Planning and Scheduling Consideration and Constraints in Automated Construction Environment. Chotchai Charoenngam, Ph.D. ABSTRACT



Similar documents
763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

Managing programme change on an NEC3 form of contract

SECTION COST LOADED CRITICAL PATH SCHEDULE

Methodical Notes for part-time BMCF TM study course M_SM / PROJECT MANAGEMENT

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Spec. Standard: 11/27/ Revision: 11/27/06

Mastering Microsoft Project 2010

Project Time Management

Chapter 2: Project Time Management

Constraint-Directed Scheduling for Multi-Storey Building Projects

Professional services. Full service for your automation tasks. We automate your success.

DCMA 14-Point Assessment Metrics

Scheduling Best Practices

SECTION PROJECT PLANNING AND SCHEDULING PART 1: GENERAL 1.1 DEFINITIONS

Software Application: Information System Elements. Project Management in Information Technology (IT) Projects. Project Scheduling basics

SE351a: Software Project & Process Management

The Project Planning Process Group

MnDOT Project Management Office Presents: Schedule Updates. Presenter: Eric Costantino Senior Schedule Consultant DRMcNatty & Associates, Inc.

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration

Efficient Planning Scheduling And Delay Analysis Of Residential Project

CRITICAL PATH METHOD (CPM) SCHEDULES

Project Time Management

Collaborative Scheduling using the CPM Method

Position Classification Flysheet for Logistics Management Series, GS-0346

Earned Value Management Best Practices

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

EXHIBIT 2-2-C PROGRESS SCHEDULES

Linear Schedules for Tunnel Projects

Criticality of Schedule Constraints Classification and Identification Qui T. Nguyen 1 and David K. H. Chua 2

Network Calculations

Should I Resource Load My Schedule?

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

Scheduling Resources and Costs

MnDOT Project Management Office Presents: Schedule Float. Presenter: Jonathan McNatty, PSP Senior Schedule Consultant DRMcNatty & Associates, Inc.

Scheduling 101 CPM Basics. Phoenix Project Management Systems, LLC

Developing Critical Path Method Scheduling (CPM)

(Refer Slide Time: 01:52)

PROJECT SCHEDULING AND TRACKING

BIM.03. Leveraging the Power of 4D Models for Analyzing and Presenting CPM Schedule Delay Analyses

Mastering Microsoft Project 2013

Dashboards and Reporting for Program Management

8. Project Time Management

Project Management Dr. James A. Bednar

Mastering Microsoft Project 2013 Course: 55054A Course Length: 3 Days

Test Fragen. October 2003 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Chapter 3 Managing the Information Systems (IS) Project

Test Fragen + Antworten. October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Unit 1: Project Planning and Scheduling

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

WORK PROGRAM GUIDELINES

SIMULATION TOOL FOR MANPOWER FORECAST LOADING AND RESOURCE LEVELING. Mikhail Hanna Janaka Y. Ruwanpura

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

Beyond Document Management - Project Management Support System

An Investigation on the Impact of Laddering Technique in Project plan: a Case of Road Construction

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Problems, Methods and Tools of Advanced Constrained Scheduling

INTRODUCTION OF CONSTRUCTION MANAGEMENT INTEGRATED SYSTEM USING BIM IN THE HONAM HIGH-SPEED RAILWAY LOT NO. 4-2

Work Breakdown Structure (WBS)

The Program Managers Guide to the Integrated Baseline Review Process

NE-50413B Mastering Microsoft Project 2010

CISC 322 Software Architecture. Project Scheduling (PERT/CPM) Ahmed E. Hassan

M Tech (Infrastructure Engineering and Management)

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

Systems Analysis and Design

A Report On project management Techniques for academia

ALGORITHM FOR SCHEDULING WITH MULTISKILLED CONSTRAINED RESOURCES

Project Management for Scientists

Methods to Assist in Teaching Planning and Scheduling

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY

Teaching Special Decisions In A Lean Accounting Environment Daniel Haskin, University of Central Oklahoma, USA

ICT Project Management. Software Project Planning By J. Ogutu

MODEL SCHEDULING SPECIFICATION

Automated construction schedule creation using project information model

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur

Developing an Integrated Monitoring and Evaluation Flow for Sustainable Investment Projects

MGMT 4135 Project Management. Chapter-4. Defining the Project

Project Management Certificate (IT Professionals)

A SIMULATION MODEL FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

PBL: Project Management. Competency: Project Definition

Project management Project Management

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

SECTION CONSTRUCTION SCHEDULE B. Part 1 - General Work Included Related Requirements Reference Standards...

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised )

Project Management Practices: The Criteria for Success or Failure

PROJECT TIME MANAGEMENT

Mastering Microsoft Project 2013

Memorandum. Jeff Jasper, P.E. Director, Division of Design. Technical Support TEBM, Division of Construction. From: Jeremiah Littleton, P.E.

Operations Management OPM-301-TE

How to Plan, Design & Implement A Bad Schedule Lessons Learned: The Scheduler as Generalist

Facility Maintenance Management Competency 4.9

PROJECT EVALUATION REVIEW TECHNIQUE (PERT) AND CRITICAL PATH METHOD (CPM)

Balancing Manufacturability and Optimal Structural Performance for Laminate Composites through a Genetic Algorithm

Mastering Microsoft Project B; 3 days, Instructor-led

Project Planning and Scheduling

Transcription:

Planning and Scheduling Consideration and Constraints in Automated Construction Environment Chotchai Charoenngam, Ph.D. Assisatant Professor, School of Civil Engineering, Asian Institute of Technology, G.P.O Box 2754 Bangkok 050 THAILAND ABSTRACT Project planning functions are to establish project activities, their logical relationships and interrelationships to each other, and the sequences in which they are to be accomplished. The process of assigning activities' duration and identifying the start and completion times of activities and project is considered as project scheduling. Project planning and scheduling is one of the most important pre-construction tasks determining the success or failure of the project in relation to time. In an automated construction environment employing automated equipment or machines to perform specific or major tasks, some conditions or constraints impacting activities' planning and scheduling are different from those of the conventional construction environment. Therefore, management needs to pay careful attention in determining the planning process and specific constraints set forth by automated equipment or machines. Otherwise, accurate pre-construction project schedule may not be obtained due to inaccurate planning assumptions.. INTRODUCTION Prior to the start of a project construction, a project plan and schedule, determining the sequential order in which and when tasks or activites will be performed, should be developed. The project schedule must satisfy the project objective as within specified time. Critical Path Method (CPM) has been proven to be a successful technique for planning and scheduling of construction projects. Presently, it is used as a tool in the systematic schedule management of construction projects. With the industrial revolution and the successful automated manufacturing system, the construction industry in developed countries has focused its attention in adopting automated construction equipment for specific activities. The use of automated equipment is aimed to reduce costs, increase capacity or production rate, and/or improve working conditions. Acheiving these goals requires automated equipment to operate under the greatest efficiency. Planning and scheduling of activities executed by automated equipment -475-3th ISARC

requires careful considerations of on-site and off-site factors, limitations and constraints imposed on the equipment. Planning and scheduling procedures of automated construction environment are partly different from those of conventional one. These differences are from the constraints and limitations that can be classified as technological, managerial, and external constraints. For example, The constraints on the limited number of automated equipment and machines, production rates, weather conditions, etc. can have a major impact on the sequences, interrelationships, and duration of activities. These types of constraints may not be major criteria when the tasks are performed by conventional equipment or machines. Typical limitations and negative aspects of newly adopted construction equipment may be loss of flexibility in sequencing work activities, vulnerability to downtime due to a composite of sophisticated mechanical and electrical machinery and controls, more maintenance, etc. Therefore, construction activities performed by automated equipment or machine must have the above mentioned constraints clearly defined as early as possible. 2. OBJECTIVES The primary objectives of this paper are:. to identify the major factor in planning and scheduling of construction activities using automated equipment. 2. to explain the constraints (technological, managerial, and external) of using automated equipment that should be seriously considered during the planning and scheduling stage. 3. FOCUS OF THE PAPER This paper is focused on the general practical principles of planning and scheduling of the construction equipment using Critical Path Method (CPM). Practical data and discussions are oriented to existing automated construction equipment, mainly tunnelboring machines. 4. PLANNING AND SCHEDULING PROCEDURES Increased production capacity and reduced total production costs are frequently used as a justification for applying advanced technology construction equipment. Frequently new equipment comes with its requirements and production data that management are not familiar with. Therefore, planning and scheduling of construction activities using automated equipment needs to look at the equipment requirements and production data more than the conventional equipment. Applying Critical Path Method (CPM) for planning and scheduling of construction projects starts with identifying the list of activities by using Work Breakdown Structure 3th ISARC -476-

(WBS). Then, the activities' logical constraints or relationships and duration need to be defined in order to identify the work sequences and start and completion dates'. Activities' duration is normally assigned by an experienced engineer familiar with the operation or by using the historical equipment performance record. Figure shows the conventioaal planning and scheduling process. Plans and Specifications Work Breakdown Stricture Activity Lists & Identification WBS MOST CRITICAL STEP Logical Relationships Constraints Duration Assignment and Scheduling J NETWORK Activity' Duration: Equipment Availability Past Performance Data Experience Project Schedule Figure. Conventional Activity Planning and Scheduling Process The work duration is normally comprised of productive, supportive, and nonproductive time. Basically, the duration of supportive time (scheduled maintenance, resetting machine, etc.) and non-productive time (unscheduled downtime, delays, etc.) is not well documented. However, for activities requiring conventional construction equipment, the work duration can be subjectively and realistically estimated based on the equipment availability, past performance data and experiences of engineers or operators. From all steps 477 3th ISARC

listed in figure, defining logical relationships between activities is the most critical step regarding the commonly found mistakes that make the schedule unrealistic. Planning and scheduling of activities using automated equipment requires planners to pay close attentions to activities' duration assignment due to several reasons. First, the automated equipment has not been employed in the organization before; then, experiences of engineers or operators related to supportive and non-productive time cannot be accurately estimated. Secondly, past performance data pertinent to the work natures may not be available. Finally, the availability of automated equipment may not be as widely as conventional one. The planning and scheduling process of activities using automated construction equipment is shown in figure 2. From all steps listed in figure 2, defining activities' duration should be the most critical step of overall process. Plans and Specifications Work Breakdown Structure Activity Lists & Identification WBS Constraints (`,, Ai_ 5 ' Estimation of Activities Duration Logical Relationships Factors:. Production Rate 2. Estimated Unscheduled Downtime 3. Scheduled Maintenance 4. Equipment Availability Project Schedule NETWORK Figure 2. Planning and Scheduling Process of Automated Equipment Activities 3th ISARC - 478

5. CONSTRAINTS AND LIMITATIONS For construction activities employing automated equipment or machines to perform specific tasks, an imposed condition or constraints regarding their availability and productivity should be seriously considered at the early stage. The constraints on the limited number of automated equipment and machines, productivity rates, weather conditions, etc. can have a major impact on the sequences, inter-relationships, and duration of activities. These types of constraints may not be major criteria when the tasks are performed by conventional equipment or machines. Therefore, construction activities performed by automated equipment or machine must have the above mentioned constraints clearly defined as early as possible. Three types of constraints imposing conditions affecting the start and completion date of activities are discussed in the context of planning and scheduling of automated construction equipment. They are technological, managerial, and external constraints. The automated equipment to be discussed in this paper is related to tunel-boring machines. The tuneling technology or equipment can be considered as one of the most widely used automated equipment. Contractors have been trying to find ways to efficiently utilize this equipment. The discussion is based on the study of tunnel-boring machine for performed by the Construction Industry Research and Information Association (CIRIA) in 9882. This study was focused on the performance of tunnel-boring machines in rock. For the 0 tunnels whose working time utilization was recorded, it was found that cutting time was only 30.0% of overall working time. The cutting time was low and restricted by many constraints to be discussed in later sections. Cut 3 % System 25% System n Support F] Maint E3 Delay n Change Reset Support 0 Cut 5% Figure 3. Utilization of Working Time for Tunnel-Boring Machine 2-479 3th ISARC

5. TECHNOLOGICAL CONSTRAINTS This types of constraints is the first and the most obvious constraint to be defined. Technological constraints defines the logical relationship between activities which cannot be changed unless the technology is changed. The applications of automated equipment or machine can alter the activities' sequences due to the changes in work nature or construction methods. The CIRIA study found that providing supports or installing the lining around the perimeter of a tunnel to prevent movements of the rock is the important activity to be accomplished before any advancement of the tunnel. The average time percentage for this unavoidable sequencing constraint alone is about 5.3 % of overall working time. Planning and scheduling of automated construction activities should account for this similar nature. 5.2 MANAGERIAL CONSTRAINTS Managerial constraints normally related to resources such as materials, equipment, and crews. They occur when it is essential to reschedule activities because resources for certain operations cannot be made available as soon as they are needed, or management feels that activities can be better sequenced or delayed from earliest starting dates. For activities performed by automated equipment, management has to consider many constraints related to the nature of the equipment and equipment management principles. There are many management factors that influence planning and scheduling of construction activities, consequently impacting equipment productivity, production rates, or operating time. Those factors should be considered by management such as timing for equipment maintenance, inventory of parts, and security programs, etc. Automated equipment should be maintained properly with appropriate scheduled maintenance program. However, for some specific automated equipment, scheduled maintenance may result in large proportion of scheduled downtime. Then, activity duration should account for this time when defining activity duration. For example, the CIRIA's study in 988 found that scheduled maintenance of tunnel-boring machine accounted for.2 % of the overall working time. Even with this large percentage of the scheduled maintenance time, the downtime from the back-up system failure was found to be 24.5 % of the overall working time. This high percentage of downtime was mainly caused by unavailability of parts for the back-up system. Management must give careful considerations about the decision on inventory of spare parts because this could have high impact on the duration of overall operation. Those factors mentioned are considered as managerial constraints impacting schedule of activities applying automated construction equipment. Unlike technological constraints, this type of constraints can be altered or eliminated if management want to do so; however, cost and time impact will be the consequences. 3th ISARC -480-

5.3 EXTERNAL CONSTRAINTS Typically, this constraints are environmental, safety or geological concerns. Some automated equipment or machines are sensitive to changing weather or subsurface conditions and causing noise or air pollution when operated. Then, there will be specific timetable for them to perform the tasks. Some of these constraints are naturally difficult to identify when a network is being developed, especially geological constraints. For example, the CIRIA's study in 988 found that delays in the advance rate of tunnel-boring machine were partly resulted from the variability of underground conditions and the flexibility or ability of the machine to deal with that variability was limited. This problem causing schedule delays is the typical external constraint for the excavation of tunnels. 6. SUMMARY Construction automation has received a lot of attention from the construction industry in the last decade. Automated construction equipment is considered as a means to reduce costs, increase capacity, and improve working conditions. Limitations and constraints imposed on planning and scheduling of construction activities performed by automated equipment should be seriously considered during the pre-construction stage. Without this consideration, project schedule cannot be realistically or accurately forecasted. Three major constraints, namely technological, managerial, and external constraints, must be carefully indicated and incorporated during the identification of activities' relationship and duration. Newly manufactured automated construction equipment normally has many limitations because they may be tested in the limited working conditions. Their performance could be impacted by managerial practices applied in different organizations. One of the most critical limitations is that the adequate historical performance record of automated construction equipment may not be available for accurate determination of project schedule. 7. REFERENCES. Charoenngam, Chotchai and Popescu, Calin, "Project Planning, Scheduling, and Control in Construction: an encyclopedia of terms and applications," John Wiley & Sons, New York, 995. 2. Construction Industry Research and Information Association, "The Performance of Tunnel-Boring Machines in Rock," Publication 62, London, 988. 3. Peurifoy, Robert and Ledbetter, William, "Construction Planning, Equipment & Methods: Fourth Edition," Mc-Graw Hill, New York, 985. 48-3th ISARC

4. Apple, James, "Material Handling Systems Design," John Wiley & Sons, New York, 972. 5. Illingworth, J. R., "Construction Methods and Planning," E & FN Spon, London, 993. 3th ISARC -482