Derbyshire Trading Standards Service Quality Manual



Similar documents
MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

ISO 9001:2008 Audit Checklist

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Quality Management 1

QUALITY MANAGEMENT IN VTS

COMPANY NAME. Environmental Management System Manual

Quality Management Subcontractor QM Guide-Section Two

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

16) QUALITY MANAGEMENT SYSTEMS

ISO 9001 : 2000 Quality Management Systems Requirements

Vigilant Security Services UK Ltd Quality Manual

ISO 9001:2000 AUDIT CHECKLIST

Compliance. Group Standard

Title: Rio Tinto management system

CENTRIS CONSULTING. Quality Control Manual

Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA

Derbyshire County Council Performance and Improvement Framework. January 2012

How to Leverage Your QMS for Competitive Advantage. Katie Farrand Continuous Improvement Specialist Synergy Resources

Association for Project Management Business Management System

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

NOS. Supply Chain Management Occupational Standards

ISO 9001:2000 Gap Analysis Checklist

Bitworks Design & Consultancy Quality Management System Part 1 - Quality Manual

ISO 9001:2008 Quality Manual Clause 3.7.4

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April Authorised by: Managing Director.

Understanding Principles and Concepts of Quality, Safety and Environmental Management System Graham Caddies

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

QUALITY MANAGEMENT SYSTEM MANUAL

Job Description and Person Specification. Post Number: HCI.C24 JE Ref: JE028

Procurement guidance Managing and monitoring suppliers performance

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

PRCA Communications Management Standard (CMS) for In-House Teams

Quality Management System

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Implementation of a Quality Management System for Aeronautical Information Services -1-

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

The Risk Management strategy sets out the framework that the Council has established.

Health and safety policy

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY

Mossfiel Electrical & Safety Management Pty Ltd

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

The Prophotonix (UK) Ltd Quality manual

Clare College Cambridge

Preparation of a Rail Safety Management System Guideline

Operations. Group Standard. Business Operations process forms the core of all our business activities

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

Uncontrolled Document

FMC Technologies Measurement Solutions Inc.

POSITION DESCRIPTION, PERFORMANCE MEASURES AND TARGETS

Information Security Management System (ISMS) Policy

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

UNCONTROLLED COPY FOR REFERENCE ONLY

Checklist. Standard for Medical Laboratory

ROLE PROFILE. Performance Consultant (Fixed Term) Assistant Director for Human Resources

Quality Management System Manual. CAD Order

Joint ICT Service ICT Strategy

Stratford on Avon District Council. The Human Resources Strategy

Version No: 2 Date: 27 July Data Quality Policy. Assistant Chief Executive. Planning & Performance. Data Quality Policy

QUALITY MANUAL. 90a BROOMFIELD ROAD CHELMSFORD ESSEX CM1 1SS. Version 3 Page 1 of 67 Feb 2013

QUALITY MANAGEMENT SYSTEM Corporate

Micro Plastics, Inc. Quality Manual

PREQUALIFICATION INFORMATION

Wirral Council: Job Role Descriptor HR USE ONLY

NABL NATIONAL ACCREDITATION

QSS 0: Products and Services without Bespoke Contracts.

ISO 9001 Quality Systems Manual

QUALITY POLICY. Our mission is to provide information, advice and support to those affected by someone else s substance misuse.

PROJECT MANAGEMENT FRAMEWORK

Bawden Contracting Services Ltd Job Profile. Contracts Manager. Purpose of the Job

G & R Labs. Quality Assurance Manual. G&R Labs Scott Boulevard Santa Clara CA Light Meters and Calibration

District Council of Cleve

Cyber Security Consultancy Standard. Version 0.2 Crown Copyright 2015 All Rights Reserved. Page 1 of 13

Charnwood Borough Council. Corporate Performance Management Framework

Quality Management System Manual

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

JOB DESCRIPTION Facilities Manager Soft Services. RESPONSIBLE FOR: Team Leaders and Contract Support staff

ISO 9001:2015 Overview of the Revised International Standard

The President of Inductors Inc. is the senior executive responsible for operations.

DOCUMENTED PROCEDURE MANUAL

Andrew Bratt, Assistant Director Human Resources, Resources and Quality Assurance

SAFETY and HEALTH MANAGEMENT STANDARDS

Implementing an Energy Management System Using ISO 50001

IPDS. Green Book Employees. An Integrated Performance Management, Pay and Grading System. Technical 2. Making West Midlands Safer.

1.1 Terms of Reference Y P N Comments/Areas for Improvement

Management Systems Consultancy & Support Specialists

Quality Assurance System Manual

ONTIC UK SUPPLIER QUALITY SURVEY

REGIONAL CENTRE EUROPE OF THE INTERNATIONAL FEDERATION OF TRANSLATORS

JOB DESCRIPTION. Emergency Ambulance Control (EAC) Quality Assurance Auditor. Assistant Director of Control and Communications

Position Description

Health and Safety Policy Part 1 Policy and organisation

North Cumbria University Hospitals NHS Trust - FoI Enclosure 01. Job Description

Gap Analysis of ISO 15189:2012 and ISO 15189:2007 in the field of Medical Testing

Senior Social Worker - Children & Young People s Services (CYPS) Various throughout Devon. Effective date of JD 1 November 2010 JE Job Number 561

This Business Management System Manual is based on ISO 9001:2008 requirements

Transcription:

Derbyshire Trading Standards Service Quality Manual This Quality Manual has been developed to give a broad outline of how the Trading Standards Division s range of services comply with the requirements of the ISO 9001:2008 Standard for Quality Management Systems. Quality Management Principles There are eight recognised quality management principles applied when developing and maintaining our services. Each of these principles has been adopted specifically for the Trading Standards Division as follows:- Customer Focus. The service depends on a broad range of customers with different and sometimes contradictory expectations. It is important that customer requirements are identified using as broad a range of techniques as possible. As a minimum these requirements and expectations are fed into the design and planning of our work activities. The importance the service places on its customers is demonstrated by its significant contribution to the departmental accreditation to the Customer Service Excellence Standard in December 2010. The Division works closely with the Cabinet Lead Member for Regeneration and the response to customer needs reflects corporate priorities. Leadership. The direction of the service comes clearly from its leadership. The Trading Standards Division forms part of the Cultural and Community Services Directorate. The Head of Trading Standards and the Deputy Head of Trading Standards sit on the Departmental Management Team led by the Strategic Director of Cultural and Community Services. Within the organisation the management of the service ensures an environment where all of these eight quality principles can be applied. Involvement of People. The most important assets of the service are the staff who carry out and support the work activities. The need to support these staff and involve them at all levels is demonstrated by the gaining and maintaining of a departmental Investors in People award. Process Approach. The service s activities have been broken down into key processes reflecting the different areas of work activity. These have been further subdivided to detail the specific control measures in place. System Approach to Management. The processes identified are managed as interrelated activities to ensure the effectiveness and efficiency of the service.

Continual Improvement. The service is committed to improvement. All areas of the Quality Management System and work activities are subject to a range of techniques aimed at identifying and delivering improvement. Officers within the service are experienced in a range of improvement tools and these are utilised when developing specific service areas or in response to any external improvement or best practice initiatives. Factual Approach to Decision-Making. All decisions taken by the service are based upon appropriate analysis of relevant information. Mutually Beneficial Supplier Relationships. Procurement is dealt with at a corporate level however the service recognises the importance of good relationships with its core suppliers to ensure any improvement opportunities are identified. Quality Management System The documented Quality Management System (QMS) operated by the service is designed to act as a reference point for both staff and other interested parties. It is a reflection of how the work activities are carried out at all levels within the organisation. The documents making up the QMS detail the range of management controls in place to ensure the effectiveness of the service. As such the QMS acts as an aid to the training of staff, an assessment tool for the service and external bodies and a marker when assessing the service and the possibilities for improvement. Processes The range of work activities undertaken by the service has been broken down into broad processes. Within each of these processes the details of the more specific elements of planning, resources, preparation, service delivery, record keeping, monitoring and links with other processes have been identified and documented Documents The QMS consists of a range of documents. The level and degree of this documentation is a reflection of the complexity and diversity of the service. Key elements of the QMS are:- Quality Policy Divisional Operating Procedures Quality Records Additional forms of documentation in support of the above are included within the QMS. These include internally generated items and those received from external sources. Document Control The documents making up the QMS are approved and made available to officers in their current form. To ensure control of documents, a specific procedure and a dedicated software system are maintained as part of the Quality Management System.

Quality Records All documents and electronic information demonstrating the effectiveness of the services provided and the processes involved are clearly identified and retrievable. This is supported by a formal retention schedule and a specific procedure within the QMS. Management Responsibility The quality of the service provision is the primary concern of the senior management team. It is therefore the management s responsibility to ensure that the following key aspects are effectively in place. Management Commitment The management s commitment to Quality Assured services is clearly demonstrated by the emphasis within the organisation of establishing customer requirements, the existence of the Quality Policy and objectives, conducting management reviews and the continuous assessment of resources. Customer focus The identification of the wide range of customers and their individual requirements has been an integral part in planning existing services and the basis for the development of the Quality Management System. Further assessments of customer requirements and reflecting corporate priorities determined by elected members will be key in future service planning. Quality Policy Our statement reflects the management and organisations commitment to the Quality Management System and the provision of Quality Assured services. Planning The Cultural & Community Service Department produces an annual Service Plan to support the priorities of the council and within this there are a range of measures specific to Trading Standards. Measures that show how the service directly contributes to corporate priorities and/or demonstrate the outcomes for customers will be prioritised and where appropriate targets, timescales and lead officers be identified. The service plan forms the main Quality Objective for the service. Any changes to the Trading Standards Division and its services are made with due consideration for the impact on the Quality Management System. Responsibilities, Authorities and Communication The different responsibilities of all staff and the authority they have to carry out work activities are clearly defined.

The Management Representative role of the Quality Assurance Officer ensures a focal point for all matters concerning the Quality Management System. Ensuring that effective controls of processes are maintained, the promotion of the Quality Management System, improvement and customer requirements are key responsibilities. The quality assurance aspects of the Information Officer s role ensure that the Quality Management System is monitored, maintained and progressed in line with the appropriate procedures and actions are completed within appropriate timescales. Officers carrying out enforcement activities are appropriately authorised through a formal system of delegated powers from Derbyshire County Council and the issuing appropriate individual warrants. Appropriate and effective means of communication exist between and across all levels of the organisation including training and information days, team meetings, e-mail and electronic sources of information. Management Review The management of the service carries out a specific review of the Quality Management System and its effectiveness. As a fundamental part of this review issues of customer focus, satisfaction and improvements to the service are raised. Resource Management The importance of resources is recognised as a key element in ensuring and maintaining the ability to deliver services. As part of a publicly funded organisation it is recognised that there is a responsibility to ensure services are delivered as effectively and efficiently as possible and that budgetary restraints are given due regard when managing resources. Provision of Resources The necessary resources to provide effective services and deliver customer satisfaction are identified and made available in sufficient quantities at the correct time. The workload of the service and individual officers is regularly monitored to ensure activities are being progressed as required and to ensure resources can be targeted at identified priorities. Human Resources Staff within the service are allocated work activities based on their competence to undertake the task. Competence requirements are established for work activities based on legislative requirements and the service s own assessments. These requirements are met by a combination of an individual s qualification, experience and training. Individual training needs are regularly assessed. Training needs are meet using specialist courses and a programme of in-house training. Training provided is assessed for its

suitability and effectiveness. Infrastructure The provision of adequate and appropriate workspace is regularly assessed to identify any additional needs. Equipment and information technology needed to provide services is maintained, upgraded and added where a need is identified and assessed. Work Environment Where necessary specific work environments are provided and controlled to ensure the successful provision of services. Service Provision Trading standards services are controlled and managed to ensure their effective and efficient delivery. Planning of Service Provision Service provision is planned in advance for a twelve month period commencing each April based on an assessment of national, regional, local and corporate priorities, analysis of appropriate data, consideration of previous activities and a range of consultation. Any priorities and targets for individual work activities set during the planning process are made publicly available. Customer Requirements and Communication A broad range of services are provided on the basis of established customer requirements. Additional requirements of legislation and the service itself are also met. When undertaking specific tasks individual requirements are confirmed and staff ensure that they are able to meet these. Communication with customers is maintained to ensure the availability of general information about trading standards services and that specific requests and feedback are possible. To ensure requirements and expectations are both managed and met the service has adopted a range of generic and service specific policies and standards. Design and Development of Services Whilst the trading standards service meets the requirements placed on it as a local authority, the methods of delivery may be subject to design and development processes. Where these processes are applicable they are carried out in a planned manner identifying

the necessary design stages and allowing for review and assessment. The actual design and development process is a creative exercise where ideas about service delivery can be explored. The management controls are therefore connected with the documenting of the process and ensuring the results meet the original requirements and are deliverable. Once established any changes to services are assessed against the original design criteria. Purchasing Any items or services obtained from outside the service with a direct impact on service delivery are made from suppliers and subcontractors in conjunction with County Procurement Officers and following corporate requirements. Orders placed ensure that all requirements of the service are clearly understood. On delivery of items or provision of services any checks identified as a result of supplier assessment or service requirements are carried out at the earliest appropriate point. Delivery of Services At the actual point of service delivery the planning and design processes has ensured that the following controls are in place:- Necessary information Appropriate instructions Suitable equipment Monitoring Post delivery activities Services where monitoring may not be possible after delivery are controlled by the establishing of competence requirements and key control measures prior to delivery. Services are appropriately identified to ensure traceability back to specific items, dates, equipment and officers as appropriate. Where the condition of items affects the service delivery these are maintained to the necessary level. All testing and measuring equipment used directly in service provision or to measure service delivery is identified and calibrated to a traceable national standard. Measurement, Analysis and Improvement To ensure that the management systems and control mechanisms are working effectively a range of measurement, analysis and improvement techniques are employed at stages throughout and between the processes.

Monitoring and Measurement Customer satisfaction is monitored by the use of specific consultation exercises, general customer feedback and specific customer complaints. Internal audits are carried out against the Divisional Operating Procedures to ensure documentation accurately reflects work carried out, service is delivered correctly and areas for improvement are identified. To ensure this, a specific procedure is maintained as part of the Quality Management System. Monitoring of processes is undertaken at predetermined intervals to establish if the control measures are effective and any specific targets are being met. Additional monitoring of the processes is carried out in response to specific incidents or need for analysis. Monitoring of the actual services provided is undertaken on a random sampling basis to establish if customer requirements and service requirements have been met. Control of Non Conforming Service Any service found to be non-conforming is corrected and controlled to ensure the effect is minimised and the service is correctly provided subsequently. To ensure this a specific procedure is maintained as part of the Quality Management System. Analysis of Data All information collected from monitoring exercises is analysed using appropriate techniques before being passed to the appropriate management team. Improvement Continual improvement is the aim of the Trading Standards Division. Wherever possible specific incidents or trends are analysed for improvement opportunities. All suggestions from any source are assessed for improvement potential. Corrective action is taken to eliminate the cause of any detected non conformities. To ensure this a specific procedure is maintained as part of the Quality Management System. Preventive action is taken where analysis indicates the possibility of future non conformities. To ensure this a specific procedure is maintained as part of the Quality Management System.