COMMONWEALTH OF VIRGINIA LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF FINAL ORDER



Similar documents
Virginia State Corporation Commission efiling CASE Document Cover Sheet

filed electronically in docket office on 10/16/15

COMMONWEALTH OF VIRGINIA AT RICHMOND, OCTOBER 19,2011

REBUILD IN ROCKBRIDGE COUNTY

Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause. Direct Testimony and Exhibits

Control Number : Item Number : 5. Addendum StartPage : 0

Virginia State Corporation Commission efiling CASE Document Cover Sheet

COMMONWEALTH OF VIRGINIA, ex rel. I LI P

COMMONWEALTH OF VIRGINIA ORDER FOR NOTICE AND HEARING. On July 8, 2015, Prince George Electric Cooperative ("PGEC" or "Cooperative") filed

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E DIRECT TESTIMONY RAJESH GUPTA PROJECT MANAGER, ENTERGY SERVICES, INC.

Chase Tower, Eighth Floor. P.O. Box July 7,2006

COMMONWEALTH OF KENTUCKY BEFORE THE KENTUCKY STATE BOARD ON ELECTRIC GENERATION AND TRANSMISSION SITING

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Control Number : Item Number: 373. Addendum StartPage: 0

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS

345 kv Brazos Valley Connection Project FAQs

OF THE STATE OF DELAWARE

BILL NO. ORDINANCE NO.

ORDINANCE NO. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HERCULES DOES HEREBY ORDAIN AS FOLLOWS:

PJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study

PROJECT NO PROPOSAL FOR PUBLICATION OF NEW AS APPROVED AT THE SEPTEMBER 25, 2002 OPEN MEETING

FINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project

1. Who is CenterPoint Energy Houston Electric, LLC?

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SUPPLY MANAGEMENT. Principles for Ground Water Pollution Prevention and Remediation

IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF WEST VIRGINIA CHARLESTON DIVISION

/ September 25, 1996 / Page i

The State of New Jersey, New Jersey Department of Environmental Protection

Case No. CV R NOTICE TO CLASS OF PROPOSED SETTLEMENT OF CLASS ACTION

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE

MEMORANDUM. Managers, Administrators, Clerks, Attorneys, and Planners

AMERICAN TRANSMISSION SYSTEMS, INCORPORATED A FIRSTENERGY COMPANY CONSTRUCTION NOTICE INLAND SUBSTATION EXPANSION PROJECT

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

IN THE SUPREME COURT OF THE STATE OF KANSAS ADMINISTRATIVE ORDER NO. 268

121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

INVESTORS TITLE INSURANCE COMPANY P.O. Drawer 2687 Chapel Hill, North Carolina

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

All routes and route segments included in this notice are available for selection and approval by the Public Utility Commission of Texas.

THIS VOLUNTARY SETTLEMENT AGREEMENT CONCERNING A DEVELOPMENT OF. entered into this day of, 2014, and executed in triplicate originals

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF WASHINGTON ) ) ) ) ) ) ) ) ) ) ) ) )

How To Get A Court Order To Stop A Man From Selling A Car To A Woman

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

NATURAL GAS ACT. (Note: All underlined material was added to the Natural Gas Act by the Energy Policy Act of 2005)

KIMBERLY COSTAIN SUNBURY PRIMARY CARE, P.A. [ 1] Kimberly Costain appeals from the dismissal of her amended

Chapter 80 CABLE TELEVISION

APS Service Territories

OFFICE OF CABLE TELEVISION. I/M/O Verizon New Jersey, Inc. Application for a System-wide Cable Television Franchise BPU Docket No.

TOWER ORDINANCE TOWN OF OWLS HEAD

APPENDIX K NATURAL GAS PIPELINE STORAGE PERMITTING PROCESSES

Rule R8-65. REPORT BY PERSONS CONSTRUCTING ELECTRIC GENERATING FACILITIES

UNITED STATES OF AMERICA 151 FERC 62,147 FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES

3 September 9, 2015 Public Hearing

ROCKBRIDGE COUNTY CODE. Chapter 14 FIRE, EMS AND EMERGENCY MANAGEMENT ARTICLE I. FIRE AND EMS DEPARTMENT

v. Record No OPINION BY JUSTICE ELIZABETH B. LACY June 8, 2007 CARLA VON NEUMANN-LILLIE

Ridgway Municipal Code Section Cable Television System Permits

MEMORANDUM City of St. Petersburg, Florida

8. The City received a $100,000 grant from the Monterey Peninsula Water Management District to conduct initial planning and engineering analyses.

APPENDIX W - REGULATIONS - IDENTITY THEFT CHAPTER 45F. IDENTITY THEFT

RESOLUTION NO. RESOLUTION TO JOIN SCHOOLS HEALTH INSURANCE FUND

ARTICLE 333 Driving Under the Influence; Reckless Driving

TERMS AND CONDITIONS

COMPLAINT AND APPLICATION FOR ORDER TO SHOW CAUSE

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES

HISTORIC PRESERVATION EXTERIOR REHABILITATION PROGRAM AGREEMENT

CHAPTER 260. AN ACT concerning employee leasing companies. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey:

MEMORANDUM CONCERNING TRUSTEE OBJECTIONS TO CHAPTER 13 PLANS AT CONFIRMATION: How to Avoid and/or Resolve Such Objections

LOBBYIST REGISTRATION FORM

STATE OF GEORGIA DEPARTMENT OF TRANSPORTATION OPEN AGENCY SERVICE CONTRACT

Cellular Antenna Towers for Cellular Telecommunications Service or Personal Communications Services

CITY DEVELOPMENT BOARD[263]

Treasure Valley Electric Plan - Community Advisory Committee

UNITED STATES DISTRICT COURT DISTRICT OF MINNESOTA. File No.

A RESOLUTION IMPOSING A HOTEL RENTAL TAX IN WASHINGTON COUNTY, MARYLAND RECITALS

State corporation commission; creation; members, appointment, terms, vacancies; chairperson; salaries; application of K-GOAL.

stated in plaintiffs' Second Amended Complaint, and further, denies liability.

Evaluation of Underground Electric Transmission Lines in Virginia

VIRGINIA ELECTRIC AND POWER COMPANY ELECTRONIC DATA INTERCHANGE (EDI) TRADING PARTNER AGREEMENT

Pipelines & The City

Chapter 32A TELECOMMUNICATION PROVIDERS

An Overview of Virginia Fence Law Jason H Carter, Extension Agent, Augusta County

Prepared by and return to: Osama Elshami, Director Utilities & Engineering Dept. City of Coconut Creek 5295 Johnson Road Coconut Creek, Florida 33073

PUBLIC UTILITIES PROPOSALS PUBLIC UTILITIES

4:15-cv RBH Date Filed 01/29/15 Entry Number 1 Page 1 of 10

Roseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95

3:14-cv JFA Date Filed 07/31/14 Entry Number 80 Page 1 of 3 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF SOUTH CAROLINA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

ATTACHMENT G. Network Operating Agreement

Sec. 22a-1a page 1 (4-97)

A BILL FOR AN ACT. 2 energy, advanced distributed energy resources, and energy. 3 efficiency in Hawaii provides significant financial, health,

Part IV Article XXXVI COMMERCIAL COMMUNICATIONS FACILITIES

DOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION

DEPARTMENT OF ENVIRONMENTAL QUALITY

Case 1:14-cv ERK-JMA Document 1-1 Filed 02/27/14 Page 1 of 2 PageID #: 6 CIVIL COVER SHEET (SEE INSTRUCTIONS ON NEXT PAGE OF THIS FORM.

State of Kansas Coal Combustion Residuals Part 256 Plan. Kansas Department of Health and Environment Bureau of Waste Management

Virginia Workers Compensation Commission

Virginia Workers Compensation Commission Frequently Asked Insurance Questions for Employers

INFORMATION SHEET ORDER NO. R XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

STATE OF SOUTH CAROLINA DEPARTMENT OF INSURANCE

Transcription:

COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF VIRGINIA ELECTRIC AND POWER COMPANY For approval and certification of electric transmission facilities for the Lexington-Cloverdale 500 kv Transmission Line Rebuild pursuant to 56-46.1 and 56-265.1 et seq. of the Code of Virginia CASE NO. PUE-2012-00046 LM FINAL ORDER On May 2, 2012, Virginia Electric and Power Company d/b/a Dominion Virginia Power ("Dominion Virginia Power" or "Company") filed with the State Corporation Commission ("Commission") an application for approval and certification of electric transmission facilities ("Application") under 56-46.1 and 56-265.1 et seq. of the Code of Virginia ("Code") to rebuild, entirely within existing rights-of-way, its 500 kv Lexington-Cloverdale Line #566 in Rockbridge County, which runs approximately 7.4 miles from the Company's Lexington Substation to a point of interconnection with a 500 kv transmission line owned by Appalachian Power Company ("APCo").' The Company further proposed to construct and install associated facilities at its Lexington Substation. 2 Construction of Line #566 began in the early 1960s and was completed in 1966. It is part of the first 500 kv transmission system built in North America. Dominion Virginia Power has proposed to remove Line #566's existing weathering steel lattice towers, which support the line's 500 kv conductors, and replace them with new galvanized steel lattice towers. The Company ' Application at2. From this point of interconnection, at APCo's Structure #11151, APCo's 500 kv line runs approximately 37.1 miles to APCo's Cloverdale Substation in Botetourt County. 2 id.

also wishes to replace the existing two 2049.5 kcmil bundled AAAC conductors with three triple-bundled 1351.5 kcmil ACSR 45/7 phase conductors. According to the Company, rebuilding Line #566 as proposed would increase the transfer capability of its portion of the line from 1810 MVA to 4325 MVA. Dominion Virginia Power also proposed to replace one existing 500kV breaker and install one additional 500 kv breaker and associated equipment within the existing substation fence at the Lexington Substation, in order to accommodate the termination of the rebuilt Line #566.3 The projected in-service date for the rebuilt line is May 2014. The estimated cost is approximately $17.0 million, of which approximately $14.1 million would be spent on transmission line construction and approximately $2.9 million would be spent on modifications at the Lexington Substation. 4 Dominion Virginia Power stated in its Application that these changes are necessary because power flow studies it conducted with PJM Interconnection, L.L.C., forecast that by Spring of 2014, during periods Of light system load, the loading on Line #566 will violate mandatory North American Electric Reliability Corporation ("NERC") Reliability Standards during certain contingencies and that the failure to address these projected NERC violations could lead to service interruptions and could potentially damage Dominion Virginia Power's electrical facilities in this area. 5 On May 30, 2012, the Commission entered an Order for Notice and Comment that, among other things, docketed the Application, established a procedural schedule, provided interested persons the opportunity to become a respondent, file written comments, or request a ' Id. at 4-5. 4 Id. at 4. 5 Id. at 2-3. 2

hearing on the Application, and directed the Commission's Staff ("Staff") to investigate the Application and present its findings in a report ("Staff Report") As noted in the Commission's Order for Notice and Comment, the Staff requested that the Department of Environmental Quality ("DEQ") coordinate a review of the Company's proposed project by state and local agencies and file a report on the review. On July 19, 2012, DEQ filed its report ("DEQ Report") with the Clerk of the Commission. The DEQ Report offers ten general recommendations for the Conunission's consideration that are in addition to any requirements of federal, state, or local law. Specifically, the DEQ Report contains the following recommendations to Dominion Virginia Power regarding the Project. The Company should : Conduct an on-site delineation of all wetlands and stream crossings within the project area with verification by the U.S. Army Corps of Engineers, using accepted methods and procedures, and follow DEQ's recommendations to avoid and minimize impacts to wetlands and streams. Follow DEQ's recommendations regarding air quality protection, as applicable. Reduce solid waste at the source, reuse it and recycle it to the maximum extent practicable, and follow DEQ's recommendations to manage waste, as applicable. Coordinate with the Department of Conservation and Recreation ("DCR") regarding DCR's recommendations, as well as check for updates to the Biotics Data System database if a significant amount of time passes before the project is implemented. Coordinate with the DCR Karst Program regarding its recommendations to protect karst features. Coordinate with the Department of Game and Inland Fisheries regarding its recommendations for wildlife protection. Coordinate with the Department of Historic Resources regarding its recommendations to protect historic and archaeological resources. 3

Coordinate with the Department of Aviation regarding its recommendations. Follow the principles and practices of pollution prevention to the maximum extent practicable. Ln Limit the use of pesticides and herbicides to the extent practicable. 6 On August 7, 2012, Staff filed its Staff Report summarizing the results of its investigation of the Company's Application. Staff concluded that the Company reasonably demonstrated the need for the proposed rebuild of the 500 kv Lexington-Cloverdale Line #566 and for the 7 associated substation work. The Staff recommended that the Commission issue the necessary 8 certificate of public convenience and necessity for the proposed project. On August 14, 2012, Dominion Virginia Power filed comments ("Comments") with the Clerk of the Commission stating that it agrees with and supports the recommendations set forth in the Staff Report, including the Staff s findings and conclusions concerning the need for the project. The Company further noted in its Comments that two hearing requests were filed in the form of public comments in this proceeding. However, since the hearing requests were originally filed, one of the requests was retracted and it has been determined that the other request actually pertained to a different transmission facility. NOW THE COMMISSION, upon consideration of this matter, is of the opinion and finds that the public convenience and necessity require that the proposed Lexington-Cloverdale 500 kv transmission line be constructed and that the associated work at the Company's existing 6 DEQ Report at 6-7. 7 Staff Report at I I - 8 Id. 4

Lexington Substation be perfon-ned as proposed in the Company's Application. Further, the Commission finds that certificates of public convenience and necessity should be issued authorizing the project. LM Approval The statutory scheme governing the Company's Application is found in several chapters of Title 56 of the Code. Section 56-265.2 A of the Code provides that "it shall be unlawful for any public utility to construct... facilities for use in public utility service... without first having obtained a certificate from the Commission that the public convenience and necessity require the exercise of such right or privilege." Section 56-46.1 of the Code further directs the Commission to consider several factors when reviewing the Company's Application. Subsection A of the statute provides that : Whenever the Commission is required to approve the construction of any electrical utility facility, it shall give consideration to the effect of that facility on the environment and establish such conditions as may be desirable or necessary to minimize adverse environmental impact.... In every proceeding under this subsection, the Commission shall receive and give consideration to all reports that relate to the proposed facility by state agencies concerned with environmental protection ; and if requested by any county or municipality in which the facility is proposed to be built, to local comprehensive plans that have been adopted.... Additionally, the Commission (a) shall consider the effect of the proposed facility on economic development within the Commonwealth... and (b) shall consider any improvements in service reliability that may result from the construction of such facility. Section 56-46.1 B of the Code further provides that : "[a]s a condition to approval the Commission shall determine that the line is needed and that the corridor or route the line is to follow will reasonably minimize adverse impact on the scenic assets, historic districts and environment of the area concerned." 5

The Code ftu-ther requires that the Commission consider existing right-of-way easements when siting transmission lines. Section 56-46.1 C of the Code provides that "[fln any hearing the public service company shall provide adequate evidence that existing rights-of-way cannot adequately serve the needs of the company." In addition, 56-259 C of the Code provides that "[p]rior to acquiring any easement of right-of-way, public service corporations will consider the feasibility of locating such facilities on, over, or under existing easements of rights-of-way." Need and Service Reliabilily We find that the Company's load growth forecasts support the need for the project. The need for the project to resolve projected violations of NERC Standards has not been questioned. Thus, the uncontroverted evidence in this case indicates that the proposed rebuild is necessary to ensure that reliable service is maintained. We therefore find that the proposed rebuild of the Lexington-Cloverdale Line #566 will effectively meet the Company's long-term transmission reliability needs. Economic Development We find that the proposed project will promote economic development in the Commonwealth of Virginia by maintaining the operational reliability of the transmission line and, in turn, continuing to ensure the delivery of sufficient supplies of electrical power. As an added benefit, the project will increase the transmission capacity for west-to-east power flows, thereby further supporting economic development in the area. Routing and Right-of-Way The Company did not consider any routing alternatives for its proposed transmission line since, if approved, the line would be located entirely on existing rights-of-way. Thus, Dominion Virginia Power was not required, in accordance with 56-46.1 C of the Code, to demonstrate 6

that existing rights-of-way could not adequately serve its needs. Similarly, 56-259 C of the Code is inapplicable to this proceeding because the Company seeks no additional easements associated with the proposed project. Scenic Assets and Historic Districts We find that the proposed project will have a minimal impact on scenic assets and historic districts consistent with 56-46.1 B of the Code. As is discussed previously, the proposed rebuilt line will be located in existing rights-of-way. Due to the fact that the proposed project vall be constructed along the same route as the existing line, adverse impacts on scenic assets and historic districts in the region will be minimized as required by 56-46.1 B of the Code. Environmental Impact Under 56-46.1 A and B of the Code, the Commission is required to consider the proposed project's impact on the environment and to establish such conditions as may be desirable or necessary to minimize adverse environmental impacts. The statute further provides that the Commission shall receive, and give consideration to, all reports that relate to the proposed project by state agencies concerned with environmental protection. We find that there are no adverse environmental impacts that would prevent the construction or operation of the proposed project. The DEQ Report, as well as the DEQ Supplement prepared by the Company as part of its Application, supports a finding that the Company's proposed route reasonably minimizes adverse environmental impacts, provided that the Company complies with the DEQ recommendations.9 We therefore firid that, as a condition 9 The DEQ recommendations are listed above and are discussed in the DEQ Report. 7

to our approval herein, the Company must comply with all of DEQ's recommendations as provided in the DEQ Report. We ftirther find that the proposed project does not represent a hazard to human health or LM safety. There is no evidence in this case that the project represents a public health or safety hazard. Accordingly, IT IS ORDERED THAT : (1) The Company is authorized to construct and operate the proposed Lexington-Cloverdale 500 kv transmission line, which runs approximately 7.4 miles from the Company's Lexington Substation to a point of interconnection with a 500 kv transmission line owned by APCo, on the route proposed in the Company's Application, subject to the findings and conditions imposed herein. The Company also is authorized to perform necessary construction and installations at the Lexington Substation as set forth in the Company's Application. (2) Pursuant to 56-46.1, 56-265.2, and related provisions of Title 56 of the Code, the Company's request for a certificate of public convenience and necessity to construct and operate the proposed Lexington-Cloverdale 500 kv transmission line and to perform necessary construction work at the Lexington Substation is granted as provided for herein, subject to the requirements set forth in this Final Order. (3) Pursuant to the Utility Facilities Act,'o the Company is issued the following certificates of public convenience and necessity : Certificate No. ET- I 07i, which authorizes Virginia Electric and Power Company under the Utility Facilities Act to operate certificated transmission lines and facilities in Rockbridge County, all as shown on the map attached to the certificate, and to construct 10 Va. Code Ann. 56-265.1 et seq. (Supp. 201 1).

and operate facilities as authorized in Case No. PUE-2012-00046, cancels Certificate No. ET- 1 07h, issued to Virginia Electric and Power Company. (4) The Commission's Division of Energy Regulation forthwith shall provide the Company copies of the certificates issued in Ordering Paragraph (3) with the detailed map attached. (5) The transmission line and associated substation work approved herein must be constructed and in service by May 1, 2014, provided, however, the Company is granted leave to apply for an extension for good cause shown. (6) As there is nothing further to come before the Commission, this matter is dismissed and the papers filed herein shall be placed in the file for ended causes. AN ATTESTED COPY hereof shall be sent by the Clerk of the Commission to : Lisa S. Booth, Esquire, and Charlotte P. McAfee, Esquire, Dominion Resources Services, Inc., 120 Tredegar Street, Richmond, Virginia, 23219 ; Stephen H. Watts, 11, Esquire, McGuireWoods LLP, One James Center, 901 East Cary Street, Richmond, Virginia 23219 ; and C. Meade Browder, Jr., Esquire, Division of Consumer Counsel, Office of Attorney General, 900 East Main Street, Second Floor, Richmond, Virginia 23219 ; and a copy shall be delivered to the Commission's office of General Counsel and Division of Energy Regulation. 9