 45.00 Work Days (Total MH/Hours per Day*Crew Size)

Factors Affecting Activity Durations You plan it and guess what happens? Poor productivity in relation to: Nature of the work Labor and Equipment Productivity Management skill Material and Equipment Availability Seasonal Conditions Work Restrictions Quality of Work Concurrent Activities

Labor Productivity How the actual job compares to the budget or estimate. Work hours % Complete Unit rate This information can then be converted to a productivity factor which will increase or decrease the overall activity duration.

Considerations Productivity should increase as experience is gained for repetitive tasks. Activities composed of repetitive tasks should benefit from the increased task productivity and have decreasing activity durations. Depending on the work, difficulty can increase if uncommon work tasks are grouped together in an activity.

Considerations Productivity can vary significantly from project to project, location to location and crew to crew. Labor productivity is a function of a number of factors that include training, experience, motivation and labor restrictions among others.

Productivity Factor Example Budget/Estimate contains 240 man-hours Actual expended to date is 100 man-hours Activity is fifty percent complete Option #1: 100/120=.8333 Option #2 120/100= 1.2 Good or Bad?

Look at Productivity Actual/Budget Budget/Actual Less than 1 is good! More than 1 is good! Each company may look at different In this class a productivity rate of less than one is good.

Calculation Adding Productivity Activity: CIP Concrete including form, reinforce, pour and finish Quantity: 5,000 cubic yards Crew Mix: 2 crews consisting of 3 Carp & 2 Lab = 5 person crew Production rate: 6 man-hours per cubic yard (from the estimate) Work Schedule: 40 hrs/week w/ 5-8 hour days Productivity Factor:.85 - based on beating the estimate

Sample Problem - Solution Step #1: Work Quantity x Production Rate = Total Hours Step #2: 5,000 cy x 6.0 mh/cy = 30,000 hours ( ) Productivity Factor (Actual to Estimate) TOTAL HOURS x / Burn Rate = DURATION * 30,000 hours x.85 = 25,500 hours ** Burn rate = (crew mix) x (work schedule) (5 x 8)*(2 crews) = 80 man-hours/day (usually days) ( 30,000 mh x.85* ) / 80 mh/day** = 318.75 days round up & say 319 days

Crew Mix & Cost Turn man-hours into Costs Two crews consisting of 3 carpenters & 2 laborers per crew 3 Carpenters @ 20.50/hour = $61.50 2 Laborers @ 16.25/hour = $32.50 $32.50 + $61.50= $94/5 = $18.80 Crew Average Wage Rate $18.80 x 2 crews = $37.60 Composite Average Wage $37.60 x 30,000 hours = $1,128,000.00 vs. $37.60 x 25,500 hours = $958,800.00 Resulting in a difference of $169,200

Variables to Evaluate for Duration Production Rate Quantity or work in place Total man-hours Project Calendar Work Schedule Crew Size or Mix Productivity