Scope of works. Name Job# TBA -1. Project: Bathroom Renovation



Similar documents
QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

In order to avoid misinterpretation, the definitions of various installation terms are listed below as follows:

Installation Guide. Bath and Wall Surrounds SERIES B

FLOODS FACT SHEET ADVICE FOR RESIDENTS Approvals for repairing, renovating or rebuilding flood-affected houses

CONDITION OF QUALITY ITEMS

Burns Home Services SUMMARY REPORT. 7/18/2006 Start: 9:00 am End: 12:30 pm

(02) Peel Street TAMWORTH STANDARD INCLUSIONS (Residential)

A home owner s guide to rebuilding after a flood

Renovation instructions

Melbourne balcony Assessments

Building Condition Assessment Report

Sports Buildings: budget costs for the Flood Relief Fund

Management Consultancy Training. Asbestos Materials. Residential Guide

Residential Inspection Guidelines

Borges Construction Company A limited liability Corporation Page1 of 1

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Energy Company Obligation (ECO): Technical Monitoring Questions

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

THE VOID LETTABLE STANDARD

Inspection Item COMMENTS

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

Inspecting to a higher standard.

Defining who is responsible for items and areas in a Strata Scheme

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

PHOENIX TAPWARE. Gloss. Shower/Wall Mixer RRP: $ Product Code: Available Finishes: GS780. Chrome MATCH WITH...

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.

Residential Pre-purchase Inspection Report

SUMMARY OF WORK FOR GENERAL CONTRACTOR

How to report a repair

BSA NEW HOME CONSTRUCTION CONTRACT

Building Condition Assessment Report

T: (011) E: W:

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Gramercy Place Condo Association, Inc.

S t e p h e n A l e x a n d e r

Leaky Homes Financial Assistance Package (FAP) Repair plan example

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

RRIO Checklist. Use of checklist: Definitions: Limitations

Dealing with damp and mould growth

PDmB, Inc. Definitions

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP

Water Leak 1: Intrusion Policy

Cowley Resident Management Organisation Ltd Cowley House, 147 Brixton Road London SW9 6LZ

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

London Borough of Redbridge

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Contents. Who is Premier Guarantee? Your Structural Warranty. What to look out for in your New Home. Running in your New Home. DIY and Maintenance

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Wet Area Construction. Carpentry - Residential Construction. Product Code: 5603

G. Common Defects in Buildings - Leakage

Responsibilities regarding the upkeep of tenant owner apartments

New Home Walk-Through Package

SUGGESTED CONSTRUCTION SEQUENCE - Owner Builders

plumbing products guide

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

PRE-PURCHASE INSPECTION REPORT

Self-Home Inspection Checklist

Application for the Alteration of a Gas Supply

Georgia State University. Urban Life Building Roof Replacement

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses

Summit Series Single Section and Double Section Homes

October 5, 2015 Dear Client,

Beautiful kitchens and bathrooms to meet your budget! KITCHEN REMODELING BATHROOM REMODELING COUNTERTOPS AND MORE!

Estimating Database Checklist

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

How to Install GoBoard:

Before You Start an Energy Efficiency Retrofit The Building Envelope

Cascade Remodeling Inc. PO Box Portland, OR Catalyzing Euphoria Phone (503) , FAX (503) CCB # 67007

Building Control Guidance Note

Your Basement Remodeling Specialist LLC

Release: 1. CPCCWP3004A Apply waterproofing remedial processes

are you under insured?

Bituminous Sheet Flat Roofs: Their repair and maintenance

MAINTENANCE MANAGEMENT

High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES

A guide to plumbing, drainlaying, and gasfitting that does not require a building consent. Superseded. Building Act 2004.

Acrylic Walls Installation Instructions

BUILDING INSPECTION REPORT for: SAMPLE BUILDING INSPECTION REPORT. Inspected Property: 90 Wentworth Street, SAMPLETON

COMPREHENSIVE PROPERTY INSPECTIONS

Repair Responsibilities A Guide for Sadeh Lok Residents

The 13 Most Common Mistakes In Bathroom Remodeling

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Cost of Building a Typical Home The impact of using PVC and alternative construction materials in house construction

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

C, D Only if fitted by Sadeh Lok. A, B, C Category dependent upon impact on residents enjoyment of their home

IMPORTANT INFORMATION

Installation Instructions

PUBLIC RESTROOMS, DESIGN INTENT

Chelton. Lower Level. Crescendo Builders. Chelton. Bethesda, Maryland. Elevation A. Elevation A. an award winning homebuilder

Repairs and looking after your home

Transcription:

Scope of works Name Job# TBA -1 Address Date Suburb P. code Phone H BH 0 Mobile E-mail Project: Bathroom Renovation.01 Demolition Strip out and remove from site: All existing fixtures, fittings and cabinets (except products intended for re-use) All existing wall tiles, and or plaster, and or render as required All existing floor tiles and or floor cladding as required Rubbish removal: A bin will be provided for the removal of all waste related to this project. It will need to be positioned on your property. If this is not possible and permits are required for the bin to be located on council property. These permit fees vary from council to council and will be an additional cost that is not included in this specification If asbestos is found during the demolition we have trained asbestos removalist on staff and if it is a small amount of blue asbestos or a large quantity of white asbestos is found then this will be removed by a specialist asbestos removal company. We will pass on any charges incurred. This will delay the project by the additional time taken to arrange asbestos removal..011 General building works Frame up bath and line in readiness to tile or stone clad (if applicable) Create wall recesses for wall cabinets and shower niche Trim out ceiling joists where possible for lights and fan Install structural support where necessary for accessories fixing and support Remove, re-fit and make good existing architraves and skirting's where necessary Install all cabinetry as specified in the product checklist Install all accessories as specified in the product checklist. Install water stop angles adhered to membrane for shower as needed Supply and fit doorstop at back of door (70mm chrome) if required Silicone all control joints with appropriate colours..02 Floor preparation - Timber floor Make good to non-structural flooring after demolition stage in preparation for laying of the new tiles Remove and replace any water damaged non-structural flooring Modify and strengthen structural flooring as required to create a ramped floor for the shower Lay 6mm ceramic tile underlay over new flooring (glued and nailed) 1/6

We have assessed there to be no significant structural water damage to the bathroom, if there is minor water damage this is to be repaired and made good. All non-structural water damage will be removed and made good.03 Wall preparation - Stud and plaster Straighten walls in preparation for tiling by plaining down or packing out the studwork as required Removed wall cladding is to be replaced with 6mm cement sheeting flush finished and sealed in readiness for painting and/or tiling Repair and make good the wall cladding above wall tile level if needed as a result of wall removal.04 Ceilings and cornice - repair Patch all holes from relocation of lights and fan Cornices are to be removed and new cornices installed when replacement of ceiling plaster is specified (Includes repair of squareset if required).05 Doors and Windows The proposed layout sketch specifies what is required in regards to door and window alterations. The careful removal of architraves and skirting for re-use is good building practice and also good for the environment. To ensure this is practiced the builder will replace these with similar at no cost if needed. (However if a custom replication is necessary only the supply and delivery is to be an extra cost.) MDF architraves and skirting should not be used where they are at significant risk of water exposure therefore if existing materials are not suitable for reuse this would be supplied at an extra cost. Where window and/or door alterations require new brickwork, the bricks will be supplied by client or selected by client and supplied as an extra cost. Where new entry points have been specified, doors are relocated or had the size changed. We have not allowed for flooring or floor surfaces to be repaired or replaced. We will discuss the options and associated costs when they are known..06 Plumbing - General Information If a Hot water tempering valve is not installed or not functional, you are required by law to do so. This is so that your household are protected from hot water burns. The plumber will inspect and advise if one is required. The cost to install tempering valve at hot water service if required will be $280 It is presumed that the existing plumbing has been constructed in accordance with the Australian Plumbing regulations, if not additional charges may apply. Disconnection or re-connection of the hydronic system should be attended to by your regular hydronic specialist and therefore is not included as a part of this scope of works. When a Gas hot water system or gas for the kitchen is being installed the entire system must be tested the repair of any existing leaks or the up-grading of any gas pipes if required are not included as a part of this scope of works. 2/6

.061 Plumbing Cap off all existing plumbing points during the demolition stage and rough-in plumbing Divert water supply pipes and waste plumbing from existing locations as needed Connect into existing waste water, hot and cold water as required Fit and connect all plumbing fixtures as specified as in proposed layout sketch and or Product Checklist All plumbing inside the bathroom is to be altered to suit new layout and products Supply a certificate of Plumbing compliance We have based the construction component of your project on the installation of all fixtures and fittings listed in the product checklist, if the quantities are adjusted we will adjust the construction costs accordingly up or down but don't worry we will keep you well informed and documented through the project management system..07 Waterproofing Second only to design, Waterproofing is the most important stage in the renovation process, Water damage constitutes 70% of all faulty workmanship claims in the domestic building industry. Attention to detail is required to avoid being a part of these statistics. Waterproof membrane must cover the entire floor where tiled, and extend up all walls to the wall tile level or to the height of the shower outlet as a minimum all round the bathroom walls as an un broken layer. It is not required on the un-tiled areas. Either applied by a waterproofing professional or inspected and certified. Metal angles are to be installed behind cement sheeting for all internal corners in wet areas. Un recessed Cement sheeting joints NOT to be but joined without the recommended gap for a polyurethane joint sealant to be installed before membrane application. Tile adhesives are to be supplied by the waterproofing manufacturer and compatible with the waterproof membrane and polyurethane jointing products. Drying times must be adhered to in accordance with the manufactures guidelines. Be weary of claims that silicone and grout are layers of waterproofing. These elements are necessary components of the tiling system but not a waterproofing element. For further information on the importance of membrane and tile adhesive compatibility please ask your designer..08 Tiling - General Information Note: Because tillers charge rate changes according to tile size, laying pattern and tile type, we have defined what your quote is based on. When the product's are selected adjustments may be required. Your designer will calculate the difference when assisting you to select your tiles so you can make informed decision. The quote will be adjusted up or down accordingly..081 Tiling - Walls Bathroom - Lay wall tiles from floor to ceiling all around the bathroom walls Wall tile laying cost based on ceramic tiles laid in block style All external corners to be mitred where appropriate Block style tiling with a maximum tile size of 300 X 600 is specified 3/6

.082 Tiling - Floors Bathroom - Lay floor tiles to floor area shown in proposed layout sketch Floor tile-laying cost based on porcelain tiles laid in block style Block style tiling with a maximum tile size of 300 X 600 is specified Newly laid tiles will terminate under the door. If a gap remains between the existing floor finish and new tiles, standard chrome colour floor trim is to be used to bridge the gap. Note: We have specified Porcelain floor tiles for two main reasons namely that they are robust and have less natural distortions (especially in larger sizes).083 Tiling - Feature tiles No allowance at this stage, If feature tiles are of the same type and general size there will be no extra charge..09 Electrical - General Information Not all electrical work is listed in the electrical scope of works some of it is to be found in the Product side of the project. For example - under tile heating, the estimates and or costing s include the labour component. This process makes adjustments to the electrical scope of works efficient and transparent Extra power points are charged at $88 each if installed in solid walls and $66 in timber walls Extra down lights or under cabinet lights are charged at $122 each (supply and install) Extra Vanity lights are charged at $210 each if installed in solid walls and $144 in timber walls (Install cost only).091 Electrical All existing electrical points and light fittings will be either moved to the new locations layout or terminated and made safe as per proposed layout sketch Supply and Install 1 fan as specifications as in Product Checklist Fan is to be on a separate switch to the lights Supply and Install 1 power point with extra switches above bench top as per proposed layout Supply and Install 1 double power point in wall cabinet as per proposed layout Install only 1 vanity light, switch is to be on the power point at the vanity Our licensed electrician will carry out an inspection when he is on site. Should a new safety switch or circuit to your existing electrical board be required a variation to the contract price if required $350 will apply. It is not included in this quote. Supply a certificate of Electrical compliance We have presumed that the electrical work in your property in accordance with the Australian electrical regulations. If not additional charges may apply. All electrical switches are white colour Clipsal unless otherwise supplied or specified.10 Ventilation Airflow is a complicated science and there are numerous factors that will affect an extraction system's ability to maintain air quality. The 3 most important things we can do maximize good airflow and air quality are: 1. To vent the extraction to the atmosphere in sealed roof spaces 2. Maintain a minimum of 22 air changes per hour (standard bathroom fans do not do this) 3. Under cut the door by 10-15mm to allow airflow 4/6

Although these are not required by the building code, we believe it to be good practice and is therefore included in this scope of works. (Including the appropriate high volume fan).11 Glazing A glazier generally installs shower screens and mirrors, therefore the installation cost is assumed to be included as a part of the product cost. All window glass below 2m from floor level in a bathroom is required to be safety glass. If specified in the proposed layout sketch it is included as a part of this scope of works. If not then it is assumed that the existing window glazing is compliant. If for some reason this is found to not be the case, the glass will need to be changed to comply with the Australian standards as an extra cost. To ensure best-fit possible, the shower screen is measured for manufacture. Once the tiles have been installed, the screen will be fitted up to 3 weeks after completion of tiling When the bathroom is commissioned, a temporary screen may be necessary if you intend to use the shower. If this is the case please inform us before commissioning stage and the temporary screen will be supplied and installed at no extra cost to you..12 Painting No allowance at this stage Any damage to solid render or plaster outside the immediate work area is to be repaired to a paintable finish. We will take all possible care to avoid this occurring During the course of the renovation process there will be some damage to adjoining rooms. It is impossible for this not to occur. We cannot predict what the scope of works will be for both the repair of these surfaces or the painting that will be required as a result. The question is how much is acceptable? And how will this be dealt with? If this is left open with a no responsibility clause on behalf of the builder, this could result in a no responsibility therefore no care attitude. Or on the other hand, if we were to make an estimate the allowances would have to include a worst case scenario. We don't see either of these options resulting in equitable outcomes for either party. Therefore our approach is that we take responsibility for the cost to repair any damage that may occur to a paintable finish and we will get the painting quoted when it is appropriate (when the exact scope of works is known) and then you can decide if you want this to be added to the scope of works or not..13 Others Any pre-existing structural defects or damage, unless otherwise stated, will be repaired as a variation on a cost plus basis. We will not install cabinetry supplied by clients unless a written guarantee is provided that the materials used in the manufacture are free from formaldehyde. Client will provide a final list of products for removal and re-installation. However, this is undertaken on an "all care but no responsibility" basis, for damage or loss.14 Building permits No building permit has been included at this stage as the proposed layout would not trigger a building permit. 5/6

.15 Guarantees Workmanship: All work will be carried out to the highest standard of tradesman ship and professionalism. All workmanship is unconditionally guaranteed for an amazing 10.5 Years this represents 50% more value than a standard 7 year guarantee and we will issue a guarantee certificate upon receipt of final payment. Guaranteed commissioning date Or WE pay YOU $100 per day until your bathroom is commissioned Electrical: All electrical workmanship is guaranteed for 10 years and a certificate of compliance will be issued upon completion Plumbing: All plumbing workmanship is guaranteed for 10 years and a certificate of compliance will be issued upon completion Waterproofing will be Inspected the manufacture's representative is guaranteed for 10 years and a certificate of compliance will be issued upon completion.16 Quality control Supervisor: Our site foremen are amongst the best craftsmen in the industry. Many of them having won multiple bathroom renovation awards for their outstanding work. Your site foreman will take the responsibility to oversee the project from start to finish; being on-site most days during the renovation process. Inspections: We guarantee at least 3 inspections during the renovation process. These will be carried out by an unrestricted licensed building practitioner who is not your site foreman. One inspection before the contract signing, another before tiling commences and finally, an inspection done at the completion of the project. Inspections are also done randomly during the renovation process. Archicentre: Archicentre will inspect and give a report before final payment is requested (for multiple renovations this inspection will be done at the completion of the last remaining renovation) valued at $464 per bathroom or laundry. Archicentre inspection cost can be refunded in full either before or after the project is completed if you decide it is not necessary Standards and codes: We will adhere to or exceed the requirements of: 1) The Australian Building Code 2) Guidelines set out by the Kitchen & Bathroom Designers Institute 3) Waterproofing Council of Australia 4) The Building Practitioners Board. Chemical reactions: We have researched and have written guarantees' for most of the chemical reaction issues surrounding membranes, adhesives, silicones and polyurethanes. So you can rest assured that those who are providing the materials for your project will be held accountable if the products fail (How much do you value the peace of mind for this level of quality control?) 6/6