SETTLEMENT INSTRUMENTATION & MONITORING



Similar documents
High Strain Dynamic Load Testing of Drilled Shafts

SECTION SUPPORT OF EXCAVATION

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SECTION SHEETING, SHORING AND BRACING

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

Elev. A = , Elev. B = , horizontal distance = 1625 feet a. 7.7 b..077 c d. 1.28

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Section Installation of pipe and casing for sanitary sewer by methods of augering.

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

GLOSSARY OF TERMINOLOGY

SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

C. Section TESTING LABORATORY SERVICE.

Brevard County Public Works Finance and Contracts Administration

SECTION 5 DRAFTING STANDARDS

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

Guidelines for Excavations

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Title 10: COMMERCE AND TRADE

CONSTRUCTION PERMIT REQUIREMENTS

DESCRIPTION OF WORK:

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 1 GENERAL REQUIREMENTS

Chapter 9 Sanitary Sewers

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

FIBER-OPTIC CABLE PLAN CHECK

Code of Standard Practice for Timber Frame Structures

Guidelines for Fiber Optic Cable Permits

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Specification for Pipe Coating Repairs Offshore

VERTICAL SPEED CONTROL DEVICES

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

SECTION REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

SECTION GRAVITY SANITARY SEWERS

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Survey Ties Guidelines

Wastewater Capital Projects Management Standard Construction Specification

NSPS SURVEY TECHNICIAN CERTIFICATION PROGRAM LEVEL III SAMPLE EXAMINATION QUESTIONS

Pro-Lift Steel Pile Foundation Repair

SECTION AS-BUILT DOCUMENTATION

SECTION GROUND WATER STORAGE TANKS

Business Entire Plumbing Contractions And Reviews

SECTION NONREINFORCED CONCRETE SEWER PIPE

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

FY08 SEWER POINT REPAIRS BID TABULATION

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

SECTION 807 PUMP STATION REHABILITATION

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Drew University Ladder Safety Program Policy and Inspection Procedure Draft 0412

IV. INDUSTRIAL TRACK DESIGN

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

Specifying Laser Scanning Services. A Quantapoint White Paper

Construction Management Program

The user forum is an excellent community in which to bounce questions off other professional users, like you.

For Office Use: Filing Date: Case Number: Zoning District:

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

Guidelines For Sealing Groundwater Wells

Close-Out Documents... 9

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

SECTION GUARDRAILS

Field Application Note

SECTION CHAIN LINK FENCES AND GATES

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

How To Install An Overhead Sewer

Safe & Sound Bridge Terminology

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

Construction Specifications for Keyhole Pavement Coring and Reinstatement

LAKEHAVEN UTILITY DISTRICT. Developer Extension Agreement Application

NEVADA IRRIGATION DISTRICT DEVELOPER REQUIREMENTS FOR TREATED WATER SYSTEM EXTENSIONS GENERAL

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

Transmission Foundations Case History : Helical piles Hydro One Networks Inc.

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

Receiving Water Body:

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Acceptance Codes APPENDIX - A. Acceptance Criteria

FUNDAMENTALS OF LANDSCAPE TECHNOLOGY GSD Harvard University Graduate School of Design Department of Landscape Architecture Fall 2006

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

LAND USE CODE CHAPTER GENERAL REGULATIONS

CITY ENGINEERS ASSOCIATION OF MINNESOTA

3. QUALITY ASSURANCE REQUIREMENTS

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

University of Northern Iowa Design Documents Standards. October 2014

CITY OF WEST PARK FENCE PERMIT REQUIREMENTS

Transcription:

SECTION 02445 SETTLEMENT INSTRUMENTATION & MONITORING PART 1 - GENERAL 1.01 SUMMARY A. The Work specified in this Section includes furnishing, installing, and monitoring settlement instrumentation to monitor ground movements around and above HDD operations. The work includes, but is not limited to: installing surface monitoring points shown in Figure 1, furnishing monitoring equipment, and recording observations and measurements from the monitoring points on a periodic basis before, during, and after HDD operations. B. The Contractor is responsible for surveying the elevations of the surface monitoring points in accordance with the requirements herein. Elevations shall be determined before HDD operations begin to establish a baseline. Survey readings shall continue during and after HDD operations to monitor any movements related to the HDD construction. All monitoring points shall be surveyed one week and one month after all HDD has been completed to evaluate long-term settlements. 1.02 RELATED WORK SPECIFIED ELSEWHERE A. Section 02619 Horizontal Directional Drilling B. Section 03360 - Annular Space and Contract Grouting 1.03 DEFINITIONS A. Surface Control Points: Control points established as a reference for measuring elevation of the ground surface using optical survey methods. 1.04 QUALITY ASSURANCE A. Surveyor Qualifications: Surveying for monitoring control points shall be performed by a land surveyor licensed in the State of Florida with previous experience surveying for the detection of structural or surface deformations. B. Install surface control points within one-half (0.5) foot of the horizontal and vertical location shown on the Drawings or as directed by the Engineer. C. Should actual field conditions prevent installation of instruments at the locations shown on the Drawings or specified herein, Contractor shall obtain written acceptance from the Engineer for new instrument location and elevation. 1.05 SUBMITTALS A. Submittals shall be made in accordance with Special Provisions of the contract documents. Provide sufficient detail to allow the Engineer to judge whether the proposed equipment, materials, and procedures will meet the Contract requirements. All drawings shall be legible with dimensions accurately shown and clearly marked in English. Drawings and photographs transmitted by a facsimile will not be accepted. The Engineer s 02445 Settlement Instrumentation.docx 1 / 10 05/08/2015

review of submitted details and data will be based on consideration of requirements for the completed work, protection of utilities and surface features, and the possibility of unnecessary delays in the execution of the work to be constructed under this Contract. Review and acceptance of the Contractor s submittals by the Engineer shall not be construed in any way as relieving the Contractor of its responsibilities under this Contract. 1. Qualifications: Submit surveying personnel qualifications in accordance with Paragraph 1.05 A. 2. Submit the following, at least one (1) month before scheduled installation of monitoring points: a. Instrumentation Schedule: Submit the proposed schedule for installing the surface monitoring points. b. Description of methods and materials for installing surface monitoring points. c. If Contractor proposes to install any instruments at locations other than those shown on the Drawings, submit drawings with alternate locations of proposed monitoring points shown in plan and profile. 3. Reports and Records: a. Provide reports of monitoring control point data to the Engineer by noon of the day following the shift for which the measurements were taken. b. Within 72 hours following installation of the instruments, submit drawings showing the actual as-built location, the instrument identification number, the instrument type, the installation date and time, and the tip elevation and instrument length. Include details of installed instruments, accessories and protective measures including all dimensions and materials used. c. Submit surveyed measurements of all monitoring points at least seven (7) days prior to commencing construction of shafts to establish baseline readings. d. Submit surveyed measurements of monitoring points during and after construction in accordance with Paragraph 3.01 C. PART 2 - PRODUCTS 2.01 MATERIALS A. Surface Control Points: Surface control points shall be established by an inscribed marking or approved surveyor s nail driven flush with the surface in asphalt or concrete paved areas. In landscaped areas, surface control points shall be established by driving a 2-inch by 2-inch by 18-inch long timber stake flush with the ground. Each control point shall have a tag or marking indicating the station and offset from centerline. PART 3 - EXECUTION 3.01 GENERAL REQUIREMENTS 02445 Settlement Instrumentation.docx 2 / 10 05/08/2015

A. Instrumentation shall be installed at the locations shown on the Drawings, or as directed by the Engineer. Instruments shall be installed in accordance with the approved installation schedule. B. Contractor shall install and perform a baseline survey of all surface settlement monitoring devices at least seven (7) days prior to the commencement of HDD operations. C. Once HDD operation commences, settlement points shall be surveyed once for every 10 feet of installed pipe. Additionally, all settlement monitoring devices shall be surveyed once per day for a period of one week, once at 14 days, and once at 30 days, after HDD operation is complete. D. Contractor shall provide access and assistance to the Engineer for obtaining supplemental monitoring data, as requested by Engineer. 3.02 SURFACE CONTROL POINTS A. Establish system of ten (10) surface control points and monitor in accordance with the appropriate Sections noted in Paragraph 1.02 and with the requirements herein. B. Surface control points shall be monitored by the Contractor in accordance with the appropriate Sections noted in Paragraph 1.02 and with the requirements herein. C. Provide data from readings of surface control points to the Engineer within 24 hours of reading. 3.03 INSTRUMENT PROTECTION, MAINTENANCE, AND REPAIR A. Protect the instruments and control points from damage. Damaged installations shall be replaced or repaired prior to continuing the HDD operation, unless permitted otherwise in writing by the Engineer. 3.04 ABANDONMENT OF INSTRUMENTS A. Surface Control Points: All surface control points on public property shall remain in place at the completion of the Work. Remove all surface control points on private property during the cleanup and restoration work, or as required by the Engineer. 02445 Settlement Instrumentation.docx 3 / 10 05/08/2015

Contractor: Measured by: Date and Time Boring position (feet from shaft) Surface Settlement Pt. 1 Surface Settlement Pt. 2 Surface Settlement Pt. 3 Settlement/ Baseline 0 0 0 0 Note: Settlement measurements to be surveyed at least once daily. 02445 Settlement Instrumentation.docx 5 / 10 05/08/2015

Legend x Settlement Point 1 1.0 Settlement Point 2 Settlement Point 3 0.5 0.0-0.5-1.0-1.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Distance from shaft to Boring face (feet) 02445 Settlement Instrumentation.docx 6 / 10 05/08/2015

Contractor: Measured by: Date and Time Boring position (feet from shaft) Surface Settlement Pt. 4 Surface Settlement Pt. 5 Surface Settlement Pt. 6 Settlement/ Baseline 0 0 0 0 Note: Settlement measurements to be surveyed at least once daily. 02445 Settlement Instrumentation.docx 7 / 10 05/08/2015

1.5 Legend x Settlement Point 4 1.0 Settlement Point 5 Settlement Point 6 0.5 0.0-0.5-1.0-1.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Distance from shaft to bore face (feet) 02445 Settlement Instrumentation.docx 8 / 10 05/08/2015

Contractor: Measured by: Date and Time Boring position (feet from shaft) Surface Settlement Pt. 7 Surface Settlement Pt. 8 Surface Settlement Pt. 9 Surface Settlement Pt. 10 Settlement/ Settlement/ Baseline 0 0 0 0 0 Note: Settlement measurements to be surveyed at least once daily. 02445 Settlement Instrumentation.docx 9 / 10 05/08/2015

Legend x Settlement Point 7 1.0 Settlement Point 8 Settlement Point 9 0.5 0.0-0.5 o Settlement Point 10-1.0-1.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Distance from shaft to Boring face (feet) END OF SECTION 02445 Settlement Instrumentation.docx 10 / 10 05/08/2015