Mechanical &Electrical Services Modernisation. Presentation to The Commons & Lords Management Boards 26 th November 2008



Similar documents
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

EXAMPLE OF A DATA CENTRE BUILD

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

PRE-LEASE SURVEY OF THE ENGINEERING SERVICES. XXXX London

In the compression-refrigeration loop (air conditioning), which is likely to be warmer? 1. Condenser coil 2. Evaporator coil

National Certificate in Heating, Ventilating, and Air Conditioning (Mechanical Services) (Level 5)

Capital Expenditure. The common definition of capital expenditure is

The KUT Partnership Project Profile

HEATING, VENTILATION & AIR CONDITIONING

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Building Services Engineering Technician

B-1 Buildings & Service Maintenance

Datacentre Capability March 2015

energy-saving checklist a guide for rental property owners

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

How To Get A Building Permit In Florida

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

AIR CONDITIONING - VENTILATION - HEATING

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Statement of Work. 3.0 Details of Service Pre Start-up Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

Electrical & Mechanical Engineers. Established 1945

FIRE ALARMS AND DETECTION SYSTEMS EQUIPMENT

Risk Management Guidelines

CIBSE Guide M: Maintenance engineering and management Statutory compliance legislation and guidance

ANNEXURE I SERVICE LEVEL AGREEMENT BETWEEN. The Client. and. The Contractor/Service Provider. HVAC Systems Maintenance Service

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

Contents. 1.0 Introduction Project definition Project brief Accommodation guidelines Objective 4

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

SMS0045 Construction Health and Safety Policy and Procedures

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

WHEN IS A PERMIT REQUIRED?

Building Energy Systems. - HVAC: Heating, Distribution -

Best Practice Guide BPGCS007

Glossary of HVAC Terms

Data Centre Powergate, London Flexible, advanced and efficient by design.

air conditioners how to choose a cooling system

Engineers Edge, LLC PDH & Professional Training

Data Centre Testing and Commissioning

Plumbing Industry Snapshot

Your partner of choice for integrated energy solutions

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits.

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor.

SECTION BASIC MECHANICAL REQUIREMENTS

CPC40912 Certificate IV in Plumbing and Services

Heating and Hot Water Services Controls General Technical Specification

JOB DESCRIPTION AND PERSON SPECIFICATION MECHANICAL AND ELECTRICAL MANAGER

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

Capgemini UK Infrastructure Outsourcing

Business Support

Planned and Emergency Utility Outage Guidelines

MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0

Commercial Heating and Ventilation

Building Condition Assessment Report

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

Accurate data and the whole life costing culture. Kathryn Bourke Whole Life Ltd

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

City of Peterborough

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Repairs and maintenance

North Street, Stoke-on-Trent, ST4 7SA. Tel: Fax: Web:

ESTATES MAINTENANCE POLICY (INCLUDING PLANNED PREVENTIVE MAINTENANCE)

Saving energy in your business

BSc (Hons) Construction Management Part-time Course content

JAWAHARLAL NEHRU UNIVERSITY

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Comfort you can count on.

Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)

Power Generation Power Plants. Electrical Engineering Systems for Power Plants

21.1 Functions, Basic Configuration, and Interfaces

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Gas Absorption Heat Pumps. Future proofing your heating and hot water

Energy Saving Opportunities for Businesses. Presented by Anna Selgert, Outreach Representative

BELLE VUE MANCHESTER DATA CENTRE

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

Sample - Existing Building Commissioning Plan

Transcription:

Mechanical &Electrical Services Modernisation Presentation to The Commons & Lords Management Boards 26 th November 2008

M&E Services Modernisation Context M&E Modernisation Overview Next Steps M&E Modernisation Next Steps Management Board

Context The M&E Modernisation was begun in 2003 has been developed by a number of consultants. had Due Diligence undertaken and presented to the Programme Board in June 2008. is considerable in size, cost, risk and impact.

Context The M&E Modernisation The services capacity is insufficient. Unable to replace or upgrade original services as they are no longer accessible. All have a High Risk to the Business of the Palace as services are becoming increasingly unreliable and failing. All services are between 60 and 110 yrs old. All services beyond their expected life

Context The M&E Modernisation affects the Palace of Westminster (PoW) only, (64% of Parliament s estate) affects the basement services only, (20% of the PoW) provides 100% service capacity to the PoW

Context The M&E Modernisation is not, Addressing the remaining 80% of the PoW services In 2009 more will be known because; Full Asset Liability Survey due in 2009 25year Programme being further developed in 2009 Estate Strategy being developed in 2009

Context M & E Plant rooms 100 M & E Distribution Risers 95 Fan Coil Units/ Convectors/Radiators 800 Air Handling Units 40 Elec. Distribution Boards 100 Heat Exchanger 34 Pipe work km Gas 3 Cold Water Service 13 Steam 4 Steam Condensate 3 Low Temperature Hot Water 6 Chilled Water 5 Condenser Water 0.4 (Possible saving 10%) Cabling km HV 2 LV 150 Earthing 4 Lightning protection 2 (Possible savings 20%) Specialist IT Supplies km Clocks 4 Fire 80 Telephone 80 PICT 180 Security Systems 70 Broadcasting/sound 50 Annunciators 12 BMS 70 Division Bells 12 (Possible savings 50%)

The M&E Modernisation Overview Project Brief The M&E project will deliver modern, services installations which will be: Resilient Manageable Expandable (future proofing capacity only) Energy efficient Accessible & Maintainable Asbestos free environment Safer working environment

The M&E Modernisation Overview Project Brief The M&E project will deliver modern, services installations for Mechanical Hot water services Cold water services Mains water services Fire mains and protection Boosted water systems Gas distribution Air-conditioning Chilled water distribution Refrigeration systems Compressed air Drainage Steam distribution Steam to heating conversion plant Heating systems Mechanical ventilation Control systems Electrical High volt distribution Transformer systems Low volt distribution Telephones Data (PVDN) Camera Security systems Security alarm systems Audio and visual systems Television and Radio Broadcasting Division Bells Annunciators Fire Detection Voice Alarm Systems Master Clock System Lightning protection Building management systems Access control

The M&E Modernisation Overview Programme FEASIBILITY PHASE DESIGN PHASE TENDER PHASE CONSTRUCTION & COMMISSIONING PHASE DLP & POE PHASE STAGE A APPRAISAL STAGE B STRATEGIC BRIEF STAGE C OUTLINE PROPOSAL STAGE D DETAILED PROPOSAL STAGE E FINAL PROPOSAL STAGE F PRODUCTION INFORMATION STAGE G TENDER DOCUMENTATION STAGE H TENDER ACTION STAGE J MOBILISATION STAGE K CONSTRUCTION STAGE L POST PRACTICAL COMPLETION Gate 0 Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 ID Task Name Start Finish 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 1 Due Dilligence Consultant 01/02/08 24/06/08 4 Contract management Consultant 04/08/08 27/02/09 7 Period for Business Case for Executive Team Fees 06/11/08 27/02/09 8 Executive Team 02/03/09 12/04/19 11 Specialist Systems (Temporary & Permanent Installations) 01/10/08 24/09/12 15 Desktop Study - For Boreholes Water, Cooling & Portable Water 08/01/09 25/09/09 16 Package 1 -Basement Infrastructure - Brief, Design & Tender 28/09/09 23/07/12 19 Package 2 - B+E+Lords Plant - Brief, Design & Tender 26/10/09 24/07/12 22 Package 3 - HV Transformers - Brief, Design & Tender 23/11/09 23/07/12 25 Package 4 - Sustainability (Tri Gen Borehole & Cooling Energy) - Brief, 04/01/10 23/07/12 Design & Tender 28 Package 5 - Outside the Basement Area (including risers) - North End - Brief, 03/05/10 25/04/14 Design & Tender 31 Package 6 - Outside the Basement Area (including risers) - South End - Brief, 23/08/10 23/05/14 Design & Tender 34 Package 7 - Basement Plant North End - Brief, Design & Tender 20/12/10 26/06/15 37 Package 8 - Basement Plant South End - Brief, Design & Tender 18/07/11 26/06/15 40 Principal Contractor 29/11/10 11/04/19 45 Package 1 - Basement Infrastructure - Work on Site 24/07/12 11/04/19 47 Package 2 - B+E+Lords Plant - Work on Site 25/07/12 10/04/15 49 Package 3 - HV Transformers - Work on Site 24/07/12 30/09/14 51 Package 4 - Sustainability (Tri Gen Borehole & Cooling Energy) - Work on 24/07/12 30/09/14 Site 53 Package 5 - Outside the Basement Area (including risers) - North End - Work 28/04/14 20/04/17 on Site 55 Package 6 - Outside the Basement Area (including risers) - South End - Work 26/05/14 18/05/17 on Site 57 Package 7 - Basement Plant North End - Work on Site 29/06/15 19/03/19 59 Package 8 - Basement Plant South End - Work on Site 29/06/15 11/04/19 61 62 House Summer Recess Periods 01/07/10 28/09/18

The M&E Modernisation Overview Progress and Stages FEASIBILITY PHASE DESIGN PHASE TENDER PHASE CONSTRUCTION & COMMISSIONING PHASE DLP & POE PHASE STAGE A APPRAISAL STAGE B STRATEGIC BRIEF STAGE C OUTLINE PROPOSAL STAGE D DETAILED PROPOSAL STAGE E FINAL PROPOSAL STAGE F PRODUCTION INFORMATION STAGE G TENDER DOCUMENTATION STAGE H TENDER ACTION STAGE J MOBILISATION STAGE K CONSTRUCTION STAGE L POST PRACTICAL COMPLETION Specialist Systems Package 1 C C R Package 2 C C R Package 3 C C R Package 4 C C R Package 5 C C R Package 6 C C R Package 7 C C R Package 8 C c R Key C=Complete R=Review OVERVIEW BUSINESS CASE SUBMISSION FOR APPROVAL STAGE D SIGN OFF FINANCIAL APPROVAL TO PROCEED

The M&E Modernisation Overview Structure PARLIAMENTARY ESTATE BOARD M&E MODERNISATION PROJECT PROGRAMME BOARD PROJECT EXECUTIVE TEAM Principal Project Leader Programme & Risk Commercial Finance Int / Ext Comms Interface Manager --------------------------------------------- Project Design Team Principle Contractor Rep Cost Consultant Specialist Advisors STAKEHOLDERS PRINCIPAL CONTRACTOR SUB-CONTRACT PACKAGES 1 2 3 4 5 6 7 8 9 PACKAGE DESIGN TEAMS SUPPLY CHAINS Key: Contractual Links Alternative Contractual Links Reporting/Responsibility Links

The M&E Modernisation Overview Budget Estimate Costs at November 08 in 000's Capital Resources M&E Contracts 168,700 Asbestos Removal 19,200 Design 33,000 Project Risk 40,600 Sustainability 1,800 Optimism Bias 59,900 8,600 Sub Total 290,200 41,600 Total 331,800

Next Steps M&E Modernisation IT Systems Rationalisation M&E Executive Team Brief & Specification Governance Arrangements Procurement Options Programme Options

Next Steps - Management Board Review of Business Case Approval Strategy Finance Procurement Programme Specification Communication Strategy Internal External/PR